{{#Wiki_filter:1 SeabrookNPEm Resource From: Green, Kimberly Sent: Friday, September 17, 2010 2:43 PM To: 'Cliche, Richard'
{{#Wiki_filter:SeabrookNPEm Resource From:                       Green, Kimberly Sent:                       Friday, September 17, 2010 2:43 PM To:                         'Cliche, Richard'


==Subject:==
==Subject:==
RE: Material and Environment AuditRick, Thanks for adjusting the schedule to accommodate the M&E verification.  
RE: Material and Environment Audit
 
: Rick, Thanks for adjusting the schedule to accommodate the M&E verification.
We plan to arrive at the site around 7:40 or so to allow time to get through the security gate. So, we'll see you  
We plan to arrive at the site around 7:40 or so to allow time to get through the security gate. So, well see you shortly thereafter.
 
Kim From: Cliche, Richard [mailto:Richard.Cliche@fpl.com]
shortly thereafter.  
Sent: Friday, September 17, 2010 1:25 PM To: Green, Kimberly Cc: Plasse, Richard; Kodal, Ali; Chew, Kenneth; Bemis, Dennis
 
Kim From: Cliche, Richard [mailto:Richard.Cliche@fpl.com]
Sent: Friday, September 17, 2010 1:25 PM To: Green, Kimberly Cc: Plasse, Richard; Kodal, Ali; Chew, Kenneth; Bemis, Dennis  


==Subject:==
==Subject:==
RE: Material and Environment Audit Kim,OK,IscheduledtimeandatechnicalescortforWed9/22AMandThursday9/23PM.Carryover(ifneeded)willgotoMon10/18PMoftheAMPAudit.RickFrom: Green, Kimberly [mailto:Kimberly.Green@nrc.gov]
RE: Material and Environment Audit
Sent: Friday, September 17, 2010 12:48 PM To: Cliche, Richard Cc: Plasse, Richard  
: Kim, OK, I scheduled time and a technical escort for Wed 9/22 AM and Thursday 9/23 PM. Carry over (if needed) will go to Mon 10/18 PM of the AMP Audit.
Rick From: Green, Kimberly [mailto:Kimberly.Green@nrc.gov]
Sent: Friday, September 17, 2010 12:48 PM To: Cliche, Richard Cc: Plasse, Richard


==Subject:==
==Subject:==
RE: Material and Environment Audit Rick, I just confirmed that it is our intent to complete the verification of the 35 random samples for the M&E audit. If we cannot complete it during this audit, it will continue during the AMP audit. It is also our intent to complete the verification of the 85 random samples for whether the component is within the scope of license renewal or not. Again, if that cannot be completed during this audit, it will continue during the AMP audit.
RE: Material and Environment Audit
Basically, one person is responsible for these two efforts, and based on past experience, it takes about a day or less to complete each one. For the M&E audit, we'll need one person to escort the reviewer to various locations within the plant (except containment) to verify the material and environment. The other effort does not  
: Rick, I just confirmed that it is our intent to complete the verification of the 35 random samples for the M&E audit. If we cannot complete it during this audit, it will continue during the AMP audit. It is also our intent to complete the verification of the 85 random samples for whether the component is within the scope of license renewal or not. Again, if that cannot be completed during this audit, it will continue during the AMP audit.
 
Basically, one person is responsible for these two efforts, and based on past experience, it takes about a day or less to complete each one. For the M&E audit, well need one person to escort the reviewer to various locations within the plant (except containment) to verify the material and environment. The other effort does not require any walkdowns.
require any walkdowns.
Please let me know if you think the walkdown for the M&E audit will not be feasible next week. Don Brittner will be the technical reviewer doing the M&E audit.
Kim 1


Please let me know if you think the walkdown for the M&E audit will not be feasible next week. Don Brittner will be the technical reviewer doing the M&E audit.
From: Cliche, Richard [mailto:Richard.Cliche@fpl.com]
 
Sent: Friday, September 17, 2010 12:06 PM To: Green, Kimberly Cc: Brittner, Donald; Min, Seung; Dozier, Jerry; Plasse, Richard
Kim
 
2 From: Cliche, Richard [mailto:Richard.Cliche@fpl.com]
Sent: Friday, September 17, 2010 12:06 PM To: Green, Kimberly Cc: Brittner, Donald; Min, Seung; Dozier, Jerry; Plasse, Richard  


==Subject:==
==Subject:==
RE: Material and Environment Audit Kim,TheScopingAuditPlanhasthepreliminaryM&EworkdonethatweekandverificationbeingperformedduringtheAMPAudit.Pleaseconfirm.-..Thanks,RickClicheFrom: Green, Kimberly [mailto:Kimberly.Green@nrc.gov]
RE: Material and Environment Audit
Sent: Thursday, September 16, 2010 5:11 PM To: Cliche, Richard Cc: Brittner, Donald; Min, Seung; Dozier, Jerry; Plasse, Richard  
: Kim, The Scoping Audit Plan has the preliminary M&E work done that week and verification being performed during the AMP Audit. Please confirm. ..Thanks, Rick Cliche From: Green, Kimberly [mailto:Kimberly.Green@nrc.gov]
Sent: Thursday, September 16, 2010 5:11 PM To: Cliche, Richard Cc: Brittner, Donald; Min, Seung; Dozier, Jerry; Plasse, Richard


==Subject:==
==Subject:==
Material and Environment Audit Rick, Attached is the material and environment spreadsheet which will be used during the upcoming scoping and screening methodology audit. It contains 35 random samples taken from the AMR Table 2's in the LRA. This spreadsheet is for the material and environment verification. As you'll see, there are several components for which NextEra will not be able to show to the reviewer because the components will not be accessible. For those components that are inaccessible, we would appreciate seeing documentation that would indicate what  
Material and Environment Audit
: Rick, Attached is the material and environment spreadsheet which will be used during the upcoming scoping and screening methodology audit. It contains 35 random samples taken from the AMR Table 2s in the LRA. This spreadsheet is for the material and environment verification. As you'll see, there are several components for which NextEra will not be able to show to the reviewer because the components will not be accessible. For those components that are inaccessible, we would appreciate seeing documentation that would indicate what are the component material and environment.
The second verification that will be conducted is of 85 random samples based on your equipment database.
Rick Plasse has already sent this file to you. For this effort, the reviewer will want to determine if the component is or is not within the scope of license renewal. For those that are determined to not be within the scope of license renewal, he will determine if the component was appropriately omitted from scope.
If you have any questions regarding these spreadsheets or what will be taking place regarding their use, please call or email me.
: Thanks, Kim 2


are the component material and environment.
Hearing Identifier:     Seabrook_License_Renewal_NonPublic Email Number:           78 Mail Envelope Properties     (F5A4366DF596BF458646C9D433EA37D73130B07733)
 
The second verification that will be conducted is of 85 random samples based on your equipment database. Rick Plasse has already sent this file to you. For this effort, the reviewer will want to determine if the component is or is not within the scope of license renewal. For those that are determined to not be within the scope of license renewal, he will determine if the component was appropriately omitted from scope.
If you have any questions regarding these spreadsheets or what will be taking place regarding their use, please call or email me.
: Thanks, Kim Hearing Identifier: Seabrook_License_Renewal_NonPublic Email Number: 78   Mail Envelope Properties   (F5A4366DF596BF458646C9D433EA37D73130B07733)


==Subject:==
==Subject:==
RE: Material and Environment Audit Sent Date:   9/17/2010 2:42:48 PM Received Date: 9/17/2010 2:42:00 PM From:   Green, Kimberly Created By:   Kimberly.Green@nrc.gov Recipients:     "'Cliche, Richard'" <Richard.Cliche@fpl.com>
RE: Material and Environment Audit Sent Date:               9/17/2010 2:42:48 PM Received Date:           9/17/2010 2:42:00 PM From:                   Green, Kimberly Created By:             Kimberly.Green@nrc.gov Recipients:
Tracking Status: None  
"'Cliche, Richard'" <Richard.Cliche@fpl.com>
 
Tracking Status: None Post Office:             HQCLSTR01.nrc.gov Files                           Size                   Date & Time MESSAGE                           3700                   9/17/2010 2:42:00 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Post Office:   HQCLSTR01.nrc.gov Files     Size     Date & Time MESSAGE   3700     9/17/2010 2:42:00 PM
Recipients Received:}}
 
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}

Revision as of 05:35, 13 November 2019

2010/09/17 Seabrook Lr - Material and Environment Audit
ML103400623
Person / Time
Site: Seabrook 
Issue date: 09/17/2010
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML103400623 (3)


Text

SeabrookNPEm Resource From: Green, Kimberly Sent: Friday, September 17, 2010 2:43 PM To: 'Cliche, Richard'

Subject:

RE: Material and Environment Audit

Rick, Thanks for adjusting the schedule to accommodate the M&E verification.

We plan to arrive at the site around 7:40 or so to allow time to get through the security gate. So, well see you shortly thereafter.

Kim From: Cliche, Richard [1]

Sent: Friday, September 17, 2010 1:25 PM To: Green, Kimberly Cc: Plasse, Richard; Kodal, Ali; Chew, Kenneth; Bemis, Dennis

Subject:

RE: Material and Environment Audit

Kim, OK, I scheduled time and a technical escort for Wed 9/22 AM and Thursday 9/23 PM. Carry over (if needed) will go to Mon 10/18 PM of the AMP Audit.

Rick From: Green, Kimberly [2]

Sent: Friday, September 17, 2010 12:48 PM To: Cliche, Richard Cc: Plasse, Richard

Subject:

RE: Material and Environment Audit

Rick, I just confirmed that it is our intent to complete the verification of the 35 random samples for the M&E audit. If we cannot complete it during this audit, it will continue during the AMP audit. It is also our intent to complete the verification of the 85 random samples for whether the component is within the scope of license renewal or not. Again, if that cannot be completed during this audit, it will continue during the AMP audit.

Basically, one person is responsible for these two efforts, and based on past experience, it takes about a day or less to complete each one. For the M&E audit, well need one person to escort the reviewer to various locations within the plant (except containment) to verify the material and environment. The other effort does not require any walkdowns.

Please let me know if you think the walkdown for the M&E audit will not be feasible next week. Don Brittner will be the technical reviewer doing the M&E audit.

Kim 1

From: Cliche, Richard [3]

Sent: Friday, September 17, 2010 12:06 PM To: Green, Kimberly Cc: Brittner, Donald; Min, Seung; Dozier, Jerry; Plasse, Richard

Subject:

RE: Material and Environment Audit

Kim, The Scoping Audit Plan has the preliminary M&E work done that week and verification being performed during the AMP Audit. Please confirm. ..Thanks, Rick Cliche From: Green, Kimberly [4]

Sent: Thursday, September 16, 2010 5:11 PM To: Cliche, Richard Cc: Brittner, Donald; Min, Seung; Dozier, Jerry; Plasse, Richard

Subject:

Material and Environment Audit

Rick, Attached is the material and environment spreadsheet which will be used during the upcoming scoping and screening methodology audit. It contains 35 random samples taken from the AMR Table 2s in the LRA. This spreadsheet is for the material and environment verification. As you'll see, there are several components for which NextEra will not be able to show to the reviewer because the components will not be accessible. For those components that are inaccessible, we would appreciate seeing documentation that would indicate what are the component material and environment.

The second verification that will be conducted is of 85 random samples based on your equipment database.

Rick Plasse has already sent this file to you. For this effort, the reviewer will want to determine if the component is or is not within the scope of license renewal. For those that are determined to not be within the scope of license renewal, he will determine if the component was appropriately omitted from scope.

If you have any questions regarding these spreadsheets or what will be taking place regarding their use, please call or email me.

Thanks, Kim 2

Hearing Identifier: Seabrook_License_Renewal_NonPublic Email Number: 78 Mail Envelope Properties (F5A4366DF596BF458646C9D433EA37D73130B07733)

Subject:

RE: Material and Environment Audit Sent Date: 9/17/2010 2:42:48 PM Received Date: 9/17/2010 2:42:00 PM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:

"'Cliche, Richard'" <Richard.Cliche@fpl.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 3700 9/17/2010 2:42:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: