ML093290035: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[JAFP-09-0134, Withdrawal of Fourth IST Interval Request PRR-01]]
| number = ML093290035
| issue date = 08/12/2009
| title = James A. FitzPatrick Nuclear Power Plant - Withdrawal of Fourth IST Interval Request PRR-01
| author name = Pechacek J
| author affiliation = Entergy Nuclear Northeast, Entergy Nuclear Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000333
| license number = DPR-059
| contact person =
| case reference number = JAFP-09-0134
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:'0 Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Joseph Pechacek Licensing Manager JAFP-09-0134 August 12, 2009 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
 
==SUBJECT:==
 
==REFERENCES:==
 
Withdrawal of Fourth IST Interval Relief Request PRR-01 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 1. Entergy letter JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Nuclear Power Plant Fourth Interval In-Service Testing Program, dated April 11, 2007.2. NRC Letter, Mark Kowal to Michael Balduzzi, James A. FitzPatrick Nuclear Power Plant -Relief Requests fro the Fourth Interval Inservice Testing Program (Reference NRC TAC Nos. MD5396, MD5397, MD5398, MD5399, MD5400, MD5401, MD5402, MD5403, and MD5404), dated 27 November, 2007.
 
==Dear Sir or Madam:==
Entergy Nuclear Operations Inc., (Entergy) submitted Relief Requests for the James A.FitzPatrick Nuclear Power Plant Fourth In-service Testing Interval on April 11, 2007 (Reference 1). Subsequently on November 27, 2007 the NRC approved the use of Relief Request PRR-01 (Reference 2). Entergy has determined that the relief provided by PRR-01 is no longer required and the required testing can be performed as described in ASME OM Code of record for the Fourth Interval Inservice Testing Program. Therefore, Entergy is withdrawing Relief Request PRR-01.There are no new commitments made in this letter.7-4 D+7 JAFP-09-0134 Page 2 of 2 Questions concerning this request may be addressed to Mr. Patrick Scanlan, Engineering Programs and Components Manager, at (315) 349-6174.Sincerely, Joseph Pechacek Licensing Manager JP/ed cc: Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. Bhalchandra Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2A Washington, DC 20555-0001 Mr. Paul Eddy"New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Francis J. Murray Jr., President NYSERDA 17 Columbia Circle Albany, NY 12203-6399}}

Latest revision as of 19:38, 16 April 2019