PLA-7449, Nuclear Property Insurance Program: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 TALEN -d Jon.Franke@TalenEnergy.com ENERGY MAR 31 Z016 U.S. Nuclear Regulatory Commission 10 CFR 50.54 Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM Docket Nos. 50-387 PLA-7449 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. | ||
Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155. | |||
This letter contains no new regulatory commitments. | This letter contains no new regulatory commitments. | ||
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP | J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP | ||
Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 TALEN -d Jon.Franke@TalenEnergy.com ENERGY MAR 31 Z016 U.S. Nuclear Regulatory Commission 10 CFR 50.54 Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM Docket Nos. 50-387 PLA-7449 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station. | |||
Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155. | |||
This letter contains no new regulatory commitments. | This letter contains no new regulatory commitments. | ||
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP}} | J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP}} | ||
Revision as of 21:16, 30 October 2019
| ML16092A125 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/31/2016 |
| From: | Franke J Susquehanna, Talen Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-7449 | |
| Download: ML16092A125 (1) | |
Text
Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 TALEN -d Jon.Franke@TalenEnergy.com ENERGY MAR 31 Z016 U.S. Nuclear Regulatory Commission 10 CFR 50.54 Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM Docket Nos. 50-387 PLA-7449 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.
Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
This letter contains no new regulatory commitments.
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP
Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 TALEN -d Jon.Franke@TalenEnergy.com ENERGY MAR 31 Z016 U.S. Nuclear Regulatory Commission 10 CFR 50.54 Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NUCLEARPROPERTYINSURANCEPROGRAM Docket Nos. 50-387 PLA-7449 and 50-388 As required by 10 CFR 50.54(w)(3), the following information represents the present level of onsite prope1iy damage insurance for Susquehanna Steam Electric Station.
Primary NEIL Policy# P16-114 $1.5 Billion Excess NEIL II Policy# X16-114 $500 Million If you have any questions or require additional infmmation, please contact Mr. Jason Jennings, Manager ofNuclear Regulatory Affairs, at (570) 542-3155.
This letter contains no new regulatory commitments.
J. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP