ML18346A702: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Operability Initiative Public Meeting NRC Staff Feedback Related To NEI 10/25 Presentation Jane Marshall Deputy Director, Division of Safety Systems Office of Nuclear Reactor Regulation December 13, 2018
 
Terms Consistent Between Draft NEI 18-03 and IMC 0326
- Current Licensing Basis
- Design Basis
- Mission Time
- Operability Declaration
- Reasonable Expectation (of Operability)
- Presumption of Operability
 
Terms Defined in IMC 0326 Not Included in Draft 18-03
* List presented by NEI contains items related to CAP.
* NRC to decide if separate guidance to be generated for inspector use (separating Operability and CAP programs).
* List included:
  - Degraded Condition and Nonconforming Condition
  - Functional - Functionality
  - Fully Qualified
  - Defect, Flaw, High Energy System, Moderate Energy Systems, NDE Indication
 
Terms Defined in IMC 0326 Defined Differently in Draft 18-03 or are new to Draft 18-03
* Deficient SSC Condition
* Compensatory Actions
* Necessary Support Function
* Operable/Operability
* Specified Function/Specified Safety Function
  - IMC 0326 definition is more inclusive and appropriate.
  - Draft 18-03 definition is a subset (only referencing Chapters 6 & 15)
 
DISCUSSION
* Open Dialogue (Staff and NEI)
* Staff/NEI Logistics
  - RIC Panel Discussion (March 12-14)
  - Future Public Meeting Schedule
* Currently Scheduled for 1/10, 2/21, & 4/11.
* PM to poll public
* Action Items, if any, documented}}

Latest revision as of 10:17, 20 October 2019

Public Meeting Presentation for December 13, 2018
ML18346A702
Person / Time
Issue date: 12/12/2018
From: John Marshall
Office of Nuclear Reactor Regulation
To:
References
Download: ML18346A702 (5)


Text

Operability Initiative Public Meeting NRC Staff Feedback Related To NEI 10/25 Presentation Jane Marshall Deputy Director, Division of Safety Systems Office of Nuclear Reactor Regulation December 13, 2018

Terms Consistent Between Draft NEI 18-03 and IMC 0326

- Current Licensing Basis

- Design Basis

- Mission Time

- Operability Declaration

- Reasonable Expectation (of Operability)

- Presumption of Operability

Terms Defined in IMC 0326 Not Included in Draft 18-03

  • List presented by NEI contains items related to CAP.
  • NRC to decide if separate guidance to be generated for inspector use (separating Operability and CAP programs).
  • List included:

- Degraded Condition and Nonconforming Condition

- Functional - Functionality

- Fully Qualified

- Defect, Flaw, High Energy System, Moderate Energy Systems, NDE Indication

Terms Defined in IMC 0326 Defined Differently in Draft 18-03 or are new to Draft 18-03

  • Deficient SSC Condition
  • Compensatory Actions
  • Necessary Support Function
  • Operable/Operability
  • Specified Function/Specified Safety Function

- IMC 0326 definition is more inclusive and appropriate.

- Draft 18-03 definition is a subset (only referencing Chapters 6 & 15)

DISCUSSION

  • Open Dialogue (Staff and NEI)
  • Staff/NEI Logistics

- RIC Panel Discussion (March 12-14)

- Future Public Meeting Schedule

  • Currently Scheduled for 1/10, 2/21, & 4/11.
  • PM to poll public
  • Action Items, if any, documented