ML14351A360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[W3F1-2014-0079, Supplement to License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications]]
| number = ML14351A360
| issue date = 12/17/2014
| title = Supplement to License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications
| author name = Chisum M
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000382
| license number = NPF-038
| contact person =
| case reference number = TAC MF3230, W3F1-2014-0079
| document type = Letter
| page count = 3
| project = TAC:MF3230
| stage = Supplement
}}
 
=Text=
{{#Wiki_filter:10 CFR 50.90 W3F1-2014-0079  
 
December 17, 2014
 
U.S. Nuclear Regulatory Commission Attn:  Document Control Desk 11555 Rockville Pike Rockville, MD 20852
 
==Subject:==
Supplement to License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications (TAC No. MF3230)
Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38 
 
==REFERENCE:==
: 1. Entergy Letter W3F1-2013-0035, License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications, dated December 9, 2013. (ADAMS Accession No. ML13345A686) 2. Letter from NRC, Request for Additional Information Regarding License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications, dated August 22, 2014.
(ADAMS Accession No. ML14161A142) 3. Entergy Letter W3F1-2014-0038, Response to Request for Additional Information Regarding License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications (TAC No. MF3230), dated October 1, 2014. (ADAMS Accession No.
ML14274A245)
 
==Dear Sir or Madam:==
 
In letter dated December 9, 2013 (Reference 1), Entergy Operations Inc. (Entergy) submitted a request to amend Waterford 3 Technical Specification (TS) 4.8.2.1, D.C. Sources, among other items to address multiple administrative issues with the Technical Specifications. The proposed change would have added a provision to the existing surveillance test requirements to limit the total battery inter-cell resistance value. The proposed change included a programmatic requirement to establish the limit on the total battery inter-cell resistance using design calculations and to document results in test procedures.
In letter dated August 22, 2014 (Reference 2), a Request for Additional Information (RAI) requested Entergy to provide additional justification for why adding the provision, instead Entergy Operations, Inc. 17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 mchisum@entergy.com Michael R. Chisum Site Vice President Waterford 3 W3F1 Page of nu m meet s In lett e additi o Requ i meet t On D e a tele p Jarrel NRR i reque Octo b woul d resist a Speci f TSTF-Enter g woul d dated nume Wate r electr i cons e A s di s hereb Dece m asso c The N (Refe r the b a consi d This c additi o 504-7 I decl a Dece m Since MRC/-2014-0079 2 of 3 m erical total s the intent o er dated Oc t onal inform a irements, wi t he intent o f ecember 10 , p honic conf el, along with i nformed W ast as origin a b er 1, 2014
( not approv e ance withou fications Ta s-500 (ADA M g y is not re a fully imple m October 1, rical total b a r ford 3 Tech ical system c e rvative TS v scussed on t y suppleme n mber 9, 201 3 ciated with W N o Significa n r ence 1) is u a ttery under dered remo v corresponde onal inform a 39-6685. are under p e mber 17, 20 r ely, /JDW  battery inte r of the Limiti n t ober 1, 201 a tion intend e thout a spe c fthe Limitin g , 2014, the N e rence with other NRR a terford 3 th ally submitte Reference 3 e such an a m t either incl u sk Force (T S M S Accessio a dy to compl ment TSTF-5 2014 (Refe r a ttery inte r-c enical Specif i conditions a v alue and a n t he Decemb n ts the subj e 3 (Referenc e W aterford 3 T nt Hazards e unchanged beach of the ved as a pa rnce contain s a tion, pleas e e nalty of pe r 14. r-cell resist a n g Condition 4 (Referen c e d to justify w cific numeri c g Conditions NRC/NRR P Entergy's Wand Waterf oat the NRC
 
d and as su 3). More sp e m endment t o uding a spe c S TF) Travel en No. ML09 2 ete and sub 5 00. A lso, f o r ence 3), En t e ll resistan c ications (TS and configur a n excessivel y er 10, 2014
, ect amend m e 1) by retr a T echnical S p evaluation c o b y this suppl3 questions r t of this sup p s no new co e contact the r jury that th e ance value, i s for Opera t c e 3), Enter g why adding t cal total batt e for Operati o roject Mana Waterford 3 R o rd 3 perso n would not a ppplemented ecifically, W a o add a limi t cific value, o r er TSTF-50 0 2 670242). mit to NRC o r reasons s t ergy could c e value as a) due to rea s ations that w y ove r-cons e , teleconfer e m ent request acting the p o pecification (o ntained in o ement, exc e (1 each) ar e p lement. mmitments.
Regulatory e foregoing i snto the Sur v tion. g y responde d t he provisio n e ry inte r-cell on. a ge r for Wat e R egulatory A nnel. Durin g pprove the s by the RAI a terford 3 w t to the total r without full 0, Revision 2 a license a m specified in tnot reason a a longterm c s onably ex p w ould ensur e e rvative TS e nce mentio nsubmitted b ortion of the a (TS) 4.8.2.1
, o riginal licen e pt that the pe no longer If you hav e A ssurance s true and c o v eillance Re q d to the RAI n into the S u resistance v e rford 3, Mr.
A ssurance M g this confer e s ubject ame response in was informe d battery inte r ly implemen 2 , hereafter mendment r e t he RAI res p ably support c ommitment p ected chan g e both, avoi d value. ned above, b y letter dat e a mendmen t , D.C. Sour c se amendm p aragraphs applicable a e any questi o Manager, J o orrect. Exe c quirements providing ur veillance value, woul d Orenak, h e M anager, Mr.
ence call ndment  letter date d d that NRC r-cell ting Techni c referred to a equest that ponse letter a specific in the g es in d ing a non-Entergy e d  t request ces. ent request pertaining t o and should b ons or requi ohn Jarrell, a c uted on  d e ld  d c al a s o b e re a t W3F1-2014-0079 Page 3 of 3
 
cc: Mr. Marc L. Dapas, Regional Administrator U.S. NRC, Region IV
 
RidsRgn4MailCenter@nrc.gov U.S. NRC Project Manager for Waterford 3 Michael.Orenak@nrc.gov
 
U.S. NRC Senior Resident Inspector for Waterford 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov Louisiana Department of Environmental Quality Office of Environmental Compliance
 
Surveillance Division Ji.Wiley@LA.gov}}

Latest revision as of 21:55, 18 August 2019