ML13029A511: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Draft Simulator Scenarios (containing ES | {{#Wiki_filter:Draft Simulator Scenarios (containing ES-D-1 and ES-D-2) | ||
-D-1 and ES-D-2) | There were no Draft Simulator Scenarios for the North Anna 2012-302 Exam (the Simulator portion of the Operating Test was waived).}} | ||
-302 Exam (the Simulator portion of the Operating Test was waived).}} | |||
Latest revision as of 23:02, 4 November 2019
| ML13029A511 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 01/24/2013 |
| From: | NRC/RGN-II |
| To: | Virginia Electric & Power Co (VEPCO) |
| References | |
| 50-338/12-302, 50-339/12-302 | |
| Download: ML13029A511 (1) | |
Text
Draft Simulator Scenarios (containing ES-D-1 and ES-D-2)
There were no Draft Simulator Scenarios for the North Anna 2012-302 Exam (the Simulator portion of the Operating Test was waived).