ML17150A455: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                NUCLEAR REGULATORY COMMISSION
  May 30, 2017  
                                                REGION II
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
Mr. George Lippard III, Vice President  
                                            May 30, 2017
 
Mr. George Lippard III, Vice President
Nuclear Operations  
Nuclear Operations
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800  
South Carolina Electric & Gas Company
Jenkinsville, SC 29065  
Virgil C. Summer Nuclear Station
 
Post Office Box 88, Mail Code 800
Jenkinsville, SC 29065
SUBJECT: NOTIFICATION OF VIRGIL C. SUMMER NUCLEAR STATION DESIGN BASES ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION  
SUBJECT: NOTIFICATION OF VIRGIL C. SUMMER NUCLEAR STATION DESIGN BASES
INSPECTION REPORT 05000395/2017007  
              ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION
              INSPECTION REPORT 05000395/2017007
Dear Mr. Lippard:  
Dear Mr. Lippard:
 
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Virgil C.  
Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Virgil C.
Summer Nuclear Station during the weeks of September 18 - 22, and October 2 - 6, 2017.  
Summer Nuclear Station during the weeks of September 18 - 22, and October 2 - 6, 2017.
Mr. Marcus Riley, a reactor inspector from the NRC's Region II office, will lead the inspection  
Mr. Marcus Riley, a reactor inspector from the NRCs Region II office, will lead the inspection
team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M, "Design Bases Assurance Inspection (Teams)," dated December 8, 2016 (ADAMS ML16238A320).  
team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M,
 
Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS
ML16238A320).
The inspection will evaluate the capability of components that have been modified and risk-
The inspection will evaluate the capability of components that have been modified and risk-
significant/low-margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.  
significant/low-margin components to function as designed and to support proper system
 
operation. The inspection will also include a review of selected operator actions, operating
experience, and modifications.
During a telephone conversation on May 23, 2017, with Mr. Bruce Thompson and Mr. Renard  
During a telephone conversation on May 23, 2017, with Mr. Bruce Thompson and Mr. Renard
Perry, we confirmed arrangements for an information-gathering site visit and the two-week onsite inspection. The schedule is as follows:  
Perry, we confirmed arrangements for an information-gathering site visit and the two-week
* Information-gathering visit: Week of August 28 - September 1, 2017  
onsite inspection. The schedule is as follows:
* Onsite weeks: Weeks of September 18 - 22, and October 2 - 6, 2017  
    *   Information-gathering visit: Week of August 28 - September 1, 2017
The purpose of the information-gathering visit is to meet with members of your staff to identify  
    *   Onsite weeks: Weeks of September 18 - 22, and October 2 - 6, 2017
components that have been modified, risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified.  
The purpose of the information-gathering visit is to meet with members of your staff to identify
Mr. George MacDonald, a Region II Senior Risk Analyst, will support Mr. Riley during the  
components that have been modified, risk-significant components and operator actions.
 
Information and documentation needed to support the inspection will also be identified.
information-gathering visit to review probabilistic risk assessment data and identify components to be examined during the inspection. Additionally, during the onsite weeks, time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based  
Mr. George MacDonald, a Region II Senior Risk Analyst, will support Mr. Riley during the
scenarios.  
information-gathering visit to review probabilistic risk assessment data and identify components
G. Lippard 2 The enclosure lists documents that will be needed prior to the information-gathering visit.  Please provide the referenced information to the Region II Office by Monday, August 14, 2017. 
to be examined during the inspection. Additionally, during the onsite weeks, time will be needed
Additional documents will be requested following the information-gathering visit.  The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.  The additional information will be needed in the Region II
on the plant-referenced simulator in order to facilitate the development of operator action-based
office by Friday, September 8, 2017, to support the inspection team's preparation week.  During the information-gathering trip, Mr. Riley will also discuss the following inspection support
scenarios.
administrative details: (1) availability of knowledgeable plant engineering and licensing
personnel to serve as points of contact during the inspection; (2) method of tracking inspector requests during the inspection; (3) licensee computer access; (4) working space; (5) arrangements for site access; and (6) other applicable information.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection
 
and copying at
http://www.nrc.gov/reading-rm/adams.html
and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
 
Thank you for your cooperation in this matter.  If you have any questions, regarding the
information requested or the inspection, please contact Mr. Riley at 404-997-4888 or contact me
at 404-997-4607.
      Sincerely,
      /RA/
  Jonathan H. Bartley, Chief        Engineering Branch 1
      Division of Reactor Safety
 
Docket Nos.: 50-395
License Nos.: NPF-12
 
Enclosure: 
Notification of Virgil C. Summer Nuclear Station,
  Design Bases Assurance Inspection (Teams) 
cc:  Distribution via Listserv 
 
____                      __________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE MAR1 JHB1      NAME M. RILEY J. BARTLEY      DATE 5/ 30/2017 5/30/2017      E-MAIL COPY?    YES NO      YES NO         
  Enclosure INFORMATION REQUEST FOR VIRGIL C. SUMMER NUCLEAR STATION  DESIGN BASES ASSURANCE INSPECTION (TEAMS)
Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.).  The CDROM (or website) should be indexed and
hyperlinked to facilitate ease of use.  The requested items below, identified with an asterisk (*),
should have a date range from June 1, 2014, until present. 
1. *List and brief description of
permanent and field work completed plant modifications including permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade
dedications.  Include an index of systems (system numbers/designators and corresponding
names), the safety classification for each modification, and type of modification.
2. From your most recent probabilistic safety analysis (PSA)
excluding external events and
fires:  a. Two risk rankings of components from your site-specific PSA:  one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
 
b. A list of the top 500 cut-sets
c.  A list of the top 500 LERF contributors
3. From your most recent PSA
including external events and fires:
a. Two risk rankings of components from your site-specific PSA:  one sorted by RAW, and the other sorted by Birnbaum Importance
b. A list of the top 500 cut-sets 
4. Risk ranking of operator actions from your site-specific PSA sorted by RAW and human reliability worksheets for these items
5. List of time-critical operator actions with a brief description of each action
 
6. *List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to
rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and associated evaluations or calculations
7. *List and brief description of Root Cause Evaluations performed 8. *List and brief description of common-cause component failures that have occurred
9. List and brief description of equipment currently in degraded or nonconforming status as described in NRC Inspection Manual Chapter 0326, issued December 3, 2015 10. *List and brief description of Operability Determinations and Functionality Assessments
 
2  11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status
12. *List of equipment on the site's Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s) along with dates added or removed from
the issues list
13. List of current "operator work arounds/burdens"
14. Copy of Updated Final Safety Analysis Report
15. Copy of Technical Specification(s)
 
16. Copy of Technical Specifications Bases
 
17. Copy of Technical Requirements Manual(s)
18. Copy of the Quality Assurance Program Manual
19. Copy of Corrective Action Program Procedure(s)


20. Copy of Operability Determination Procedure(s)
G. Lippard                                    2
21. List of motor operated valves and air operated valves in the valve program, and their associated design margin and risk ranking
The enclosure lists documents that will be needed prior to the information-gathering visit.
22. Primary AC and DC calculations for safety-related buses
Please provide the referenced information to the Region II Office by Monday, August 14, 2017.
23. One-line diagram of electrical plant (Electronic only)  
Additional documents will be requested following the information-gathering visit. The inspectors
will try to minimize your administrative burden by specifically identifying only those documents
24. Index and legend for electrical plant one-line diagrams
required for inspection preparation. The additional information will be needed in the Region II
office by Friday, September 8, 2017, to support the inspection teams preparation week. During
the information-gathering trip, Mr. Riley will also discuss the following inspection support
administrative details: (1) availability of knowledgeable plant engineering and licensing
personnel to serve as points of contact during the inspection; (2) method of tracking inspector
requests during the inspection; (3) licensee computer access; (4) working space; (5)
arrangements for site access; and (6) other applicable information.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
Thank you for your cooperation in this matter. If you have any questions, regarding the
information requested or the inspection, please contact Mr. Riley at 404-997-4888 or contact me
at 404-997-4607.
                                                Sincerely,
                                                /RA/
                                                Jonathan H. Bartley, Chief
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket Nos.: 50-395
License Nos.: NPF-12
Enclosure:
Notification of Virgil C. Summer Nuclear Station,
  Design Bases Assurance Inspection (Teams)
cc: Distribution via Listserv


25. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)
26. Index and legend for P&IDs


   
____            __________          SUNSI REVIEW COMPLETE    FORM 665 ATTACHED
27. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures
  OFFICE            RII:DRS        RII:DRS
SIGNATURE          MAR1          JHB1
NAME              M. RILEY      J. BARTLEY
DATE                  5/ 30/2017    5/30/2017
E-MAIL COPY?          YES    NO  YES      NO
       
          INFORMATION REQUEST FOR VIRGIL C. SUMMER NUCLEAR STATION
                      DESIGN BASES ASSURANCE INSPECTION (TEAMS)
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and
hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),
should have a date range from June 1, 2014, until present.
1.  *List and brief description of permanent and field work completed plant modifications
    including permanent plant changes, design changes, set point changes, procedure
    changes, equivalency evaluations, suitability analyses, calculations, and commercial grade
    dedications. Include an index of systems (system numbers/designators and corresponding
    names), the safety classification for each modification, and type of modification.
2.  From your most recent probabilistic safety analysis (PSA) excluding external events and
    fires:
          a. Two risk rankings of components from your site-specific PSA: one sorted by Risk
              Achievement Worth (RAW), and the other sorted by Birnbaum Importance
          b. A list of the top 500 cut-sets
        c. A list of the top 500 LERF contributors
3.  From your most recent PSA including external events and fires:
          a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,
              and the other sorted by Birnbaum Importance
          b. A list of the top 500 cut-sets
4.  Risk ranking of operator actions from your site-specific PSA sorted by RAW and human
    reliability worksheets for these items
5.  List of time-critical operator actions with a brief description of each action
6.  *List of components with low-design margins (i.e., pumps closest to the design limit for flow
    or pressure, diesel generator close to design-required output, heat exchangers close to
    rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and
    associated evaluations or calculations
7.  *List and brief description of Root Cause Evaluations performed
8.  *List and brief description of common-cause component failures that have occurred
9.  List and brief description of equipment currently in degraded or nonconforming status as
    described in NRC Inspection Manual Chapter 0326, issued December 3, 2015
10. *List and brief description of Operability Determinations and Functionality Assessments
                                                                                          Enclosure


28. Copies of corrective action documents generated from previous CDBI  
                                                2
11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status
29. Copy of any self-assessments performed, and corrective action documents generated, in preparation for current DBAI  
12. *List of equipment on the sites Station Equipment Reliability Issues List, including a
    description of the reason(s) why each component is on that list, and summaries (if
30. Contact information for a person to discuss PSA information prior to and during the information-gathering trip (Name, title, phone number, and e-mail address)
    available) of your plans to address the issue(s) along with dates added or removed from
    the issues list
13. List of current operator work arounds/burdens
14. Copy of Updated Final Safety Analysis Report
15. Copy of Technical Specification(s)
16. Copy of Technical Specifications Bases
17. Copy of Technical Requirements Manual(s)
18. Copy of the Quality Assurance Program Manual
19. Copy of Corrective Action Program Procedure(s)
20. Copy of Operability Determination Procedure(s)
21. List of motor operated valves and air operated valves in the valve program, and their
    associated design margin and risk ranking
22. Primary AC and DC calculations for safety-related buses
23. One-line diagram of electrical plant (Electronic only)
24. Index and legend for electrical plant one-line diagrams
25. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)
26. Index and legend for P&IDs
27. Index (procedure number, title, and current revision) of station Emergency Operating
    Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures
28. Copies of corrective action documents generated from previous CDBI
29. Copy of any self-assessments performed, and corrective action documents generated, in
    preparation for current DBAI
30. Contact information for a person to discuss PSA information prior to and during the
    information-gathering trip (Name, title, phone number, and e-mail address)
}}
}}

Revision as of 02:42, 30 October 2019

Notification of Virgil C. Summer Design Bases Assurance Inspection - NRC Inspection Report 05000395/2017007
ML17150A455
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/30/2017
From: Bartley J
NRC/RGN-II/DRS/EB1
To: Lippard G
South Carolina Electric & Gas Co
References
IR 2017007
Download: ML17150A455 (5)


See also: IR 05000395/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 30, 2017

Mr. George Lippard III, Vice President

Nuclear Operations

South Carolina Electric & Gas Company

Virgil C. Summer Nuclear Station

Post Office Box 88, Mail Code 800

Jenkinsville, SC 29065

SUBJECT: NOTIFICATION OF VIRGIL C. SUMMER NUCLEAR STATION DESIGN BASES

ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION

INSPECTION REPORT 05000395/2017007

Dear Mr. Lippard:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your Virgil C.

Summer Nuclear Station during the weeks of September 18 - 22, and October 2 - 6, 2017.

Mr. Marcus Riley, a reactor inspector from the NRCs Region II office, will lead the inspection

team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M,

Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS

ML16238A320).

The inspection will evaluate the capability of components that have been modified and risk-

significant/low-margin components to function as designed and to support proper system

operation. The inspection will also include a review of selected operator actions, operating

experience, and modifications.

During a telephone conversation on May 23, 2017, with Mr. Bruce Thompson and Mr. Renard

Perry, we confirmed arrangements for an information-gathering site visit and the two-week

onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of August 28 - September 1, 2017
  • Onsite weeks: Weeks of September 18 - 22, and October 2 - 6, 2017

The purpose of the information-gathering visit is to meet with members of your staff to identify

components that have been modified, risk-significant components and operator actions.

Information and documentation needed to support the inspection will also be identified.

Mr. George MacDonald, a Region II Senior Risk Analyst, will support Mr. Riley during the

information-gathering visit to review probabilistic risk assessment data and identify components

to be examined during the inspection. Additionally, during the onsite weeks, time will be needed

on the plant-referenced simulator in order to facilitate the development of operator action-based

scenarios.

G. Lippard 2

The enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II Office by Monday, August 14, 2017.

Additional documents will be requested following the information-gathering visit. The inspectors

will try to minimize your administrative burden by specifically identifying only those documents

required for inspection preparation. The additional information will be needed in the Region II

office by Friday, September 8, 2017, to support the inspection teams preparation week. During

the information-gathering trip, Mr. Riley will also discuss the following inspection support

administrative details: (1) availability of knowledgeable plant engineering and licensing

personnel to serve as points of contact during the inspection; (2) method of tracking inspector

requests during the inspection; (3) licensee computer access; (4) working space; (5)

arrangements for site access; and (6) other applicable information.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Thank you for your cooperation in this matter. If you have any questions, regarding the

information requested or the inspection, please contact Mr. Riley at 404-997-4888 or contact me

at 404-997-4607.

Sincerely,

/RA/

Jonathan H. Bartley, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-395

License Nos.: NPF-12

Enclosure:

Notification of Virgil C. Summer Nuclear Station,

Design Bases Assurance Inspection (Teams)

cc: Distribution via Listserv

____ __________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE MAR1 JHB1

NAME M. RILEY J. BARTLEY

DATE 5/ 30/2017 5/30/2017

E-MAIL COPY? YES NO YES NO

INFORMATION REQUEST FOR VIRGIL C. SUMMER NUCLEAR STATION

DESIGN BASES ASSURANCE INSPECTION (TEAMS)

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),

should have a date range from June 1, 2014, until present.

1. *List and brief description of permanent and field work completed plant modifications

including permanent plant changes, design changes, set point changes, procedure

changes, equivalency evaluations, suitability analyses, calculations, and commercial grade

dedications. Include an index of systems (system numbers/designators and corresponding

names), the safety classification for each modification, and type of modification.

2. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by Risk

Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

c. A list of the top 500 LERF contributors

3. From your most recent PSA including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,

and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

4. Risk ranking of operator actions from your site-specific PSA sorted by RAW and human

reliability worksheets for these items

5. List of time-critical operator actions with a brief description of each action

6. *List of components with low-design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and

associated evaluations or calculations

7. *List and brief description of Root Cause Evaluations performed

8. *List and brief description of common-cause component failures that have occurred

9. List and brief description of equipment currently in degraded or nonconforming status as

described in NRC Inspection Manual Chapter 0326, issued December 3, 2015

10. *List and brief description of Operability Determinations and Functionality Assessments

Enclosure

2

11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status

12. *List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s) along with dates added or removed from

the issues list

13. List of current operator work arounds/burdens

14. Copy of Updated Final Safety Analysis Report

15. Copy of Technical Specification(s)

16. Copy of Technical Specifications Bases

17. Copy of Technical Requirements Manual(s)

18. Copy of the Quality Assurance Program Manual

19. Copy of Corrective Action Program Procedure(s)

20. Copy of Operability Determination Procedure(s)

21. List of motor operated valves and air operated valves in the valve program, and their

associated design margin and risk ranking

22. Primary AC and DC calculations for safety-related buses

23. One-line diagram of electrical plant (Electronic only)

24. Index and legend for electrical plant one-line diagrams

25. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)

26. Index and legend for P&IDs

27. Index (procedure number, title, and current revision) of station Emergency Operating

Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures

28. Copies of corrective action documents generated from previous CDBI

29. Copy of any self-assessments performed, and corrective action documents generated, in

preparation for current DBAI

30. Contact information for a person to discuss PSA information prior to and during the

information-gathering trip (Name, title, phone number, and e-mail address)