{{#Wiki_filter:Key Principles for Inspection of Risk-Informed Initiatives CJ Fong , Branch Chief, P.E.PRA Oversight Branch, DRA, NRRNEI Lessons
{{#Wiki_filter:Key Principles for Inspection of Risk-Informed Initiatives CJ Fong, Branch Chief, P.E.
-Learned Workshop, January 30  
PRA Oversight Branch, DRA, NRR NEI Lessons-Learned Workshop, January 30 - 31, 2019
-31, 2019 Vision*Licensees implement risk
 
-informed initiatives in a manner consistent with what was approved in licensing. This provides operational flexibility while ensuring an appropriate level of safety.
Vision
*NRC monitors implementation under the ROP to verify that safety conclusions drawn during licensing remain valid.
* Licensees implement risk-informed initiatives in a manner consistent with what was approved in licensing. This provides operational flexibility while ensuring an appropriate level of safety.
2 Objectives 3*To present high level principles the NRC plans to apply during oversight of risk
* NRC monitors implementation under the ROP to verify that safety conclusions drawn during licensing remain valid.
-informed initiatives.
2
*To solicit early feedback or questions related to oversight of risk
 
-informed initiatives.
Objectives
Key Principles 1.Risk-informed initiatives  
* To present high level principles the NRC plans to apply during oversight of risk-informed initiatives.
-when implemented properly  
* To solicit early feedback or questions related to oversight of risk-informed initiatives.
-appropriately focus NRC and licensee resources on areas of greatest safety significance.
3
2."Trust but verify.NRC expects/assumes that licensees are implementing risk
 
-informed initiatives IAW current licensing bases (CLB) butperformance
Key Principles
-based inspection is needed to verify.
: 1. Risk-informed initiatives - when implemented properly -
3.Inspection should be consistent with ROP bases (both technical and policy).
appropriately focus NRC and licensee resources on areas of greatest safety significance.
4.NRC strives to ensure any changes to the inspection program promote efficiency without compromising safety. 5.Inspections should focus on those aspects of risk
: 2. Trust but verify. NRC expects/assumes that licensees are implementing risk-informed initiatives IAW current licensing bases (CLB) but performance-based inspection is needed to verify.
-informed initiatives that  
: 3. Inspection should be consistent with ROP bases (both technical and policy).
-if improperly implemented  
: 4. NRC strives to ensure any changes to the inspection program promote efficiency without compromising safety.
-could lead to increased plant risk.
: 5. Inspections should focus on those aspects of risk-informed initiatives that - if improperly implemented -
4 Principle 1  
could lead to increased plant risk.                     4
-Win/Win When properly implemented, risk
 
-informed initiatives benefit all stakeholders.NRC understands the value of RI initiatives and has a long history of encouraging implementation."The use of PRA technology should be increased in all regulatory matters to the extent supported by the state
Principle 1 - Win/Win When properly implemented, risk-informed initiatives benefit all stakeholders.
-of-the-art in PRA methods and data-" [Commission's 1995 PRA Policy Statement]Risk-informed approaches "-better focus licensee and regulatory attention on design and operational issues commensurate with their importance to public health and safety." [SECY 144]5 Principle 2  
NRC understands the value of RI initiatives and has a long history of encouraging implementation.
-Trust B ut V erifyNRC position on need to inspect risk
The use of PRA technology should be increased in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data [Commissions 1995 PRA Policy Statement]
-informed initiatives has been consistent:"[T]he Commission plans to conduct inspections of  
Risk-informed approaches better focus licensee and regulatory attention on design and operational issues commensurate with their importance to public health and safety. [SECY-98-144]
§50.69 implementation." [2004 50.69 FRN]"Each entry into the RMTS is required to be properly documented to permit proper review and oversight to determine compliance with the TS requirements." [2007, 4B Safety Evaluation]"The licensee does not need to report the results of the [performance] monitoring to the NRC but should retain them on site for inspection." [1998, RG 1.174]
5
6 Principle 3  
 
-Inspection IAW ROP NRC will inspect RI initiatives consistent with the ROP's existing technical basis document, IMC 0308:
Principle 2 - Trust But Verify NRC position on need to inspect risk-informed initiatives has been consistent:
*Inspectableareas are based on their risk importance in measuring a cornerstone objective.  
[T]he Commission plans to conduct inspections of § 50.69 implementation. [2004 50.69 FRN]
*Inspection frequency, how many activities to inspect, and how much time to spend inspecting activities in each inspectablearea is based on risk information
Each entry into the RMTS is required to be properly documented to permit proper review and oversight to determine compliance with the TS requirements. [2007, 4B Safety Evaluation]
.*Selection of activities to inspect in each inspectablearea is based on plant
The licensee does not need to report the results of the
-specific risk information
[performance] monitoring to the NRC but should retain them on site for inspection. [1998, RG 1.174]
.*The more fully a [performance] indicator measures an area, the less extensive is the scope of inspection.
6
7 Principle 4  
 
-Inspect E fficientlyNRC will continue to focus on efficient utilization of resources commensurate with safety.It is expected that level of effort will scale with verified successful implementation of program."-recent changes in the external environment-provide a compelling opportunity to better focus NRC resources on the most safety and security significant aspects of our work, while continuing to enhance the effectiveness, efficiency and agility of our licensing and oversight functions." [SECY-18-0060]8 Principle 5  
Principle 3 - Inspection IAW ROP NRC will inspect RI initiatives consistent with the ROPs existing technical basis document, IMC 0308:
-Focus on S afetyNRC will focus on inspectableareas of greatest safety impact."Regulatory activities should be consistent with the degree of risk reduction that they achieve." [Principles of Good Regulation]"-inspection will also consider the implementation of RISC-3 treatment focusing on programmatic and common cause issues, which could undermine the categorization process and its results." [50.69 FRN]
* Inspectable areas are based on their risk importance in measuring a cornerstone objective.
9 Questions?
* Inspection frequency, how many activities to inspect, and how much time to spend inspecting activities in each inspectable area is based on risk information.
1 0 1.Risk-informed initiatives  
* Selection of activities to inspect in each inspectable area is based on plant-specific risk information.
-when implemented properly  
* The more fully a [performance] indicator measures an area, the less extensive is the scope of inspection.
-appropriately focus NRC and licensee resources on areas of greatest safety significance.
7
2."Trust but verify.NRC expects/assumes that licensees are implementing risk
 
-informed initiatives IAW current licensing bases (CLB) butperformance
Principle 4 - Inspect Efficiently NRC will continue to focus on efficient utilization of resources commensurate with safety.
-based inspection is needed to verify.3.Inspection should be consistent with ROP bases (both technical and policy).
It is expected that level of effort will scale with verified successful implementation of program.
4.NRC strives to ensure any changes to the inspection program promote efficiency without compromising safety.
recent changes in the external environmentprovide a compelling opportunity to better focus NRC resources on the most safety and security significant aspects of our work, while continuing to enhance the effectiveness, efficiency and agility of our licensing and oversight functions. [SECY-18-0060]
5.Inspections should focus on those aspects of risk
8
-informed initiatives that  
 
-if improperly implemented  
Principle 5 - Focus on Safety NRC will focus on inspectable areas of greatest safety impact.
-could lead to increased plant risk.
Regulatory activities should be consistent with the degree of risk reduction that they achieve. [Principles of Good Regulation]
inspection will also consider the implementation of RISC-3 treatment focusing on programmatic and common cause issues, which could undermine the categorization process and its results. [50.69 FRN]
9
 
Questions?
: 1. Risk-informed initiatives - when implemented properly -
appropriately focus NRC and licensee resources on areas of greatest safety significance.
: 2. Trust but verify. NRC expects/assumes that licensees are implementing risk-informed initiatives IAW current licensing bases (CLB) but performance-based inspection is needed to verify.
: 3. Inspection should be consistent with ROP bases (both technical and policy).
: 4. NRC strives to ensure any changes to the inspection program promote efficiency without compromising safety.
: 5. Inspections should focus on those aspects of risk-informed initiatives that - if improperly implemented - could lead to increased plant risk.
1 0
 
References
References
*Regulatory Guide 1.174, Revision 3, "An Approach for Using Probabilistic Risk Assessment in Risk
* Regulatory Guide 1.174, Revision 3, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Jan 2018, (ML17317A256).
-Informed Decisions on Plant
* Final SE for NEI Topical Report NEI 06-09, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications Guidelines, May 17 2007, (ML071200238).
-Specific Changes to the Licensing Basis," Jan 2018, (ML17317A256).
* SECY-98-144, White Paper on Risk-Informed and Performance-Based Regulation, June 22, 1998.
*Final SE for NEI Topical Report NEI 06-09, "Risk-Informed Technical Specifications Initiative 4b, Risk
* 10 CFR50.69, Final Rule, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, November 22, 2004 (69 FR 68008).
-Managed Technical Specifications Guidelines," May 17 2007, (ML071200238).
* IMC-0308 Attachment 2, Technical Basis for Inspection Program, January 5, 2018 (ML16306A386).
*SECY-98-144 , "White Paper on Risk-Informed and Performance
* SECY-18-0060, Achieving Modern Risk-Informed Regulation, May 23, 2018 (ML18110A187).
-Based Regulation," June 22, 1998.*10 CFR50.69, Final Rule, Risk
* Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities; Final Policy Statement, August 16, 1995 (60 FR 42622).         1 1
-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, November 22, 2004 (69 FR 68008
 
).*IMC-0308 Attachment 2, "Technical Basis for Inspection Program," January 5, 2018 (ML16306A386).
History and Experience with Inspection of Risk-Informed Initiatives Aron Lewin, Reactor Systems Engineer Reactor Inspection Branch, DIRS, NRR NEI Lessons-Learned Workshop, January 30 - 31, 2019
*SECY-18-0060, "Achieving Modern Risk
 
-Informed Regulation," May 23, 2018 (ML18110A187).
Oversight of Technical Specification Surveillance Frequency Control Program
*Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities; Final Policy Statement, August 16, 1995 (60 FR 42622
* Oversight conducted via Reactor Oversight Process (ROP) baseline Inspection Procedure (IP) 71111.22, Surveillance Testing. (ML18177A109)
).1 1 History and Experience with Inspection of Risk-Informed Initiatives Aron Lewin , R eactor S ystems Engineer Reactor Inspection Branch, DIRS, NRRNEI Lessons
* Verifies that surveillance testing activities provide objective evidence that risk or safety significant structures, systems, and components (SSCs) remain capable of performing their intended safety functions.
-Learned Workshop, January 30  
* 14 to 22 inspection samples conducted per year.
-31, 2019 Oversight of Technical Specification Surveillance Frequency Control Program  
* Flexibility afforded to inspector on sample selection.
*Oversight conducted via Reactor Oversight Process (ROP) baseline Inspection Procedure (IP) 71111.22, "Surveillance Testing." (ML18177A109
* IP provides guidance on attributes to consider if a sample on implementation of the Surveillance Frequency Control Program (SFCP) is selected.         2
)*Verifies that surveillance testing activities provide objective evidence that risk or safety significant structures, systems, and components (SSCs) remain capable of performing their intended safety functions
 
.*14 to 22 inspection samples conducted per year
Oversight of Technical Specification Risk-Informed Completion Times
.*Flexibility afforded to inspector on sample selection
* Oversight conducted via ROP baseline IP 71111.13, Maintenance Risk Assessments and Emergent Work Control. (ML17194A934)
.*IP provides guidance on attributes to consider if a sample on implementation of the Surveillance Frequency Control Program (SFCP) is selected
* Verifies that appropriate risk assessments (RAs) and corresponding work controls and risk management actions (RMAs) are implemented during planned and emergent maintenance activities.
.2 Oversight of Technical Specification Risk-Informed Completion Times
* 14 to 24 inspection samples conducted per year.
*Oversight conducted via ROP baseline IP 71111.13, "Maintenance Risk Assessments and Emergent Work Control." (ML17194A934)
* Flexibility afforded to inspector on sample selection.
*Verifies that appropriate risk assessments (RAs) and corresponding work controls and risk management actions (RMAs) are implemented during planned and emergent maintenance activities.
* IP provides guidance on attributes to consider if a sample on Risk Informed Completion Times (RICT) is selected.                                             3
*14 to 24 inspection samples conducted per year.
 
*Flexibility afforded to inspector on sample selection.
Oversight of 10 CFR 50.69
*IP provides guidance on attributes to consider if a sample on Risk Informed Completion Times (RICT) is selected.3 Oversight of 10 CFR 50.69*Oversight conducted via ROP special and infrequently performed IP 37060, "10 CFR 50.69 Risk
* Oversight conducted via ROP special and infrequently performed IP 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection. (ML102700396)
-Informed Categorization and Treatment of Structures, Systems, and Components Inspection." (ML102700396)
* Verifies: (1) that programs and procedures have properly incorporated the approved license amendment associated with 10 CFR 50.69, (2) proper implementation of the 10 CFR 50.69 categorization, and (3) properly implementation of alternate treatment requirements.
*Verifies: (1) that programs and procedures have properly incorporated the approved license amendment associated with 10 CFR 50.69, (2) proper implementation of the 10 CFR 50.69 categorization, and (3) properly implementation of alternate treatment requirements.
* IP performed at discretion and approval by Regional Administrator.
*IP performed at discretion and approval by Regional Administrator.
4
4 History and Experience with Inspection of Risk-Informed InitiativesMichael Montecalvo, Reactor Operations EngineerPRA Oversight Branch, DRA, NRRNEI Lessons
 
-Learned Workshop, January 30  
History and Experience with Inspection of Risk-Informed Initiatives Michael Montecalvo, Reactor Operations Engineer PRA Oversight Branch, DRA, NRR NEI Lessons-Learned Workshop, January 30 - 31, 2019
-31, 2019 Working Group
 
*Objective: Ensure a smooth transition to oversight for licensees approved for RI initiatives
Working Group
-Training/awareness for inspectors
* Objective: Ensure a smooth transition to oversight for licensees approved for RI initiatives
-Monitoring oversight activities  
    - Training/awareness for inspectors
-Recommendations on Inspection Procedure changes (if needed)-Recommendations on other oversight document changes (if needed)*Supporting Personnel
    - Monitoring oversight activities
-Program office support from Division of Risk Assessment (DRA) and Division of Inspection and Regional Support (DIRS)
    - Recommendations on Inspection Procedure changes (if needed)
-Regional support from Senior Reactor Analysts, region based Inspectors, Resident/Senior Resident Inspectors 2
    - Recommendations on other oversight document changes (if needed)
Insights from Vogtle 10 CFR 50.69 InspectionJohn David Hanna, Senior Reactor Analyst Division of Reactor Projects, Region 3NEI Lessons
* Supporting Personnel
-Learned Workshop, January 30  
    - Program office support from Division of Risk Assessment (DRA) and Division of Inspection and Regional Support (DIRS)
-31, 2019 Overview of the Presentation
    - Regional support from Senior Reactor Analysts, region based Inspectors, Resident/Senior Resident Inspectors 2
*General Information
 
*Process Challenges
Insights from Vogtle 10 CFR 50.69 Inspection John David Hanna, Senior Reactor Analyst Division of Reactor Projects, Region 3 NEI Lessons-Learned Workshop, January 30 - 31, 2019
*Technical Challenges (One Individual's Observations from Vogtle)*Potential Benefits from Implementation 2
 
Overview of the Presentation
* General Information
* Process Challenges
* Technical Challenges (One Individuals Observations from Vogtle)
* Potential Benefits from Implementation 2
 
General Information
General Information
*My Background and Experience 3
* My Background and Experience 3
 
General Information (Continued)
General Information (Continued)
*What did we inspect?
* What did we inspect?
*What topics will this presentation cover?
* What topics will this presentation cover?
*What topics won't be covered?
* What topics wont be covered?
-pre-decisional information from the Vogtleinspection
  - pre-decisional information from the Vogtle inspection
-an overview of the 50.69 process since this is well understood by those implementing it
  - an overview of the 50.69 process since this is well understood by those implementing it
-recommendations on whether to implement or how to accomplish 4
  - recommendations on whether to implement or how to accomplish 4
 
Process Challenges
Process Challenges
*Cultural aspects as a regulator
* Cultural aspects as a regulator
*Inspector skill sets necessary
* Inspector skill sets necessary
*Loss of corporate knowledge
* Loss of corporate knowledge
*Ambiguous guidance & requirements
* Ambiguous guidance & requirements
-IP 37060 requirement 02.01.d and 10CFR50.69 (c)(iv) links safety margins with risk and uses a "reasonable confidence" level which isn't well defined- at least for inspectors
  - IP 37060 requirement 02.01.d and 10CFR50.69 (c)(iv) links safety margins with risk and uses a reasonable confidence level which isnt well defined at least for inspectors
-10CFR50.69 (c)(i) refers to PRA of "sufficient quality "5
  - 10CFR50.69 (c)(i) refers to PRA of sufficient quality 5
 
Process Challenges (Continued)
Process Challenges (Continued)
*Unclear Guidance and Requirements  
* Unclear Guidance and Requirements -
-continued-Corrective action requirements
continued
-Reportabilityrequirements under 50.72 and 50.73
  - Corrective action requirements
*Interface with other inspection programs
  - Reportability requirements under 50.72 and 50.73
*Risk rankings used in the guidance are FV and RAW values 6 Process Challenges (Continued)
* Interface with other inspection programs
*Timing will be important in coordinating on IP
* Risk rankings used in the guidance are FV and RAW values 6
-37060 inspections:
 
-Too early = limits the opportunities to review the "feedback" process and the effects of alternate treatment, - which impacts our effectiveness
Process Challenges (Continued)
-Too late = failure of the agency to be timely in inspections of an active program
* Timing will be important in coordinating on IP-37060 inspections:
*Inspection of SSCs characterized as RISC unrelated to risk calculations
  - Too early = limits the opportunities to review the feedback process and the effects of alternate treatment, which impacts our effectiveness
*Visualization of the process
  - Too late = failure of the agency to be timely in inspections of an active program
*Risk sensitivity studies
* Inspection of SSCs characterized as RISC-3 unrelated to risk calculations
-Impact of a CCCG
* Visualization of the process
-Standby SSCs & demands 7
* Risk sensitivity studies
  - Impact of a CCCG
  - Standby SSCs & demands                             7
 
Technical Challenges
Technical Challenges
*Independence of technical staff on the IDP, particularly in the PRA discipline
* Independence of technical staff on the IDP, particularly in the PRA discipline
*RISC-3 categorization of systems if they are not present in the PRA model
* RISC-3 categorization of systems if they are not present in the PRA model
*HSS categorization of SSCs due to Seismic Margin Analysis
* HSS categorization of SSCs due to Seismic Margin Analysis
*Use of PRA information during "design basis" portions of the categorization process
* Use of PRA information during design basis portions of the categorization process
*Follow-up effort once IP
* Follow-up effort once IP-37060 has been performed 8
-37060 has been performed 8
 
Benefits of Implementation
Benefits of Implementation
*Potential lessening of the "regulatory burden" for a number of systems
* Potential lessening of the regulatory burden for a number of systems
*May result in a reduction in inspection and assessment resources and hence increased efficiency and effectiveness
* May result in a reduction in inspection and assessment resources and hence increased efficiency and effectiveness
*Greater operational flexibility for our plants
* Greater operational flexibility for our plants
*Potential cost savings for our licensees (especially in the area of procurement)
* Potential cost savings for our licensees (especially in the area of procurement)
*Overall improved safety focus by the agency 9
* Overall improved safety focus by the agency 9
 
Questions or Comments?
Questions or Comments?
1 0 Acronyms*FV -FussellVesely**HSS -High Safety Significance
1 0
*IDP -Integrated Decision Making Panel
 
*LERF -Large Early Release Frequency
Acronyms
*PRA -Probabilistic Risk Assessment
* FV - Fussell Vesely *
*RAW -Risk Achievement Worth*
* HSS - High Safety Significance
*RISC -Risk Informed Safety Classification
* IDP - Integrated Decision Making Panel
*SE -Safety Evaluation
* LERF - Large Early Release Frequency
*SSC -Structure, System or Component 1 1* FusselVesselyand Risk Achievement Worth are risk metrics, similar to Birnbaum values.
* PRA - Probabilistic Risk Assessment
NRC Panel: Inspection of Risk-Informed InitiativesNEI Lessons
* RAW - Risk Achievement Worth*
-Learned Workshop, January 30  
* RISC - Risk Informed Safety Classification
-31, 2019 Panelists*CJ Fong, Branch Chief, P.E.PRA Oversight Branch, DRA, NRR*John David Hanna, Senior Reactor Analyst Division of Reactor Projects, Region 3*Aron Lewin, Reactor Systems Engineer Reactor Inspection Branch, DIRS, NRR
* SE - Safety Evaluation
*Michael Montecalvo, Reactor Operations EngineerPRA Oversight Branch, DRA, NRR 2
* SSC - Structure, System or Component
* Fussel Vessely and Risk Achievement Worth are risk metrics, similar to Birnbaum 1 values.
1
 
NRC Panel: Inspection of Risk-Informed Initiatives NEI Lessons-Learned Workshop, January 30 - 31, 2019
 
Panelists
* CJ Fong, Branch Chief, P.E.
PRA Oversight Branch, DRA, NRR
* John David Hanna, Senior Reactor Analyst Division of Reactor Projects, Region 3
* Aron Lewin, Reactor Systems Engineer Reactor Inspection Branch, DIRS, NRR
* Michael Montecalvo, Reactor Operations Engineer PRA Oversight Branch, DRA, NRR 2
 
Process for Revisions to Inspection Program Documents
Process for Revisions to Inspection Program Documents
*Revision process governed by Inspection Manual Chapter (IMC) 0040, "Preparing, Revising and Issuing Documents for the NRC Inspection Manual." (ML18003A122)
* Revision process governed by Inspection Manual Chapter (IMC) 0040, Preparing, Revising and Issuing Documents for the NRC Inspection Manual.
*Process involves review and feedback from multiple NRC HQ offices and Regions.
(ML18003A122)
*Depending on revision, inspector training may be required prior to Inspection Procedure (IP) implementation.  
* Process involves review and feedback from multiple NRC HQ offices and Regions.
*Revisions should continue to ensure that Reactor Oversight Process (ROP) baseline inspections are risk
* Depending on revision, inspector training may be required prior to Inspection Procedure (IP) implementation.
-informed and performance
* Revisions should continue to ensure that Reactor Oversight Process (ROP) baseline inspections are risk-informed and performance-based.
-based.3 Facilitated Discussion /
3
 
Facilitated Discussion /
Question and Answer Session 4}}
Question and Answer Session 4}}

Latest revision as of 00:32, 20 October 2019

Enclosure 4 - NRC Presentations on Inspection of Risk-Informed Initiatives
ML19064B034
Person / Time
Issue date: 01/30/2019
From: Cj Fong
NRC/NRR/DRA
To:
References
Download: ML19064B034 (32)


Text

Key Principles for Inspection of Risk-Informed Initiatives CJ Fong, Branch Chief, P.E.

PRA Oversight Branch, DRA, NRR NEI Lessons-Learned Workshop, January 30 - 31, 2019

Vision

  • Licensees implement risk-informed initiatives in a manner consistent with what was approved in licensing. This provides operational flexibility while ensuring an appropriate level of safety.
  • NRC monitors implementation under the ROP to verify that safety conclusions drawn during licensing remain valid.

2

Objectives

  • To present high level principles the NRC plans to apply during oversight of risk-informed initiatives.
  • To solicit early feedback or questions related to oversight of risk-informed initiatives.

3

Key Principles

1. Risk-informed initiatives - when implemented properly -

appropriately focus NRC and licensee resources on areas of greatest safety significance.

2. Trust but verify. NRC expects/assumes that licensees are implementing risk-informed initiatives IAW current licensing bases (CLB) but performance-based inspection is needed to verify.
3. Inspection should be consistent with ROP bases (both technical and policy).
4. NRC strives to ensure any changes to the inspection program promote efficiency without compromising safety.
5. Inspections should focus on those aspects of risk-informed initiatives that - if improperly implemented -

could lead to increased plant risk. 4

Principle 1 - Win/Win When properly implemented, risk-informed initiatives benefit all stakeholders.

NRC understands the value of RI initiatives and has a long history of encouraging implementation.

The use of PRA technology should be increased in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data [Commissions 1995 PRA Policy Statement]

Risk-informed approaches better focus licensee and regulatory attention on design and operational issues commensurate with their importance to public health and safety. [SECY-98-144]

5

Principle 2 - Trust But Verify NRC position on need to inspect risk-informed initiatives has been consistent:

[T]he Commission plans to conduct inspections of § 50.69 implementation. [2004 50.69 FRN]

Each entry into the RMTS is required to be properly documented to permit proper review and oversight to determine compliance with the TS requirements. [2007, 4B Safety Evaluation]

The licensee does not need to report the results of the

[performance] monitoring to the NRC but should retain them on site for inspection. [1998, RG 1.174]

6

Principle 3 - Inspection IAW ROP NRC will inspect RI initiatives consistent with the ROPs existing technical basis document, IMC 0308:

  • Inspectable areas are based on their risk importance in measuring a cornerstone objective.
  • Inspection frequency, how many activities to inspect, and how much time to spend inspecting activities in each inspectable area is based on risk information.
  • Selection of activities to inspect in each inspectable area is based on plant-specific risk information.
  • The more fully a [performance] indicator measures an area, the less extensive is the scope of inspection.

7

Principle 4 - Inspect Efficiently NRC will continue to focus on efficient utilization of resources commensurate with safety.

It is expected that level of effort will scale with verified successful implementation of program.

recent changes in the external environmentprovide a compelling opportunity to better focus NRC resources on the most safety and security significant aspects of our work, while continuing to enhance the effectiveness, efficiency and agility of our licensing and oversight functions. [SECY-18-0060]

8

Principle 5 - Focus on Safety NRC will focus on inspectable areas of greatest safety impact.

Regulatory activities should be consistent with the degree of risk reduction that they achieve. [Principles of Good Regulation]

inspection will also consider the implementation of RISC-3 treatment focusing on programmatic and common cause issues, which could undermine the categorization process and its results. [50.69 FRN]

9

Questions?

1. Risk-informed initiatives - when implemented properly -

appropriately focus NRC and licensee resources on areas of greatest safety significance.

2. Trust but verify. NRC expects/assumes that licensees are implementing risk-informed initiatives IAW current licensing bases (CLB) but performance-based inspection is needed to verify.
3. Inspection should be consistent with ROP bases (both technical and policy).
4. NRC strives to ensure any changes to the inspection program promote efficiency without compromising safety.
5. Inspections should focus on those aspects of risk-informed initiatives that - if improperly implemented - could lead to increased plant risk.

1 0

References

  • Final SE for NEI Topical Report NEI 06-09, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications Guidelines, May 17 2007, (ML071200238).
  • SECY-98-144, White Paper on Risk-Informed and Performance-Based Regulation, June 22, 1998.
  • 10 CFR50.69, Final Rule, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, November 22, 2004 (69 FR 68008).
  • IMC-0308 Attachment 2, Technical Basis for Inspection Program, January 5, 2018 (ML16306A386).

History and Experience with Inspection of Risk-Informed Initiatives Aron Lewin, Reactor Systems Engineer Reactor Inspection Branch, DIRS, NRR NEI Lessons-Learned Workshop, January 30 - 31, 2019

Oversight of Technical Specification Surveillance Frequency Control Program

  • Verifies that surveillance testing activities provide objective evidence that risk or safety significant structures, systems, and components (SSCs) remain capable of performing their intended safety functions.
  • 14 to 22 inspection samples conducted per year.
  • Flexibility afforded to inspector on sample selection.

Oversight of Technical Specification Risk-Informed Completion Times

  • Verifies that appropriate risk assessments (RAs) and corresponding work controls and risk management actions (RMAs) are implemented during planned and emergent maintenance activities.
  • 14 to 24 inspection samples conducted per year.
  • Flexibility afforded to inspector on sample selection.
  • IP provides guidance on attributes to consider if a sample on Risk Informed Completion Times (RICT) is selected. 3

Oversight of 10 CFR 50.69

  • Oversight conducted via ROP special and infrequently performed IP 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection. (ML102700396)
  • Verifies: (1) that programs and procedures have properly incorporated the approved license amendment associated with 10 CFR 50.69, (2) proper implementation of the 10 CFR 50.69 categorization, and (3) properly implementation of alternate treatment requirements.
  • IP performed at discretion and approval by Regional Administrator.

4

History and Experience with Inspection of Risk-Informed Initiatives Michael Montecalvo, Reactor Operations Engineer PRA Oversight Branch, DRA, NRR NEI Lessons-Learned Workshop, January 30 - 31, 2019

Working Group

  • Objective: Ensure a smooth transition to oversight for licensees approved for RI initiatives

- Training/awareness for inspectors

- Monitoring oversight activities

- Recommendations on Inspection Procedure changes (if needed)

- Recommendations on other oversight document changes (if needed)

  • Supporting Personnel

- Program office support from Division of Risk Assessment (DRA) and Division of Inspection and Regional Support (DIRS)

- Regional support from Senior Reactor Analysts, region based Inspectors, Resident/Senior Resident Inspectors 2

Insights from Vogtle 10 CFR 50.69 Inspection John David Hanna, Senior Reactor Analyst Division of Reactor Projects, Region 3 NEI Lessons-Learned Workshop, January 30 - 31, 2019

Overview of the Presentation

  • General Information
  • Process Challenges
  • Technical Challenges (One Individuals Observations from Vogtle)
  • Potential Benefits from Implementation 2

General Information

  • My Background and Experience 3

General Information (Continued)

  • What did we inspect?
  • What topics will this presentation cover?
  • What topics wont be covered?

- pre-decisional information from the Vogtle inspection

- an overview of the 50.69 process since this is well understood by those implementing it

- recommendations on whether to implement or how to accomplish 4

Process Challenges

  • Cultural aspects as a regulator
  • Inspector skill sets necessary
  • Loss of corporate knowledge
  • Ambiguous guidance & requirements

- IP 37060 requirement 02.01.d and 10CFR50.69 (c)(iv) links safety margins with risk and uses a reasonable confidence level which isnt well defined at least for inspectors

- 10CFR50.69 (c)(i) refers to PRA of sufficient quality 5

Process Challenges (Continued)

  • Unclear Guidance and Requirements -

continued

- Corrective action requirements

- Reportability requirements under 50.72 and 50.73

  • Interface with other inspection programs
  • Risk rankings used in the guidance are FV and RAW values 6

Process Challenges (Continued)

  • Timing will be important in coordinating on IP-37060 inspections:

- Too early = limits the opportunities to review the feedback process and the effects of alternate treatment, which impacts our effectiveness

- Too late = failure of the agency to be timely in inspections of an active program

  • Inspection of SSCs characterized as RISC-3 unrelated to risk calculations
  • Visualization of the process
  • Risk sensitivity studies

- Impact of a CCCG

- Standby SSCs & demands 7

Technical Challenges

  • Independence of technical staff on the IDP, particularly in the PRA discipline
  • RISC-3 categorization of systems if they are not present in the PRA model
  • HSS categorization of SSCs due to Seismic Margin Analysis
  • Use of PRA information during design basis portions of the categorization process
  • Follow-up effort once IP-37060 has been performed 8

Benefits of Implementation

  • Potential lessening of the regulatory burden for a number of systems
  • May result in a reduction in inspection and assessment resources and hence increased efficiency and effectiveness
  • Greater operational flexibility for our plants
  • Potential cost savings for our licensees (especially in the area of procurement)
  • Overall improved safety focus by the agency 9

Questions or Comments?

1 0

Acronyms

  • FV - Fussell Vesely *
  • HSS - High Safety Significance
  • IDP - Integrated Decision Making Panel
  • RAW - Risk Achievement Worth*
  • RISC - Risk Informed Safety Classification
  • SE - Safety Evaluation
  • SSC - Structure, System or Component
  • Fussel Vessely and Risk Achievement Worth are risk metrics, similar to Birnbaum 1 values.

1

NRC Panel: Inspection of Risk-Informed Initiatives NEI Lessons-Learned Workshop, January 30 - 31, 2019

Panelists

PRA Oversight Branch, DRA, NRR

  • John David Hanna, Senior Reactor Analyst Division of Reactor Projects, Region 3
  • Aron Lewin, Reactor Systems Engineer Reactor Inspection Branch, DIRS, NRR

Process for Revisions to Inspection Program Documents

(ML18003A122)

  • Process involves review and feedback from multiple NRC HQ offices and Regions.
  • Depending on revision, inspector training may be required prior to Inspection Procedure (IP) implementation.
  • Revisions should continue to ensure that Reactor Oversight Process (ROP) baseline inspections are risk-informed and performance-based.

3

Facilitated Discussion /

Question and Answer Session 4