ML12179A216: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-12-252, Readiness for NRC Inspection Procedure (IP) 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area.]]
| number = ML12179A216
| issue date = 06/19/2012
| title = Readiness for NRC Inspection Procedure (IP) 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area.
| author name = Kaminskas V A
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000440
| license number = NPF-058
| contact person =
| case reference number = L-12-252
| document type = Letter
| page count = 1
}}
 
=Text=
{{#Wiki_filter:FENOC TM Perry Nuclear Power Plant--%10 Center Road FlrstEnergy Nuclear Operating Company Perry Ohio 44081 Vito A. Kaminskas 440-280-5382 Vice President Fax: 440-280-8029 June 19, 2012 L-12-252 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Readiness for NRC Inspection Procedure (IP) 95002 "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area" In the U.S. Nuclear Regulatory Commission's (NRC) Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2011007, ADAMS Accession No.ML12065A157), dated March 5, 2012, the NRC staff requested that FirstEnergy Nuclear Operating Company (FENOC) advise the staff, in writing, when FENOC is ready for the supplemental inspection at the Perry Nuclear Power Plant (PNPP) using NRC Inspection Procedure (IP) 95002,. "Supplemental Inspection for One Degraded Cornerstone or Any Three-White Inputs in a.Strategic Performance Area." In letter L-12-176, dated April 30, 2012, P,.NPP informed the staff that FENOC was ready for the I P 95002 inspection.
On June 11, 2012, PNPP requested that the NRC postpone the planned 95002 Supplemental Inspection.
The request was made because some questions arose regarding the completeness and adequacy of the corrective actions that were developed to address the root and contributing causes of the previously identified performance issues. PNPP requested additional time to conduct a further review to assure that the plant was adequately prepared for the NRC's supplemental inspection.
We will advise the NRC in writing when this review is completed and FENOC is ready for the supplemental inspection at the PNPP. There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Robert Coad, Manager -Regulatory Compliance, at (440) 280-5328.Sincerely, Vito A Kaminskas:
cc; NRC Region. IIIAdministrator NRC Resident Inspector NRR Project-Manager}}