0CAN061202, Response to NRC Request for Information Per 10CFR50.54(f) Re Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:0CAN061202  
{{#Wiki_filter:Entergy Operations, Inc.
 
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Christopher J. Schwarz Vice President, Operations Arkansas Nuclear One 0CAN061202 June 8, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
June 8, 2012  
 
U.S. Nuclear Regulatory Commission  
 
ATTN: Document Control Desk  
 
11555 Rockville Pike  
 
Rockville, MD 20852  


==SUBJECT:==
==SUBJECT:==
Entergy's Response to NRC Request for Information (RFI)
Entergys Response to NRC Request for Information (RFI)
Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of  
Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
 
Recommendations 2.1 and 2.3 of the Near-Term Task Force  
 
Review of Insights from the Fukushima Dai-ichi Accident  
 
Arkansas Nuclear One - Units 1 and 2  
 
Docket Nos. 50-313 and 50-368  
 
License Nos. DPR-51 and NPF-6  


==References:==
==References:==
: 1. NRC letter to Entergy, RFI Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima  
: 1. NRC letter to Entergy, RFI Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (0CNA031208)
 
(ML12053A340)
Dai-ichi Accident , dated March 12, 2012 (0CNA031208) (ML12053A340) 2. NRC Letter to Entergy, Prioritization of Response Due Dates for Site Flooding Hazard Evaluations , dated May 11, 2012 (0CNA051203) (ML12097A509) 3. NRC letter, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features
: 2. NRC Letter to Entergy, Prioritization of Response Due Dates for Site Flooding Hazard Evaluations, dated May 11, 2012 (0CNA051203)
," dated May 31, 2012  
(ML12097A509)
: 3. NRC letter, Endorsement of Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features, dated May 31, 2012


==Dear Sir or Madam:==
==Dear Sir or Madam:==


On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees.
On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees.
Enclosures 2 and 4 of Reference 1 contain specific requested actions, requested information, and required responses associated with Recommendations 2.1 and 2.3 for flooding evaluations and walkdowns. This letter provides Entergy Operations, Inc.
(Entergys) 90-day response to Reference 1 for Arkansas Nuclear One (ANO).


Enclosures 2 and 4 of Reference 1 contain specific requested actions, requested
0CAN061202 Page 2 of 3 Recommendation 2.1: Flooding The response date for ANOs flood hazard evaluation was identified in Reference 2 as March 12, 2014, which corresponds to two years from the date of Reference 1.
 
Entergy plans to meet the requested date for the other required responses in of Reference 1. Specifically, an approach for developing an Integrated Assessment for ANO will be submitted 60 days after NRC endorsement of the Integrated Assessment Guidance. In addition, an Integrated Assessment report for ANO, if it is necessary, will be submitted two years after the flood evaluation is submitted.
information, and required responses associated with Recommendations 2.1 and 2.3 for
Recommendation 2.3: Flooding For flooding Recommendation 2.3 (walkdowns), Enclosure 4 of Reference 1 states that each licensee is to confirm that it will use the NRC-endorsed flooding walkdown procedure or provide a description of the process it will use. Entergy confirms that it will use the flooding walkdown procedure (NEI 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns at ANO.
 
Entergy plans to comply with the response timeline in Enclosure 4 of Reference 1.
flooding evaluations and walkdowns. This letter provides Entergy Operations', Inc.
Specifically, Entergy will submit a report documenting the results of its flooding design basis walkdowns at ANO by November 27, 2012, which corresponds to 180 days after NRC endorsement of the generic guidance.
(Entergy's) 90-day response to Reference 1 for Arkansas Nuclear One (ANO). Entergy Operations, Inc.
The new commitments contained in this submittal are summarized in the attachment.
1448 S.R. 333 Russellville, AR  72802
Should you have any questions concerning the content of this letter, please contact Stephenie Pyle at 479.858.4704.
 
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 8, 2012.
Tel  479-858-3110 Christopher J. Schwarz Vice President, Operations A rkansas Nuclear One
Sincerely, Original signed by Christopher J. Schwarz CJS/nbm
 
0CAN061202 Page 2 of 3  
 
Recommendation 2.1: Flooding
 
The response date for ANO's flood hazard evaluation was identified in Reference 2 as  
 
March 12, 2014, which corresponds to two years from the date of Reference 1.  
 
Entergy plans to meet the requested date for the other required responses in of Reference 1. Specifically, an approach for developing an Integrated  
 
Assessment for ANO will be submitted 60 days after NRC endorsement of the Integrated  
 
Assessment Guidance. In addition, an Integrated Assessment report for ANO, if it is  
 
necessary, will be submitted two years a fter the flood evaluation is submitted.  
 
Recommendation 2.3: Flooding
 
For flooding Recommendation 2.3 (walkdowns), Enclosure 4 of Reference 1 states that  
 
each licensee is to confirm that it will use the NRC-endorsed flooding walkdown  
 
procedure or provide a description of the process it will use. Entergy confirms that it will  
 
use the flooding walkdown procedure (NEI 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns at ANO.  
 
Entergy plans to comply with the response timeline in Enclosure 4 of Reference 1.
 
Specifically, Entergy will submit a report documenting the results of its flooding design  
 
basis walkdowns at ANO by November 27, 2012, which corresponds to 180 days after  
 
NRC endorsement of the generic guidance.  
 
The new commitments contained in this submittal are summarized in the attachment.
 
Should you have any questions concerning the content of this letter, please contact  
 
Stephenie Pyle at 479.858.4704.  
 
I declare under penalty of perjury that the foregoing is true and correct. Executed on  
 
June 8, 2012.  
 
Sincerely,  
 
Original signed by Christopher J. Schwarz  
 
CJS/nbm  


==Attachment:==
==Attachment:==
List of Regulatory Commitments 0CAN061202 Page 3 of 3
List of Regulatory Commitments
 
cc: Mr. Elmo Collins Regional Administrator
 
U. S. Nuclear Regulatory Commission, Region IV
 
1600 East Lamar Boulevard Arlington, TX 76011-4511
 
U. S. Nuclear Regulatory Commission
 
Attn: Director, Office of Nuclear Reactor Regulation
 
One White Flint North
 
11555 Rockville Pike
 
Rockville, MD 20852
 
NRC Senior Resident Inspector
 
Arkansas Nuclear One
 
P.O. Box 310
 
London, AR 72847
 
U. S. Nuclear Regulatory Commission
 
Attn: Mr. Kaly Kalyanam
 
MS O-8 B1
 
One White Flint North
 
11555 Rockville Pike
 
Rockville, MD 20852 
 
Attachment to 0CAN061202 List of Regulatory Commitments Attachment to 0CAN061202
 
Page 1 of 1
 
List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other
 
statements in this submittal are provided for information purposes and are not considered to be
 
regulatory commitments.
TYPE (Check One)
COMMITMENT ONE-TIME ACTION CONTINUING COMPLIANCE SCHEDULED COMPLETION DATE (If Required)
Submit flood hazard evaluation to the NRC. X  March 12, 2014 An approach for developing an Integrated Assessment for Arkansas Nuclear One (ANO) will be submitted.
X  60-days after NRC endorsement of the
 
Integrated Assessment
 
Guidance An Integrated Assessment report for
 
ANO, if it is necessary, will be submitted
 
two years after the flood evaluation is
 
completed.
X  March 12, 2016 (if necessary)
Entergy will use the flooding walkdown
 
procedure (Nuclear Energy Institute
 
12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding
 
walkdowns and plans to comply with the
 
response timeline in Enclosure 4 of
 
Reference 1 by submitting a report
 
documenting the results of its flooding


design basis walkdowns at ANO 180 days
0CAN061202 Page 3 of 3 cc:  Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission Attn: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852


after NRC endorsement of the generic
Attachment to 0CAN061202 List of Regulatory Commitments


guidance. X November 27, 2012}}
Attachment to 0CAN061202 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE SCHEDULED (Check One)              COMPLETION COMMITMENT                                                          DATE ONE-TIME    CONTINUING            (If Required)
ACTION    COMPLIANCE Submit flood hazard evaluation to the              X                      March 12, 2014 NRC.
An approach for developing an Integrated          X                      60-days after NRC Assessment for Arkansas Nuclear One                                        endorsement of the (ANO) will be submitted.                                                  Integrated Assessment Guidance An Integrated Assessment report for                X                      March 12, 2016 ANO, if it is necessary, will be submitted                                (if necessary) two years after the flood evaluation is completed.
Entergy will use the flooding walkdown            X                       November 27, 2012 procedure (Nuclear Energy Institute 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns and plans to comply with the response timeline in Enclosure 4 of Reference 1 by submitting a report documenting the results of its flooding design basis walkdowns at ANO 180 days after NRC endorsement of the generic guidance.}}

Latest revision as of 03:22, 12 November 2019

Response to NRC Request for Information Per 10CFR50.54(f) Re Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident
ML12164A567
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/08/2012
From: Schwarz C
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
0CAN061202
Download: ML12164A567 (5)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Christopher J. Schwarz Vice President, Operations Arkansas Nuclear One 0CAN061202 June 8, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Entergys Response to NRC Request for Information (RFI)

Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

References:

1. NRC letter to Entergy, RFI Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (0CNA031208)

(ML12053A340)

2. NRC Letter to Entergy, Prioritization of Response Due Dates for Site Flooding Hazard Evaluations, dated May 11, 2012 (0CNA051203)

(ML12097A509)

3. NRC letter, Endorsement of Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features, dated May 31, 2012

Dear Sir or Madam:

On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees.

Enclosures 2 and 4 of Reference 1 contain specific requested actions, requested information, and required responses associated with Recommendations 2.1 and 2.3 for flooding evaluations and walkdowns. This letter provides Entergy Operations, Inc.

(Entergys) 90-day response to Reference 1 for Arkansas Nuclear One (ANO).

0CAN061202 Page 2 of 3 Recommendation 2.1: Flooding The response date for ANOs flood hazard evaluation was identified in Reference 2 as March 12, 2014, which corresponds to two years from the date of Reference 1.

Entergy plans to meet the requested date for the other required responses in of Reference 1. Specifically, an approach for developing an Integrated Assessment for ANO will be submitted 60 days after NRC endorsement of the Integrated Assessment Guidance. In addition, an Integrated Assessment report for ANO, if it is necessary, will be submitted two years after the flood evaluation is submitted.

Recommendation 2.3: Flooding For flooding Recommendation 2.3 (walkdowns), Enclosure 4 of Reference 1 states that each licensee is to confirm that it will use the NRC-endorsed flooding walkdown procedure or provide a description of the process it will use. Entergy confirms that it will use the flooding walkdown procedure (NEI 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns at ANO.

Entergy plans to comply with the response timeline in Enclosure 4 of Reference 1.

Specifically, Entergy will submit a report documenting the results of its flooding design basis walkdowns at ANO by November 27, 2012, which corresponds to 180 days after NRC endorsement of the generic guidance.

The new commitments contained in this submittal are summarized in the attachment.

Should you have any questions concerning the content of this letter, please contact Stephenie Pyle at 479.858.4704.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 8, 2012.

Sincerely, Original signed by Christopher J. Schwarz CJS/nbm

Attachment:

List of Regulatory Commitments

0CAN061202 Page 3 of 3 cc: Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission Attn: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852

Attachment to 0CAN061202 List of Regulatory Commitments

Attachment to 0CAN061202 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE SCHEDULED (Check One) COMPLETION COMMITMENT DATE ONE-TIME CONTINUING (If Required)

ACTION COMPLIANCE Submit flood hazard evaluation to the X March 12, 2014 NRC.

An approach for developing an Integrated X 60-days after NRC Assessment for Arkansas Nuclear One endorsement of the (ANO) will be submitted. Integrated Assessment Guidance An Integrated Assessment report for X March 12, 2016 ANO, if it is necessary, will be submitted (if necessary) two years after the flood evaluation is completed.

Entergy will use the flooding walkdown X November 27, 2012 procedure (Nuclear Energy Institute 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns and plans to comply with the response timeline in Enclosure 4 of Reference 1 by submitting a report documenting the results of its flooding design basis walkdowns at ANO 180 days after NRC endorsement of the generic guidance.