{{#Wiki_filter:t 6 ACCELERATED
{{#Wiki_filter:t 6 ACCELERATED DIjRIBUTION DEMONSTiTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR: 9101280251 DOC.DATE: 91/01/26 NOTARIZED:
DIjRIBUTION
NO FACIL:50-335 St.Lucie Plant., Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION GOLDBERG,J.'H.
DEMONSTiTION
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)SUM'ECT: Clarifies 900413 response to violations noted in Insp Repts 50-335/90-02
SYSTEM REGULATORY
&50-389/90-02.Corrective actions:nuclear job planning sys changed to include speed governor oil changes consistent w/vendor recommendations.
INFORMATION
DISTRIBUTION CODE: ZE01D COPIES RECEIVED:LTR ENCLSIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES: DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DI RE~FILE 0 EXTERNAL: EG&G/BRYCE
DISTRIBUTION
~J.H.NSZC COPIES LTTR ENCL 2 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAB NRR MORISSEAU,D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9 D-NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 ib 1 NOTE TO ALL"RIDS" RECIPIENTS:
SYSTEM (RIDS)ESSION NBR: 9101280251
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELliVIINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL Q  
DOC.DATE: 91/01/26 NOTARIZED:
 
NO FACIL:50-335
P.O.Box14000, Juno Beach, FL 33408-0420 JANUARY 2 4 1991 L-91-26 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
St.Lucie Plant., Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION
Re: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Clarification Ins ection Re ort 90-02 Reference A: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Ins ection Re ort 90-02 L-90-138, dated April 13, 1990 On January 10, 1991, a discussion between NRC Region II personnel and the St.Lucie Plant staff resulted in a request by the NRC for clarification of the"specific procedures" mentioned in Finding B, Response 3, in Reference A.In Reference A, Florida Power&Light Company (FPL)stated: 3.The specific vendor recommendation regarding the speed governor oil change was completed.
GOLDBERG,J.'H.
-The specific procedures were changed to reflect the oil changes at a frequency consistent with the vendor's recommendation.
Florida Power&Light Co.RECIP.NAME
RECIPIENT AFFILIATION
Document Control Branch (Document Control Desk)SUM'ECT: Clarifies 900413 response to violations
noted in Insp Repts 50-335/90-02
&50-389/90-02.Corrective
actions:nuclear
job planning sys changed to include speed governor oil changes consistent
w/vendor recommendations.
DISTRIBUTION
CODE: ZE01D COPIES RECEIVED:LTR
ENCLSIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Vio ation Response NOTES: DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB
DEDRO NRR SHANKMAN,S
NRR/DOEA/OEAB
NRR/DRIS/DIR
NRR/PMAS/ILRB12
OE DI RE~FILE 0 EXTERNAL: EG&G/BRYCE
~J.H.NSZC COPIES LTTR ENCL 2 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAB NRR MORISSEAU,D
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9
D-NRR/DST/DIR
8E2 NUDOCS-ABSTRACT
OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 ib 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELliVIINATE
YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL Q  
P.O.Box14000, Juno Beach, FL 33408-0420
JANUARY 2 4 1991 L-91-26 U.S.Nuclear Regulatory
Commission
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Re: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Clarification
Ins ection Re ort 90-02 Reference A: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Ins ection Re ort 90-02 L-90-138, dated April 13, 1990 On January 10, 1991, a discussion
between NRC Region II personnel and the St.Lucie Plant staff resulted in a request by the NRC for clarification
of the"specific procedures" mentioned in Finding B, Response 3, in Reference A.In Reference A, Florida Power&Light Company (FPL)stated: 3.The specific vendor recommendation
regarding the speed governor oil change was completed.
-The specific procedures
were changed to reflect the oil changes at a frequency consistent
with the vendor's recommendation.
FPL submits the following clarification:
FPL submits the following clarification:
The Nuclear Job Planning System (NJPS)was changed to include the speed governor oil changes at a frequency consistent
The Nuclear Job Planning System (NJPS)was changed to include the speed governor oil changes at a frequency consistent with the vendor's recommendation on February 2, 1990.The NJPS is a system designed to ensure preventative maintenance is scheduled within the desired time frames and tracked to completion.
with the vendor's recommendation
A detailed set of written work instructions was developed using the guidance in the vendor technical manual to perform the required preventative maintenance.
on February 2, 1990.The NJPS is a system designed to ensure preventative
This detailed set of written work instructions was in the form of an attachment which was issued with the maintenance work order.When this maintenance was subsequently performed, it was done using the developed set of detailed 92022S02~25i 91012~OCK 05000735 PDR~go//gp an FPL Group company L-91-26 Page 2 instructions.
maintenance
In addition, this maintenance was performed under the supervision of the Instrument and Control supervisor and the System Engineer.FPL regrets any confusion caused by our response of April 13, 1990.A detailed written procedure was issued on January 11, 1991, replacing the written instructions discussed above.Very tru y yours, J.H.Goldberg President-Nuclear Division t4 JHG/JWH cc: Stewart D.Ebneter, Regional Administrator, USNRC Region IZ Senior Resident Inspector, USNRC, St.Lucie Plant}}
is scheduled within the desired time frames and tracked to completion.
A detailed set of written work instructions
was developed using the guidance in the vendor technical manual to perform the required preventative
maintenance.
This detailed set of written work instructions
was in the form of an attachment
which was issued with the maintenance
work order.When this maintenance
was subsequently
performed, it was done using the developed set of detailed 92022S02~25i 91012~OCK 05000735 PDR~go//gp an FPL Group company  
L-91-26 Page 2 instructions.
In addition, this maintenance
was performed under the supervision
of the Instrument
and Control supervisor
and the System Engineer.FPL regrets any confusion caused by our response of April 13, 1990.A detailed written procedure was issued on January 11, 1991, replacing the written instructions
discussed above.Very tru y yours, J.H.Goldberg President-Nuclear Division t4 JHG/JWH cc: Stewart D.Ebneter, Regional Administrator, USNRC Region IZ Senior Resident Inspector, USNRC, St.Lucie Plant
}}

Revision as of 15:13, 17 August 2019

Clarifies 900413 Response to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Job Planning Sys Changed to Include Speed Governor Oil Changes Consistent W/Vendor Recommendations
ML17223B066
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/24/1991
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-26, NUDOCS 9101280251
Download: ML17223B066 (4)


Text

t 6 ACCELERATED DIjRIBUTION DEMONSTiTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR: 9101280251 DOC.DATE: 91/01/26 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant., Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION GOLDBERG,J.'H.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)SUM'ECT: Clarifies 900413 response to violations noted in Insp Repts 50-335/90-02

&50-389/90-02.Corrective actions:nuclear job planning sys changed to include speed governor oil changes consistent w/vendor recommendations.

DISTRIBUTION CODE: ZE01D COPIES RECEIVED:LTR ENCLSIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES: DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DI RE~FILE 0 EXTERNAL: EG&G/BRYCE

~J.H.NSZC COPIES LTTR ENCL 2 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAB NRR MORISSEAU,D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9 D-NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 ib 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELliVIINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL Q

P.O.Box14000, Juno Beach, FL 33408-0420 JANUARY 2 4 1991 L-91-26 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Clarification Ins ection Re ort 90-02 Reference A: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Ins ection Re ort 90-02 L-90-138, dated April 13, 1990 On January 10, 1991, a discussion between NRC Region II personnel and the St.Lucie Plant staff resulted in a request by the NRC for clarification of the"specific procedures" mentioned in Finding B, Response 3, in Reference A.In Reference A, Florida Power&Light Company (FPL)stated: 3.The specific vendor recommendation regarding the speed governor oil change was completed.

-The specific procedures were changed to reflect the oil changes at a frequency consistent with the vendor's recommendation.

FPL submits the following clarification:

The Nuclear Job Planning System (NJPS)was changed to include the speed governor oil changes at a frequency consistent with the vendor's recommendation on February 2, 1990.The NJPS is a system designed to ensure preventative maintenance is scheduled within the desired time frames and tracked to completion.

A detailed set of written work instructions was developed using the guidance in the vendor technical manual to perform the required preventative maintenance.

This detailed set of written work instructions was in the form of an attachment which was issued with the maintenance work order.When this maintenance was subsequently performed, it was done using the developed set of detailed 92022S02~25i 91012~OCK 05000735 PDR~go//gp an FPL Group company L-91-26 Page 2 instructions.

In addition, this maintenance was performed under the supervision of the Instrument and Control supervisor and the System Engineer.FPL regrets any confusion caused by our response of April 13, 1990.A detailed written procedure was issued on January 11, 1991, replacing the written instructions discussed above.Very tru y yours, J.H.Goldberg President-Nuclear Division t4 JHG/JWH cc: Stewart D.Ebneter, Regional Administrator, USNRC Region IZ Senior Resident Inspector, USNRC, St.Lucie Plant