CNL-14-014, Revised Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[ML14062A050]]
| number = ML14062A050
| issue date = 02/07/2014
| title = Revised Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)
| author name = Shea J
| author affiliation = Tennessee Valley Authority
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000390, 05000391
| license number = CPPR-092, NPF-090
| contact person =
| case reference number = CNL-14-014, EA-12-049, L44 140207 002, TAC MF0950, TAC MF1177
| package number = ML14064A240
| document type = Letter type:CNL
| page count = 86
| project = TAC:MF0950, TAC:MF1177
| stage = Other
}}
 
=Text=
{{#Wiki_filter:}}

Latest revision as of 08:26, 4 November 2019

Redirect to: