ML070780524: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Morning Report Date: | {{#Wiki_filter:PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I Morning Report Date: MAR 19, 2007 Licensee/Facility: Notification: | ||
MAR 19, 2007 | ENTERGY NUCLEAR GENERATION COMPANY MR Number: 1-2007-0008 Pilgrim Date: 03/17/2007 Plymouth, Massachusetts Call from Licensee Dockets: 050-00293 | ||
[1] GE-3 | |||
Notification: | |||
1-2007-0008 03/17/2007 | |||
[1] GE-3 | |||
==Subject:== | ==Subject:== | ||
Pilgrim Manual Reactor Shutdown. | |||
Discussion: | |||
On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage. | On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage. | ||
Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The | Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately 6:00 a.m. on March 19, 2007. | ||
Contact: Org: Phone No: Email: | |||
valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately | POWELL, RAYMOND J R1 (610) 337-6967 RJP@nrc.gov}} | ||
6:00 a.m. on March 19, 2007. | |||
Contact: |
Revision as of 09:18, 23 November 2019
ML070780524 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 03/17/2007 |
From: | Racquel Powell NRC Region 1 |
To: | |
Powell R, RI/DRP/610-337-6967 | |
References | |
MR-1-2007-0008 | |
Download: ML070780524 (1) | |
Text
PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I Morning Report Date: MAR 19, 2007 Licensee/Facility: Notification:
ENTERGY NUCLEAR GENERATION COMPANY MR Number: 1-2007-0008 Pilgrim Date: 03/17/2007 Plymouth, Massachusetts Call from Licensee Dockets: 050-00293
[1] GE-3
Subject:
Pilgrim Manual Reactor Shutdown.
Discussion:
On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.
Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately 6:00 a.m. on March 19, 2007.
Contact: Org: Phone No: Email:
POWELL, RAYMOND J R1 (610) 337-6967 RJP@nrc.gov