AEP-NRC-2018-25, Donald C. Cook, Units 1 and 2, Submittal of 30-Day Report Detailing a Testing Error by a Health and Human Services Certified Laboratory: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[AEP-NRC-2018-25, Submittal of 30-Day Report Detailing a Testing Error by a Health and Human Services Certified Laboratory]]
| number = ML18081A685
| issue date = 03/19/2018
| title = Donald C. Cook, Units 1 and 2, Submittal of 30-Day Report Detailing a Testing Error by a Health and Human Services Certified Laboratory
| author name = Scarpello M K
| author affiliation = Indiana Michigan Power Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000315, 05000316
| license number =
| contact person =
| case reference number = AEP-NRC-2018-25
| document type = Letter type:AEP, Licensee 30-Day Written Event Report
| page count = 2
}}
 
=Text=
{{#Wiki_filter:m INDIANA MICHIGAN POWER A unit of American Electric Power March 19, 2018
* Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk
* Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 10 CFR 26.719(c)
Report: Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 lndianaMichiganPower.com AEP.:NRC-2018-25 10 CFR 26.719 Testing Error by a Health and Human Services Certified Laboratory In accordance with 10 CFR 26.719(c), Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant Units 1 and 2, is submitting a 30 day report detailing a testing error by a Health and Human Services certified laboratory.
This letter contains no new commitments.
Should you have any questions, please. contact me, at (269) 466-2649.
* Sincerely, lrn.t~ Michael K. Scarpello Manager of Regulatory Affairs MBE/db
 
==Enclosure:==
 
10 CFR 26. 719(c), Testing Error by a Health and Human Services Certified Laboratory c: R. J. Ancona -MPSC MOEQ -RMD/RPS NRG Resident Inspector J. K. Rankin -Washington D.C.
* K. S. West-NRG Region Ill --A. J. Williamson
-Ft. Wayne AEP, w/o enclosures i I I ENCLOSURE TO AEP-NRC-2018-25 10 CFR 26.719{c)
Report Testing Error by a Health and*Huinan Services Certified Laboratory Summary of Issue: On February 13, 2018, a pre-employment drug screening sample was collected by Donald C. Cook Nuclear Plant (CNP) and submitted to Clinical Reference Laboratory (CRL) in Lenexa, Kansas for testing. On February 14, 2018, initial screening indicated that the sample specific gravity and creatinine were low and the sample was reported to CNP as negative dilute. Upon investigation, CRL discovered that the Screening Technician did not load the sample on the refractometer consistent with Standard Operating Procedures (SOPs). Due to the misleading of the sample, an incorrect specific gravity value was obtained which resulted in the sample being reported as negative dilute. Subsequently, CRL personnel tested a new aliquot from the primary sample consistent with the applicable SOP. This testing result showed the sample was not dilute. On February 16, 2018, a corrected report was issued to CNP indicating that the sample was negative.
On February 21, 2018, CRL reported the results of the investigation into this error to CNP. CRL has performed the corrective actions detailed below to prevent recurrence.
Corrective Actions: 1. The CRL Screening Department received retraining on the applicable SOP for loading the refractometer.}}

Latest revision as of 19:07, 25 April 2019