{{#Wiki_filter:consumers  
{{#Wiki_filter:consumers Power POWERING MICHIGAN'S.
Power POWERING MICHIGAN'S.  
PROGRESS . Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 :
PROGRESS . Palisades  
* July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET  
Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 : * July 6, 1993 Nuclear Regulatory  
Commission  
Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET  
-LICENSE  
-LICENSE  
-
-
PLANT -REPLY TO NOTICE OF VIOLATION;  
PLANT -REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No .. 92-028 -EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing. The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure Injection (lPSI) check valves were exercised to their full open position.
NRC INSPECTION  
Our reply to the of Vio.lation was dated February 22, 1993. Corrective action 4, in the reply to the Notice of Violation to avoid non-compliance, was a verification that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria.
REPORT No .. 92-028 -EXTENSION  
These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage. . . . Because of the other work activities have higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993. Specific actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades 9307140226 930706 PDR ADOCK 05000255 G PDR \IJ: . . ?'.*" A cMs ENERGY COMPANY *}}
OF COMPLETION  
DATE NRC Inspection  
Report No. 92028, dated january 21, 1993, _forwarded  
the results of the NRC inspection  
conducted  
from December 7 through 18, 1992 in the area of irtservice  
testing. The inspection  
report identified  
an apparent violation  
of NRC requirements  
pertaining  
to inadequate  
acceptance  
criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure  
Injection (lPSI) check valves were exercised  
to their full open position.  
Our reply to the  
of Vio.lation  
was dated February 22, 1993. Corrective  
action 4, in the reply to the Notice of Violation  
to avoid  
non-compliance, was a verification  
that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring  
full flow testing are -included  
in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures  
that take.credit  
for full flow testing state the correct flow rates as acceptance  
criteria.  
These actions were proposed to be completed  
by July 15, 1993 which was the forecast end of the refueling  
outage. . . . Because of the other work activities  
have  
higher priority, we are extending  
the forecast cdmpletion  
date of corrective  
action 4 in our reply to the Notice of Violation  
from July 15, 1993 until December 1, 1993. Specific  
actions for verification  
that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion  
during the ongoing 1993 refueling  
outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades  
9307140226  
930706 PDR ADOCK 05000255 G PDR \IJ: . . ?'.*" A cMs ENERGY COMPANY *
}}

Revision as of 23:40, 16 August 2019

Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201
ML18058B917
Person / Time
Site: Palisades 
Issue date: 07/06/1993
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9307140226
Download: ML18058B917 (1)


Text

consumers Power POWERING MICHIGAN'S.

PROGRESS . Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 :

  • July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET

-LICENSE

-

PLANT -REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No ..92-028 -EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing. The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure Injection (lPSI) check valves were exercised to their full open position.

Our reply to the of Vio.lation was dated February 22, 1993. Corrective action 4, in the reply to the Notice of Violation to avoid non-compliance, was a verification that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria.

These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage. . . . Because of the other work activities have higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993. Specific actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades 9307140226 930706 PDR ADOCK 05000255 G PDR \IJ: . . ?'.*" A cMs ENERGY COMPANY *