{{#Wiki_filter:* Public Service Electric and Gas Company anley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800  
{{#Wiki_filter:* Public Service Electric and Gas Company anley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vice President  
Vice President  
-Nuclear Operations June 8, 1990 NLR-N90114 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
-Nuclear Operations  
RESPONSE TO NRC INSPECTION REPORT NO. 50-272/90-80 AND 50-311/90-80 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and.Gas Company (PSE&G) acknowledges receipt of the subject report dated March 29, 1990. PSE&G hereby transmits our response, including expected completion dates, to the identified weaknesses.  
June 8, 1990 NLR-N90114  
*
United States Nuclear Regulatory  
* Should you have any questions regarding this transmittal, do not hesitate to call. Attachment 90060S fDR-05000272 W PDC Sincerely, Document Control Desk NLR-N90114 c Mr. J. c. stone 2 Licensing Project Manager -Salem Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 6-8-90 NLR-N90114 ATTACHMENT RESPONSE TO NRC INSPECTION REPORT 50-272/90-80 AND 50-311/90-80 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Your letter of March 29, 1990, forwarded combined NRC Inspection Report 50-272/90-80 and 50-311/90-80 for Salem Units 1 and 2. This report included weaknesses identified during the inspection and requested a response to these weaknesses.
Commission  
The specific weaknesses and associated responses are provided below. Unresolved Item 272 and 311/90-80-01 Resolve fire door automatic closure problem and establish interim *compensatory measures.
Document Control Desk Washington, D.C. 20555 Gentlemen:  
Response Interim Compensatory Measures In-Place -* PSE&G Nuclear Fire Department performs a daily inspection of fire doors in safety related areas. Each Technical Specification fire door closure/latch mechanism is examined for operability.
RESPONSE TO NRC INSPECTION  
* Appendix R and Penetration Seal Projects require compensatory hourly f irewatches in all safety related areas. Firewatches are instructed to observe fire doors during their hourly roves and ensure they are in the closed position.
REPORT NO. 50-272/90-80  
* PSE&G anticipates no reduction in the present level of fire watch activity before May, 1991. Before an existing fire watch is removed from a safety related area, PSE&G Nuclear Fire Department will assess the area for ventilation related fire door problems.
AND 50-311/90-80  
A* decision to continue compensatory f irewatches will be made then based on the assessment results. Planned Corrective Actions -* Nuclear Fire Department has compiled a list of recurring, ventilation related, fire door problems.
SALEM GENERATING  
These fire doors will be placed on a blanket preventive maintenance work order. When damaged fire doors are observed, Fire Department personnel will notify Maintenance to take immediate action to repair the door.
STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and.Gas Company (PSE&G) acknowledges  
* Nuclear Fire Department plans to disseminate information to site personnel on the importance of keeping fire doors closed.
receipt of the subject report dated March 29, 1990. PSE&G hereby transmits  
* A task force is reviewing the ventilation problems at Salem, and will be recommending root cause corrective actions. Since most fire door problems stem from ventilation related causes, addressing the ventilation issues should resolve the long standing fire door problems.
our response, including  
Open Item 272 and 311/90-80-02 Correct deviation document errors and more fully document deviation justifications.
expected completion  
Review EOPs and correct logic statements that have action and decision steps in the wrong sequence.
dates, to the identified  
Response PSE&G will correct deviation document errors and expand appropriate deviation justifications in conjunction with Salem EOP Revision 2. This revision is under development and scheduled for issuance September, 1990. Open Item 272 and 311/90-80-03 Identify and correct in-plant labeling deficiencies during procedure Validation and Verification (V & V). In the control room, correctly identify the containment air particulate detector isolation valves, and remove Boron Injection Tank and CV-139/140 indicating lights that are no longer in-use. Response Inspection identified in-plant labeling deficiencies will be corrected by August 31, 1990. In-plant labeling deficiencies noted during the EOP/AOP V&V effort will be corrected as part of the V&V process. Control Room labeling deficiencies will be incorporated into the Control Room Design Review program scope. Open Item 272 and 311/90-80-04 Perform V & V walkdowns of AOPs as they are revised, and correct any identified deficiencies.
weaknesses.  
Response PSE&G will evaluate all audit deficiencies indicated on attachment 2 of the Inspection Report, and revise the AOPs to correct any technical deficiencies by September 1990. All AOPs will undergo a Human Factors Upgrade as part of the Procedure Upgrade Program, including a V & V walkdown.
* * Should you have any questions  
The present schedule for completion is December 1991.
regarding  
Open Item 272 and 311/90-80-05 Organize EOP Table actions to minimize required operator movement in the control room. Provide P/A phone capability for the Desk Operator in the simulator.
this transmittal, do not hesitate to call. Attachment  
Response PSE&G contacted L. Briggs (NRC Region 1) to determine the specific EOP Table. Larry stated that he directed the comment to EOP-Trip-1, Table c. PSE&G will review this Table and make any appropriate changes with EOP revision 2, presently scheduled for September, 1990. Installation of a P/A for the simulator desk operator, with the same capabilities that exist in the Salem Unit 2 Control Room, will be completed by December, 1990. Open Item 272 and 311/90-80-06 Correct differences between EOP-Trip-4, 5, 6 and AD-44. Revise AOP writer's guide to require local versus Control Room action distinction within the AOPs. Response AD-44 will be revised to correct the identified discrepancy by July 31, 1990. PSE&G reviewed the existing AOP dual column format and decided to eliminate this format during the PUP effort. AOP steps will be listed in sequential order, with question steps using the "Yes/No/Go To" format. The Implementing Procedure Writer's Guide will be revised by August, 1990, requiring local versus Control Room action distinction in the AOPs. Open Item 272 and 311/90-80-07 Develop a formal and objective means to determine training required on EOP revisions.
90060S fDR-
Revise AD-44 to require immediate EOP changes to be made within 2 weeks. Response PSE&G will revise AD-44 to address training requirements by September, 1990. A revision to AD-44 requiring .immediate EOP changes within 2 weeks is complete.
05000272 W PDC Sincerely,
Open Item 272 and 311/90-80-08 Revise AD-44 and AD-2 to require in-plant walkdowns for EOPs and AOPs.
Document Control Desk NLR-N90114  
Response Operations Department deleted AD-2. AD-44 was revised to include EOP in-plant walkdowns as part of the validation process. Additional clarification of the walkdown requirements will be incorporated by July, 1990. The governing procedure for AOP V & V, sc.TE-AP.PUP-OOOl(Z), will be revised to include in-plant walkdowns by June, 1990.}}
c Mr. J. c. stone 2 Licensing  
Project Manager -Salem Mr. T. Johnson Senior Resident Inspector  
Mr. T. Martin, Administrator  
Region I Mr. Kent Tosch, Chief New Jersey Department  
of Environmental  
Protection  
Division of Environmental  
Quality Bureau of Nuclear Engineering  
CN 415 Trenton, NJ 08625 6-8-90
NLR-N90114  
ATTACHMENT  
RESPONSE TO NRC INSPECTION  
REPORT 50-272/90-80  
AND 50-311/90-80  
SALEM GENERATING  
STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Your letter of March 29, 1990, forwarded  
combined NRC Inspection  
Report 50-272/90-80  
and 50-311/90-80  
for Salem Units 1 and 2. This report included weaknesses  
identified  
during the inspection  
and requested  
a response to these weaknesses.  
The specific weaknesses  
and associated  
responses  
are provided below. Unresolved  
Item 272 and 311/90-80-01  
Resolve fire door automatic  
closure problem and establish  
interim *compensatory  
measures.  
Response Interim Compensatory  
Measures In-Place -* PSE&G Nuclear Fire Department  
performs a daily inspection  
of fire doors in safety related areas. Each Technical  
Specification  
fire door closure/latch  
mechanism  
is examined for operability.  
* Appendix R and Penetration  
Seal Projects require compensatory  
hourly f irewatches  
in all safety related areas. Firewatches  
are instructed  
to observe fire doors during their hourly roves and ensure they are in the closed position.  
* PSE&G anticipates  
no reduction  
in the present level of fire watch activity before May, 1991. Before an existing fire watch is removed from a safety related area, PSE&G Nuclear Fire Department  
will assess the area for ventilation  
related fire door problems.  
A* decision to continue compensatory  
f irewatches  
will be made then based on the assessment  
results. Planned Corrective  
Actions -* Nuclear Fire Department  
has compiled a list of recurring, ventilation  
related, fire door problems.  
These fire doors will be placed on a blanket preventive  
maintenance  
work order. When damaged fire doors are observed, Fire Department  
personnel  
will notify Maintenance  
to take immediate  
action to repair the door.
* Nuclear Fire Department  
plans to disseminate  
information  
to site personnel  
on the importance  
of keeping fire doors closed. * A task force is reviewing  
the ventilation  
problems at Salem, and will be recommending  
root cause corrective  
actions. Since most fire door problems stem from ventilation  
related causes, addressing  
the ventilation  
issues should resolve the long standing fire door problems.  
Open Item 272 and 311/90-80-02  
Correct deviation  
document errors and more fully document deviation  
justifications.  
Review EOPs and correct logic statements  
that have action and decision steps in the wrong sequence.  
Response PSE&G will correct deviation  
document errors and expand appropriate  
deviation  
justifications  
in conjunction  
with Salem EOP Revision 2. This revision is under development  
and scheduled  
for issuance September, 1990. Open Item 272 and 311/90-80-03  
Identify and correct in-plant labeling deficiencies  
during procedure  
Validation  
and Verification (V & V). In the control room, correctly  
identify the containment  
air particulate  
detector isolation  
valves, and remove Boron Injection  
Tank and CV-139/140  
indicating  
lights that are no longer in-use. Response Inspection  
identified  
in-plant labeling deficiencies  
will be corrected  
by August 31, 1990. In-plant labeling deficiencies  
noted during the EOP/AOP V&V effort will be corrected  
as part of the V&V process. Control Room labeling deficiencies  
will be incorporated  
into the Control Room Design Review program scope. Open Item 272 and 311/90-80-04  
Perform V & V walkdowns  
of AOPs as they are revised, and correct any identified  
deficiencies.  
Response PSE&G will evaluate all audit deficiencies  
indicated  
on attachment  
2 of the Inspection  
Report, and revise the AOPs to correct any technical  
deficiencies  
by September  
1990. All AOPs will undergo a Human Factors Upgrade as part of the Procedure  
Upgrade Program, including a V & V walkdown.  
The present schedule for completion  
is December 1991.
Open Item 272 and 311/90-80-05  
Organize EOP Table actions to minimize required operator movement in the control room. Provide P/A phone capability  
for the Desk Operator in the simulator.  
Response PSE&G contacted  
L. Briggs (NRC Region 1) to determine  
the specific EOP Table. Larry stated that he directed the comment to EOP-Trip-1, Table c. PSE&G will review this Table and make any appropriate  
changes with EOP revision 2, presently  
scheduled  
for September, 1990. Installation  
of a P/A for the simulator  
desk operator, with the same capabilities  
that exist in the Salem Unit 2 Control Room, will be completed  
by December, 1990. Open Item 272 and 311/90-80-06  
Correct differences  
between EOP-Trip-4, 5, 6 and AD-44. Revise AOP writer's guide to require local versus Control Room action distinction  
within the AOPs. Response AD-44 will be revised to correct the identified  
discrepancy  
by July 31, 1990. PSE&G reviewed the existing AOP dual column format and decided to eliminate  
this format during the PUP effort. AOP steps will be listed in sequential  
order, with question steps using the "Yes/No/Go  
To" format. The Implementing  
Procedure  
Writer's Guide will be revised by August, 1990, requiring  
local versus Control Room action distinction  
in the AOPs. Open Item 272 and 311/90-80-07  
Develop a formal and objective  
means to determine  
training required on EOP revisions.  
Revise AD-44 to require immediate  
EOP changes to be made within 2 weeks. Response PSE&G will revise AD-44 to address training requirements  
by September, 1990. A revision to AD-44 requiring .immediate  
EOP changes within 2 weeks is complete.  
Open Item 272 and 311/90-80-08  
Revise AD-44 and AD-2 to require in-plant walkdowns  
for EOPs and AOPs.
Response Operations  
Department  
deleted AD-2. AD-44 was revised to include EOP in-plant walkdowns  
as part of the validation  
process. Additional  
clarification  
of the walkdown requirements  
will be incorporated  
by July, 1990. The governing  
procedure  
for AOP V & V, sc.TE-AP.PUP-OOOl(Z), will be revised to include in-plant walkdowns  
by June, 1990.
}}

Revision as of 19:49, 31 July 2019

Responds to NRC 900329 Ltr Re Weaknesses Noted in Insp Repts 50-272/90-80 & 50-311/90-80.Corrective Actions:Fire Doors Placed on Blanket Preventive Maint Work Order & Damaged Fire Doors Will Be Repaired Immediately
ML18095A272
Person / Time
Site: Salem  
Issue date: 06/08/1990
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLR-N90114, NUDOCS 9006150023
Download: ML18095A272 (6)


Text

  • Public Service Electric and Gas Company anley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vice President

-Nuclear Operations June 8, 1990 NLR-N90114 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

RESPONSE TO NRC INSPECTION REPORT NO. 50-272/90-80 AND 50-311/90-80 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and.Gas Company (PSE&G) acknowledges receipt of the subject report dated March 29, 1990. PSE&G hereby transmits our response, including expected completion dates, to the identified weaknesses.

  • Should you have any questions regarding this transmittal, do not hesitate to call. Attachment 90060S fDR-05000272 W PDC Sincerely, Document Control Desk NLR-N90114 c Mr. J. c. stone 2 Licensing Project Manager -Salem Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 6-8-90 NLR-N90114 ATTACHMENT RESPONSE TO NRC INSPECTION REPORT 50-272/90-80 AND 50-311/90-80 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Your letter of March 29, 1990, forwarded combined NRC Inspection Report 50-272/90-80 and 50-311/90-80 for Salem Units 1 and 2. This report included weaknesses identified during the inspection and requested a response to these weaknesses.

The specific weaknesses and associated responses are provided below. Unresolved Item 272 and 311/90-80-01 Resolve fire door automatic closure problem and establish interim *compensatory measures.

Response Interim Compensatory Measures In-Place -* PSE&G Nuclear Fire Department performs a daily inspection of fire doors in safety related areas. Each Technical Specification fire door closure/latch mechanism is examined for operability.

  • Appendix R and Penetration Seal Projects require compensatory hourly f irewatches in all safety related areas. Firewatches are instructed to observe fire doors during their hourly roves and ensure they are in the closed position.
  • PSE&G anticipates no reduction in the present level of fire watch activity before May, 1991. Before an existing fire watch is removed from a safety related area, PSE&G Nuclear Fire Department will assess the area for ventilation related fire door problems.

A* decision to continue compensatory f irewatches will be made then based on the assessment results. Planned Corrective Actions -* Nuclear Fire Department has compiled a list of recurring, ventilation related, fire door problems.

These fire doors will be placed on a blanket preventive maintenance work order. When damaged fire doors are observed, Fire Department personnel will notify Maintenance to take immediate action to repair the door.

  • Nuclear Fire Department plans to disseminate information to site personnel on the importance of keeping fire doors closed.
  • A task force is reviewing the ventilation problems at Salem, and will be recommending root cause corrective actions. Since most fire door problems stem from ventilation related causes, addressing the ventilation issues should resolve the long standing fire door problems.

Open Item 272 and 311/90-80-02 Correct deviation document errors and more fully document deviation justifications.

Review EOPs and correct logic statements that have action and decision steps in the wrong sequence.

Response PSE&G will correct deviation document errors and expand appropriate deviation justifications in conjunction with Salem EOP Revision 2. This revision is under development and scheduled for issuance September, 1990. Open Item 272 and 311/90-80-03 Identify and correct in-plant labeling deficiencies during procedure Validation and Verification (V & V). In the control room, correctly identify the containment air particulate detector isolation valves, and remove Boron Injection Tank and CV-139/140 indicating lights that are no longer in-use. Response Inspection identified in-plant labeling deficiencies will be corrected by August 31, 1990. In-plant labeling deficiencies noted during the EOP/AOP V&V effort will be corrected as part of the V&V process. Control Room labeling deficiencies will be incorporated into the Control Room Design Review program scope. Open Item 272 and 311/90-80-04 Perform V & V walkdowns of AOPs as they are revised, and correct any identified deficiencies.

Response PSE&G will evaluate all audit deficiencies indicated on attachment 2 of the Inspection Report, and revise the AOPs to correct any technical deficiencies by September 1990. All AOPs will undergo a Human Factors Upgrade as part of the Procedure Upgrade Program, including a V & V walkdown.

The present schedule for completion is December 1991.

Open Item 272 and 311/90-80-05 Organize EOP Table actions to minimize required operator movement in the control room. Provide P/A phone capability for the Desk Operator in the simulator.

Response PSE&G contacted L. Briggs (NRC Region 1) to determine the specific EOP Table. Larry stated that he directed the comment to EOP-Trip-1, Table c. PSE&G will review this Table and make any appropriate changes with EOP revision 2, presently scheduled for September, 1990. Installation of a P/A for the simulator desk operator, with the same capabilities that exist in the Salem Unit 2 Control Room, will be completed by December, 1990. Open Item 272 and 311/90-80-06 Correct differences between EOP-Trip-4, 5, 6 and AD-44. Revise AOP writer's guide to require local versus Control Room action distinction within the AOPs. Response AD-44 will be revised to correct the identified discrepancy by July 31, 1990. PSE&G reviewed the existing AOP dual column format and decided to eliminate this format during the PUP effort. AOP steps will be listed in sequential order, with question steps using the "Yes/No/Go To" format. The Implementing Procedure Writer's Guide will be revised by August, 1990, requiring local versus Control Room action distinction in the AOPs. Open Item 272 and 311/90-80-07 Develop a formal and objective means to determine training required on EOP revisions.

Revise AD-44 to require immediate EOP changes to be made within 2 weeks. Response PSE&G will revise AD-44 to address training requirements by September, 1990. A revision to AD-44 requiring .immediate EOP changes within 2 weeks is complete.

Open Item 272 and 311/90-80-08 Revise AD-44 and AD-2 to require in-plant walkdowns for EOPs and AOPs.

Response Operations Department deleted AD-2. AD-44 was revised to include EOP in-plant walkdowns as part of the validation process. Additional clarification of the walkdown requirements will be incorporated by July, 1990. The governing procedure for AOP V & V, sc.TE-AP.PUP-OOOl(Z), will be revised to include in-plant walkdowns by June, 1990.