NEI 03-01, Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Entergy Operations, Inc.River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225 381 4157 Fax 225 635 5068 dlorfin@entergy.com David N. Lorfing Manager-Licensing SAFEGUARDS INFORMATION April 8, 2009 U. S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:Entergy Operations, Inc.
Document Control Desk One White Rockville Pike Rockville, MD 20852-2738 RBG-46900 RBF1-09-0048
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225 381 4157 Fax 225 635 5068 dlorfin@entergy.com David N. Lorfing Manager-Licensing SAFEGUARDS INFORMATION April 8, 2009 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Rockville Pike Rockville, MD 20852-2738 RBG-46900 RBF1-09-0048


==Subject:==
==Subject:==
Supplemental Information for River Bend Station Submittal of Revision 4 to the Security Plan, Training &Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 River Bend Station -Unit 1 Docket No. 50-458 License No. NPF-47  
Supplemental Information for River Bend Station Submittal of Revision 4 to the Security Plan, Training &Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47


==REFERENCE:==
==REFERENCE:==
: 1. Nuclear Energy Institute (NEI) 03-01, Revision 2, "Nuclear Power Plant Access Authorization Program" 2. Letter from Entergy to US NRC dated April 1, 2009 (RBG-46896)
: 1. Nuclear Energy Institute (NEI) 03-01, Revision 2, "Nuclear Power Plant Access Authorization Program"
: 2. Letter from Entergy to US NRC dated April 1, 2009 (RBG-46896)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
The following statement supplements the information in the cover letter to River Bend Station's revision 'to the Security Plan, Training & Qualification (T&Q) Plan and Safeguards Contingency Plan. These documents were previously submitted to the NRC on April 1, 2009 (Reference 2).In accordance with I OCFR50. 54(p), these changes do not decrease the effectiveness of the Security Plan.This letter includes no new commitments.
 
If you require additional information, please contact Mr. Andre' James at (225) 381-4158.Sincerely, DNL/kh NOTICE: Enclosure contains "Safeguards Information".
The following statement supplements the information in the cover letter to River Bend Station's revision 'to the Security Plan, Training & Qualification (T&Q) Plan and Safeguards Contingency Plan. These documents were previously submitted to the NRC on April 1, 2009 (Reference 2).
Upon separation of the Enclosure, this letter becomes "DECONTROLLED." SAFEGUARDS INFORMATION cSo~
In accordancewith I OCFR50.54(p), these changes do not decrease the effectiveness of the Security Plan.
River Bend Station Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan RBG-46900 RBF1-09-0048 Page 2 of 2 SAFEGUARDS INFORMATION cc: w/o Enclosure U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4125 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Mr. Carl F. Lyon, Project Manager U.S. Nuclear Regulatory Commission MS 0-8B1 11555 Rockville Pike Rockville, MD 20852-2738 NOTICE: Enclosure contains "Safeguards Information".
This letter includes no new commitments. If you require additional information, please contact Mr. Andre' James at (225) 381-4158.
Upon separation of the Enclosure, this letter becomes "DECONTROLLED." SAFEGUARDS INFORMATION}}
Sincerely, DNL/kh NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."
SAFEGUARDS INFORMATION cSo~
 
River Bend Station Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan RBG-46900 RBF1-09-0048 Page 2 of 2 SAFEGUARDS INFORMATION cc:   w/o Enclosure U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4125 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Mr. Carl F. Lyon, Project Manager U.S. Nuclear Regulatory Commission MS 0-8B1 11555 Rockville Pike Rockville, MD 20852-2738 NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."
SAFEGUARDS INFORMATION}}

Revision as of 07:06, 14 November 2019

Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter
ML091050539
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/08/2009
From: Lorfing D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEI 03-01, RBF1-09-0048, RBG-46900
Download: ML091050539 (2)


Text

Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225 381 4157 Fax 225 635 5068 dlorfin@entergy.com David N. Lorfing Manager-Licensing SAFEGUARDS INFORMATION April 8, 2009 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Rockville Pike Rockville, MD 20852-2738 RBG-46900 RBF1-09-0048

Subject:

Supplemental Information for River Bend Station Submittal of Revision 4 to the Security Plan, Training &Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47

REFERENCE:

1. Nuclear Energy Institute (NEI) 03-01, Revision 2, "Nuclear Power Plant Access Authorization Program"
2. Letter from Entergy to US NRC dated April 1, 2009 (RBG-46896)

Dear Sir or Madam:

The following statement supplements the information in the cover letter to River Bend Station's revision 'to the Security Plan, Training & Qualification (T&Q) Plan and Safeguards Contingency Plan. These documents were previously submitted to the NRC on April 1, 2009 (Reference 2).

In accordancewith I OCFR50.54(p), these changes do not decrease the effectiveness of the Security Plan.

This letter includes no new commitments. If you require additional information, please contact Mr. Andre' James at (225) 381-4158.

Sincerely, DNL/kh NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."

SAFEGUARDS INFORMATION cSo~

River Bend Station Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan RBG-46900 RBF1-09-0048 Page 2 of 2 SAFEGUARDS INFORMATION cc: w/o Enclosure U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4125 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Mr. Carl F. Lyon, Project Manager U.S. Nuclear Regulatory Commission MS 0-8B1 11555 Rockville Pike Rockville, MD 20852-2738 NOTICE: Enclosure contains "Safeguards Information". Upon separation of the Enclosure, this letter becomes "DECONTROLLED."

SAFEGUARDS INFORMATION