{{#Wiki_filter:/RA/  
{{#Wiki_filter:December 27, 2018
EA-18-173
Mr. Brad Sawatzke
Chief Executive Officer
Energy Northwest
MD 1023
P.O. Box 968
Richland, WA 99352
SUBJECT:        COLUMBIA GENERATING STATION - ACKNOWLEDGMENT OF RESPONSE
                TO NRC BASELINE INSPECTION REPORT 05000397/2018003 AND
                DISPUTED NON-CITED VIOLATION
Dear Mr. Sawatzke:
This letter acknowledges your November 29, 2018, correspondence (ML18333A389)
in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection
Report 05000397/2018003 (ML18304A362), dated October 31, 2018. In the inspection report,
the NRC documented a Green non-cited violation (NCV) that was the subject of your response:
NCV 05000397/2018003-02, Green NCV of Technical Specification 5.7.2 for failure to control
workers in a high radiation area exceeding 1.0 rem/hr. The cover letter to the inspection report
requested you to respond in writing within 30 days if you contested any of the violations.
On November 29, 2018, the NRC received a letter from you contesting this NCV. The NRC is
currently reviewing your basis for contesting the violation in accordance with Section 2.2.7 of the
Enforcement Manual. Accordingly, we will provide the results of our evaluations by written
response within 90 days of the receipt of your letter.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
                                                Sincerely,
                                                /RA/
                                                Heather J. Gepford, Chief
                                                Plant Support Branch 2
                                                Division of Reactor Safety
Docket No. 50-397
License No. NPF-21
cc: Electronic Distribution




 
ML18361A865
 
SUNSI Review        ADAMS:            Non-Publicly Available        Non-Sensitive    Keyword:
   
  By: HJG              Yes No        Publicly Available            Sensitive          NRC-002
 
OFFICE        C:PSB2        C:DRP/A        C:PSB2          D:DRS              C:PSB2
 
NAME          HGepford      MHaire        HGepford        MShaffer          HGepford
 
SIGNATURE        /RA/         /RA/           /RA/         /RA REL for/       /RA/
 
DATE          12/21/2018   12/21/2018     12/21/2018         12/27/2018     12/27/2018
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
/RA/ /RA/ /RA/ /RA REL for/ /RA/ 12/21/2018 12/21/2018 12/21/2018 12/27/2018 12/27/2018
}}
}}

Latest revision as of 07:37, 20 October 2019

Acknowledgement of Response to NRC Baseline Inspection Report 05000397/2018003 and Disputed Non-Cited Violation
ML18361A865
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/27/2018
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Sawatzke B
Energy Northwest
Gepford H
References
EA-18-173 IR 2018003
Download: ML18361A865 (2)


See also: IR 05000397/2018003

Text

December 27, 2018

EA-18-173

Mr. Brad Sawatzke

Chief Executive Officer

Energy Northwest

MD 1023

P.O. Box 968

Richland, WA 99352

SUBJECT: COLUMBIA GENERATING STATION - ACKNOWLEDGMENT OF RESPONSE

TO NRC BASELINE INSPECTION REPORT 05000397/2018003 AND

DISPUTED NON-CITED VIOLATION

Dear Mr. Sawatzke:

This letter acknowledges your November 29, 2018, correspondence (ML18333A389)

in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection

Report 05000397/2018003 (ML18304A362), dated October 31, 2018. In the inspection report,

the NRC documented a Green non-cited violation (NCV) that was the subject of your response:

NCV 05000397/2018003-02, Green NCV of Technical Specification 5.7.2 for failure to control

workers in a high radiation area exceeding 1.0 rem/hr. The cover letter to the inspection report

requested you to respond in writing within 30 days if you contested any of the violations.

On November 29, 2018, the NRC received a letter from you contesting this NCV. The NRC is

currently reviewing your basis for contesting the violation in accordance with Section 2.2.7 of the

Enforcement Manual. Accordingly, we will provide the results of our evaluations by written

response within 90 days of the receipt of your letter.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Heather J. Gepford, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-397

License No. NPF-21

cc: Electronic Distribution

ML18361A865

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: HJG Yes No Publicly Available Sensitive NRC-002

OFFICE C:PSB2 C:DRP/A C:PSB2 D:DRS C:PSB2

NAME HGepford MHaire HGepford MShaffer HGepford

SIGNATURE /RA/ /RA/ /RA/ /RA REL for/ /RA/

DATE 12/21/2018 12/21/2018 12/21/2018 12/27/2018 12/27/2018