ML19093A404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter::** February.
{{#Wiki_filter:February. 7, 1~7~1
7, 1~7~1 . . . :r~i"'.'1 r.: .:J . Mr. Jan:ies P. O'Reiliy, Direct'or . _2_'.1:)lV~:r::~J1l_J1.l4 l PIJ 1-ciQ .... erial Noe . .)~t'$-i'1':filtfl/ . Office of Ir .. spection an<l
                                                                                                                                          .             . . :r~i"'.'1 ~ r.: .:J   .
* Enfor.cefilent  
                                                                                                                                  ~            . _2_'.1:)lV~:r::~J1l_J1.l4l PIJ -ciQ Mr. Jan:ies P. O'Reiliy, Direct'or                                                                                        . . erial Noe . .)~t'$-i'1':filtfl/             1
-U. S~ Nuclear Regulatory Conllllis*s:i.011.*.
    . Office of               Ir. spection an<l *Enfor.cefilent -                                                              PO&li/DLB: das - * *                            * .
Region II -Suite 818 *
* U. S~ Nuclear Regulatory Conllllis*s:i.011.*.                                                                             Docket. Nos. -280' Region II - Suite 818                                                     *
* PO&li/DLB:
* 50_;28L
das -* * * .
      *230 Peachtree*Street, Northwest                                                                                         Licenee Noe. D?R-32
* Docket. Nos. -280'
*230 Peachtree*Street, Northwest 50_;28L Licenee Noe. D?R-32 DPR'."."37
* Atlanta, Georg~.
* Atlanta, Georg~.
* 30303
* 30303
* Desr: Mr~ O'Ref~ly:_ . '; . '!'his ia -in response to your
* DPR'."."37 Desr: Mr~             O'Ref~ly:_ . '; .
* let-ter. of November
                      '!'his ia -in response to                         your *let-ter. of                     November
* 11, .197_7, 1n: ,ref eren~e* to the inspection  
* 11, .197_7, 1n: ,ref eren~e* to the           inspection *condhcted at                           Surry     PO"s11er St:e.tiqn_                     on Octob.er .'Lr-7*~*: *19_77 anci *report..;.
*condhcted at Surry PO"s11er St:e.tiqn_
* E!d in IE Inspection *Report Nos. ';)0-2S0/77:_29 and 50-281/77-29 ~- . ThiE1:.is                                                                                             a *supple-..
on Octob.er .'Lr-7*~*:  
ment to our previous_resp'cinsea of-December'_6~ *t977 and r;c;cembcr:21, 1977; _arid
*19_77 anci *report..;.
    ._addresses_ Appeodix A, page_2*; item E*.of_your .letter of 1.fovemb~r.'.'11;**1977_ ,.. **_*.
* E!d in IE Inspection  
:In. order       to       insure         that*. the_ Liquid Wast*e Monitor* is. perf orm.1:ag. is*: specified
*Report Nos. ';)0-2S0/77:_29 and 50-281/77-29  
:**    ii:!.* Tecb.nicr.J. Specification conductecl.
~-. ThiE1:.is a *supple-.. ment to our previous_resp'cinsea of-December'_6~  
(1)
*t977 and r;c;cembcr:21, 1977; _arid ._addresses_
                                            .
Appeodix A, page_2*; item E*.of_your .letter of 1.fovemb~r.'.'11;**1977_ , .. **_*. : In. order to insure that*. the_ Liquid Wast*e Monitor* is. perf orm.1:ag.
:E
is*: specified ii:!.* Tecb.nicr.J.
: 3. 7. . au<l .'I'able. :3 .)-5 *l.:he :followi,ng
Specification
                                                                                                    '
: 3. 7 :E au<l .'I'able :3 .)-5 *l.:he :followi,ng p~ogrwn wili be . . . . ' . --" ' conductecl.
tn order** to 'insure: that. the'.l:Lquid. wa_ste monitor..- will. alarm *and< .
(1) tn order** to 'insure: that. the'.l:Lquid.
                          . shut the discharge valve 138 required~. a test*.willbe done usin~{ ."
wa_ste monitor..-
liquid .weste 5Wllples with :i.5!otope, &!!tivities near :the*. ill.arm* *set-.
will. alarm *and< . . shut the discharge valve 138 required~.
                                                                                                                                        -          - ~
a test*.willbe done usin~{ ." liquid .weste 5Wllples with :i.5!otope, &!!tivities near :the*. ill.arm* *set-. ** point: aa
p~ogrwn wili be .
* detem:iued.
                                                                                                                                                                              "  '
by the _roul ti_.channel analy~~r .-'The;~ test-_ will be eonducte:d
                            ** point:     aa
:during -the week_ of,February 6~1973._*_ . ' . ~-*, .. . * (2)
* detem:iued. by the _roul ti_.channel analy~~r .- 'The;~ test-_ will be eonducte:d :during           .    '  .
* In. or.der eval~iat.e*,_~ve~~il -pei;'fo:rniance of the i:tqciid was-~e monii : .. tor, *.& correla:i:i<m  
                                                                          -the week_ of,February   ~- .. .
,&tudy will be. conducted betwe'en monitor teadings, .
                                                                                                          *,
* and :liquid _waste !Ullll.pleli of known* isotope *activities.*
6~1973._*_
: In :order to obtaiu-liquia waste &~plea &#xa3;ram* worst case c.ond1tions,.
                * (2)
the study* ,
* In. or.der ~~- eval~iat.e*,_~ve~~il -pei;'fo:rniance of the i:tqciid was-~e monii :..
* will ... include s~ple& from-liquid_.wsste d,~e 'to. tp.e }L-'\rc.h UnH 1:lo*. 2
tor, *.& correla:i:i<m ,&tudy will be. conducted betwe'en monitor teadings,
* __ shutdo~~/ . :J'h:ts*.
                          .
st~dy. >~~pu;d ''-be -COl:ll)lef;eq_'hy  
* and :liquid _waste !Ullll.pleli of known* isotope *activities.* : In :order to obtaiu-liquia waste &~plea &#xa3;ram* worst case c.ond1tions,. the study* , *
'Apr:,q: ~s, J9?~-.. -_ ._:_ .. *; cc: -* *. ,. ..... * . ! .*. -* ... * ' ' *. ,.*.
          ._:_ . .*;            will   . .include s~ple& from-liquid_.wsste d,~e 'to. tp.e }L-'\rc.h UnH 1:lo*. 2
* t. . ' *Mr. ** Robert* W *. Reid /. .. -,,,, Ve:iy _ truly
* __ shutdo~~/ .:J'h:ts*.
* your*~,-~. )n,:~.Jlft(u~j:..:?.
                                          -    * *., . .....
C. lL, tall:h1gs  
st~dy. >~~pu;d
*Vice President.:..  
                                                                    *        . !  . * . -*
~ewer.Supply . autl-Production Operations  
                                                                                              ''-be -COl:ll)lef;eq_'hy 'Apr:,q: ~s, J9?~- .. - _
~\,* \ *7*~!.041 I.)\ *. -_J . I --~ .-------------. . --
                                                                                            ...       *       '               '     *.   ,.*.
* UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 11 230 PEACHTREE STREET, N.W. SUITE 818 ATLANTA, GEORGIA 30303 In Reply Refer To: RII :SCE 50-280/77-29 50-281/77-29 FF;*_: r: *** 1978 Virginia Electric and Power Company ATTN: Mr. W. L. Proffitt Senior Vice President, Power P. 0. Box 26666 Richmond, Virginia 23261 Gentlemen:
* t. .   '
                                                                                        - ,,,,                                   Ve:iy _truly *your*~,-
                                                                                                                              ~. )n,:~.Jlft(u~j:..:?.
C. lL, ~ tall:h1gs
                                                                                                              *Vice President.:.. ~ewer.Supply
                                                                                                                    . autl-Production Operations cc: *Mr.
* Robert* W*. Reid / . ..
                                                                                      ~\,*
                                                                                                    *7*~!.041 I.)\*. ~ -               _J .
                                                                                        \                I   -
                                                                                                            ---- - .
                                                                                                                      - ~ . - - ------
                                                                                          .
                                                                                          ~~  --
 
UNITED STATES
* NUCLEAR REGULATORY COMMISSION REGION 11 230 PEACHTREE STREET, N.W. SUITE 818 ATLANTA, GEORGIA 30303 FF;*_:  r: *** 1978 In Reply Refer To:
RII :SCE 50-280/77-29 50-281/77-29 Virginia Electric and Power Company ATTN: Mr. W. L. Proffitt Senior Vice President, Power P. 0. Box 26666 Richmond, Virginia 23261 Gentlemen:
Thank you for your letter of February 7, 1978, informing us of steps you have taken to correct the items of noncompliance concerning activities under NRC Operating License Nos. DPR-32 and DPR-37 brought to your attention in our letter of November 11, 1977. We will examine your corrective actions and plans during subsequent inspections.
Thank you for your letter of February 7, 1978, informing us of steps you have taken to correct the items of noncompliance concerning activities under NRC Operating License Nos. DPR-32 and DPR-37 brought to your attention in our letter of November 11, 1977. We will examine your corrective actions and plans during subsequent inspections.
We appreciate your cooperation with us. cc: Mr. T. L. Baucom Surry Power Station P. 0. Box 315 Surry, Virginia 23883 Sincerely, ... -;, "-/ ::-? --;-/) _,, ( ~/ *v-* x__/~i2J(g__,_,_<'.1.; . ~J. T. Sutherland, Chief Fuel Facility and Materials Safety Branch *
We appreciate your cooperation with us.
' , (. ' J" I -~-VIRGINIA Et.ECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 February 7, 1978 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Connnission Region II -Suite 818 Serial No. 519B/111177 PO&M/DLB:das Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 230 Peachtree Street, Northwest Atlanta, Georgia 30303  
Sincerely,
                                                    ...-;, "-/ ::-? --;-/) _,, (
                                              ~/ *v-* x__/~i2J(g__,_,_<'.1.; .
                                              ~J. T. Sutherland, Chief Fuel Facility and Materials Safety Branch cc:  Mr. T. L. Baucom Surry Power Station P. 0. Box 315 Surry, Virginia 23883
*
 
      , (.
'           J"
                ' -~-
I                          VIRGINIA Et.ECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 February 7, 1978 Mr. James P. O'Reilly, Director                           Serial No. 519B/111177 Office of Inspection and Enforcement                      PO&M/DLB:das U.S. Nuclear Regulatory Connnission                      Docket Nos. 50-280 Region II - Suite 818                                                      50-281 230 Peachtree Street, Northwest                          License Nos. DPR-32 Atlanta, Georgia 30303                                                     DPR-37


==Dear :==
==Dear :==
t-fr. 0 'Reilly: This is in response to your letter of November 11, 1977, in reference to the inspection conducted at Surry Power Station on October 4-7, ed in IE Inspection Report Nos. 50-280/77-29 and 50-281/77-29.
t-fr. 0 'Reilly:
ment to our previous responses of December 6, 1977 and December addresses Appendix A, page 2, item E of your letter of November 1977 and This is a supple-21, 1977, and 11, 1977. In order to insure that the Liquid Waste honitor is performing as specified  
This is in response to your letter of November 11, 1977, in reference to the inspection conducted at Surry Power Station on October 4-7, 1977 and report-ed in IE Inspection Report Nos. 50-280/77-29 and 50-281/77-29. This is a supple-ment to our previous responses of December 6, 1977 and December 21, 1977, and addresses Appendix A, page 2, item E of your letter of November 11, 1977.
*. Technical Specification 3.7.E and Table 3.7-5 the following program will be ducted. (1) In order to insure that the liquid waste monitor will alarm and shut the discharge valve as required, a test will be done using liquid waste samples with isotope activities near the alarm point as determined by the multi-channel analyzer.
In order to insure that the Liquid Waste honitor is performing as specified
The test will be conducted during the week of February 6, 1978. (2) In order to evaluate overall performance of the liquid waste tor, a correlation study will be conducted between monitor readings, and liquid waste samples of known isotope activities.
    .     Technical Specification 3.7.E and Table 3.7-5 the following program will be
In order to obtain liquid waste samples from worst case conditions, the study will include samples from liquid waste due to the March Unit No. 2 shutdown.
* ducted.
This study should be completed by April 15, 1978. Very truly yours, .. .--'. ,_)/_, ( ,:, ,_ *--) C.H. Stallings Vice President  
(1)     In order to insure that the liquid waste monitor will alarm and shut the discharge valve as required, a test will be done using liquid waste samples with isotope activities near the alarm set-point as determined by the multi-channel analyzer. The test will be conducted during the week of February 6, 1978.
-Power Supply and Production Operations cc: Mr. Robert W. Reid **}}
(2)     In order to evaluate overall performance of the liquid waste moni-tor, a correlation study will be conducted between monitor readings, and liquid waste samples of known isotope activities. In order to obtain liquid waste samples from worst case conditions, the study will include samples from liquid waste due to the March Unit No. 2 shutdown. This study should be completed by April 15, 1978.
Very truly yours,
                                                                .. .--'. ,_)/_, ( ,:, ,_ *--
                                                                                              )
C.H. Stallings Vice President - Power Supply and Production Operations
  **
cc:       Mr. Robert W. Reid}}

Revision as of 22:05, 19 October 2019

Response to Letter of 11/11/1977 in Reference to Inspection Conducted on 10/04-10/07/1977 and Reported in IE Inspection Report Nos. 05000280/1977029 & 05000281/1977029
ML19093A404
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/07/1978
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: O'Reilly J
NRC/RGN-II
References
IR 1977029
Download: ML19093A404 (3)


Text

February. 7, 1~7~1

. . . :r~i"'.'1 ~ r.: .:J .

~ . _2_'.1:)lV~:r::~J1l_J1.l4l PIJ -ciQ Mr. Jan:ies P. O'Reiliy, Direct'or . . erial Noe . .)~t'$-i'1':filtfl/ 1

. Office of Ir. spection an<l *Enfor.cefilent - PO&li/DLB: das - * * * .

  • U. S~ Nuclear Regulatory Conllllis*s:i.011.*. Docket. Nos. -280' Region II - Suite 818 *
  • 50_;28L
  • 230 Peachtree*Street, Northwest Licenee Noe. D?R-32
  • Atlanta, Georg~.
  • 30303
  • DPR'."."37 Desr: Mr~ O'Ref~ly:_ . '; .

'!'his ia -in response to your *let-ter. of November

  • 11, .197_7, 1n: ,ref eren~e* to the inspection *condhcted at Surry PO"s11er St:e.tiqn_ on Octob.er .'Lr-7*~*: *19_77 anci *report..;.
  • E!d in IE Inspection *Report Nos. ';)0-2S0/77:_29 and 50-281/77-29 ~- . ThiE1:.is a *supple-..

ment to our previous_resp'cinsea of-December'_6~ *t977 and r;c;cembcr:21, 1977; _arid

._addresses_ Appeodix A, page_2*; item E*.of_your .letter of 1.fovemb~r.'.'11;**1977_ ,.. **_*.

In. order to insure that*. the_ Liquid Wast*e Monitor* is. perf orm.1:ag. is*: specified
    • ii:!.* Tecb.nicr.J. Specification conductecl.

(1)

.

E
3. 7. . au<l .'I'able. :3 .)-5 *l.:he :followi,ng

'

tn order** to 'insure: that. the'.l:Lquid. wa_ste monitor..- will. alarm *and< .

. shut the discharge valve 138 required~. a test*.willbe done usin~{ ."

liquid .weste 5Wllples with :i.5!otope, &!!tivities near :the*. ill.arm* *set-.

- - ~

p~ogrwn wili be .

" '

    • point: aa
  • detem:iued. by the _roul ti_.channel analy~~r .- 'The;~ test-_ will be eonducte:d :during . ' .

-the week_ of,February ~- .. .

  • ,

6~1973._*_

  • (2)
  • In. or.der ~~- eval~iat.e*,_~ve~~il -pei;'fo:rniance of the i:tqciid was-~e monii :..

tor, *.& correla:i:i<m ,&tudy will be. conducted betwe'en monitor teadings,

.

  • and :liquid _waste !Ullll.pleli of known* isotope *activities.* : In :order to obtaiu-liquia waste &~plea £ram* worst case c.ond1tions,. the study* , *

._:_ . .*; will . .include s~ple& from-liquid_.wsste d,~e 'to. tp.e }L-'\rc.h UnH 1:lo*. 2

  • __ shutdo~~/ .:J'h:ts*.

- * *., . .....

st~dy. >~~pu;d

  • . ! . * . -*

-be -COl:ll)lef;eq_'hy 'Apr:,q: ~s, J9?~- .. - _

... * ' ' *. ,.*.

  • t. . '

- ,,,, Ve:iy _truly *your*~,-

~. )n,:~.Jlft(u~j:..:?.

C. lL, ~ tall:h1gs

  • Vice President.:.. ~ewer.Supply

. autl-Production Operations cc: *Mr.

  • Robert* W*. Reid / . ..

~\,*

  • 7*~!.041 I.)\*. ~ - _J .

\ I -


- .

- ~ . - - ------

.

~~ --

UNITED STATES

  • NUCLEAR REGULATORY COMMISSION REGION 11 230 PEACHTREE STREET, N.W. SUITE 818 ATLANTA, GEORGIA 30303 FF;*_: r: *** 1978 In Reply Refer To:

RII :SCE 50-280/77-29 50-281/77-29 Virginia Electric and Power Company ATTN: Mr. W. L. Proffitt Senior Vice President, Power P. 0. Box 26666 Richmond, Virginia 23261 Gentlemen:

Thank you for your letter of February 7, 1978, informing us of steps you have taken to correct the items of noncompliance concerning activities under NRC Operating License Nos. DPR-32 and DPR-37 brought to your attention in our letter of November 11, 1977. We will examine your corrective actions and plans during subsequent inspections.

We appreciate your cooperation with us.

Sincerely,

...-;, "-/ ::-? --;-/) _,, (

~/ *v-* x__/~i2J(g__,_,_<'.1.; .

~J. T. Sutherland, Chief Fuel Facility and Materials Safety Branch cc: Mr. T. L. Baucom Surry Power Station P. 0. Box 315 Surry, Virginia 23883

, (.

' J"

' -~-

I VIRGINIA Et.ECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 February 7, 1978 Mr. James P. O'Reilly, Director Serial No. 519B/111177 Office of Inspection and Enforcement PO&M/DLB:das U.S. Nuclear Regulatory Connnission Docket Nos. 50-280 Region II - Suite 818 50-281 230 Peachtree Street, Northwest License Nos. DPR-32 Atlanta, Georgia 30303 DPR-37

Dear :

t-fr. 0 'Reilly:

This is in response to your letter of November 11, 1977, in reference to the inspection conducted at Surry Power Station on October 4-7, 1977 and report-ed in IE Inspection Report Nos. 50-280/77-29 and 50-281/77-29. This is a supple-ment to our previous responses of December 6, 1977 and December 21, 1977, and addresses Appendix A, page 2, item E of your letter of November 11, 1977.

In order to insure that the Liquid Waste honitor is performing as specified

. Technical Specification 3.7.E and Table 3.7-5 the following program will be

  • ducted.

(1) In order to insure that the liquid waste monitor will alarm and shut the discharge valve as required, a test will be done using liquid waste samples with isotope activities near the alarm set-point as determined by the multi-channel analyzer. The test will be conducted during the week of February 6, 1978.

(2) In order to evaluate overall performance of the liquid waste moni-tor, a correlation study will be conducted between monitor readings, and liquid waste samples of known isotope activities. In order to obtain liquid waste samples from worst case conditions, the study will include samples from liquid waste due to the March Unit No. 2 shutdown. This study should be completed by April 15, 1978.

Very truly yours,

.. .--'. ,_)/_, ( ,:, ,_ *--

)

C.H. Stallings Vice President - Power Supply and Production Operations

cc: Mr. Robert W. Reid