ML18095A272: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 3: | Line 3: | ||
| issue date = 06/08/1990 | | issue date = 06/08/1990 | ||
| title = Responds to NRC 900329 Ltr Re Weaknesses Noted in Insp Repts 50-272/90-80 & 50-311/90-80.Corrective Actions:Fire Doors Placed on Blanket Preventive Maint Work Order & Damaged Fire Doors Will Be Repaired Immediately | | title = Responds to NRC 900329 Ltr Re Weaknesses Noted in Insp Repts 50-272/90-80 & 50-311/90-80.Corrective Actions:Fire Doors Placed on Blanket Preventive Maint Work Order & Damaged Fire Doors Will Be Repaired Immediately | ||
| author name = | | author name = Labruna S | ||
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | | author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | ||
| addressee name = | | addressee name = | ||
| Line 14: | Line 14: | ||
| page count = 6 | | page count = 6 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000272/1990080]] | ||
=Text= | =Text= | ||
Revision as of 12:59, 17 June 2019
| ML18095A272 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/08/1990 |
| From: | Labruna S Public Service Enterprise Group |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NLR-N90114, NUDOCS 9006150023 | |
| Download: ML18095A272 (6) | |
See also: IR 05000272/1990080
Text
- Public Service Electric and Gas Company anley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800
Vice President
-Nuclear Operations
June 8, 1990 NLR-N90114
United States Nuclear Regulatory
Commission
Document Control Desk Washington, D.C. 20555 Gentlemen:
RESPONSE TO NRC INSPECTION
REPORT NO. 50-272/90-80
AND 50-311/90-80
SALEM GENERATING
STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and.Gas Company (PSE&G) acknowledges
receipt of the subject report dated March 29, 1990. PSE&G hereby transmits
our response, including
expected completion
dates, to the identified
weaknesses.
- * Should you have any questions
regarding
this transmittal, do not hesitate to call. Attachment
90060S fDR-
05000272 W PDC Sincerely,
Document Control Desk NLR-N90114
c Mr. J. c. stone 2 Licensing
Project Manager -Salem Mr. T. Johnson Senior Resident Inspector
Mr. T. Martin, Administrator
Region I Mr. Kent Tosch, Chief New Jersey Department
of Environmental
Protection
Division of Environmental
Quality Bureau of Nuclear Engineering
CN 415 Trenton, NJ 08625 6-8-90
NLR-N90114
ATTACHMENT
RESPONSE TO NRC INSPECTION
REPORT 50-272/90-80
AND 50-311/90-80
SALEM GENERATING
STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Your letter of March 29, 1990, forwarded
combined NRC Inspection
Report 50-272/90-80
and 50-311/90-80
for Salem Units 1 and 2. This report included weaknesses
identified
during the inspection
and requested
a response to these weaknesses.
The specific weaknesses
and associated
responses
are provided below. Unresolved
Item 272 and 311/90-80-01
Resolve fire door automatic
closure problem and establish
interim *compensatory
measures.
Response Interim Compensatory
Measures In-Place -* PSE&G Nuclear Fire Department
performs a daily inspection
of fire doors in safety related areas. Each Technical
Specification
fire door closure/latch
mechanism
is examined for operability.
- Appendix R and Penetration
Seal Projects require compensatory
hourly f irewatches
in all safety related areas. Firewatches
are instructed
to observe fire doors during their hourly roves and ensure they are in the closed position.
- PSE&G anticipates
no reduction
in the present level of fire watch activity before May, 1991. Before an existing fire watch is removed from a safety related area, PSE&G Nuclear Fire Department
will assess the area for ventilation
related fire door problems.
A* decision to continue compensatory
f irewatches
will be made then based on the assessment
results. Planned Corrective
Actions -* Nuclear Fire Department
has compiled a list of recurring, ventilation
related, fire door problems.
These fire doors will be placed on a blanket preventive
maintenance
work order. When damaged fire doors are observed, Fire Department
personnel
will notify Maintenance
to take immediate
action to repair the door.
- Nuclear Fire Department
plans to disseminate
information
to site personnel
on the importance
of keeping fire doors closed. * A task force is reviewing
the ventilation
problems at Salem, and will be recommending
root cause corrective
actions. Since most fire door problems stem from ventilation
related causes, addressing
the ventilation
issues should resolve the long standing fire door problems.
Open Item 272 and 311/90-80-02
Correct deviation
document errors and more fully document deviation
justifications.
Review EOPs and correct logic statements
that have action and decision steps in the wrong sequence.
Response PSE&G will correct deviation
document errors and expand appropriate
deviation
justifications
in conjunction
with Salem EOP Revision 2. This revision is under development
and scheduled
for issuance September, 1990. Open Item 272 and 311/90-80-03
Identify and correct in-plant labeling deficiencies
during procedure
Validation
and Verification (V & V). In the control room, correctly
identify the containment
air particulate
detector isolation
valves, and remove Boron Injection
Tank and CV-139/140
indicating
lights that are no longer in-use. Response Inspection
identified
in-plant labeling deficiencies
will be corrected
by August 31, 1990. In-plant labeling deficiencies
noted during the EOP/AOP V&V effort will be corrected
as part of the V&V process. Control Room labeling deficiencies
will be incorporated
into the Control Room Design Review program scope. Open Item 272 and 311/90-80-04
Perform V & V walkdowns
of AOPs as they are revised, and correct any identified
deficiencies.
Response PSE&G will evaluate all audit deficiencies
indicated
on attachment
2 of the Inspection
Report, and revise the AOPs to correct any technical
deficiencies
by September
1990. All AOPs will undergo a Human Factors Upgrade as part of the Procedure
Upgrade Program, including a V & V walkdown.
The present schedule for completion
is December 1991.
Open Item 272 and 311/90-80-05
Organize EOP Table actions to minimize required operator movement in the control room. Provide P/A phone capability
for the Desk Operator in the simulator.
Response PSE&G contacted
L. Briggs (NRC Region 1) to determine
the specific EOP Table. Larry stated that he directed the comment to EOP-Trip-1, Table c. PSE&G will review this Table and make any appropriate
changes with EOP revision 2, presently
scheduled
for September, 1990. Installation
of a P/A for the simulator
desk operator, with the same capabilities
that exist in the Salem Unit 2 Control Room, will be completed
by December, 1990. Open Item 272 and 311/90-80-06
Correct differences
between EOP-Trip-4, 5, 6 and AD-44. Revise AOP writer's guide to require local versus Control Room action distinction
within the AOPs. Response AD-44 will be revised to correct the identified
discrepancy
by July 31, 1990. PSE&G reviewed the existing AOP dual column format and decided to eliminate
this format during the PUP effort. AOP steps will be listed in sequential
order, with question steps using the "Yes/No/Go
To" format. The Implementing
Procedure
Writer's Guide will be revised by August, 1990, requiring
local versus Control Room action distinction
in the AOPs. Open Item 272 and 311/90-80-07
Develop a formal and objective
means to determine
training required on EOP revisions.
Revise AD-44 to require immediate
EOP changes to be made within 2 weeks. Response PSE&G will revise AD-44 to address training requirements
by September, 1990. A revision to AD-44 requiring .immediate
EOP changes within 2 weeks is complete.
Open Item 272 and 311/90-80-08
Revise AD-44 and AD-2 to require in-plant walkdowns
Response Operations
Department
deleted AD-2. AD-44 was revised to include EOP in-plant walkdowns
as part of the validation
process. Additional
clarification
of the walkdown requirements
will be incorporated
by July, 1990. The governing
procedure
for AOP V & V, sc.TE-AP.PUP-OOOl(Z), will be revised to include in-plant walkdowns
by June, 1990.