{{#Wiki_filter: | {{#Wiki_filter:DRAFT OUTLINE COMMENTS First Exam Facility: Comanche Peak 03/23/15 Date: | ||
Written Exam Outline (Generated by NRC on 9/10/14; Comments Based on 11/20/14 Proposed Revisions) | |||
Comment Resolution Question 53: The proposed replacement The subject matter became Question 26, Tier K/A, generic 2.1.14, is not one of the K/A 2, Group 1, 078 Instrument Air. The K/A 1 statements approved for use in Tier 1 statement was changed to Generic 2.1.23. | |||
and 2 questions. See NUREG-1021, ES-401, Section D.1.b. | |||
Question 63: When the site has to do an This issue was discussed with the licensee. | |||
infrequent, planned gaseous release, as Based on review of system design, there described in FSAR Section 11.3.3.1, were no ventilation components within the ventilation would be controlled as part of purview of a Reactor Operator during a the process. Assuming there is a gaseous discharge that would allow for procedure to conduct this discharge, it writing an adequate question to this K/A would seem that design parameters statement. Therefore, this K/A statement was associated with the Gaseous Waste rejected, and replaced with Tier 2, Group 2, 2 | |||
Processing System (GWPS) (example: 035 Steam Generator, K/A Statement A1.02. | |||
FSAR Table 11.3-2) would be monitored to ensure that appropriate actions are taken if alarms/trends associated with them require some action. Verify that there are no parameters tied to GWPS design controls that are not monitored in this situation. | |||
Editorial: Add the Date of the Exam to Editorial comment resolved. | |||
3 the Tier 3 form (Form ES-401-3). | |||
Administrative JPM Outline (Date) | |||
Comment Resolution 1 N/A - written RO exam only Control Room / In-Plant System JPM Outline (Date) | |||
Comment Resolution 1 N/A - written RO exam only Simulator Scenario Outline Comments (Date) | |||
Comment Resolution 1 N/A - written RO exam only OBDI 202 - IOLE Process Rev 1}} | |||
Revision as of 14:59, 31 October 2019
| ML15084A080 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/23/2015 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | |
| laura hurley | |
| References | |
| Download: ML15084A080 (1) | |
Text
DRAFT OUTLINE COMMENTS First Exam Facility: Comanche Peak 03/23/15 Date:
Written Exam Outline (Generated by NRC on 9/10/14; Comments Based on 11/20/14 Proposed Revisions)
Comment Resolution Question 53: The proposed replacement The subject matter became Question 26, Tier K/A, generic 2.1.14, is not one of the K/A 2, Group 1, 078 Instrument Air. The K/A 1 statements approved for use in Tier 1 statement was changed to Generic 2.1.23.
and 2 questions. See NUREG-1021, ES-401, Section D.1.b.
Question 63: When the site has to do an This issue was discussed with the licensee.
infrequent, planned gaseous release, as Based on review of system design, there described in FSAR Section 11.3.3.1, were no ventilation components within the ventilation would be controlled as part of purview of a Reactor Operator during a the process. Assuming there is a gaseous discharge that would allow for procedure to conduct this discharge, it writing an adequate question to this K/A would seem that design parameters statement. Therefore, this K/A statement was associated with the Gaseous Waste rejected, and replaced with Tier 2, Group 2, 2
Processing System (GWPS) (example: 035 Steam Generator, K/A Statement A1.02.
FSAR Table 11.3-2) would be monitored to ensure that appropriate actions are taken if alarms/trends associated with them require some action. Verify that there are no parameters tied to GWPS design controls that are not monitored in this situation.
Editorial: Add the Date of the Exam to Editorial comment resolved.
3 the Tier 3 form (Form ES-401-3).
Administrative JPM Outline (Date)
Comment Resolution 1 N/A - written RO exam only Control Room / In-Plant System JPM Outline (Date)
Comment Resolution 1 N/A - written RO exam only Simulator Scenario Outline Comments (Date)
Comment Resolution 1 N/A - written RO exam only OBDI 202 - IOLE Process Rev 1