{{#Wiki_filter:January 16, 2007Mr. Stephen J. LaFlamme, Reactor SupervisorNuclear Reactor Facility Worcester Polytechnic Institute Worcester, MA 01609
{{#Wiki_filter:January 16, 2007 Mr. Stephen J. LaFlamme, Reactor Supervisor Nuclear Reactor Facility Worcester Polytechnic Institute Worcester, MA 01609


==SUBJECT:==
==SUBJECT:==
INITIAL EXAMINATION CORPORATE NOTIFICATION LETTER NO.50-134/OL-07-01, WORCESTER POLYTECHNIC INSTITUTE.
INITIAL EXAMINATION CORPORATE NOTIFICATION LETTER NO.
50-134/OL-07-01, WORCESTER POLYTECHNIC INSTITUTE.


==Dear Mr. LaFlamme:==
==Dear Mr. LaFlamme:==


I made arrangements with you for the administration of an operator licensing retakeexamination at the Worcester Polytechnic Institute reactor. The written examination is scheduled for the week of January 22, 2007.In order to meet this schedule, I will use the reference material you provided for the April, 2006 examination. If there are any updates to this material (for the theory portion of the written examination) please furnish it to me as soon as possible to the following address: (U.S. Postal Service)(Overnight Delivery)U.S. Nuclear Regulatory CommissionU.S. Nuclear Regulatory Commission ATTN: Paul V. Doyle Jr.ATTN: Paul V. Doyle Jr.
I made arrangements with you for the administration of an operator licensing retake examination at the Worcester Polytechnic Institute reactor. The written examination is scheduled for the week of January 22, 2007.
Mail Stop O-12 G-13Mail Stop O-12 G-13 Washington, D.C. 2055511555 Rockville PikeRockville, MD 20852-2738Enclosure 1, "Facility Licensee Responsibilities for Written Examinations," describes yourresponsibilities for conducting written examinations. Enclosure 2, "Applicant Responsibilities forthe Written Examination," describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules. Your review of the written examination will be conducted in accordance with the proceduresspecified in Enclosure 3, "Facility Review of Written Examinations Prior to Administration." Final, signed operator license applications certifying that all training has been completed mustbe submitted at least 14 days before the first examination dates. This will allow the chief examiner time to review the training and experience of the applicants, process the medical certifications, and process the applications. If the review cannot be completed in time to determine an applicant's eligibility, that applicant may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.
In order to meet this schedule, I will use the reference material you provided for the April, 2006 examination. If there are any updates to this material (for the theory portion of the written examination) please furnish it to me as soon as possible to the following address:
Mr. S. LaFlamme The NRC has copies of the application forms Personal Qualification Statement -- Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf andwww.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.This request is covered by Office of Management and Budget (OMB) Clearance Number3150-0018, which expires June 30, 2009. The estimated average burden is 7.7 hours per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and FOIA/Privacy Services Branch, (T-5 F-52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <infocollects@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.If you have any questions regarding the examination procedures and requirements, pleasecontact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.Sincerely, /RA/Paul V. Doyle Jr., Chief ExaminerResearch and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor RegulationDocket No. 50-134
(U.S. Postal Service)                         (Overnight Delivery)
U.S. Nuclear Regulatory Commission            U.S. Nuclear Regulatory Commission ATTN: Paul V. Doyle Jr.                       ATTN: Paul V. Doyle Jr.
Mail Stop O-12 G-13                          Mail Stop O-12 G-13 Washington, D.C. 20555                        11555 Rockville Pike Rockville, MD 20852-2738 , "Facility Licensee Responsibilities for Written Examinations," describes your responsibilities for conducting written examinations. Enclosure 2, "Applicant Responsibilities for the Written Examination," describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules.
Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 3, "Facility Review of Written Examinations Prior to Administration."
Final, signed operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination dates. This will allow the chief examiner time to review the training and experience of the applicants, process the medical certifications, and process the applications. If the review cannot be completed in time to determine an applicant's eligibility, that applicant may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.
 
Mr. S. LaFlamme                               The NRC has copies of the application forms Personal Qualification Statement --
Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2009. The estimated average burden is 7.7 hours per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and FOIA/Privacy Services Branch, (T-5 F-52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <infocollects@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.
Sincerely,
                                          /RA/
Paul V. Doyle Jr., Chief Examiner Research and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-134


==Enclosures:==
==Enclosures:==
1.Facility Licensee Responsibilities for Written Examinations2.Applicant Responsibilities for Written Examinations 3.Facility Review of Written Examinations Prior to Administration Dr. S. LaFlamme The NRC has copies of the application forms Personal Qualification Statement -- Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf andwww.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.This request is covered by Office of Management and Budget (OMB) Clearance Number3150-0018, which expires June 30, 2009. The estimated average burden is 7.7 hours per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and FOIA/Privacy Services Branch, (T-5 F-52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <infocollects@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.If you have any questions regarding the examination procedures and requirements, pleasecontact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.Sincerely, /RA/Paul V. Doyle Jr., Chief ExaminerResearch and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor RegulationDocket No. 50-134
: 1. Facility Licensee Responsibilities for Written Examinations
: 2. Applicant Responsibilities for Written Examinations
: 3. Facility Review of Written Examinations Prior to Administration
 
Dr. S. LaFlamme                                 The NRC has copies of the application forms Personal Qualification Statement --
Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2009. The estimated average burden is 7.7 hours per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and FOIA/Privacy Services Branch, (T-5 F-52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <infocollects@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.
Sincerely,
                                      /RA/
Paul V. Doyle Jr., Chief Examiner Research and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-134


==Enclosures:==
==Enclosures:==
1.Facility Licensee Responsibilities for Written Examinations2.Applicant Responsibilities for Written Examinations 3.Facility Review of Written Examinations Prior to AdministrationDISTRIBUTION
: 1. Facility Licensee Responsibilities for Written Examinations
:PUBLICPRTB r/f JEads Facility File (EBarnhill) O-6 F-2MCasePIsaac, PM ADAMS ACCESSION #: ML070160004TEMPLATE #: NRR-079OFFICE:PRTB:CEIOLB:LAPRTB:BCNAME:PDoyleEBarnhillJEads DATE:01/16/200701/16/200701/16/2007OFFICIAL RECORD COPY Worcester Polytechnic InstituteDocket No. 50-134 cc:
: 2. Applicant Responsibilities for Written Examinations
City ManagerCity Hall 455 Main Street, Room 309 Worcester, MA 01608Office of the Attorney GeneralEnvironmental Protection Division
: 3. Facility Review of Written Examinations Prior to Administration DISTRIBUTION:
PUBLIC                                PRTB r/f                 JEads Facility File (EBarnhill) O-6 F-2      MCase                    PIsaac, PM ADAMS ACCESSION #: ML070160004                                                TEMPLATE #: NRR-079 OFFICE:           PRTB:CE                      IOLB:LA                    PRTB:BC NAME:                   PDoyle                    EBarnhill                  JEads DATE:                 01/16/2007                  01/16/2007                01/16/2007 OFFICIAL RECORD COPY
 
Worcester Polytechnic Institute      Docket No. 50-134 cc:
City Manager City Hall 455 Main Street, Room 309 Worcester, MA 01608 Office of the Attorney General Environmental Protection Division 19th Floor One Ashburton Place Boston, MA 02180 Department of Environmental Quality Engineering 100 Cambridge Street Boston, MA 02180 Dr. John F. Carney Provost and VP Academic Affairs Boynton Hall, 2nd Floor 100 Institute Road Worcester Polytechnic Institute Worcester, MA 01609 Gretar Tryggvason, Professor and Head Department of Mechanical Engineering Worcester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280 Dr. William Vernetson TRTR Newsletter Director, Nuclear Facilities University of Florida 202 Nuclear Science Bldg.
Gainesville, FL 32611-8300
 
FACILITY LICENSEE RESPONSIBILITIES FOR THE WRITTEN EXAMINATION
: 1. The facility licensee is responsible for providing a single room for the administration of the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination.
: 2. Minimum spacing is necessary to ensure examination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three-foot space between tables).
: 3. The facility may make arrangements subject to chief examiner review, if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with Item 1 above.
: 4. The facility licensee may provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner will distribute these pads to the applicants as needed.
: 5. Applicants may bring pens, pencils, calculators and slide rules into the examination room.
Only black ink or dark pencils should be used for writing answers to questions.
: 6. The Chief Examiner must approve any wall charts, models, or other training materials present in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.
: 7. The facility staff will be provided a copy of the written examination with answer key at the beginning of the administration of the written examination. The facility staff may start reviewing the examination immediately. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.
Please NOTE: All arrangements are subject to Chief Examiner review.
ENCLOSURE 1
 
APPLICANT RESPONSIBILITIES FOR THE WRITTEN EXAMINATION
: 1. You must provide a picture identification.
: 2. You must not review your examination until instructed to do so by the examiner/proctor.
: 3. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 4. When you have completed your examination, you must sign the statement at the bottom of the cover sheet, prior to handing in the examination to the examiner/proctor.
: 5. Only one applicant may leave the room for a trip to the restroom. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating. NOTE: The examiner/proctor may modify this requirement to only one applicant of each sex.
: 6. Use black ink or dark pencil only to facilitate legible reproductions.
: 7. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
: 8. Mark your answers on the answer sheet provided.
: 9. The point value for each question is shown in [brackets] after the question.
: 10. If the intent of a question is unclear, ask questions of the examiner only.
: 11. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition, turn in all scrap paper.
: 12. You must achieve a grade of 70 percent or greater in each category to pass the examination.
: 13. There is a time limit of one hour per section of the examination. A one section examination has a one hour time limit, a two section examination has a two hour time limit and a three section examination has a three hour time limit.
: 14. After turning in your examination, leave the examination area (DEFINE THE AREA). If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
Enclosure 2


19 th FloorOne Ashburton Place Boston, MA  02180Department of Environmental  Quality Engineering 100 Cambridge Street Boston, MA  02180Dr. John F. CarneyProvost and VP Academic Affairs Boynton Hall, 2 nd Floor100 Institute Road Worcester Polytechnic Institute Worcester, MA  01609Gretar Tryggvason, Professor and HeadDepartment of Mechanical Engineering Worcester Polytechnic Institute 100 Institute Road Worcester, MA  01609-2280Dr. William VernetsonTRTR Newsletter Director, Nuclear Facilities University of Florida 202 Nuclear Science Bldg.
FACILITY REVIEW OF WRITTEN EXAMINATIONS PRIOR TO ADMINISTRATION
Gainesville, FL  32611-8300 ENCLOSURE 1FACILITY LICENSEE RESPONSIBILITIES FOR THE WRITTEN EXAMINATION1.The facility licensee is responsible for providing a single room for the administration of thewritten examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination. 2.Minimum spacing is necessary to ensure examination integrity as determined by the ChiefExaminer (i.e., one applicant per table, with a three-foot space between tables). 3.The facility may make arrangements subject to chief examiner review, if the applicants areto have lunch, coffee or other refreshments. These arrangements shall comply with Item 1 above.4.The facility licensee may provide pads of 8-1/2 by 11 inch lined paper in unopened packagesfor each applicant's use in completing the examination. The examiner will distribute these pads to the applicants as needed. 5.Applicants may bring pens, pencils, calculators and slide rules into the examination room. Only black ink or dark pencils should be used for writing answers to questions. 6.The Chief Examiner must approve any wall charts, models, or other training materialspresent in the examination room. No other equipment or reference material will be allowed unless provided by the examiner. 7.The facility staff will be provided a copy of the written examination with answer key at thebeginning of the administration of the written examination. The facility staff may start reviewing the examination immediately. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner. Please NOTE:  All arrangements are subject to Chief Examiner review. APPLICANT RESPONSIBILITIES FOR THE WRITTEN EXAMINATION  1.You must provide a picture identification. 2.You must not review your examination until instructed to do so by the examiner/proctor.
: 1. At the option of the Chief of the Research and Test Reactors Branch, the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review. The examination or written notes will NOT be retained by the facility.
3.Cheating on the examination means an automatic denial of your application and couldresult in more severe penalties. 4.When you have completed your examination, you must sign the statement at the bottomof the cover sheet, prior to handing in the examination to the examiner/proctor. 5.Only one applicant may leave the room for a trip to the restroom. You must avoid allcontact with anyone outside the examination room to avoid even the appearance or possibility of cheating. NOTE:  The examiner/proctor may modify this requirement to only one applicant of each sex. 6.Use black ink or dark pencil only to facilitate legible reproductions.
Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the examination.
7.Print your name in the blank provided in the upper right-hand corner of the examinationcover sheet and each answer sheet. 8.Mark your answers on the answer sheet provided.
: a. Pre-Examination Security Agreement I ______________________ acknowledge that I have acquired specialized knowledge concerning the examination scheduled for                                           at
9.The point value for each question is shown in [brackets] after the question.
10.If the intent of a question is unclear, ask questions of the examiner only.
11.When turning in your examination, assemble the completed examination withexamination questions, examination aids and answer sheets. In addition, turn in all scrap paper. 12.You must achieve a grade of 70 percent or greater in each category to pass theexamination. 13.There is a time limit of one hour per section of the examination. A one sectionexamination has a one hour time limit, a two section examination has a two hour time limit and a three section examination has a three hour time limit.14.After turning in your examination, leave the examination area (DEFINE THE AREA). Ifyou are observed in this area while the examination is still in progress, your license may be denied or revoked. FACILITY REVIEW OF WRITTEN EXAMINATIONS PRIOR TO ADMINISTRATION1.At the option of the Chief of the Research and Test Reactors Branch, the facility may reviewthe written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review. The examination or written notes will NOT be retained by the facility. Whenever this option of examination review is utilized, the facility reviewers will sign thefollowing statement prior to being allowed access to the examination. a.Pre-Examination Security AgreementI ______________________ acknowledge that I have acquired specialized knowledgeconcerning the examination scheduled for                                                     at
___________________ as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.
___________________ as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.
______________________________________Signature/DateIn addition, the facility staff reviewers will sign the following statement after the writtenexamination has been administered. b.Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any informationconcerning the examinations administered during the week of
______________________________________
Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.
: b. Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of
____________________________ at ____________________ or provide any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.
____________________________ at ____________________ or provide any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.
__________________________________Signature/Date 2.Regardless of whether the above examination review option is exercised, immediatelyfollowing the administration of the written examination, the facility staff is provided a marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration. If the facility did not review the examination prior to its administration, they will have five (5)working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments must be given to an examiner prior to his/her leaving the facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis. This may cause delays in grading the examinations.3.The following format should be used for submittal of specific comments: a.Listing of NRC question, answer and reference b.Facility comment/recommendation c.Reference (to support facility comment)NOTES:1.No change to the examination will be made without a reference to support thefacility comment. Any supporting documentation that was not previously supplied, should be provided. 2.Comments made without a concise facility recommendation will not beaddressed. 3.A two-hour post examination review may be held at the discretion of the ChiefExaminer. If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.}}
__________________________________
Signature/Date Enclosure 3
: 2. Regardless of whether the above examination review option is exercised, immediately following the administration of the written examination, the facility staff is provided a marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration.
If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments must be given to an examiner prior to his/her leaving the facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis. This may cause delays in grading the examinations.
: 3. The following format should be used for submittal of specific comments:
: a. Listing of NRC question, answer and reference
: b. Facility comment/recommendation
: c. Reference (to support facility comment)
NOTES:       1. No change to the examination will be made without a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.
: 2. Comments made without a concise facility recommendation will not be addressed.
: 3. A two-hour post examination review may be held at the discretion of the Chief Examiner. If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.}}

Revision as of 11:36, 23 November 2019

Initial Examination Corporate Notification Letter No. 50-134/OL-07-01, Worcester Polytechnic Institute
ML070160004
Person / Time
Site: 05000134
Issue date: 01/16/2007
From: Doyle P
NRC/NRR/ADRA/DPR/PRTB
To: Laflamme S
Worcester Polytechnic Institute
Doyle P, NRC/NRR/DPR/PRT, 415-1058
Shared Package
ML070160003 List:
References
50-134/Ol-07-01
Download: ML070160004 (8)


Text

January 16, 2007 Mr. Stephen J. LaFlamme, Reactor Supervisor Nuclear Reactor Facility Worcester Polytechnic Institute Worcester, MA 01609

SUBJECT:

INITIAL EXAMINATION CORPORATE NOTIFICATION LETTER NO.

50-134/OL-07-01, WORCESTER POLYTECHNIC INSTITUTE.

Dear Mr. LaFlamme:

I made arrangements with you for the administration of an operator licensing retake examination at the Worcester Polytechnic Institute reactor. The written examination is scheduled for the week of January 22, 2007.

In order to meet this schedule, I will use the reference material you provided for the April, 2006 examination. If there are any updates to this material (for the theory portion of the written examination) please furnish it to me as soon as possible to the following address:

(U.S. Postal Service) (Overnight Delivery)

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Paul V. Doyle Jr. ATTN: Paul V. Doyle Jr.

Mail Stop O-12 G-13 Mail Stop O-12 G-13 Washington, D.C. 20555 11555 Rockville Pike Rockville, MD 20852-2738 , "Facility Licensee Responsibilities for Written Examinations," describes your responsibilities for conducting written examinations. Enclosure 2, "Applicant Responsibilities for the Written Examination," describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules.

Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 3, "Facility Review of Written Examinations Prior to Administration."

Final, signed operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination dates. This will allow the chief examiner time to review the training and experience of the applicants, process the medical certifications, and process the applications. If the review cannot be completed in time to determine an applicant's eligibility, that applicant may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.

Mr. S. LaFlamme The NRC has copies of the application forms Personal Qualification Statement --

Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2009. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and FOIA/Privacy Services Branch, (T-5 F-52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <infocollects@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul V. Doyle Jr., Chief Examiner Research and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-134

Enclosures:

1. Facility Licensee Responsibilities for Written Examinations
2. Applicant Responsibilities for Written Examinations
3. Facility Review of Written Examinations Prior to Administration

Dr. S. LaFlamme The NRC has copies of the application forms Personal Qualification Statement --

Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2009. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and FOIA/Privacy Services Branch, (T-5 F-52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to <infocollects@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul V. Doyle Jr., Chief Examiner Research and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-134

Enclosures:

1. Facility Licensee Responsibilities for Written Examinations
2. Applicant Responsibilities for Written Examinations
3. Facility Review of Written Examinations Prior to Administration DISTRIBUTION:

PUBLIC PRTB r/f JEads Facility File (EBarnhill) O-6 F-2 MCase PIsaac, PM ADAMS ACCESSION #: ML070160004 TEMPLATE #: NRR-079 OFFICE: PRTB:CE IOLB:LA PRTB:BC NAME: PDoyle EBarnhill JEads DATE: 01/16/2007 01/16/2007 01/16/2007 OFFICIAL RECORD COPY

Worcester Polytechnic Institute Docket No. 50-134 cc:

City Manager City Hall 455 Main Street, Room 309 Worcester, MA 01608 Office of the Attorney General Environmental Protection Division 19th Floor One Ashburton Place Boston, MA 02180 Department of Environmental Quality Engineering 100 Cambridge Street Boston, MA 02180 Dr. John F. Carney Provost and VP Academic Affairs Boynton Hall, 2nd Floor 100 Institute Road Worcester Polytechnic Institute Worcester, MA 01609 Gretar Tryggvason, Professor and Head Department of Mechanical Engineering Worcester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280 Dr. William Vernetson TRTR Newsletter Director, Nuclear Facilities University of Florida 202 Nuclear Science Bldg.

Gainesville, FL 32611-8300

FACILITY LICENSEE RESPONSIBILITIES FOR THE WRITTEN EXAMINATION

1. The facility licensee is responsible for providing a single room for the administration of the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination.
2. Minimum spacing is necessary to ensure examination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three-foot space between tables).
3. The facility may make arrangements subject to chief examiner review, if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with Item 1 above.
4. The facility licensee may provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner will distribute these pads to the applicants as needed.
5. Applicants may bring pens, pencils, calculators and slide rules into the examination room.

Only black ink or dark pencils should be used for writing answers to questions.

6. The Chief Examiner must approve any wall charts, models, or other training materials present in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.
7. The facility staff will be provided a copy of the written examination with answer key at the beginning of the administration of the written examination. The facility staff may start reviewing the examination immediately. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.

Please NOTE: All arrangements are subject to Chief Examiner review.

ENCLOSURE 1

APPLICANT RESPONSIBILITIES FOR THE WRITTEN EXAMINATION

1. You must provide a picture identification.
2. You must not review your examination until instructed to do so by the examiner/proctor.
3. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
4. When you have completed your examination, you must sign the statement at the bottom of the cover sheet, prior to handing in the examination to the examiner/proctor.
5. Only one applicant may leave the room for a trip to the restroom. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating. NOTE: The examiner/proctor may modify this requirement to only one applicant of each sex.
6. Use black ink or dark pencil only to facilitate legible reproductions.
7. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
8. Mark your answers on the answer sheet provided.
9. The point value for each question is shown in [brackets] after the question.
10. If the intent of a question is unclear, ask questions of the examiner only.
11. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition, turn in all scrap paper.
12. You must achieve a grade of 70 percent or greater in each category to pass the examination.
13. There is a time limit of one hour per section of the examination. A one section examination has a one hour time limit, a two section examination has a two hour time limit and a three section examination has a three hour time limit.
14. After turning in your examination, leave the examination area (DEFINE THE AREA). If you are observed in this area while the examination is still in progress, your license may be denied or revoked.

Enclosure 2

FACILITY REVIEW OF WRITTEN EXAMINATIONS PRIOR TO ADMINISTRATION

1. At the option of the Chief of the Research and Test Reactors Branch, the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review. The examination or written notes will NOT be retained by the facility.

Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the examination.

a. Pre-Examination Security Agreement I ______________________ acknowledge that I have acquired specialized knowledge concerning the examination scheduled for at

___________________ as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.

______________________________________

Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.

b. Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of

____________________________ at ____________________ or provide any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.

__________________________________

Signature/Date Enclosure 3

2. Regardless of whether the above examination review option is exercised, immediately following the administration of the written examination, the facility staff is provided a marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration.

If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments must be given to an examiner prior to his/her leaving the facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis. This may cause delays in grading the examinations.

3. The following format should be used for submittal of specific comments:
a. Listing of NRC question, answer and reference
b. Facility comment/recommendation
c. Reference (to support facility comment)

NOTES: 1. No change to the examination will be made without a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.

2. Comments made without a concise facility recommendation will not be addressed.
3. A two-hour post examination review may be held at the discretion of the Chief Examiner. If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.