| title = Draft Regulatory Guide DG-1140, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses
| title = Draft Regulatory Guide DG-1140, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses
| author name = Lintz M P
| author name = Lintz M
| author affiliation = NRC/NRR/DRIP/RLEP
| author affiliation = NRC/NRR/DRIP/RLEP
| addressee name =  
| addressee name =  
Line 24: Line 24:
a supplement to the plant's final safety analysis report (FSAR), (5) any necessary changes to theplant's technical specifications (along with related justifications), and (6) a supplement to the plant's environmental report. The FSAR supplement should provide a summa ry description of the programs and activities that the licensee will use to m anage the effects of aging throughout the period of extended operation, which is determined by the IPA and the evaluation of TLAAs.
a supplement to the plant's final safety analysis report (FSAR), (5) any necessary changes to theplant's technical specifications (along with related justifications), and (6) a supplement to the plant's environmental report. The FSAR supplement should provide a summa ry description of the programs and activities that the licensee will use to m anage the effects of aging throughout the period of extended operation, which is determined by the IPA and the evaluation of TLAAs.
1 Regulatory issue summaries are available through the NRC's public Web site at http://www.nrc.gov/reading-rm/doc-co llections/gen-comm/reg-issues/
1 Regulatory issue summaries are available through the NRC's public Web site at http://www.nrc.gov/reading-rm/doc-co llections/gen-comm/reg-issues/
.2 The following general provisions, with the corresponding regulations, apply to filing an application for a renewed operating license:*The application must be filed in accordance with Subpart A of 10 CFR Part 2, 10 CFR 50.4, and 10 CFR 50.30.  [10 CFR 54.17(a)]*The licensee may not submit the application to the Commission earlier than 20 years before the expiration of the operating license currently in effect.  [10 CFR 54.17(c)]*For the timely renewal provisions of 10 CFR 2.109(b) to apply, the licensee must file a sufficient application at least 5 years prio r to the expiration of the existing license.  
.2 The following general provisions, with the corresponding regulations, apply to filing an application for a renewed operating license:*The application must be filed in accordance with Subpart A of 10 CFR Part 2, 10 CFR 50.4, and 10 CFR 50.30.  [10 CFR 54.17(a)]*The licensee may not submit the application to the Commission earlier than 20 years before the expiration of the operating license currently in effect.  [10 CFR 54.17(c)]*For the timely renewal provisions of 10 CFR 2.109(b) to apply, the licensee must file a sufficient application at least 5 years prio r to the expiration of the existing license.
[10 CFR 2.109(b)]*The application for a renewed license may be combined with applications for other types of licenses.  [10 CFR 54.17(d)]*The application may incorporate by refe rence information contained in previous applications for licenses or license amendments, statements, correspondence, or reports filed with the Commission, provided that the references are clear and specific.  [10 CFR 54.17(e)]
[10 CFR 2.109(b)]*The application for a renewed license may be combined with applications for other types of licenses.  [10 CFR 54.17(d)]*The application may incorporate by refe rence information contained in previous applications for licenses or license amendments, statements, correspondence, or reports filed with the Commission, provided that the references are clear and specific.  [10 CFR 54.17(e)]
This regulatory guide applies to license r enewal applications or portions thereof.
This regulatory guide applies to license r enewal applications or portions thereof.

Revision as of 04:00, 14 July 2019

Draft Regulatory Guide DG-1140, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses
ML050230010
Person / Time
Issue date: 01/24/2005
From: Mark Lintz
NRC/NRR/DRIP/RLEP
To:
References
DG-1140
Download: ML050230010 (10)


Text

This regulatory guide is being issued in draft form to involve the public in the early stages of the development of a regulatory position in this area. It has not received staff review or approval and does not represent an official NRC staff position.

Public comments are being solicited on this draft guide (including any implementation schedule) and its associated regulatory analysis orvalue/impact statement. Comments should be accompanied by appropriate supporting data. Written comments may be submitted to t he Rules and Directives Branch, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Comments may b esubmitted electronically through the NRC' s interactive rulemaking Web page at http://www.nrc.gov/what-we-do/regulatory/rulemaking.html. Copiesof comments received may be examined at the NRC Public Document Room, 11555 Rockville Pike, Rockville, MD. Comments will be mo sthelpful if received by March 31, 2005

.Requests for single copies of draft or active regulatory guides (which may be reproduced) or for placement on an automatic dist ribution list for single copies of future draft guides in specific divisions should be made to the U.S. Nuclear Regulatory Commission, Washington , DC 20555, Attention: Reproduction and Distribution Services Section, or by fax to (301)415-2289; or by email to Distribution@nrc.gov. El ectronic copies ofthis draft regulatory guide are available through the NRC's in teractive rulemaking Web page (s ee above); the NRC's public Web site under DraftRegulatory Guides in the Regulatory Guides document collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections/; and theNRC's Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html , under Accession No.ML050230010. Note, however, that the NRC has temporarily suspended public access to ADAMS so that the agency can complete securityreviews of publicly available documents and remove potentially s ensitive information. Please check the NRC's Web site for upda tes concerning the resumption of public access to ADAMS.

U.S. NUCLEAR REGULATORY COMMISSION January 2005 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE Contact: M.P. Lintz, (301) 415-4051 DRAFT REGULATORY GUIDE DG-1140 (Proposed Revision 1 of Regulatory Guide 1.188, dated July 2001)

STANDARD FORMAT AND CONTENT FOR APPLICATIONS TO RENEW NUCLEAR POWER PLANT OPERATING LICENSES A. INTRODUCTION The issuance of renewed operating licenses for nuclear power plants is governed by Title 10, Part 54, of the Code of Federal Regulations (10 CFR Part 54), "Requirements forRenewal of Operating Licenses for Nuclear Power Plants" (commonly known as the license renewal rule).As such, 10 CFR Part 54 specifies the information that a nuclear power plant licensee must include in its application to renew an operating license issued by the U.S. Nuclear Regulatory Commission (NRC). As discussed in this regulatory guide, the application should include (1) general information,(2) an integrated plant assessment (IPA), (3) an evaluation of time-limited aging analyses (TLAAs), (4)

a supplement to the plant's final safety analysis report (FSAR), (5) any necessary changes to theplant's technical specifications (along with related justifications), and (6) a supplement to the plant's environmental report. The FSAR supplement should provide a summa ry description of the programs and activities that the licensee will use to m anage the effects of aging throughout the period of extended operation, which is determined by the IPA and the evaluation of TLAAs.

1 Regulatory issue summaries are available through the NRC's public Web site at http://www.nrc.gov/reading-rm/doc-co llections/gen-comm/reg-issues/

.2 The following general provisions, with the corresponding regulations, apply to filing an application for a renewed operating license:*The application must be filed in accordance with Subpart A of 10 CFR Part 2, 10 CFR 50.4, and 10 CFR 50.30. [10 CFR 54.17(a)]*The licensee may not submit the application to the Commission earlier than 20 years before the expiration of the operating license currently in effect. [10 CFR 54.17(c)]*For the timely renewal provisions of 10 CFR 2.109(b) to apply, the licensee must file a sufficient application at least 5 years prio r to the expiration of the existing license.

[10 CFR 2.109(b)]*The application for a renewed license may be combined with applications for other types of licenses. [10 CFR 54.17(d)]*The application may incorporate by refe rence information contained in previous applications for licenses or license amendments, statements, correspondence, or reports filed with the Commission, provided that the references are clear and specific. [10 CFR 54.17(e)]

This regulatory guide applies to license r enewal applications or portions thereof.

The requirements for filing a license renewal application are specified in 10 CFR 54.17.

Licensees may submit their license renewal app lications to the NRC in either paper format or electronically, as described in Regulat ory Issue Summary (RIS)01-005, "Guidance on Submitting Documents to the NRC by Electronic Information Exchange or on CD-ROM."

1 The RIS provides general guidance on accept able formats for electronic submittalsand references detailed instructions, which are available through the NRC's public Web site at http://www.nrc.gov/site-help/eie.html

.Regulatory guides are issued to describe to the public methods that the NRC staff considers acceptable for use in implementing specific parts of the agency's regulations,to explain techniques that the staff uses in evaluating specific problems or postulated accidents, and to provide guidance to applicants. Regulator y guides are not substitutes for regulations,and compliance with regulatory guides is not required. Regulatory guides are issued in draft formto solicit public comment and involve the public in developing the agency's regulatory positions.

Draft regulatory guides have not received comp lete staff review; therefore, they do not represent official NRC staff positions.

This draft regulatory guide contains info rmation collections that are covered by the requirements of 10 CFR Part 54, which the Office of Management and Budget (OMB) approved under OMB control number 3150-0155. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection request or requirement

unless the requesting document displays a currently valid OMB control number.

2 Copies are available at current rates from t he U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20402-9328 (telephone (202) 512-1800); or from the National Technical Information

Service (NTIS) by writing NTIS at 5285 Port Royal Road, Springfield, VA 22161; http://www.ntis.gov

telephone (703) 487-4650. Copies are available for inspection or copying for a fee from the NRC's

Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing address is USNRC

PDR, Washington, DC 20555; telephone (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; email

is PDR@nrc.gov. These documents are also available electronically through the NRC's public Web site at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/

.3 Copies are available for inspection or copying for a fee from the NRC's Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC

20555; telephone (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.gov. This document is also available through the NRC's license renewal Web page

at http://www.nrc.gov/reactors/operating/

licensing/renewal/guidance.html#nuclear , and through the NRC's Agencywide Documents Access and Management System (ADAMS)

at http://www.nrc.gov/reading-rm/adams.html , under Accession No. ML050280113. Note, however, that the NRC has temporarily suspended public access to ADAMS so that the agency can complete security

reviews of publicly available documents and remove pot entially sensitive information. Please check the NRC's Web site for updates concerning the resumption of public access to ADAMS.

3 B. DISCUSSION This revised guide provides guidance on the information that licensees must submit in their applications for renewal of nuclear power plant operating licenses and the uniform format that the NRC staff considers acceptable for structuring and presenting the required

information. Conformance with this guide is not required, but its use facilitates both a licensee's preparation of a license renew al application and the NRC staff's timely and consistent review. The NRC staff will consi der other non-standard formats if they provide an adequate basis for approval of the license renewal application.

The NRC initially issued this guide as Regulatory Guide 1.188, dated July 2001, after soliciting and resolving public comment s on three draft regulatory guides (DG-1104 in August 2000, DG-1047 in August 1996, and DG-1009 in December 1990). As such, Regulatory Guide 1.188 incorporated lessons learned from the review of license renewal applications and Owners Group topical report reviews. The guide also incorporated relevant information gleaned from developing the "Standard Review Plan for the Review of License Renewal Applications for Nu clear Power Plants" (SRP-LR) (NUREG-1800), 2 and the "Generic Aging Lessons Lear ned (GALL) Report" (NUREG-1801), 2 as well as public comments received on those documents. (The staff summarized those comments

in NUREG-1739, "Analysis of Public Comments on the Improved License Renewal

Guidance Documents".

2)Since the NRC initially published Regulatory Guide 1.188 in July 2001, the Nuclear Energy Institute (NEI) has developed Revision 5 of NEI 95-10, "Industry Guideline

for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,"

dated January 2005.

3 The NRC staff has reviewed that document and found that, with the exceptions discussed in Section C, "Regulatory Position," of this guide, Revision 5 of NEI 95-10 provides guidance that the staff considers acceptable for use in implementing

the license renewal rule. Licensees may m eet the intent of the license renewal rule using methods other than those provided in Revision 5 of NEI 95-10, but the NRC staff

will determine the acceptability of such methods on a case-by-case basis. For additional

information concerning the preparation of acceptable license renewal applications, licensees should refer to NUREG-1800, "St andard Review Plan for License Renewal."

2 4

5 C. REGULATORY POSITION This section discusses the NRC staff's regulatory position on the standard format and content of applications for renewal of operating licenses for commercial nuclear power plants. As such, the guidance provi ded in this section is expected to ensure that licensees have identified and taken (or will take) actions to ensure plant safety throughout the period of extended operation. Specifically, such actions relate to (1) managing the effects

of aging on the functionality of plant structures, systems, and components that the NRC staff

has identified as requiring aging management, and (2) evaluating TLAAs that the NRC staff

has identified as requiring such review.

Following this guidance provides reasonableassurance that the licensee will continue to conduct the activities authorized by the renewed license, in accordance with the plant's current licensing basis (CLB).1.Contents of an Application To renew a nuclear power plant oper ating license, an applicant must meet the requirements delineated in 10 CFR Part 54, "Requirements for Renewal of Operating

Licenses for Nuclear Power Plants." This lic ense renewal rule establishes the procedures, criteria, and standards governing renewal of an operating license. Figure 1 summarizes the required content of a license renewal application.The information that an applicant develops and submits or retains for license renewal should permit the NRC staff to determine that the applicant has met the requirements

of 10 CFR Part 54. The format in which the applicant presents this information should allow

optimum use of the applicant's resources, while facilitating the NRC staff's review of the license renewal application. As required by 10 CFR Part 54, an application shall consist of general information concerning both the applicant and the plant, technical information

referenced or contained in the IPA and the eval uation of TLAAs, a supplement to the FSAR, technical specification changes and their justif ication, and a supplement to the environmental report.The technical information that an applicant submits should focus on identifying structures, systems, and components within the scope of 10 CFR Part 54, and on reviews

of aging management, TLAAs, and the activities necessary to ensure that the licensee

will maintain the plant's CLB throughout the period of extended operation. The technical content of a license renewal application s hould be sufficient to allow NRC reviewers to understand (1) the methodologies used to determine the structures, systems, and components that are subject to aging management review, and (2) the actions taken (or to be taken) to manage the effects of aging during the period of extended operation.

The NRC staff will review these areas to (1) determine whether the methodology is acceptable and whether the lists of structures, systems, and components and TLAAs

are comprehensive; (2) assess the effectiveness of actions taken (or to be taken)

to manage aging during the period of extended operation; and (3) determine whether TLAAs will remain valid for the period of extended operation or have been acceptably resolved

or dispositioned for the purposes of license renewal.

6 4 Single copies of regulatory guides, both active and draft, and draft NUREG documents may be obtained free of charge by writing the Reproduction and Distribution Services, USNRC, Washington, DC 20555-0001, or by fax to (301) 415-2289, or by email to DISTRIBUTION@nrc.gov. Active guides may also be purchased from the National Technical Information Service on a standing order basis. Details

on this service may be obtained by writing NTIS, 5285 Port Royal Road, Springfield, VA 22161;

telephone (703) 487-4650; online at http://www.ntis.gov. Copies of active and draft guides are also available for inspection or copying for a fee fr om the NRC's Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone

(301) 415-4737 or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.gov

.7 The FSAR supplement should contain a summary description of the TLAA evaluationand the programs and activities that the licensee will use to managing the effects of aging. The

regulatory controls associated with placing a summary description of these evaluations and activities into the FSAR, along with the existi ng regulatory process, should ensure that future program changes that could decrease the over all effectiveness of the TLAA evaluation and aging management activities will receiv e appropriate review by the licensee.

The license renewal application must also incorporate the general information required by 10 CFR 54.17 and 54.19. This information should include any conforming changes to the indemnity agreement to account for the expiration term of the renewed license

[10 CFR 54.19(b)] and restricted data agreements [

10 CFR 54.17(f) and (g)]. In addition, the IPA, the TLAA evaluation, and/or the FSAR supplement should contain or reference the technical information required by 10 CFR 54.21 and 54.22.

The license renewal application should also include or reference any technical specification changes or additions that ar e necessary to manage the effects of aging during the period of extended operation.

The applicant should identify technicalspecification changes or additions when additional regulatory control is warranted to ensure that the licensee will manage the effects of aging, such that the necessary quality of systems, structures, and components will continue to be main tained, facility operation will continue to be within safety limits, and limiting conditions for operation will continue to be met. As such, the

application should include justification fo r the proposed changes or additions, and the justifications must comply with the requirements of 10 CFR Part 50. The NRC staff may also

include conditions or limitations on the renew ed license, in accordance with 10 CFR 54.33(b) when the staff determines that additional regulat ory control is warranted to ensure that the licensee will adequately manage the effects of aging.

In addition, the applicant should provide environmental information in a supplement to the plant's environmental report, and such info rmation must comply with the requirements of Subpart A of 10 CFR Part 51, as required by 10 CFR 54.23. For additional guidance

concerning the format and content of the environmental report, applicants should refer to Supplement 1 to Regulatory Guide 4.2, "Prepar ation of Supplemental Environmental Reports for Applications To Renew Nuclear Power Plant Operating Licenses" (September 2000).

4 5 Copies are available for inspection or copying for a fee from the NRC's Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC

20555; telephone (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.gov. This document is also available through the NRC's license renewal Web page

at http://www.nrc.gov/reactors/operating/

licensing/renewal/guidance.html#nuclear , and through the NRC's Agencywide Documents Access and Management System (ADAMS)

at http://www.nrc.gov/reading-rm/adams.html , under Accession No. ML050280113. Note, however, that the NRC has temporarily suspended public access to ADAMS so that the agency can complete security

reviews of publicly available documents and remove pot entially sensitive information. Please check the NRC's Web site for updates concerning the resumption of public access to ADAMS.

82.Endorsement of NEI Guideline Revision 5 of NEI 95-10, "Industry Guideline for Implementing the Requirements of 10 CFR Part 54-The License Renewal Rule," dated January 2005, 5 provides methods that the NRC staff considers acceptable, with two e xceptions, for complying with the requirements of 10 CFR Part 54, as they relate to preparing a license renewal application. Specifically, the staff takes exception to the use of the portion of Appendix F, from the unnumbered paragraph following paragraph 4.4 through the end of Secti on 4, "Non-Safety SSCs Directly Connected to Safety-Related SSCs." In addition, the NRC staff takes exception to the use

of paragraph 5.2.3.1, "Exposure Duration."3.Formatting Specifications The filing requirements for a license renewal application are specified in 10 CFR 54.17. Licensees may submit applications to the NRC in electronic or paper format, as descri bed inRegulatory Issue Summary (RIS) 2001-05, "Guidance on Submitting Documents to the NRC by Electronic Information Exchange or on CD-ROM."

1 This guidance applies to license renewal applications or portions thereof.3.1Graphical Presentations Licensees should employ graphical pres entations (such as drawings, maps, diagrams, sketches, and tables) if such means may convey the information more adequately

or conveniently. In so doing, licensees should take due care to ensure that all information

so presented is legible, symbols are defined, no essential information is lost when colored

drawings are printed in black on white paper, and scales are not reduced to the extent that visual aids are necessary to interpret per tinent information. Such graphical presentations should appear in the section where they are pr imarily discussed. References used may be cited either as footnotes on the page where t hey are discussed, or as endnotes at the end of the chapter in which they are discussed.3.2Physical Specifications3.2.1Paper Size*Text pages: 81/2 x 11 inches.*Drawings and graphics: 81/2 x 11 inches. A lar ger size is acceptable, provided that the finished copy, when folded, does not exceed 81/2 x 11 inches.

93.2.2Paper Stock and Ink Use suitable quality in substance, paper color, and ink density for handling and reproduction by microfilmi ng or image-copying equipment.3.2.3Page Margins Maintain a margin of no less than 1 inch on the top, bottom, and binding side of all pages submitted.3.2.4Printing*Composition: Text pages should be single-spaced.*Type Face and Style: Use type faces and styles that are suitable for reproduction by microfilming or image-copying equipment.*Reproduction: Copies may be mechani cally or photographically reproduced.

All text pages should be printed on both sides, with the image printed head-to-head.3.2.5Binding Pages should be punched for standar d 3-hole looseleaf binders.3.2.6Page Numbering Pages should be numbered with digits co rresponding to the chapter and section, followed by a hyphen and a sequential page number (e.g., the third page of Section 4.1

of Chapter 4 should be numbered 4.1-3). Do not number the entire report sequentially.3.2.7Table of Contents Provide a table of contents and index of key terms for the renewal application.3.3Procedure for Updating or Revising Pages Text and graphical presentations should be revised by providing replacement pages.

The new or modified portion of each page s hould be highlighted by a "change indicator,"

consisting of a bold vertical line drawn in the margin opposite the binding margin.

The line should be of the same length as the new or modified portion of the page.

All pages submitted to update, revise, or add pages to the report should show the date of the change, as well as the change or amendment number. A guide page listing the pages

to be inserted and pages to be removed should accompany each submission of revised

pages. In addition, when making major changes or additions, the applicant should provide a revised table of contents.

10 D. IMPLEMENTATION The purpose of this section is to provide information to applicants and licensees regarding the NRC staff's plans for using this draft regulatory guide.The NRC has issued this draft guide to encourage public participation in its development.

Except in those cases in which an applicant or licensee proposes or has previously

established an acceptable alternative met hod for complying with specified portions of the NRC's regulations, the methods to be described in the active guide will reflect public comments and will be used in evaluating applications to renew nuclear power plant operating licenses.

REGULATORY ANALYSIS The NRC staff did not prepare a separate regul atory analysis for this regulatory guide.

The regulatory analysis prepared for the final license renewal rule also provides the regulatory basis for this guide and examines the costs and benefits of implementing the rule.

A copy of that regulatory analysis, "Nuclear Power Plant License Renewal - 10 CFR Part 54,"

dated February 1995, is available for inspection and copying for a fee at the NRC's Public

Document Room, located at 11555 Rockville Pike, Rockville, Maryland.

BACKFIT ANALYSIS This regulatory guide proposes NRC sta ff guidance on complying with the final license renewal rule, 10 CFR Part 54, which became effective on June 7, 1995.

Accordingly, publication of this regulatory guide does not constitute a backfit

under 10 CFR 50.109, and no backfit analysis is necessary or has been prepared

for this regulatory guide.