{{#Wiki_filter:NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/24/2008    R EV. 0  Number: NRCADM061-COO-RO1 Title: Determine if Channel Check Criteria is Met Examinee:
{{#Wiki_filter:NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-RO1 Title:           Determine if Channel Check Criteria is Met Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                       Signature           Date Results:         Sat                   Unsat               Total Time:       minutes Comments:       Designed for RO Candidates in a classroom setting.
minutes Comments: Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
STP I-1A, Mode 1 Checklist, Rev. 109, Page 14 OPS Policy B-5, Rev. 5 Photo of SG Level Channels  
STP I-1A, Mode 1 Checklist, Rev. 109, Page 14 OPS Policy B-5, Rev. 5 Photo of SG Level Channels Alternate Path:  Yes            X              No Time Critical:    Yes                            No              X Time Allotment:  10 minutes Critical Steps:  1, 2 Job Designation:  RO K/A:              G 2.1.7; Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Rating:          4.4 AUTHOR:                        DAVID BURNS                      DATE:    01/24/2008 REV. 0


Alternate Path: Yes  X  No    Time Critical: Yes    No  X  Time Allotment:
JPM TITLE:     DETERMINE IF CHANNEL CHECK              JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
10 minutes Critical Steps:
Required Materials:   OPS Policy B-5, Channel Check Criteria, Rev. 5 Photo of SG Level Channels Initial Conditions:    Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
1, 2 Job Designation: RO K/A: G 2.1.7; Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. Rating: 4.4 JPM TITLE: DETERMINE IF C HANNEL C HECK C RITERIA IS M ET JPM NUMBER: NRCADM061-COO-RO1 INSTRUCTOR W ORKSHEET ML082830905.DOC Page 2 of 6 R EV. 0  Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: OPS Policy B-5, Channel Check Criteria, Rev. 5 Photo of SG Level Channels  
Initiating Cue:        The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria. Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Task Standard:        DO NOT READ TO STUDENTS: All level channels that do not meet the channel check requirement are identified. This will be documented on the student handout.
ML082830905.DOC                            Page 2 of 6                                    REV. 0


Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised. Initiating Cue: The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; "Channel Check Criteria." Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements. Task Standard: DO NOT READ TO STUDENTS: All level channels that do not meet the channel check requirement are identified. This will be documented on
JPM TITLE:   DETERMINE IF CHANNEL CHECK                    JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET INSTRUCTOR W ORKSHEET Start Time:
Step                                      Expected Operator Actions
**  1. Identify LI-519 does not meet the             2.1 Identifies the following channel as not CHANNEL CHECK criteria.                            meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % lower than other 2 channels.
* LI-519 Step was: Sat: ______ Unsat _______*
**  2. Identify LI-538 does not meet the              2.1 Identifies the following channel as not CHANNEL CHECK criteria.                            meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % Higher than other 2 channels.
* LI-538 Step was: Sat: ______ Unsat _______*
Stop Time:
Total Time:                  (Enter total time on the cover page)
* Denotes an entry required on the JPM cover sheet.
** Denotes a Critical Step.
ML082830905.DOC                                Page 3 of 6                                      REV. 0


the student handout.
JPM NUMBER: NRCADM061-COO-RO1 EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
JPM TITLE: DETERMINE IF C HANNEL C HECK C RITERIA IS M ET JPM NUMBER:  NRCADM061-COO-RO1 INSTRUCTOR WORKSHEET
Initiating Cue:     The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 3 of 6 R EV. 0    Start Time:
Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Step  Expected Operator Actions ** 1. Identify LI-519 does not meet the CHANNEL CHECK criteria.
Channel         Met     Not Met                   Channel           Met       Not Met LI-517                                               LI-537 LI-518                                               LI-538 LI-519                                               LI-539 LI-527                                               LI-547 LI-528                                               LI-548 LI-529                                               LI-549 ML082830905.DOC                        Page 4 of 6                                REV. 0
2.1 Identifies the following channel as not meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % lower than other 2 channels.
 
* LI-519    Step was:  Sat: ______  Unsat _______*
JPM Title: DETERMINE IF CHANNEL CHECK                  JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
** 2. Identify LI-538 does not meet the CHANNEL CHECK criteria.
ML082830905.DOC                          Page 5 of 6                          REV. 0
2.1 Identifies the following channel as not meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % Higher than other 2 channels.
* LI-538      Step was:  Sat: ______  Unsat _______*
Stop Time:
Total Time:  (Enter total time on the cover page)
JPM NUMBER: NRCADM061-COO-RO1 EXAMINEE C UE S HEET  ML082830905.DOC Page 4 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised. Initiating Cue: The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; "Channel Check Criteria.Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Channel Met Not Met Channel Met Not Met LI-517   LI-537   LI-518   LI-538   LI-519   LI-539 LI-527   LI-547   LI-528   LI-548   LI-529   LI-549  


JPM Title:
JPM Title: DETERMINE IF CHANNEL CHECK                  JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET ANSWER KEY Initial Conditions:   Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
DETERMINE IF C HANNEL C HECK C RITERIA IS M ET JPM NUMBER: NRCADM061-COO-RO1 ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 5 of 6 R EV. 0    The simulator is not needed for the performance of this JPM.
Initiating Cue:       The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.
JPM Title:
Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
DETERMINE IF C HANNEL C HECK C RITERIA IS M ET JPM NUMBER:  NRCADM061-COO-RO1 ANSWER KEY   ML082830905.DOC Page 6 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised. Initiating Cue: The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; "Channel Check Criteria.Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Channel         Met       Not Met                   Channel           Met       Not Met LI-517           X                                     LI-537           X LI-518           X                                     LI-538                       X LI-519                       X                       LI-539           X LI-527           X                                     LI-547           X LI-528           X                                     LI-548           X LI-529           X                                     LI-549           X ML082830905.DOC                          Page 6 of 6                                REV. 0
Channel Met Not Met Channel Met Not Met LI-517 X LI-537 X LI-518 X LI-538 X LI-519 X LI-539 X LI-527 X LI-547 X LI-528 X LI-548 X LI-529 X LI-549 X


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/24/2008    R EV. 0    Number: NRCADM061-COO-RO2 Title: Application of Overtime Restrictions Examinee:
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-RO2 Title:           Application of Overtime Restrictions Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                       Signature               Date Results:         Sat                   Unsat             Total Time:             minutes Comments:       Designed for RO Candidates in a classroom setting.
minutes Comments: Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path: Yes X No   Time Critical: Yes   No X Time Allotment:
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:   Yes             X             No Time Critical:   Yes                           No               X Time Allotment:   10 minutes Critical Steps:   2, 3 Job Designation: RO K/A:             G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
10 minutes Critical Steps:
Rating:           2.9 AUTHOR:                       DAVID BURNS                      DATE:       01/24/2008 REV. 0
2, 3 Job Designation: RO K/A: G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Rating: 2.9 JPM TITLE: APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 INSTRUCTOR W ORKSHEET  ML082830905.DOC Page 8 of 6 R EV. 0   Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions: Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs. Initiating Cue: The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and


document ALL overtime restrictions violated. You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator. Task Standard: DO NOT READ TO STUDENTS: All overtime restrictions that have been exceeded have been identified. This will be documented on the  
JPM TITLE:    APPLICATION OF OVERTIME                  JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS INSTRUCTOR W ORKSHEET Directions:            No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Required Materials:    OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:    Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
Initiating Cue:        The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
Task Standard:         DO NOT READ TO STUDENTS: All overtime restrictions that have been exceeded have been identified. This will be documented on the student handout.
ML082830905.DOC                            Page 8 of 6                                    REV. 0


student handout.
JPM TITLE:   APPLICATION OF OVERTIME                         JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE: APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 INSTRUCTOR WORKSHEET
Step                                       Expected Operator Actions
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 9 of 6 R EV. 0    Start Time:
: 1. Identifies that the 16 hour limits are         1.1 Identifies that following limits do not apply.
Step Expected Operator Actions
not exceeded.
: 1. Identifies that the 16 hour limits are not exceeded.
1.1 Identifies that following limits do not apply.
* 16 consecutive hours.
* 16 consecutive hours.
* 16 hours in 24 hours.
* 16 hours in 24 hours.
Note: Turnover time is not counted as actual time worked.
Note: Turnover time is not counted as actual time worked.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
** 2. Identifies that the 24 hour limit is exceeded.
**   2. Identifies that the 24 hour limit is           2.1 Identifies that the following limit was exceeded.                                          exceeded.
2.1 Identifies that the following limit was exceeded.
* 24 hours in 48 hours Note: This limit was exceeded after working on Wednesday and again on Thursday.
* 24 hours in 48 hours Note: This limit was exceeded after working on Wednesday and again on Thursday. (ONLY ONE IS REQUIRED)
(ONLY ONE IS REQUIRED)
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
** 3. Identifies that the 72 hour limit is exceeded.
**   3. Identifies that the 72 hour limit is           2.1 Identifies that following limit was exceeded.
2.1 Identifies that following limit was exceeded.
exceeded.
* 72 hours in 7 days.
* 72 hours in 7 days.
Note: This limit was exceeded after working on Sunday, 73 hours total.
Note: This limit was exceeded after working on Sunday, 73 hours total.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time: (Enter total time on the cover page)
Total Time:                   (Enter total time on the cover page)
JPM NUMBER:  NRCADM061-COO-RO2 EXAMINEE C UE S HEET  ML082830905.DOC Page 10 of 6 R EV. 0   Initial Conditions: Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs. Initiating Cue: The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and
* Denotes an entry required on the JPM cover sheet.
** Denotes a Critical Step.
ML082830905.DOC                                 Page 9 of 6                                       REV. 0


document ALL overtime restrictions violated. You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator. Previous Work Schedule:
JPM NUMBER: NRCADM061-COO-RO2 EXAMINEE CUE SHEET Initial Conditions:    Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
Day Number of Hours Worked Turnover Time (Hours) Position Sunday 0 0 OFF Monday 12 1 U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1 U1 BOPCO Friday 12 0 U1 CO Saturday 0 0 OFF Sunday 12 0 U1 CO Monday 0 0 OFF Today 12 0 U1 CO Overtime Restrictions Violated:
Initiating Cue:        The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
Previous Work Schedule:
Day             Number of Hours           Turnover Time               Position Worked                  (Hours)
Sunday                     0                       0                       OFF Monday                   12                       1                   U1 BOPCO Tuesday                   12                       0.5                 U1 BOPCO Wednesday                   13                       0.5                 U1 BOPCO Thursday                   12                       1                   U1 BOPCO Friday                   12                       0                     U1 CO Saturday                   0                       0                       OFF Sunday                   12                       0                     U1 CO Monday                     0                       0                       OFF Today                   12                       0                     U1 CO Overtime Restrictions Violated:
ML082830905.DOC                          Page 10 of 6                                    REV. 0


JPM Title:
JPM Title: APPLICATION OF OVERTIME                     JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 11 of 6 R EV. 0    The simulator is not needed for the performance of this JPM.
ML082830905.DOC                           Page 11 of 6                         REV. 0
JPM Title:
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER:  NRCADM061-COO-RO2ANSWER KEY  ML082830905.DOC Page 12 of 6 R EV. 0   Initial Conditions: Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs. Initiating Cue: The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and


document ALL overtime restrictions violated. You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
JPM Title: APPLICATION OF OVERTIME                    JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ANSWER KEY Initial Conditions:  Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
JPM Title:
Initiating Cue:      The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER:  NRCADM061-COO-RO2ANSWER KEY  ML082830905.DOC Page 13 of 6 R EV. 0 Previous Work Schedule:
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
Day Number of Hours Worked Turnover Time (Hours) Position Sunday 0 0 OFF Monday 12 1 U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1 U1 BOPCO Friday 12 0 U1 CO  Saturday 0 0 OFF Sunday 12 0 U1 CO  Monday 0 0 OFF Today 12 0 U1 CO Overtime Restrictions Violated:  24 hours in 48 hours on Wednesday and Thursday. (Only one is required) 72 hours in 7 days on Sunday. (73 hours total)
ML082830905.DOC                         Page 12 of 6                                   REV. 0


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/24/2008    R EV. 0  Number: NRCADM061-EC-RO Title: Determine Clearance Points and Tagging Requirements Examinee:
JPM Title: APPLICATION OF OVERTIME                      JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ANSWER KEY Previous Work Schedule:
Day              Number of Hours            Turnover Time          Position Worked                  (Hours)
Sunday                      0                        0                OFF Monday                    12                        1              U1 BOPCO Tuesday                    12                      0.5            U1 BOPCO Wednesday                    13                      0.5            U1 BOPCO Thursday                    12                        1              U1 BOPCO Friday                    12                        0                U1 CO Saturday                    0                        0                OFF Sunday                    12                        0                U1 CO Monday                      0                        0                OFF Today                      12                        0                U1 CO Overtime Restrictions Violated:
24 hours in 48 hours on Wednesday and Thursday. (Only one is required) 72 hours in 7 days on Sunday. (73 hours total)
ML082830905.DOC                            Page 13 of 6                            REV. 0
 
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-EC-RO Title:           Determine Clearance Points and Tagging Requirements Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                     Signature           Date Results:         Sat                   Unsat           Total Time:       minutes Comments:       Designed for RO Candidates in a classroom setting.
minutes Comments: Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45  
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Alternate Path:  Yes                          No              X Time Critical:    Yes                          No              X Time Allotment:  20 minutes Critical Steps:  1, 2, 3 Job Designation:  RO K/A:              G 2.2.13; Knowledge of tagging and clearance procedures.
Rating:          4.1 AUTHOR:                        DAVID BURNS                    DATE:    01/24/2008 REV. 0


Alternate Path: Yes    No  X  Time Critical: Yes    No  X  Time Allotment:
JPM TITLE:     DETERMINE CLEARANCE POINTS               JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
20 minutes Critical Steps:
Required Materials:   OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
1, 2, 3 Job Designation: RO K/A: G 2.2.13; Knowledge of tagging and clearance procedures. Rating: 4.1 JPM TITLE: DETERMINE C LEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR W ORKSHEET ML082830905.DOC Page 15 of 6 R EV. 0  Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required. Initiating Cue: The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements. Task Standard: DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.
Initiating Cue:       The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
JPM TITLE: DETERMINE C LEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR WORKSHEET
Task Standard:         DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 16 of 6 R EV. 0    Start Time:
ML082830905.DOC                            Page 15 of 6                                    REV. 0
Step Expected Operator Actions ** 1. Identify breaker required to be re-positioned for isolation of power to SCWP 1-1.
 
2.1 Identifies the following breakers to be OPENED:
JPM TITLE:     DETERMINE CLEARANCE POINTS                     JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR W ORKSHEET Start Time:
Step                                         Expected Operator Actions
**   1. Identify breaker required to be re-             2.1 Identifies the following breakers to be positioned for isolation of power to                 OPENED:
SCWP 1-1.
* 52-11D-05 (motor)
* 52-11D-05 (motor)
NOTE: May place Control Board Caution (CBC) Tag on SCW PP 1-1. (not part of critical task).
NOTE: May place Control Board Caution (CBC) Tag on SCW PP 1-1. (not part of critical task).
1.2 Identifies that a DANGER tag should be used for this component.
1.2 Identifies that a DANGER tag should be used for this component.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
** 2. Identify valves required to be closed to isolate SCWP 1-1.
: 2. Identify valves required to be closed           2.1 Identifies the following valves CLOSED:
2.1 Identifies the following valves CLOSED:
**
to isolate SCWP 1-1.
* SCW-1-9 discharge valve
* SCW-1-9 discharge valve
* SCW-1-1 suction valve 2.2 Identifies that a DANGER tag should be used for these components.
* SCW-1-1 suction valve 2.2 Identifies that a DANGER tag should be used for these components.
Step was: Sat: ______   Unsat _______* ** 3. Identify valves required to be opened to drain and vent SCWP 1-1.
Step was: Sat: ______ Unsat _______*
3.1 Identifies the following valves OPEN.
: 3. Identify valves required to be                 3.1 Identifies the following valves OPEN.
**
opened to drain and vent SCWP 1-1.
* SCW-1-3 pump suction drain
* SCW-1-3 pump suction drain
* SCW-1-5 pump casing vent
* SCW-1-5 pump casing vent
* SCW-1-7 pump discharge drain
* SCW-1-7 pump discharge drain
* SCW-1-423 pump discharge drain NOTE: May CAUTION tag pump control switch, but not required.  
* SCW-1-423 pump discharge drain NOTE: May CAUTION tag pump control switch, but not required.
 
3.2 Identifies that a CAUTION Tag should be used for these components.
3.2 Identifies that a CAUTION Tag should be used for these components.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time: (Enter total time on the cover page)
Total Time:                   (Enter total time on the cover page)
JPM NUMBER: NRCADM061-EC-RO EXAMINEE C UE S HEET  ML082830905.DOC Page 17 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required. Initiating Cue: The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
* Denotes an entry required on the JPM cover sheet.
** Denotes a Critical Step.
ML082830905.DOC                                Page 16 of 6                                      REV. 0
 
JPM NUMBER: NRCADM061-EC-RO EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
Initiating Cue:     The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
CLEARANCE                DESCRIPTION                    CLEARED              TAGGING POINT                                                  POSITION        REQUIREMENT ML082830905.DOC                        Page 17 of 6                                    REV. 0


CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 18 of 6 R EV. 0    The simulator is not needed for the performance of this JPM.
JPM Title: Determine Clearance Points                 JPM NUMBER: NRCADM061-EC-RO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
JPM Title: Determine Clearance Points JPM NUMBER:  NRCADM061-EC-RO ANSWER KEY  ML082830905.DOC Page 19 of 6 R EV. 0   Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required. Initiating Cue: The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
ML082830905.DOC                           Page 18 of 6                       REV. 0
JPM Title: Determine Clearance Points JPM NUMBER:  NRCADM061-EC-RO ANSWER KEY  ML082830905.DOC Page 20 of 6 R EV. 0    CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF Control Board Caution* 52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION
*CBC for SCW pump control switch is not required for completion of this task.


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/258/2008    R EV. 0    Number: NRCADM061-RC-RO Title: Stay Time Determination Examinee:
JPM Title: Determine Clearance Points                    JPM NUMBER: NRCADM061-EC-RO ANSWER KEY Initial Conditions:  Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
Initiating Cue:      The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
ML082830905.DOC                          Page 19 of 6                                    REV. 0
 
JPM Title: Determine Clearance Points                JPM NUMBER: NRCADM061-EC-RO ANSWER KEY CLEARANCE                  DESCRIPTION                  CLEARED              TAGGING POINT                                                POSITION          REQUIREMENT SCW PP-1-1    Control Switch                              OFF            Control Board Caution*
52-11D-05    SCW Pump 1-1 480 v Supply                  OPEN              DANGER SCW-1-9      SCW Pump 1-1 Discharge Valve              CLOSED              DANGER SCW-1-1      SCW Pump 1-1 Suction Valve                CLOSED              DANGER SCW 1-3      SCW Pump 1-1 Suction Drain Valve            OPEN              CAUTION SCW 1-5      SCW Pump 1-1 Casing Vent Valve              OPEN              CAUTION SCW-1-7      SCW Pump 1-1 Discharge Drain Valve          OPEN              CAUTION SCW-1-423    SCW Pump 1-1 Discharge Drain Valve          OPEN              CAUTION
*CBC for SCW pump control switch is not required for completion of this task.
ML082830905.DOC                        Page 20 of 6                                  REV. 0
 
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-RC-RO Title:           Stay Time Determination Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                     Signature             Date Results:         Sat                   Unsat           Total Time:           minutes Comments:       Designed for RO Candidates in a classroom setting.
minutes Comments: Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Alternate Path: Yes   No X Time Critical: Yes   No X Time Allotment:
RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Alternate Path:   Yes                         No             X Time Critical:     Yes                         No             X Time Allotment:   10 minutes Critical Steps:   3.3 Job Designation:   RO K/A:               G 2.3.4; Knowledge of radiation exposure limits under normal or emergency conditions.
10 minutes Critical Steps:
Rating:           3.2 AUTHOR:                        DAVID BURNS                  DATE:      01/258/2008 REV. 0
3.3 Job Designation: RO K/A: G 2.3.4; Knowledge of radiation exposure limits under normal or emergency conditions. Rating: 3.2 JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR WORKSHEET  ML082830905.DOC Page 22 of 66 R EV. 0  Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Attachment 8.1 Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
 
JPM TITLE:     STAY TIME DETERMINATION             JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR W ORKSHEET Directions:             No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Required Materials:     RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Attachment 8.1 Initial Conditions:     The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Shallow Dose Equivalent (SDE) 5 mrem   Initiating Cue: The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE). Task Standard:
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:         The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
DO NOT READ TO STUDENT: Maximum Stay time is calculated.
Task Standard:           DO NOT READ TO STUDENT: Maximum Stay time is calculated.
JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR WORKSHEET
ML082830905.DOC                            Page 22 of 66                                  REV. 0
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 23 of 66 R EV. 0    Start Time:
 
Step Expected Operator Actions
JPM TITLE:   STAY TIME DETERMINATION                   JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR W ORKSHEET Start Time:
: 1. Determine TEDE 1.1 TEDE = DDE + CEDE 1.2 TEDE = 400 mrem + 200 mrem 1.3 TEDE = 600 mrem Step was: Sat: ______   Unsat _______*
Step                                 Expected Operator Actions
: 2. Determine DCPP Administrative Limits for TEDE 2.1 Determines DCPP Administrative Limit for TEDE = 4500 mrem 2.2 Determines DCPP Administrative Guideline for TEDE = 2000 mrem 2.3 Determine MARGIN to Administrative Guideline is: 2000 - 600 = 1400 mrem Step was: Sat: ______   Unsat _______*
: 1. Determine TEDE                             1.1     TEDE = DDE + CEDE 1.2     TEDE = 400 mrem + 200 mrem 1.3     TEDE = 600 mrem Step was: Sat: ______ Unsat _______*
** 3. Determine maximum stay time  
: 2. Determine DCPP Administrative             2.1     Determines DCPP Administrative Limits for TEDE                                    Limit for TEDE = 4500 mrem 2.2     Determines DCPP Administrative Guideline for TEDE = 2000 mrem 2.3     Determine MARGIN to Administrative Guideline is:
**3.1 Stay time = Margin / Dose Rate 3.2 Stay time = 1400 mrem / 280 mrem/hr 3.3 Stay time = 5 hours ACCEPTABLE TIME: 4.8 - 5.0 hours Step was: Sat: ______   Unsat _______*
2000 - 600 = 1400 mrem Step was: Sat: ______ Unsat _______*
** 3. Determine maximum stay time                   3.1     Stay time = Margin / Dose Rate 3.2     Stay time = 1400 mrem / 280 mrem/hr
                                                ** 3.3     Stay time = 5 hours ACCEPTABLE TIME: 4.8 - 5.0 hours Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time: (Enter total time on the cover page)  
Total Time:                 (Enter total time on the cover page)
* Denotes an entry required on the JPM cover sheet.
** Denotes a Critical Step.
ML082830905.DOC                            Page 23 of 66                                REV. 0


JPM NUMBER: NRCADM061-RC - RO EXAMINEE C UE S HEET  ML082830905.DOC Page 24 of 66 R EV. 0  Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
JPM NUMBER: NRCADM061-RC - RO EXAMINEE CUE SHEET Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Shallow Dose Equivalent (SDE) 5 mrem   Initiating Cue: The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:     The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
 
Document Your Answer Here ML082830905.DOC                        Page 24 of 66                                REV. 0
Document Your Answer Here  


JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 25 of 66 R EV. 0    The simulator is not needed for the performance of this JPM.  
JPM TITLE:   STAY TIME DETERMINATION                   JPM NUMBER: NRCADM061-RC - RO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
ML082830905.DOC                          Page 25 of 66                        REV. 0


JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER K EY  ML082830905.DOC Page 26 of 66 R EV. 0  Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
JPM TITLE:     STAY TIME DETERMINATION                   JPM NUMBER: NRCADM061-RC - RO ANSWER KEY Initial Conditions:     The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Shallow Dose Equivalent (SDE) 5 mrem   Initiating Cue: The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:         The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER K EY  ML082830905.DOC Page 27 of 66 R EV. 0    Document Your Answer Here TEDE = DDE + CEDE         TEDE = 400 mrem + 200 mrem       TEDE = 600 mrem Margin = 2000 - 600 = 1400 mrem Stay time = Margin / Dose Rate 1400 mrem / 280 mrem/hr Stay time = 5 hours  
ML082830905.DOC                            Page 26 of 66                                REV. 0
 
JPM TITLE:     STAY TIME DETERMINATION               JPM NUMBER: NRCADM061-RC - RO ANSWER KEY Document Your Answer Here TEDE = DDE + CEDE         TEDE = 400 mrem + 200 mrem       TEDE = 600 mrem Margin = 2000 - 600 = 1400 mrem Stay time = Margin / Dose Rate     1400 mrem / 280 mrem/hr Stay time = 5 hours ML082830905.DOC                        Page 27 of 66                        REV. 0


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/24/2008    R EV. 0  Number: NRCADM061-COO-SRO1 Title: Determination of Shift Staffing and Overtime Restrictions Examinee:
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-SRO1 Title:           Determination of Shift Staffing and Overtime Restrictions Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                       Signature               Date Results:         Sat                   Unsat             Total Time:             minutes Comments:       Designed for SRO Candidates in a classroom setting.
minutes Comments: Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path: Yes X No X Time Critical: Yes   No X Time Allotment:
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:   Yes             X             No               X Time Critical:   Yes                           No               X Time Allotment:   10 minutes Critical Steps:   1, 2, 3 Job Designation: SRO K/A:             G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
10 minutes Critical Steps:
Rating:           3.9 AUTHOR:                        DAVID BURNS                      DATE:        01/24/2008 REV. 0
1, 2, 3 Job Designation: SRO K/A: G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Rating: 3.9 JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 INSTRUCTOR W ORKSHEET ML082830905.DOC Page 29 of 6 R EV. 0  Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator. Initiating Cue: Assuming today is June 16 th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval. Task Standard: DO NOT READ TO STUDENTS: All Reactor Operators that can work the shift have been identified. This will be documented on the student  
 
JPM TITLE:     DETERMINATION OF SHIFT STAFFING AND       JPM NUMBER: NRCADM061-COO-OVERTIME RESTRICTIONS                    SRO1 INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Required Materials:   OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:   Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
Initiating Cue:       Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
Task Standard:         DO NOT READ TO STUDENTS: All Reactor Operators that can work the shift have been identified. This will be documented on the student handout.
ML082830905.DOC                            Page 29 of 6                                  REV. 0


handout.
JPM TITLE:   DETERMINATION OF SHIFT STAFFING AND           JPM NUMBER: NRCADM061-COO-OVERTIME RESTRICTIONS                        SRO1 INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 INSTRUCTOR WORKSHEET
Step                                     Expected Operator Actions
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 30 of 6 R EV. 0    Start Time:
**   1. Evaluates RO1 previous work                   1.2     Identifies that following limit applies.
Step Expected Operator Actions ** 1. Evaluates RO1 previous work schedule.
schedule.
1.2 Identifies that following limit applies.
* 72 hours in 7 days.
* 72 hours in 7 days.
1.3 Determines that RO1 is not eligible. **
1.3     Determines that RO1 is not eligible. **
Note: This limit will be exceeded after working today. Step was: Sat: ______   Unsat _______*
Note: This limit will be exceeded after working today.
** 2. Evaluates RO2 previous work schedule.
Step was: Sat: ______ Unsat _______*
2.1 Determines that no limits have been exceeded.
**   2. Evaluates RO2 previous work                   2.1     Determines that no limits have been schedule.                                            exceeded.
2.2 Determines that RO2 is eligible. **
2.2     Determines that RO2 is eligible. **
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
** 3. Evaluates RO3 previous work schedule.
**   3. Evaluates RO3 previous work                   3.1     Identifies that following limit applies.
3.1 Identifies that following limit applies.
schedule.
* 24 hours in 48 hours.
* 24 hours in 48 hours.
3.2 Determines that RO3 is not eligible. **
3.2     Determines that RO3 is not eligible. **
Note: This limit will be exceeded after working today. Step was: Sat: ______   Unsat _______*
Note: This limit will be exceeded after working today.
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time: (Enter total time on the cover page)
Total Time:                 (Enter total time on the cover page)
JPM NUMBER: NRCADM061-COO-SRO1 EXAMINEE C UE S HEET  ML082830905.DOC Page 31 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator. Initiating Cue: Assuming today is June 16 th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
* Denotes an entry required on the JPM cover sheet.
Previous Work Schedule:  
** Denotes a Critical Step.
ML082830905.DOC                              Page 30 of 6                                        REV. 0
 
JPM NUMBER: NRCADM061-COO-SRO1 EXAMINEE CUE SHEET Initial Conditions:     Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
Initiating Cue:         Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
Previous Work Schedule:
Mon        Tues        Wed      Thurs      Fri        Sat      Sun      Mon Operator    June 9    June 10    June 11  June 12    June 13    June 14  June 15    June 16 RO1        OFF        0700-      0700-    0700-      0700-      0700-    0700-1900        1900      1900      1900        1900      1900 RO2      0700-      0700-      0700-    0700-      OFF        0700-    0700-1900      1900        1900      1900                  1900      1900 RO3        OFF        0700-      0700-    0700-      0700-        OFF      0700-1700        1700      1700      1700                  2100 Reactor Operator(s) eligible to work June 16th Yes              No RO1          [ ]              [ ]
RO2          [ ]              [ ]
RO3          [ ]              [ ]
ML082830905.DOC                            Page 31 of 6                                  REV. 0
 
JPM TITLE:  DETERMINATION OF SHIFT STAFFING          JPM NUMBER: NRCADM061-COO-SRO1 AND OVERTIME RESTRICTIONS ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
ML082830905.DOC                          Page 32 of 6                          REV. 0


Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 RO2 0700-1900 0700-1900 0700-1900 0700-1900 OFF 0700-1900 0700-1900  RO3 OFF 0700-1700 0700-1700 0700-1700 0700-1700 OFF 0700-2100  Reactor Operator(s) eligible to work June 16 th  Yes  No RO1  [  ]  [  ]  RO2 [  ]  [  ] RO3 [  ]  [  ]
JPM TITLE: DETERMINATION OF SHIFT STAFFING AND      JPM NUMBER: NRCADM061-COO-SRO1 OVERTIME RESTRICTIONS ANSWER KEY Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
Initiating Cue:      Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
ML082830905.DOC                        Page 33 of 6                                  REV. 0


JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER:  NRCADM061-COO-SRO1 ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 32 of 6 R EV. 0    The simulator is not needed for the performance of this JPM.
JPM TITLE: DETERMINATION OF SHIFT STAFFING AND           JPM NUMBER: NRCADM061-COO-SRO1 OVERTIME RESTRICTIONS ANSWER KEY Previous Work Schedule:
JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 ANSWER K EY  ML082830905.DOC Page 33 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator. Initiating Cue: Assuming today is June 16 th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
Mon         Tues       Wed       Thurs       Fri     Sat     Sun     Mon Operator   June 9     June 10   June 11   June 12   June 13 June 14 June 15 June 16 RO1       OFF         0700-     0700-     0700-     0700-   0700-   0700-1900       1900        1900      1900    1900    1900 RO2     0700-       0700-     0700-     0700-       OFF     0700-   0700-1900       1900      1900        1900              1900    1900 RO3       OFF         0700-     0700-     0700-     0700-     OFF     0700-1700      1700        1700      1700              2100 Reactor Operator(s) eligible to work June 16th Yes             No RO1         [ ]             [X]
JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER:  NRCADM061-COO-SRO1 ANSWER K EY  ML082830905.DOC Page 34 of 6 R EV. 0  Previous Work Schedule:
RO2         [X]             [ ]
Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 RO2 0700-1900 0700-1900 0700-1900 0700-1900 OFF 0700-1900 0700-1900 RO3 OFF 0700-1700 0700-1700 0700-1700 0700-1700 OFF 0700-2100   Reactor Operator(s) eligible to work June 16 th  Yes   No RO1 [   ]   [X] RO2 [X]   [   ] RO3 [   ]   [X]
RO3         [ ]             [X]
ML082830905.DOC                            Page 34 of 6                            REV. 0


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/24/2008    R EV. 0  Number: NRCADM061-COO-SRO2 Title: Approve Movement of Spent Fuel Assemblies Examinee:
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-SRO2 Title:           Approve Movement of Spent Fuel Assemblies Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                     Signature           Date Results:         Sat                   Unsat           Total Time:         minutes Comments:       Designed for SRO Candidates in a classroom setting.
minutes Comments: Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OP B-8DS3, Insert Shuffle Within the Spent Fuel Pool, Rev. 18 Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Alternate Path: Yes X No   Time Critical: Yes   No X Time Allotment:
OP B-8DS3, Insert Shuffle Within the Spent Fuel Pool, Rev. 18 Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Alternate Path:   Yes             X           No Time Critical:   Yes                         No             X Time Allotment:   15 minutes Critical Steps:   1, 2, 3, 4 Job Designation: SRO K/A:             G 2.1.40; Knowledge of refueling administrative requirements.
15 minutes Critical Steps:
Rating:           3.9 AUTHOR:                       DAVID BURNS                    DATE:     01/24/2008 REV. 0
1, 2, 3, 4 Job Designation: SRO K/A: G 2.1.40; Knowledge of refueling administrative requirements. Rating: 3.9 JPM TITLE: A PPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR W ORKSHEET  ML082830905.DOC Page 36 of 6 R EV. 0   Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Initial Conditions: Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack. Initiating Cue: You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack


should be allowed or dis-allowed, based on the conditions given for each assembly. Task Standard: DO NOT READ TO STUDENTS: Determination of proper storage location for each fuel assembly in made. This will be documented on the student handout.
JPM TITLE:    APPROVE MOVEMENT OF SPENT FUEL          JPM NUMBER: NRCADM061-COO-ASSEMBLIES                              SRO2 INSTRUCTOR W ORKSHEET Directions:            No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE: A PPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER:  NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET
Required Materials:  Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Initial Conditions:  Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 37 of 6 R EV. 0   Start Time:
Initiating Cue:      You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.
Step  Expected Operator Actions
Task Standard:       DO NOT READ TO STUDENTS: Determination of proper storage location for each fuel assembly in made. This will be documented on the student handout.
** 1. Determine if Element K-24 can be placed in the Cask Pit Storage
ML082830905.DOC                           Page 36 of 6                                   REV. 0


Rack. 2.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 2.1 Determines that Decay time is less than allowable limit.
JPM TITLE:    APPROVE MOVEMENT OF SPENT FUEL            JPM NUMBER: NRCADM061-COO-ASSEMBLIES                                SRO2 INSTRUCTOR W ORKSHEET Start Time:
Step                                Expected Operator Actions
** 1. Determine if Element K-24 can            2.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          acceptable region on Figure 3.7.17-4 2.1 Determines that Decay time is less than allowable limit.
2.1 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
2.1 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
  ** 2. Determine if Element F-06 can be placed in the Cask Pit Storage
  ** 2. Determine if Element F-06 can             2.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          acceptable region on Figure 3.7.17-4 2.2 Determines that Decay time meets allowable limit.
 
Rack. 2.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 2.2 Determines that Decay time meets allowable limit.
2.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
2.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
  ** 3. Determine if Element G-17 can be placed in the Cask Pit Storage
  ** 3. Determine if Element G-17 can             3.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          Unacceptable region on Figure 3.7.17-4 3.2 Determines that Decay time meets the allowable limit.
 
Rack. 3.1 Determines that the assembly discharge burn up and Initial Enrichment is in the Unacceptable region on Figure 3.7.17-4 3.2 Determines that Decay time meets the allowable limit.
3.3 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
3.3 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
* Denotes an entry required on the JPM cover sheet.
** Denotes a Critical Step.
ML082830905.DOC                          Page 37 of 6                                    REV. 0


JPM TITLE: A PPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET
JPM TITLE:   APPROVE MOVEMENT OF SPENT FUEL             JPM NUMBER: NRCADM061-COO-ASSEMBLIES                                  SRO2 INSTRUCTOR W ORKSHEET
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 38 of 6 R EV. 0 ** 4. Determine if Element D-32 can be placed in the Cask Pit Storage
  ** 4. Determine if Element D-32 can               4.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          acceptable region on Figure 3.7.17-4 4.2 Determines that Decay time meets allowable limit.
 
Rack. 4.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 4.2 Determines that Decay time meets allowable limit.
4.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
4.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time: (Enter total time on the cover page)
Total Time:                 (Enter total time on the cover page)
JPM NUMBER:  NRCADM061-COO-SRO2 EXAMINEE C UE S HEET  ML082830905.DOC Page 39 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack. Initiating Cue: You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.
* Denotes an entry required on the JPM cover sheet.
Element Initial Enrichment (wt% U-235) Discharge Burnup (GWd/mtU) Decay Time (Years) Allow or Dis-allow K-24 3.0 26 8 Allow [  ] Dis-allow [  ] F-06 3.25 23 12 Allow [  ] Dis-allow [  ] G-17 3.5 21 11 Allow [  ] Dis-allow [  ] D-32 3.5 25 14 Allow [  ] Dis-allow [  ]
** Denotes a Critical Step.
ML082830905.DOC                           Page 38 of 6                                   REV. 0


JPM TITLE: A PPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER:  NRCADM061-COO-SRO2 ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 40 of 6 R EV. 0    The simulator is not needed for the performance of this JPM.
JPM NUMBER: NRCADM061-COO-SRO2 EXAMINEE CUE SHEET Initial Conditions:     Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
JPM TITLE: A PPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ANSWER K EY  ML082830905.DOC Page 41 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack. Initiating Cue: You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack  
Initiating Cue:         You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.
Element        Initial          Discharge        Decay          Allow or Dis-allow Enrichment          Burnup          Time (wt% U-235)        (GWd/mtU)        (Years)
K-24            3.0                26              8        Allow [ ]    Dis-allow [ ]
F-06          3.25                23              12        Allow [ ]    Dis-allow [ ]
G-17            3.5                21              11        Allow [ ]    Dis-allow [ ]
D-32            3.5                25              14        Allow [ ]    Dis-allow [ ]
ML082830905.DOC                              Page 39 of 6                                REV. 0


should be allowed or dis-allowed based on the conditions given for each assembly.
JPM TITLE:   APPROVE MOVEMENT OF SPENT FUEL           JPM NUMBER: NRCADM061-COO-ASSEMBLIES                                SRO2 ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
JPM TITLE: A PPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ANSWER K EY  ML082830905.DOC Page 42 of 6 R EV. 0    Element Initial Enrichment (wt% U-235) Discharge Burnup (GWd/mtU) Decay Time (Years) Allow or Dis-allow K-24 3.0 26 8 Allow [  ] Dis-allow [ X ] F-06 3.25 23 12  Allow [ X ]  Dis-allow [  ] G-17 3.5 21 11 Allow [  ] Dis-allow [ X ] D-32 3.5 25 14  Allow [ X ]  Dis-allow [  ]
ML082830905.DOC                           Page 40 of 6                         REV. 0


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/24/2008    R EV. 0  Number: NRCADM061-EC-SRO Title: Evaluate Clearance Points and Tagging Requirements Examinee:
JPM TITLE:    APPROVE MOVEMENT OF SPENT FUEL          JPM NUMBER: NRCADM061-COO-ASSEMBLIES                              SRO2 ANSWER KEY Initial Conditions:  Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
Initiating Cue:      You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed based on the conditions given for each assembly.
ML082830905.DOC                          Page 41 of 6                                REV. 0
 
JPM TITLE:  APPROVE MOVEMENT OF SPENT FUEL      JPM NUMBER: NRCADM061-COO-ASSEMBLIES                          SRO2 ANSWER KEY Element      Initial    Discharge        Decay        Allow or Dis-allow Enrichment      Burnup          Time (wt% U-235)    (GWd/mtU)        (Years)
K-24          3.0          26              8      Allow [ ]  Dis-allow [ X ]
F-06          3.25          23            12      Allow [ X ] Dis-allow [ ]
G-17          3.5          21            11      Allow [ ]  Dis-allow [ X ]
D-32          3.5          25            14      Allow [ X ] Dis-allow [ ]
ML082830905.DOC                      Page 42 of 6                              REV. 0
 
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-EC-SRO Title:           Evaluate Clearance Points and Tagging Requirements Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                     Signature           Date Results:         Sat                   Unsat           Total Time:       minutes Comments:       Designed for SRO Candidates in a classroom setting.
minutes Comments: Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43  
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Alternate Path:  Yes            X            No Time Critical:    Yes                          No              X Time Allotment:  15 minutes Critical Steps:  1, 2, 3 Job Designation:  SRO K/A:              G 2.2.13; Knowledge of tagging and clearance procedures.
Rating:          4.3 AUTHOR:                        DAVID BURNS                    DATE:    01/24/2008 REV. 0


Alternate Path: Yes  X  No    Time Critical: Yes    No  X  Time Allotment:
JPM TITLE:     DETERMINE CLEARANCE POINTS               JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
15 minutes Critical Steps:
Required Materials:   OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
1, 2, 3 Job Designation: SRO K/A: G 2.2.13; Knowledge of tagging and clearance procedures. Rating: 4.3 JPM TITLE: DETERMINE C LEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR W ORKSHEET ML082830905.DOC Page 44 of 6 R EV. 0  Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required. Initiating Cue: The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted. Task Standard: DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.
Initiating Cue:       The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
JPM TITLE: DETERMINE C LEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR WORKSHEET
Task Standard:         DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 45 of 6 R EV. 0    Start Time:
ML082830905.DOC                          Page 44 of 6                                    REV. 0
Step Expected Operator Actions  
 
** 1. Identify breaker for isolation of SCWP 1-1, power supply is tagged incorrectly.
JPM TITLE:   DETERMINE CLEARANCE POINTS                 JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR W ORKSHEET Start Time:
2.1 Identifies that a DANGER tag should be used for this component:
Step                                 Expected Operator Actions
** 1. Identify breaker for isolation of           2.1 Identifies that a DANGER tag should be SCWP 1-1, power supply is                      used for this component:
tagged incorrectly.
* 52-11D-05 (motor)
* 52-11D-05 (motor)
Step was: Sat: ______   Unsat _______*
Step was: Sat: ______ Unsat _______*
  ** 2. Identify discharge valve is required to be re-positioned for isolation of SCWP 1-1, check valve is not allowed isolation  
  ** 2. Identify discharge valve is               2.2 Identifies the following valve should be required to be re-positioned for               CLOSED:
isolation of SCWP 1-1, check valve is not allowed isolation
* SCW-1-9 discharge valve point.
Step was: Sat: ______ Unsat _______*
** 3. Identify additional valve required        3.2 Identifies the following valves OPEN.
to be opened to drain and vent SCWP 1-1.
* SCW-1-423 pump discharge drain NOTE: Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.
3.2 Identifies that a CAUTION Tag should be used for this components.
Step was: Sat: ______ Unsat _______*
Stop Time:
Total Time:                (Enter total time on the cover page)
* Denotes an entry required on the JPM cover sheet.
** Denotes a Critical Step.
ML082830905.DOC                            Page 45 of 6                                    REV. 0
 
JPM NUMBER: NRCADM061-EC-SRO EXAMINEE CUE SHEET Initial Conditions:    Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
Initiating Cue:        The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
CLEARANCE                    DESCRIPTION                    CLEARED              TAGGING POINT                                                    POSITION          REQUIREMENT SCW PP-1-1      Control Switch                                  OFF                CBC 52-11D-05      SCW Pump 1-1 480 v Supply                      OPEN              CAUTION SCW-1-293      SCW Pump 1-1 Discharge Valve                CLOSED              DANGER SCW-1-1      SCW Pump 1-1 Suction Valve                  CLOSED              DANGER SCW 1-3      SCW Pump 1-1 Suction Drain Valve              OPEN              CAUTION SCW 1-5      SCW Pump 1-1 Casing Vent Valve                OPEN              CAUTION SCW-1-7      SCW Pump 1-1 Discharge Drain Valve            OPEN              CAUTION Discrepancies found ML082830905.DOC                          Page 46 of 6                                    REV. 0


point. 2.2 Identifies the following valve should be CLOSED:
JPM Title: Determine Clearance Points                  JPM NUMBER: NRCADM061-EC-SRO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
* SCW-1-9 discharge valve Step was:  Sat: ______  Unsat _______* ** 3. Identify additional valve required to be opened to drain and vent
ML082830905.DOC                          Page 47 of 6                        REV. 0


SCWP 1-1.
JPM Title: Determine Clearance Points                  JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
3.2 Identifies the following valves OPEN.
Initiating Cue:       The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
* SCW-1-423 pump discharge drain NOTE: Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump
ML082830905.DOC                          Page 48 of 6                                    REV. 0
. 3.2 Identifies that a CAUTION Tag should be used for this components.
 
Step was:  Sat: ______  Unsat _______*
JPM Title: Determine Clearance Points                  JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY CLEARANCE                   DESCRIPTION                     CLEARED             TAGGING POINT                                                    POSITION         REQUIREMENT SCW PP-1-1     Control Switch                                   OFF                 CBC 52-11D-05     SCW Pump 1-1 480 v Supply                       OPEN             CAUTION SCW-1-293     SCW Pump 1-1 Discharge Valve                 CLOSED               DANGER SCW-1-1       SCW Pump 1-1 Suction Valve                   CLOSED               DANGER SCW 1-3       SCW Pump 1-1 Suction Drain Valve               OPEN             CAUTION SCW 1-5       SCW Pump 1-1 Casing Vent Valve                 OPEN             CAUTION SCW-1-7       SCW Pump 1-1 Discharge Drain Valve             OPEN             CAUTION Discrepancies found CLEARANCE                    DESCRIPTION                      CLEARED              TAGGING POINT                                                    POSITION          REQUIREMENT 52-11D-05      SCW Pump 1-1 480 v Supply                      OPEN              DANGER SCW-1-9 not    SCW Pump 1-1 Discharge Valve                  CLOSED              DANGER SCW-1-293 SCW-1-423      SCW Pump 1-1 Discharge Drain Valve              OPEN              CAUTION Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.
Stop Time:
ML082830905.DOC                          Page 49 of 6                                    REV. 0
Total Time: (Enter total time on the cover page)
JPM NUMBER: NRCADM061-EC-SRO EXAMINEE C UE S HEET  ML082830905.DOC Page 46 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required. Initiating Cue: The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted. CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found  


JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 47 of 6 R EV. 0    The simulator is not needed for the performance of this JPM.
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-EP-SRO Title:           CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE Examinee:
JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY  ML082830905.DOC Page 48 of 6 R EV. 0  Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required. Initiating Cue: The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY  ML082830905.DOC Page 49 of 6 R EV. 0  CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT 52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 not SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/28/08    R EV. 0  Number: NRCADM061-EP-SRO Title: CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat   Total Time:   minutes Comments: The simulator is not needed for the performance of this JPM.  
Print                     Signature             Date Results:         Sat             Unsat             Total Time:               minutes Comments:       The simulator is not needed for the performance of this JPM.


==References:==
==References:==
DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 35 Alternate Path: Yes   No X Time Critical: Yes   No X Time Allotment:
DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 35 Alternate Path: Yes             No     X Time Critical:   Yes             No     X Time Allotment: 15 minutes Critical Steps: 2 Job Designation: SRO K/A:             G 2.4.41; Knowledge of the emergency action level thresholds and classifications.
15 minutes Critical Steps:
Rating:         4.6 AUTHOR:                        DAVID BURNS                  DATE:        01/28/08 REV. 0
2 Job Designation: SRO K/A: G 2.4.41; Knowledge of the emergency action level thresholds and classifications. Rating: 4.6 JPM Title: CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
 
NRCADM061-EP-SRO Instructor Worksheet ML082830905.DOC Page 51 of 66 R EV. 0  Directions: No PLANT controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions, initiating cue, and task standard. The examiner will then ask if any clarifications are needed. The examinee may be given the applicable procedure and step with which to begin. Required Materials: DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 34 Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator "SEISMIC INSTR SYSTEM". The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc. A Dose Assessment using EP R-2, "Release of Airborne Radioactive Materials Initial Assessment" has been performed using PPC Meteorological Data. The following results are predicted at the site boundary:
JPM Title: CLASSIFY AN EARTHQUAKE WITH A                         JPM Number:
TEDE: 150 mR Thyroid CDE: 600 mR
RADIATION RELEASE                                    NRCADM061-EP-SRO Instructor Worksheet Directions:           No PLANT controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions, initiating cue, and task standard. The examiner will then ask if any clarifications are needed. The examinee may be given the applicable procedure and step with which to begin.
Required Materials:   DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 34 Initial Conditions:   Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
The following results are predicted at the site boundary:
TEDE:                   150 mR Thyroid CDE:           600 mR Initiating Cue:      Determine the proper event classification and report results to the Shift Manager.
Task Standard:        DO NOT READ TO STUDENT: The proper event classification is determined and the results reported to the Shift Manager.
ML082830905.DOC                          Page 51 of 66                                  REV. 0


Initiating Cue: Determine the proper event classification and report results to the Shift Manager.
JPM Title: CLASSIFY AN EARTHQUAKE WITH A                           JPM Number:
Task Standard: DO NOT READ TO STUDENT: The proper event classification is determined and the results reported to the Shift Manager.
RADIATION RELEASE                                      NRCADM061-EP-SRO Instructor Worksheet Start Time:
JPM Title: CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
Step                                   Expected Operator Actions
NRCADM061-EP-SRO Instructor Worksheet
: 1. Obtain correct procedure.                   1.1   References DCPP Emergency Action Level Matrix or EP G-1.
* Denotes an entry required on the JPM cover sheet.
Step was: Sat: _______ Unsat ______*
** Denotes Critical Step and Sub Steps. ML082830905.DOC Page 52 of 66 R EV. 0    Start Time:
** 2. DCPP Emergency Action Level                 2.1     Determines the Earthquake event is Matrix or EP G-1.                                  an ALERT (HA 1.1 or ALERT 17).
Step Expected Operator Actions 1. Obtain correct procedure. 1.1 References DCPP Emergency Action Level Matrix or EP G-1.
2.2     Determines the Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)**
Step was: Sat: _______   Unsat ______* ** 2. DCPP Emergency Action Level Matrix or EP G-1.
Note: Order of classification is not important, final classification is critical step.
2.1 Determines the Earthquake event is an ALERT (HA 1.1 or ALERT 17).
Step was: Sat: _______ Unsat ______*
2.2 Determines the Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)**   Note: Order of classification is not important, final classification is critical step.
: 3. Report Event Classification                 3.1   Reports to Shift Manager an initial classification of Site Area Emergency.
Step was: Sat: _______   Unsat ______*
Step was: Sat: _______ Unsat ______*
: 3. Report Event Classification 3.1 Reports to Shift Manager an initial classification of Site Area Emergency.
Step was: Sat: _______   Unsat ______*
Stop Time:
Stop Time:
Total Time: (Enter total time on the cover page)  
Total Time:                 (Enter total time on the cover page)
* Denotes an entry required on the JPM cover sheet.
** Denotes Critical Step and Sub Steps.
ML082830905.DOC                          Page 52 of 66                                  REV. 0


JPM Number:
JPM Number:
NRCADM061-EP-SRO Examinee Cue Sheet ML082830905.DOC Page 53 of 66 R EV. 0  Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator "SEISMIC INSTR SYSTEM". The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc. A Dose Assessment using EP R-2, "Release of Airborne Radioactive Materials Initial Assessment" has been performed using PPC Meteorological Data. The following results are predicted at the site boundary:
NRCADM061-EP-SRO Examinee Cue Sheet Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
TEDE: 150 mR Thyroid CDE: 600 mR
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
The following results are predicted at the site boundary:
TEDE:                   150 mR Thyroid CDE:           600 mR Initiating Cue:    Determine the proper event classification and report results to the Shift Manager.
Document Your Answer Here ML082830905.DOC                        Page 53 of 66                                  REV. 0


Initiating Cue: Determine the proper event classification and report results to the Shift Manager.
JPM Title: CLASSIFY AN EARTHQUAKE WITH A    JPM Number:
Document Your Answer Here
RADIATION RELEASE                NRCADM061-EP-SRO , Simulator Setup ML082830905.DOC                Page 54 of 66                REV. 0


JPM Title: CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
JPM Title: CLASSIFY AN EARTHQUAKE WITH A                   JPM Number:
NRCADM061-EP-SRO Attachment 1, Simulator Setup ML082830905.DOC Page 54 of 66 R EV. 0 JPM Title:  CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
RADIATION RELEASE                               NRCADM061-EP-SRO Attachment 1, Simulator Setup The simulator is not needed for the performance of this JPM.
NRCADM061-EP-SRO Attachment 1, Simulator Setup ML082830905.DOC Page 55 of 66 R EV. 0  The simulator is not needed for the performance of this JPM.
ML082830905.DOC                           Page 55 of 66                   REV. 0
JPM Title:  CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
NRCADM061-EP-SRO Attachment 1, Simulator Setup ML082830905.DOC Page 56 of 66 R EV. 0  Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator "SEISMIC INSTR SYSTEM". The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc. A Dose Assessment using EP R-2, "Release of Airborne Radioactive Materials Initial Assessment" has been performed using PPC Meteorological Data. The following results are predicted at the site boundary:
TEDE: 150 mR Thyroid CDE: 600 mR 


Initiating Cue: Determine the proper event classification and report results to the Shift Manager.
JPM Title: CLASSIFY AN EARTHQUAKE WITH A                            JPM Number:
RADIATION RELEASE                                        NRCADM061-EP-SRO Attachment 1, Simulator Setup Initial Conditions:    Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
The following results are predicted at the site boundary:
TEDE:                  150 mR Thyroid CDE:            600 mR Initiating Cue:         Determine the proper event classification and report results to the Shift Manager.
Document Your Answer Here Earthquake event is an ALERT (HA 1.1 or ALERT 17).
Document Your Answer Here Earthquake event is an ALERT (HA 1.1 or ALERT 17).
Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE   3)
Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)
EVENT CLASSIFICATION IS: SITE AREA EMERGENCY (RS 1.2 or SAE 3)
EVENT CLASSIFICATION IS: SITE AREA EMERGENCY (RS 1.2 or SAE 3)
JPM Title: CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
ML082830905.DOC                            Page 56 of 66                                  REV. 0
NRCADM061-EP-SRO Attachment 1, Simulator Setup ML082830905.DOC Page 57 of 66 R EV. 0 NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE   AUTHOR: DAVID B URNS D ATE: 01/28/2008    R EV. 0  Number: NRCADM061-RC-SRO Title: Authorize Gas Decay Tank Discharge Examinee:
 
JPM Title: CLASSIFY AN EARTHQUAKE WITH A     JPM Number:
RADIATION RELEASE                NRCADM061-EP-SRO , Simulator Setup ML082830905.DOC               Page 57 of 66               REV. 0
 
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-RC-SRO Title:           Authorize Gas Decay Tank Discharge Examinee:
Evaluator:
Evaluator:
Print   Signature   Date Results: Sat   Unsat       Total Time:
Print                       Signature       Date Results:         Sat                   Unsat             Total Time:     minutes Comments:       Designed for SRO Candidates in a classroom setting.
minutes Comments: Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OP G-2:V, Gaseous Radwaste System - Gas Decay Tank Discharge, Rev. 10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Alternate Path: Yes X No   Time Critical: Yes   No X Time Allotment:
OP G-2:V, Gaseous Radwaste System - Gas Decay Tank Discharge, Rev. 10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Alternate Path:   Yes             X             No Time Critical:   Yes                           No             X Time Allotment:   20 minutes Critical Steps:   4 Job Designation: SRO K/A:             G 2.3.6; Ability to approve release permits.
20 minutes Critical Steps:
Rating:           3.8 AUTHOR:                        DAVID BURNS                    DATE: 01/28/2008 REV. 0
4 Job Designation: SRO K/A: G 2.3.6; Ability to approve release permits. Rating: 3.8 JPM TITLE: AUTHORIZE G AS DECAY T ANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO INSTRUCTOR W ORKSHEET ML082830905.DOC Page 59 of 6 R EV. 0  Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin. Required Materials: OP G-2:V, Gaseous Radwaste System - Gas Decay tank Discharge, Rev.
 
10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Completed Attachment 11.1 Initial Conditions: RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6 th, 2008 @ 1350 hours. It is June 16 th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch. You have just received the "Authorization for a Gas Decay Tank Discharge" attachment from CAP A-6, from the control operator for your final approval. Initiating Cue: As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review. Task Standard: DO NOT READ TO STUDENTS: 2 Technical errors are identified and discharge authorization is not approved. This will be documented on the  
JPM TITLE:     AUTHORIZE GAS DECAY TANK                  JPM NUMBER: NRCADM061-RC-SRO DISCHARGE INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Required Materials:   OP G-2:V, Gaseous Radwaste System - Gas Decay tank Discharge, Rev.
10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Completed Attachment 11.1 Initial Conditions:   RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
Initiating Cue:       As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Task Standard:         DO NOT READ TO STUDENTS: 2 Technical errors are identified and discharge authorization is not approved. This will be documented on the student handout.
ML082830905.DOC                            Page 59 of 6                                  REV. 0


student handout.
JPM TITLE:   AUTHORIZE GAS DECAY TANK                    JPM NUMBER: NRCADM061-RC-SRO DISCHARGE INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE: AUTHORIZE G AS DECAY T ANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO INSTRUCTOR WORKSHEET
Step                                 Expected Operator Actions
* Denotes an entry required on the JPM cover sheet. ** Denotes a Critical Step. ML082830905.DOC Page 60 of 6 R EV. 0    Start Time:
: 1. Review Sample Information and               2.1 Identifies that a second sample of the Analysis information for                        GDT should have been done, since RE-accuracy.                                      22 is inoperable.
Step Expected Operator Actions
Step was: Sat: ______ Unsat _______*
: 1. Review Sample Information and Analysis information for accuracy.
: 2. Review Release Authorization               2.3 Determines that Release Authorization (CHEM) for accuracy.                            (CHEM) is correct.
2.1 Identifies that a second sample of the GDT should have been done, since RE-22 is inoperable.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______   Unsat _______*
: 3. Review Release Information and             3.3 Identifies that Gas Decay Tank Pressure Approval for accuracy.                          has decreased by 6 psig.
: 2. Review Release Authorization (CHEM) for accuracy.
Step was: Sat: ______ Unsat _______*
2.3 Determines that Release Authorization (CHEM) is correct.
  ** 4. Determine if Authorization                 4.1 Determines that the Authorization should be approved.                            should not be approved, based on either condition not meeting the procedural requirements.
Step was: Sat: ______   Unsat _______* 3. Review Release Information and Approval for accuracy.
Step was: Sat: ______ Unsat _______*
3.3 Identifies that Gas Decay Tank Pressure has decreased by 6 psig.
Step was: Sat: ______   Unsat _______*
  ** 4. Determine if Authorization should be approved.
4.1 Determines that the Authorization should not be approved, based on either condition not meeting the procedural requirements.
Step was: Sat: ______   Unsat _______*
Stop Time:
Stop Time:
Total Time: (Enter total time on the cover page)
Total Time:                 (Enter total time on the cover page)
JPM NUMBER: NRCADM061-RC-SRO EXAMINEE C UE SHEET   ML082830905.DOC Page 61 of 6 R EV. 0  Initial Conditions: RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6 th, 2008 @ 1350 hours. It is June 16 th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch. You have just received the "Authorization for a Gas Decay Tank Discharge" attachment from CAP A-6, from the control operator for your final approval. Initiating Cue: As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
* Denotes an entry required on the JPM cover sheet.
Technical Errors Identified:  
** Denotes a Critical Step.
ML082830905.DOC                            Page 60 of 6                                    REV. 0
 
JPM NUMBER: NRCADM061-RC-SRO EXAMINEE CUE SHEET Initial Conditions:     RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
Initiating Cue:         As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Technical Errors Identified:
[ ] APPROVE Discharge                                [ ] DO NOT Approve Discharge ML082830905.DOC                              Page 61 of 6                                REV. 0


[  ] APPROVE Discharge    [  ] DO NOT Approve Discharge
AUTHORIZE GAS DECAY TANK DISCHARGE                    JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
ML082830905.DOC                          Page 62 of 6                        REV. 0


AUTHORIZE G AS DECAY T ANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 62 of 6 R EV. 0      The simulator is not needed for the performance of this JPM.
AUTHORIZE GAS DECAY TANK DISCHARGE                         JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP Initial Conditions:     RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
AUTHORIZE G AS DECAY T ANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR S ETUP  ML082830905.DOC Page 63 of 6 R EV. 0  Initial Conditions: RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6 th, 2008 @ 1350 hours. It is June 16 th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch. You have just received the "Authorization for a Gas Decay Tank Discharge" attachment from CAP A-6, from the control operator for your final approval. Initiating Cue: As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
Initiating Cue:         As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Technical Errors Identified:
Technical Errors Identified:
Section 1: Second sample not completed, required when RE-22 is Inoperable. P&L 5.3 and Step 6.1.2.b.4  
Section 1: Second sample not completed, required when RE-22 is Inoperable.
P&L 5.3 and Step 6.1.2.b.4 Section 2: Pressure in Gas Decay Tank has dropped 6 PSIG, Discharge Shall not be performed.
P&L 5.8
[ ] APPROVE Discharge                                [ X ] DO NOT Approve Discharge ML082830905.DOC                              Page 63 of 6                                REV. 0


Section 2: Pressure in Gas Decay Tank has dropped 6 PSIG, Discharge Shall not be performed. P&L 5.8  [  ] APPROVE Discharge     [ X ] DO NOT Approve Discharge
69-9351            07/25/02                                                  Page 64 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1                          1AND 2 Batch No.
TITLE:     Authorization for Gas Decay Tank Discharge                                           2008-1-1 Parts 1 and 2 of this form must be completed prior to release of a GDT batch. Part 3 must be completed by the Shift Foreman supervising the release. Return the completed form to Chemistry.
: 1. SAMPLE INFORMATION AND ANALYSIS                                        Unit #        1
: a. GDT No.              1-1        Tank Pressure              98        psig
: b. Date/Time Sample Collected: First        06/15/2008 / 1505    Second            N/A
: c. Sample Analysis Summary Nuclide    Concentration, Ci/cc (ntp)                Nuclide      Concentration, Ci/cc (ntp)
KR-85      1.26E-004
: d. Projected Dose at Site Boundary
: 1)    Gamma air dose          5.69E-008    mrad          N/A        mrad (Second Sample)
: 2)    Beta air dose          6.45-006      mrad          N/A        mrad (Second Sample)
: e. Projected Release Rate
: 1)     Q& t =          1.8E+000      Ci/sec          N/A          Ci/sec (Second Sample)
: 2)    Percent of release rate limit =          0.0      %        N/A      % (Second Sample)
: 2. RELEASE AUTHORIZATION (CHEM)
Expected reading (Above Background)            RE-22      4    cpm High alarm setpoint (Admin. Limit)              RE-22 7020      cpm GDT No.              1-1        is approved for discharge. OP1.DC2 applies.
The following additional requirements must be met prior to release:
Signed:            Joe Chemist                                    Date/Time        06/15/2008 / 1800 Chemistry Supervision or Authorized Personnel


69-9351 07/25/02 Page 64 of 2 DIABLO CANYON POWER PLANT 1 AND 2 CAP A-6 ATTACHMENT 11.1 TITLE: Authorization for Gas Decay Tank Discharge Parts 1 and 2 of this form must be completed prior to release of a GDT batch. Part 3 must be completed by the Shift Foreman supervising the release. Return the completed form to Chemistry. 1. SAMPLE INFORMATION AND ANALYSIS Unit # 1  a. GDT No. 1-1 Tank Pressure  98 psig  b. Date/Time Sample Collected:  First 06/15/2008 / 1505 Second N/A  c. Sample Analysis Summary Nuclide Concentration, µCi/cc (ntp) Nuclide Concentration, µCi/cc (ntp) KR-85 1.26E-004                    d. Projected Dose at Site Boundary   1) Gamma air dose 5.69E-008 mrad N/A mrad (Second Sample)  2) Beta air dose 6.45-006 mrad N/A mrad (Second Sample)  e. Projected Release Rate  1) t Q=  1.8E+000
69-9351       07/25/02                                                   Page 65 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1                           1AND 2 TITLE:  Authorization for Gas Decay Tank Discharge
µCi/sec  N/A µCi/sec (Second Sample)  2) Percent of release rate limit = 0.0 % N/A % (Second Sample) 2. RELEASE AUTHORIZATION (CHEM)  Expected reading (Above Background) RE-22 4 cpm  High alarm setpoint (Admin. Limit) RE-22 7020 cpm  GDT No. 1-1 is approved for discharge. OP1.DC2 applies. The following additional requirements must be met prior to release:
: 3. RELEASE INFORMATION AND APPROVAL
Signed:  Joe Chemist Date/Time06/15/2008 / 1800  Chemistry Supervision or Authorized Personnel  Batch No.2008-1-1 69-9351 07/25/02 Page 65 of 2 DIABLO CANYON POWER PLANT 1 AND 2  CAP A-6 ATTACHMENT 11.1 TITLE: Authorization for Gas Decay Tank Discharge
: a. RE-22 instrument check Channel Check     SAT                     UNSAT        X Source check reading     N/A     cpm     Date/Time     N/A   / N/A RE-22 is OPERABLE [ ]. INOPERABLE [X ]             (if INOPERABLE, attach Caution Tag to FCV-410 and fill out an AR).
: 3. RELEASE INFORMATION AND APPROVAL a. RE-22 instrument check   Channel Check SAT UNSATX  Source check reading     N/A cpm Date/Time     N/A     /   N/A   RE-22 is OPERABLE [ ]. INOPERABLE [X ] (if INOPERABLE, attach Caution Tag to FCV-410 and fill out an AR). Date/Time Caution Tag attached to FCV-410 key 06/06/2008 / 1350   Date/Time 14-day period expires 06/20/2008 / 1350   Date/Time AR filled out 06/06/2008 / 1410   b. Valve Alignment: SignedJoe Operator     Operator performing valve alignment   Valve Number used: SignedKen Cando     1-FCV-404 Operator verifying valve alignment   c. Gas Decay Tank Pressure prior to release 92 psig d. Approved Date/Time     Shift Foreman     e. Date/Time FCV-410 opened /
Date/Time Caution Tag attached to FCV-410 key           06/06/2008 / 1350 Date/Time 14-day period expires                         06/20/2008 / 1350 Date/Time AR filled out                                 06/06/2008 / 1410
: f. Date/Time release terminated /   g. GDT pressure after release psig h. Comments:           Signed /     Operator Date/Time   Reviewed /     Shift Foreman Date/Time   Noted     Chemistry Supervision
: b. Valve Alignment:       Signed                Joe Operator Operator performing valve alignment Valve Number used:     Signed                Ken Cando 1-FCV-404                         Operator verifying valve alignment
: c. Gas Decay Tank Pressure prior to release       92     psig
: d. Approved                             Date/Time Shift Foreman
: e. Date/Time FCV-410 opened                   /
: f. Date/Time release terminated               /
: g. GDT pressure after release                     psig
: h. Comments:
Signed                               /
Operator                       Date/Time Reviewed                               /
Shift Foreman                   Date/Time Noted Chemistry Supervision


69-9351 07/25/02 Page 66 of 2 DIABLO CANYON POWER PLANT 1 AND 2  CAP A-6 ATTACHMENT 11.1 TITLE: Authorization for Gas Decay Tank Discharge}}
69-9351     07/25/02                                 Page 66 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1         1AND 2 TITLE: Authorization for Gas Decay Tank Discharge}}

Revision as of 12:13, 14 November 2019

DC-2008-06-Draft Admin Jpms
ML082830905
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/27/2008
From: Garchow S
Operations Branch IV
To:
Pacific Gas & Electric Co
References
Download: ML082830905 (66)


Text

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-COO-RO1 Title: Determine if Channel Check Criteria is Met Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for RO Candidates in a classroom setting.

References:

STP I-1A, Mode 1 Checklist, Rev. 109, Page 14 OPS Policy B-5, Rev. 5 Photo of SG Level Channels Alternate Path: Yes X No Time Critical: Yes No X Time Allotment: 10 minutes Critical Steps: 1, 2 Job Designation: RO K/A: G 2.1.7; Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Rating: 4.4 AUTHOR: DAVID BURNS DATE: 01/24/2008 REV. 0

JPM TITLE: DETERMINE IF CHANNEL CHECK JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: OPS Policy B-5, Channel Check Criteria, Rev. 5 Photo of SG Level Channels Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.

Initiating Cue: The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria. Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.

Task Standard: DO NOT READ TO STUDENTS: All level channels that do not meet the channel check requirement are identified. This will be documented on the student handout.

ML082830905.DOC Page 2 of 6 REV. 0

JPM TITLE: DETERMINE IF CHANNEL CHECK JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

    • 1. Identify LI-519 does not meet the 2.1 Identifies the following channel as not CHANNEL CHECK criteria. meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % lower than other 2 channels.
  • LI-519 Step was: Sat: ______ Unsat _______*
    • 2. Identify LI-538 does not meet the 2.1 Identifies the following channel as not CHANNEL CHECK criteria. meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % Higher than other 2 channels.
  • LI-538 Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 3 of 6 REV. 0

JPM NUMBER: NRCADM061-COO-RO1 EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.

Initiating Cue: The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.

Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.

Channel Met Not Met Channel Met Not Met LI-517 LI-537 LI-518 LI-538 LI-519 LI-539 LI-527 LI-547 LI-528 LI-548 LI-529 LI-549 ML082830905.DOC Page 4 of 6 REV. 0

JPM Title: DETERMINE IF CHANNEL CHECK JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 5 of 6 REV. 0

JPM Title: DETERMINE IF CHANNEL CHECK JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET ANSWER KEY Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.

Initiating Cue: The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.

Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.

Channel Met Not Met Channel Met Not Met LI-517 X LI-537 X LI-518 X LI-538 X LI-519 X LI-539 X LI-527 X LI-547 X LI-528 X LI-548 X LI-529 X LI-549 X ML082830905.DOC Page 6 of 6 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-COO-RO2 Title: Application of Overtime Restrictions Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for RO Candidates in a classroom setting.

References:

OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path: Yes X No Time Critical: Yes No X Time Allotment: 10 minutes Critical Steps: 2, 3 Job Designation: RO K/A: G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

Rating: 2.9 AUTHOR: DAVID BURNS DATE: 01/24/2008 REV. 0

JPM TITLE: APPLICATION OF OVERTIME JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions: Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.

Initiating Cue: The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.

You are currently scheduled to work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> today, as the Unit 1 Control Operator.

Task Standard: DO NOT READ TO STUDENTS: All overtime restrictions that have been exceeded have been identified. This will be documented on the student handout.

ML082830905.DOC Page 8 of 6 REV. 0

JPM TITLE: APPLICATION OF OVERTIME JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

1. Identifies that the 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> limits are 1.1 Identifies that following limits do not apply.

not exceeded.

  • 16 consecutive hours.
  • 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Note: Turnover time is not counted as actual time worked.

Step was: Sat: ______ Unsat _______*

    • 2. Identifies that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> limit is 2.1 Identifies that the following limit was exceeded. exceeded.
  • 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Note: This limit was exceeded after working on Wednesday and again on Thursday.

(ONLY ONE IS REQUIRED)

Step was: Sat: ______ Unsat _______*

    • 3. Identifies that the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit is 2.1 Identifies that following limit was exceeded.

exceeded.

  • 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 days.

Note: This limit was exceeded after working on Sunday, 73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> total.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 9 of 6 REV. 0

JPM NUMBER: NRCADM061-COO-RO2 EXAMINEE CUE SHEET Initial Conditions: Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.

Initiating Cue: The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.

You are currently scheduled to work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> today, as the Unit 1 Control Operator.

Previous Work Schedule:

Day Number of Hours Turnover Time Position Worked (Hours)

Sunday 0 0 OFF Monday 12 1 U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1 U1 BOPCO Friday 12 0 U1 CO Saturday 0 0 OFF Sunday 12 0 U1 CO Monday 0 0 OFF Today 12 0 U1 CO Overtime Restrictions Violated:

ML082830905.DOC Page 10 of 6 REV. 0

JPM Title: APPLICATION OF OVERTIME JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 11 of 6 REV. 0

JPM Title: APPLICATION OF OVERTIME JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ANSWER KEY Initial Conditions: Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.

Initiating Cue: The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.

You are currently scheduled to work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> today, as the Unit 1 Control Operator.

ML082830905.DOC Page 12 of 6 REV. 0

JPM Title: APPLICATION OF OVERTIME JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ANSWER KEY Previous Work Schedule:

Day Number of Hours Turnover Time Position Worked (Hours)

Sunday 0 0 OFF Monday 12 1 U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1 U1 BOPCO Friday 12 0 U1 CO Saturday 0 0 OFF Sunday 12 0 U1 CO Monday 0 0 OFF Today 12 0 U1 CO Overtime Restrictions Violated:

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> on Wednesday and Thursday. (Only one is required) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 days on Sunday. (73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> total)

ML082830905.DOC Page 13 of 6 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-EC-RO Title: Determine Clearance Points and Tagging Requirements Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for RO Candidates in a classroom setting.

References:

OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Alternate Path: Yes No X Time Critical: Yes No X Time Allotment: 20 minutes Critical Steps: 1, 2, 3 Job Designation: RO K/A: G 2.2.13; Knowledge of tagging and clearance procedures.

Rating: 4.1 AUTHOR: DAVID BURNS DATE: 01/24/2008 REV. 0

JPM TITLE: DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue: The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.

Task Standard: DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.

ML082830905.DOC Page 15 of 6 REV. 0

JPM TITLE: DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

    • 1. Identify breaker required to be re- 2.1 Identifies the following breakers to be positioned for isolation of power to OPENED:

SCWP 1-1.

NOTE: May place Control Board Caution (CBC) Tag on SCW PP 1-1. (not part of critical task).

1.2 Identifies that a DANGER tag should be used for this component.

Step was: Sat: ______ Unsat _______*

2. Identify valves required to be closed 2.1 Identifies the following valves CLOSED:

to isolate SCWP 1-1.

  • SCW-1-9 discharge valve
  • SCW-1-1 suction valve 2.2 Identifies that a DANGER tag should be used for these components.

Step was: Sat: ______ Unsat _______*

3. Identify valves required to be 3.1 Identifies the following valves OPEN.

opened to drain and vent SCWP 1-1.

  • SCW-1-3 pump suction drain
  • SCW-1-5 pump casing vent
  • SCW-1-7 pump discharge drain
  • SCW-1-423 pump discharge drain NOTE: May CAUTION tag pump control switch, but not required.

3.2 Identifies that a CAUTION Tag should be used for these components.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 16 of 6 REV. 0

JPM NUMBER: NRCADM061-EC-RO EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue: The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.

CLEARANCE DESCRIPTION CLEARED TAGGING POINT POSITION REQUIREMENT ML082830905.DOC Page 17 of 6 REV. 0

JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 18 of 6 REV. 0

JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ANSWER KEY Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue: The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.

ML082830905.DOC Page 19 of 6 REV. 0

JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ANSWER KEY CLEARANCE DESCRIPTION CLEARED TAGGING POINT POSITION REQUIREMENT SCW PP-1-1 Control Switch OFF Control Board Caution*

52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION

  • CBC for SCW pump control switch is not required for completion of this task.

ML082830905.DOC Page 20 of 6 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-RC-RO Title: Stay Time Determination Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for RO Candidates in a classroom setting.

References:

RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Alternate Path: Yes No X Time Critical: Yes No X Time Allotment: 10 minutes Critical Steps: 3.3 Job Designation: RO K/A: G 2.3.4; Knowledge of radiation exposure limits under normal or emergency conditions.

Rating: 3.2 AUTHOR: DAVID BURNS DATE: 01/258/2008 REV. 0

JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Attachment 8.1 Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:

  • Committed Dose Equivalent (CDE) 10 mrem
  • Committed Effective Dose Equivalent (CEDE) 200 mrem
  • Eye Dose Equivalent (LDE) 20 mrem
  • Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue: The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).

Task Standard: DO NOT READ TO STUDENT: Maximum Stay time is calculated.

ML082830905.DOC Page 22 of 66 REV. 0

JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

1. Determine TEDE 1.1 TEDE = DDE + CEDE 1.2 TEDE = 400 mrem + 200 mrem 1.3 TEDE = 600 mrem Step was: Sat: ______ Unsat _______*
2. Determine DCPP Administrative 2.1 Determines DCPP Administrative Limits for TEDE Limit for TEDE = 4500 mrem 2.2 Determines DCPP Administrative Guideline for TEDE = 2000 mrem 2.3 Determine MARGIN to Administrative Guideline is:

2000 - 600 = 1400 mrem Step was: Sat: ______ Unsat _______*

    • 3. Determine maximum stay time 3.1 Stay time = Margin / Dose Rate 3.2 Stay time = 1400 mrem / 280 mrem/hr
    • 3.3 Stay time = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ACCEPTABLE TIME: 4.8 - 5.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 23 of 66 REV. 0

JPM NUMBER: NRCADM061-RC - RO EXAMINEE CUE SHEET Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:

  • Committed Dose Equivalent (CDE) 10 mrem
  • Committed Effective Dose Equivalent (CEDE) 200 mrem
  • Eye Dose Equivalent (LDE) 20 mrem
  • Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue: The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).

Document Your Answer Here ML082830905.DOC Page 24 of 66 REV. 0

JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 25 of 66 REV. 0

JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER KEY Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:

  • Committed Dose Equivalent (CDE) 10 mrem
  • Committed Effective Dose Equivalent (CEDE) 200 mrem
  • Eye Dose Equivalent (LDE) 20 mrem
  • Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue: The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).

ML082830905.DOC Page 26 of 66 REV. 0

JPM TITLE: STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER KEY Document Your Answer Here TEDE = DDE + CEDE TEDE = 400 mrem + 200 mrem TEDE = 600 mrem Margin = 2000 - 600 = 1400 mrem Stay time = Margin / Dose Rate 1400 mrem / 280 mrem/hr Stay time = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ML082830905.DOC Page 27 of 66 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-COO-SRO1 Title: Determination of Shift Staffing and Overtime Restrictions Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for SRO Candidates in a classroom setting.

References:

OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path: Yes X No X Time Critical: Yes No X Time Allotment: 10 minutes Critical Steps: 1, 2, 3 Job Designation: SRO K/A: G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

Rating: 3.9 AUTHOR: DAVID BURNS DATE: 01/24/2008 REV. 0

JPM TITLE: DETERMINATION OF SHIFT STAFFING AND JPM NUMBER: NRCADM061-COO-OVERTIME RESTRICTIONS SRO1 INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.

Initiating Cue: Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.

Task Standard: DO NOT READ TO STUDENTS: All Reactor Operators that can work the shift have been identified. This will be documented on the student handout.

ML082830905.DOC Page 29 of 6 REV. 0

JPM TITLE: DETERMINATION OF SHIFT STAFFING AND JPM NUMBER: NRCADM061-COO-OVERTIME RESTRICTIONS SRO1 INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

    • 1. Evaluates RO1 previous work 1.2 Identifies that following limit applies.

schedule.

  • 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 days.

1.3 Determines that RO1 is not eligible. **

Note: This limit will be exceeded after working today.

Step was: Sat: ______ Unsat _______*

    • 2. Evaluates RO2 previous work 2.1 Determines that no limits have been schedule. exceeded.

2.2 Determines that RO2 is eligible. **

Step was: Sat: ______ Unsat _______*

    • 3. Evaluates RO3 previous work 3.1 Identifies that following limit applies.

schedule.

  • 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

3.2 Determines that RO3 is not eligible. **

Note: This limit will be exceeded after working today.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 30 of 6 REV. 0

JPM NUMBER: NRCADM061-COO-SRO1 EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.

Initiating Cue: Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.

Previous Work Schedule:

Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700- 0700- 0700- 0700- 0700- 0700-1900 1900 1900 1900 1900 1900 RO2 0700- 0700- 0700- 0700- OFF 0700- 0700-1900 1900 1900 1900 1900 1900 RO3 OFF 0700- 0700- 0700- 0700- OFF 0700-1700 1700 1700 1700 2100 Reactor Operator(s) eligible to work June 16th Yes No RO1 [ ] [ ]

RO2 [ ] [ ]

RO3 [ ] [ ]

ML082830905.DOC Page 31 of 6 REV. 0

JPM TITLE: DETERMINATION OF SHIFT STAFFING JPM NUMBER: NRCADM061-COO-SRO1 AND OVERTIME RESTRICTIONS ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 32 of 6 REV. 0

JPM TITLE: DETERMINATION OF SHIFT STAFFING AND JPM NUMBER: NRCADM061-COO-SRO1 OVERTIME RESTRICTIONS ANSWER KEY Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.

Initiating Cue: Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.

ML082830905.DOC Page 33 of 6 REV. 0

JPM TITLE: DETERMINATION OF SHIFT STAFFING AND JPM NUMBER: NRCADM061-COO-SRO1 OVERTIME RESTRICTIONS ANSWER KEY Previous Work Schedule:

Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700- 0700- 0700- 0700- 0700- 0700-1900 1900 1900 1900 1900 1900 RO2 0700- 0700- 0700- 0700- OFF 0700- 0700-1900 1900 1900 1900 1900 1900 RO3 OFF 0700- 0700- 0700- 0700- OFF 0700-1700 1700 1700 1700 2100 Reactor Operator(s) eligible to work June 16th Yes No RO1 [ ] [X]

RO2 [X] [ ]

RO3 [ ] [X]

ML082830905.DOC Page 34 of 6 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-COO-SRO2 Title: Approve Movement of Spent Fuel Assemblies Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for SRO Candidates in a classroom setting.

References:

OP B-8DS3, Insert Shuffle Within the Spent Fuel Pool, Rev. 18 Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Alternate Path: Yes X No Time Critical: Yes No X Time Allotment: 15 minutes Critical Steps: 1, 2, 3, 4 Job Designation: SRO K/A: G 2.1.40; Knowledge of refueling administrative requirements.

Rating: 3.9 AUTHOR: DAVID BURNS DATE: 01/24/2008 REV. 0

JPM TITLE: APPROVE MOVEMENT OF SPENT FUEL JPM NUMBER: NRCADM061-COO-ASSEMBLIES SRO2 INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Initial Conditions: Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.

Initiating Cue: You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.

Task Standard: DO NOT READ TO STUDENTS: Determination of proper storage location for each fuel assembly in made. This will be documented on the student handout.

ML082830905.DOC Page 36 of 6 REV. 0

JPM TITLE: APPROVE MOVEMENT OF SPENT FUEL JPM NUMBER: NRCADM061-COO-ASSEMBLIES SRO2 INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

    • 1. Determine if Element K-24 can 2.1 Determines that the assembly discharge be placed in the Cask Pit Storage burn up and Initial Enrichment is in the Rack. acceptable region on Figure 3.7.17-4 2.1 Determines that Decay time is less than allowable limit.

2.1 Determines that the assembly should not be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

    • 2. Determine if Element F-06 can 2.1 Determines that the assembly discharge be placed in the Cask Pit Storage burn up and Initial Enrichment is in the Rack. acceptable region on Figure 3.7.17-4 2.2 Determines that Decay time meets allowable limit.

2.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

    • 3. Determine if Element G-17 can 3.1 Determines that the assembly discharge be placed in the Cask Pit Storage burn up and Initial Enrichment is in the Rack. Unacceptable region on Figure 3.7.17-4 3.2 Determines that Decay time meets the allowable limit.

3.3 Determines that the assembly should not be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 37 of 6 REV. 0

JPM TITLE: APPROVE MOVEMENT OF SPENT FUEL JPM NUMBER: NRCADM061-COO-ASSEMBLIES SRO2 INSTRUCTOR W ORKSHEET

    • 4. Determine if Element D-32 can 4.1 Determines that the assembly discharge be placed in the Cask Pit Storage burn up and Initial Enrichment is in the Rack. acceptable region on Figure 3.7.17-4 4.2 Determines that Decay time meets allowable limit.

4.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 38 of 6 REV. 0

JPM NUMBER: NRCADM061-COO-SRO2 EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.

Initiating Cue: You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.

Element Initial Discharge Decay Allow or Dis-allow Enrichment Burnup Time (wt% U-235) (GWd/mtU) (Years)

K-24 3.0 26 8 Allow [ ] Dis-allow [ ]

F-06 3.25 23 12 Allow [ ] Dis-allow [ ]

G-17 3.5 21 11 Allow [ ] Dis-allow [ ]

D-32 3.5 25 14 Allow [ ] Dis-allow [ ]

ML082830905.DOC Page 39 of 6 REV. 0

JPM TITLE: APPROVE MOVEMENT OF SPENT FUEL JPM NUMBER: NRCADM061-COO-ASSEMBLIES SRO2 ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 40 of 6 REV. 0

JPM TITLE: APPROVE MOVEMENT OF SPENT FUEL JPM NUMBER: NRCADM061-COO-ASSEMBLIES SRO2 ANSWER KEY Initial Conditions: Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.

Initiating Cue: You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed based on the conditions given for each assembly.

ML082830905.DOC Page 41 of 6 REV. 0

JPM TITLE: APPROVE MOVEMENT OF SPENT FUEL JPM NUMBER: NRCADM061-COO-ASSEMBLIES SRO2 ANSWER KEY Element Initial Discharge Decay Allow or Dis-allow Enrichment Burnup Time (wt% U-235) (GWd/mtU) (Years)

K-24 3.0 26 8 Allow [ ] Dis-allow [ X ]

F-06 3.25 23 12 Allow [ X ] Dis-allow [ ]

G-17 3.5 21 11 Allow [ ] Dis-allow [ X ]

D-32 3.5 25 14 Allow [ X ] Dis-allow [ ]

ML082830905.DOC Page 42 of 6 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-EC-SRO Title: Evaluate Clearance Points and Tagging Requirements Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for SRO Candidates in a classroom setting.

References:

OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Alternate Path: Yes X No Time Critical: Yes No X Time Allotment: 15 minutes Critical Steps: 1, 2, 3 Job Designation: SRO K/A: G 2.2.13; Knowledge of tagging and clearance procedures.

Rating: 4.3 AUTHOR: DAVID BURNS DATE: 01/24/2008 REV. 0

JPM TITLE: DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue: The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.

Task Standard: DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.

ML082830905.DOC Page 44 of 6 REV. 0

JPM TITLE: DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

    • 1. Identify breaker for isolation of 2.1 Identifies that a DANGER tag should be SCWP 1-1, power supply is used for this component:

tagged incorrectly.

Step was: Sat: ______ Unsat _______*

    • 2. Identify discharge valve is 2.2 Identifies the following valve should be required to be re-positioned for CLOSED:

isolation of SCWP 1-1, check valve is not allowed isolation

  • SCW-1-9 discharge valve point.

Step was: Sat: ______ Unsat _______*

    • 3. Identify additional valve required 3.2 Identifies the following valves OPEN.

to be opened to drain and vent SCWP 1-1.

  • SCW-1-423 pump discharge drain NOTE: Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.

3.2 Identifies that a CAUTION Tag should be used for this components.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 45 of 6 REV. 0

JPM NUMBER: NRCADM061-EC-SRO EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue: The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.

CLEARANCE DESCRIPTION CLEARED TAGGING POINT POSITION REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found ML082830905.DOC Page 46 of 6 REV. 0

JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 47 of 6 REV. 0

JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue: The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.

ML082830905.DOC Page 48 of 6 REV. 0

JPM Title: Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY CLEARANCE DESCRIPTION CLEARED TAGGING POINT POSITION REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found CLEARANCE DESCRIPTION CLEARED TAGGING POINT POSITION REQUIREMENT 52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 not SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-293 SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.

ML082830905.DOC Page 49 of 6 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-EP-SRO Title: CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: The simulator is not needed for the performance of this JPM.

References:

DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 35 Alternate Path: Yes No X Time Critical: Yes No X Time Allotment: 15 minutes Critical Steps: 2 Job Designation: SRO K/A: G 2.4.41; Knowledge of the emergency action level thresholds and classifications.

Rating: 4.6 AUTHOR: DAVID BURNS DATE: 01/28/08 REV. 0

JPM Title: CLASSIFY AN EARTHQUAKE WITH A JPM Number:

RADIATION RELEASE NRCADM061-EP-SRO Instructor Worksheet Directions: No PLANT controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions, initiating cue, and task standard. The examiner will then ask if any clarifications are needed. The examinee may be given the applicable procedure and step with which to begin.

Required Materials: DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 34 Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.

The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.

A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.

The following results are predicted at the site boundary:

TEDE: 150 mR Thyroid CDE: 600 mR Initiating Cue: Determine the proper event classification and report results to the Shift Manager.

Task Standard: DO NOT READ TO STUDENT: The proper event classification is determined and the results reported to the Shift Manager.

ML082830905.DOC Page 51 of 66 REV. 0

JPM Title: CLASSIFY AN EARTHQUAKE WITH A JPM Number:

RADIATION RELEASE NRCADM061-EP-SRO Instructor Worksheet Start Time:

Step Expected Operator Actions

1. Obtain correct procedure. 1.1 References DCPP Emergency Action Level Matrix or EP G-1.

Step was: Sat: _______ Unsat ______*

    • 2. DCPP Emergency Action Level 2.1 Determines the Earthquake event is Matrix or EP G-1. an ALERT (HA 1.1 or ALERT 17).

2.2 Determines the Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)**

Note: Order of classification is not important, final classification is critical step.

Step was: Sat: _______ Unsat ______*

3. Report Event Classification 3.1 Reports to Shift Manager an initial classification of Site Area Emergency.

Step was: Sat: _______ Unsat ______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes Critical Step and Sub Steps.

ML082830905.DOC Page 52 of 66 REV. 0

JPM Number:

NRCADM061-EP-SRO Examinee Cue Sheet Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.

The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.

A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.

The following results are predicted at the site boundary:

TEDE: 150 mR Thyroid CDE: 600 mR Initiating Cue: Determine the proper event classification and report results to the Shift Manager.

Document Your Answer Here ML082830905.DOC Page 53 of 66 REV. 0

JPM Title: CLASSIFY AN EARTHQUAKE WITH A JPM Number:

RADIATION RELEASE NRCADM061-EP-SRO , Simulator Setup ML082830905.DOC Page 54 of 66 REV. 0

JPM Title: CLASSIFY AN EARTHQUAKE WITH A JPM Number:

RADIATION RELEASE NRCADM061-EP-SRO Attachment 1, Simulator Setup The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 55 of 66 REV. 0

JPM Title: CLASSIFY AN EARTHQUAKE WITH A JPM Number:

RADIATION RELEASE NRCADM061-EP-SRO Attachment 1, Simulator Setup Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.

The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.

A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.

The following results are predicted at the site boundary:

TEDE: 150 mR Thyroid CDE: 600 mR Initiating Cue: Determine the proper event classification and report results to the Shift Manager.

Document Your Answer Here Earthquake event is an ALERT (HA 1.1 or ALERT 17).

Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)

EVENT CLASSIFICATION IS: SITE AREA EMERGENCY (RS 1.2 or SAE 3)

ML082830905.DOC Page 56 of 66 REV. 0

JPM Title: CLASSIFY AN EARTHQUAKE WITH A JPM Number:

RADIATION RELEASE NRCADM061-EP-SRO , Simulator Setup ML082830905.DOC Page 57 of 66 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number: NRCADM061-RC-SRO Title: Authorize Gas Decay Tank Discharge Examinee:

Evaluator:

Print Signature Date Results: Sat Unsat Total Time: minutes Comments: Designed for SRO Candidates in a classroom setting.

References:

OP G-2:V, Gaseous Radwaste System - Gas Decay Tank Discharge, Rev. 10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Alternate Path: Yes X No Time Critical: Yes No X Time Allotment: 20 minutes Critical Steps: 4 Job Designation: SRO K/A: G 2.3.6; Ability to approve release permits.

Rating: 3.8 AUTHOR: DAVID BURNS DATE: 01/28/2008 REV. 0

JPM TITLE: AUTHORIZE GAS DECAY TANK JPM NUMBER: NRCADM061-RC-SRO DISCHARGE INSTRUCTOR W ORKSHEET Directions: No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials: OP G-2:V, Gaseous Radwaste System - Gas Decay tank Discharge, Rev.

10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Completed Attachment 11.1 Initial Conditions: RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.

It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.

You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.

Initiating Cue: As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.

Task Standard: DO NOT READ TO STUDENTS: 2 Technical errors are identified and discharge authorization is not approved. This will be documented on the student handout.

ML082830905.DOC Page 59 of 6 REV. 0

JPM TITLE: AUTHORIZE GAS DECAY TANK JPM NUMBER: NRCADM061-RC-SRO DISCHARGE INSTRUCTOR W ORKSHEET Start Time:

Step Expected Operator Actions

1. Review Sample Information and 2.1 Identifies that a second sample of the Analysis information for GDT should have been done, since RE-accuracy. 22 is inoperable.

Step was: Sat: ______ Unsat _______*

2. Review Release Authorization 2.3 Determines that Release Authorization (CHEM) for accuracy. (CHEM) is correct.

Step was: Sat: ______ Unsat _______*

3. Review Release Information and 3.3 Identifies that Gas Decay Tank Pressure Approval for accuracy. has decreased by 6 psig.

Step was: Sat: ______ Unsat _______*

    • 4. Determine if Authorization 4.1 Determines that the Authorization should be approved. should not be approved, based on either condition not meeting the procedural requirements.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time: (Enter total time on the cover page)

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 60 of 6 REV. 0

JPM NUMBER: NRCADM061-RC-SRO EXAMINEE CUE SHEET Initial Conditions: RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.

It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.

You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.

Initiating Cue: As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.

Technical Errors Identified:

[ ] APPROVE Discharge [ ] DO NOT Approve Discharge ML082830905.DOC Page 61 of 6 REV. 0

AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.

ML082830905.DOC Page 62 of 6 REV. 0

AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP Initial Conditions: RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.

It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.

You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.

Initiating Cue: As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.

Technical Errors Identified:

Section 1: Second sample not completed, required when RE-22 is Inoperable.

P&L 5.3 and Step 6.1.2.b.4 Section 2: Pressure in Gas Decay Tank has dropped 6 PSIG, Discharge Shall not be performed.

P&L 5.8

[ ] APPROVE Discharge [ X ] DO NOT Approve Discharge ML082830905.DOC Page 63 of 6 REV. 0

69-9351 07/25/02 Page 64 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1 1AND 2 Batch No.

TITLE: Authorization for Gas Decay Tank Discharge 2008-1-1 Parts 1 and 2 of this form must be completed prior to release of a GDT batch. Part 3 must be completed by the Shift Foreman supervising the release. Return the completed form to Chemistry.

1. SAMPLE INFORMATION AND ANALYSIS Unit # 1
a. GDT No. 1-1 Tank Pressure 98 psig
b. Date/Time Sample Collected: First 06/15/2008 / 1505 Second N/A
c. Sample Analysis Summary Nuclide Concentration, Ci/cc (ntp) Nuclide Concentration, Ci/cc (ntp)

KR-85 1.26E-004

d. Projected Dose at Site Boundary
1) Gamma air dose 5.69E-008 mrad N/A mrad (Second Sample)
2) Beta air dose 6.45-006 mrad N/A mrad (Second Sample)
e. Projected Release Rate
1) Q& t = 1.8E+000 Ci/sec N/A Ci/sec (Second Sample)
2) Percent of release rate limit = 0.0  % N/A  % (Second Sample)
2. RELEASE AUTHORIZATION (CHEM)

Expected reading (Above Background) RE-22 4 cpm High alarm setpoint (Admin. Limit) RE-22 7020 cpm GDT No. 1-1 is approved for discharge. OP1.DC2 applies.

The following additional requirements must be met prior to release:

Signed: Joe Chemist Date/Time 06/15/2008 / 1800 Chemistry Supervision or Authorized Personnel

69-9351 07/25/02 Page 65 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1 1AND 2 TITLE: Authorization for Gas Decay Tank Discharge

3. RELEASE INFORMATION AND APPROVAL
a. RE-22 instrument check Channel Check SAT UNSAT X Source check reading N/A cpm Date/Time N/A / N/A RE-22 is OPERABLE [ ]. INOPERABLE [X ] (if INOPERABLE, attach Caution Tag to FCV-410 and fill out an AR).

Date/Time Caution Tag attached to FCV-410 key 06/06/2008 / 1350 Date/Time 14-day period expires 06/20/2008 / 1350 Date/Time AR filled out 06/06/2008 / 1410

b. Valve Alignment: Signed Joe Operator Operator performing valve alignment Valve Number used: Signed Ken Cando 1-FCV-404 Operator verifying valve alignment
c. Gas Decay Tank Pressure prior to release 92 psig
d. Approved Date/Time Shift Foreman
e. Date/Time FCV-410 opened /
f. Date/Time release terminated /
g. GDT pressure after release psig
h. Comments:

Signed /

Operator Date/Time Reviewed /

Shift Foreman Date/Time Noted Chemistry Supervision

69-9351 07/25/02 Page 66 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1 1AND 2 TITLE: Authorization for Gas Decay Tank Discharge