ML19136A352: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Baker B
| author name = Baker B
| author affiliation = NRC/OIG/AIGA
| author affiliation = NRC/OIG/AIGA
| addressee name = Doane M M
| addressee name = Doane M
| addressee affiliation = NRC/EDO
| addressee affiliation = NRC/EDO
| docket =  
| docket =  

Revision as of 09:37, 12 June 2019

OIG-15-A-15-Status of Recommendations: Audit of Nrc'S Regulatory Analysis Process Dated May 16, 2019
ML19136A352
Person / Time
Issue date: 05/16/2019
From: Baker B
NRC/OIG/AIGA
To: Margaret Doane
NRC/EDO
References
OIG-15-A-15
Download: ML19136A352 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF THE INSPECTOR GENERAL May 16, 2019 MEMORANDUM TO: Margaret M. Doane Executive Director for Operations FROM: Dr. Brett M. Baker /RA/ Assistant Inspector General for Audits

SUBJECT:

STATUS OF RECOMMENDATION: S REGULATORY ANALYSIS PROCESS (OIG-15-A-15)

REFERENCE:

DIRECTOR, OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS, MEMORANDUM DATED APRIL 29, 2019 (OIG) analysis and status of the recommendation April 29, 2019. Based on this response and additional information provided, Recommendation 3 is closed. All recommendations in OIG-15-A-15 are now closed. If you have any questions or concerns, please contact me at (301) 415-5915 or Eric Rivera, Team Leader, at (301) 415-7032. Attachments: As stated cc: R. Lewis, OEDO J. Jolicoeur, OEDO D. Jackson, OEDO S. Miotla, OEDO EDO_ACS Distribution Audit Report REGULATORY ANALYSIS PROCESS OIG-15-A-15 Status of Recommendations Recommendation 3: Update and implement the cost benefit guidance documents as planned in SECY-14-0002. Incorporate this guidance into office procedures by reference. Agency Response Dated April 29, 2019: On March 29, 2018, the staff submitted to the Commission by a notation vote paper SECY-18-NUREG/BR-0058, Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission. Following Commission review and approval of Revision 5, the staff will issue the final NUREG and publish the document on the NRC public Web site. An internal announcement will be issued to inform staff when the document is finalized. On September 28, 2018, the staff issued Revision 3 of the Office of Nuclear Material Safety and Safeguards (NMSS) Policy and Procedures 6- Preparation and Review of Rulemaking Packages, which includes a reference to NUREG/BR-0058. This reference results in the incorporation of the approved cost benefit guidance into office policies and procedures. Target Completion Dates: April 2018 (completed) issued notation vote paper with Revision 5 to NUREG/BR-0058 September 2018 (completed) issued NMSS Policy and Procedure 6-10, Revision 3 OIG Analysis: OIG reviewed additional documentation provided by a representative of NMSS. The staff has informed the Commission and Congress that it is using the draft final NUREG to perform its regulatory analysis. It is documented Status Report on the Licensing Activities and Regulatory Duties of the U.S. Nuclear Regulatory Commission For the Reporting Period In this document the staff states the draft final NUREG is available for interim staff use and that in conducting its regulatory analyses, the staff is implementing the best practices and lessons learned that are contained within the NUREG.

Audit Report ATORY ANALYSIS PROCESS OIG-15-A-15 Status of Recommendations Recommendation 3: Additionally, OIG reviewed NMSS Policy and Procedures 6-10, NMSS Procedures for Preparation and Review of Rulemaking PackagesNUREG/BR-0058. This reference results in the incorporation of the approved cost benefit guidance into office policies and procedures. Status: Closed.