{{#Wiki_filter:Morning Report Date:
{{#Wiki_filter:PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I                                Morning Report Date: MAR 19, 2007 Licensee/Facility:                                                     Notification:
MAR 19, 2007 PRIORITY ATTENTION REQUIRED MORNING REPORT -
ENTERGY NUCLEAR GENERATION COMPANY                                      MR Number: 1-2007-0008 Pilgrim                                                                  Date:        03/17/2007 Plymouth, Massachusetts                                                  Call from Licensee Dockets: 050-00293
REGION I Licensee/Facility:
[1] GE-3
Notification:
1-2007-0008 03/17/2007 MR Number:
ENTERGY NUCLEAR GENERATION COMPANY
[1] GE-3 Date: Pilgrim Call from Licensee Plymouth, Massachusetts 050-00293 Dockets: Pilgrim Manual Reactor Shutdown.


==Subject:==
==Subject:==
Pilgrim Manual Reactor Shutdown.
Discussion:
On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.
On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.
Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The
Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately 6:00 a.m. on March 19, 2007.
 
Contact:                             Org:       Phone No:         Email:
valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately
POWELL, RAYMOND J                     R1        (610) 337-6967     RJP@nrc.gov}}
 
6:00 a.m. on March 19, 2007.
Discussion:
Contact: Email: Phone No: Org: POWELL, RAYMOND J RJP@nrc.gov (610) 337-6967 R1}}

Revision as of 09:18, 23 November 2019

Morning Report 1-2007-0008 - Pilgrim Manual Reactor Shutdown
ML070780524
Person / Time
Site: Pilgrim
Issue date: 03/17/2007
From: Racquel Powell
NRC Region 1
To:
Powell R, RI/DRP/610-337-6967
References
MR-1-2007-0008
Download: ML070780524 (1)


Text

PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I Morning Report Date: MAR 19, 2007 Licensee/Facility: Notification:

ENTERGY NUCLEAR GENERATION COMPANY MR Number: 1-2007-0008 Pilgrim Date: 03/17/2007 Plymouth, Massachusetts Call from Licensee Dockets: 050-00293

[1] GE-3

Subject:

Pilgrim Manual Reactor Shutdown.

Discussion:

On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.

Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately 6:00 a.m. on March 19, 2007.

Contact: Org: Phone No: Email:

POWELL, RAYMOND J R1 (610) 337-6967 RJP@nrc.gov