ML12349A162: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-2012-416, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic]]
| number = ML12349A162
| issue date = 11/27/2012
| title = Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic
| author name = Kiley M
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000250, 05000251
| license number =
| contact person =
| case reference number = L-2012-416
| document type = Letter
| page count = 715
| project =
| stage = Request
}}
 
=Text=
{{#Wiki_filter:0N 7V 27012 FPL. L-2012-416
: 0 CFR 50.54(f)U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic  
 
==References:==
: 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident; dated March 12, 2012, Accession No. ML12073A348.
: 2. NRC Letter to Nuclear Energy Institute, "Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, 'Seismic Walkdown Guidance,' " dated May 31, 2012, Accession No. ML12145A529.
: 3. M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2012-.272), "Florida Power& Light Company's 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding
'the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," Accession No.ML12198A003, June 29, 2012.Per Reference 1, the above report is to be submitted within 180 days of the NRC's endorsement of the walkdown process and should include a list of any areas that could not be inspected due to inaccessibility and should identify a schedule for when the walkdown will be completed.
On May 31, 2012, the NRC issued its endorsement of EPRI Draft Report 1025286, Seismic Walkdown Guidance (Reference 2). Based on the Reference 2 endorsement date, the subject seismic walkdown report is due by November 27, 2012.Per Reference 3, Florida Power & Light confirmed that it will use the NRC-endorsed EPRI Report 1025286, Seismic Walkdown Guidance.
The enclosed report, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendations 2.3: Seismic for Turkey Point Unit 3 and 4, was prepared in accordance with the approved EPRI guidance and provides the requested seismic walkdown information.
This submittal completes FPL's response to the Reference 1, Enclosure 3 information request.This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments.
Florida Power & Light Company 9760 SW 3 4 4' St., Florida City, FL 33035 Turkey Point Nuclear Plant L-2012-416 Docket Nos. 50-250 and 50-251 Page 2 of 2 If you have any questions or require additional information, please contact Mr. Robert J.Tomonto, Licensing Manager, at (305) 246-7327.I declare under penalty of perjury that the foregoing is true and correct.Executed on November 7.7, 2012.Veytruly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant Enclosure cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Turkey Point Nuclear Plant L-2012-416 Docket Nos. 50-250 and 50-251 Enclosure Enclosure Seismic Walkdown Report in Response to the 50.54(0) Information Request Regarding Fukushima Near-Term Task Force Recommendations 2.3: Seismic for Turkey Point Unit 3, Rev. 1 360 pages Seismic Walkdown Report in Response to the 50.54(0) Information Request Regarding Fukushima Near-Term Task Force Recommendations 2.3: Seismic for Turkey Point Unit 4, Rev. 1 352 pages 12Q4117-RPT-001 Rev. 1 SEISMIC WALKDOWN REPORT IN RESPONSE TO THE 50.54(f) INFORMATION REQUEST REGARDING FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.3: SEISMIC For TURKEY POINT UNOT 3 NRC Docket No. 50-250 Florida Power & Light Company Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 Prepared by: Stevenson
& Associates 275 Mishawum Road, Suite 200 Woburn, MA 01801 Submittal Date: November 2012 Contents L ist o f T a b le s .......................................................................................
................
iii Executive Summary ..............................................................................................
iv I Introduction
........................................................................................................................
I 1 .1 B a c k g ro u n d ................................................................................................................
1 1.2 Plant Overview ....................................................................................................
1 1 .3 A p p ro a c h ....................................................................................................................
1 2 Seism ic Licensing Basis ...............................................................................................
2 2.1 Site Seism icity ....................................................................................................
2 2.2 Seism ic Design Basis .............................................................................................
2 2.3 USI A-46 and Seism ic IPEEE ...............................................................................
3 3 Personnel Qualifications
..............................................................................................
5 3 .1 O v e rv ie w ....................................................................................................................
5 3.2 Project Personnel
...................................................................................................
5 3.3 Equipment Selection Personnel
.............................................................................
6 3.4 Seismic W alkdown Engineers
................................................................................
6 3.5 Licensing Basis Reviewers
...................................................................................
6 3.6 IPEEE Reviewers
...................................................................................................
6 3.7 Peer Review Team ...............................
;................................................................
6 3.8 Additional Personnel
..............................................................................................
6 4 Selection of SSCs ......................................................................................................
7 5 Seism ic W alkdowns and Area W alk-Bys .....................................................................
8 5 .1 O v e rv ie w .....................................................
..............................................................
8 5.2 Seismic W alkdowns .............................
................................................................
8 5.3 Area Walk-Bys .................................................
31 6 Licensing Basis Evaluations
..........................................................................................
39 7 IPEEE Vulnerabilities Resolution Report ................................................................
40 8 Peer Review .....................................................................................................................
46 9 References
........................................................................................................................
47 A Project Personnel Resumes and SWE Certificates
...............................................
A-1 B SW EL Selection Report .............................................................................................
B-1 C Seism ic W alkdown Checklists (SW Cs) ...................................................................
C-1 D Area W alk-By Checklists (A W Cs) ............................................................................
D -1 E Plan for Future Seismic Walkdown of Inaccessible Equipment
..............................
E-1 F Peer Review Report ...................................................................................................
F-1 ii List of Tables T able 3-1: P ersonnel R o les .....................................................................................
5 Table 5-1: Anchorage Configuration Confirmation
....................................................
10 Table 5-2:Table of Actions Resulting from Seismic Walkdown Inspection
.........................
13 Table 5-3:Table of Actions Resulting from Area Walk-by Inspections
..............................
34 Table 7-1: USI A-46 Outlier Resolution
.....................................................................
41 iii Executive Summary The purpose of this report is to provide information as requested by the Nuclear Regulatory Commission (NRC) in its March 12, 2012 letter issued to all power reactor licensees and holders of construction permits in active or deferred status. (Ref. 12) In particular, this report provides information requested to address Enclosure 3, Recommendation 2.3: Seismic, of the March 12, 2012 letter. (Ref. 12)The 50.54(f) letter requires, in part, all U.S. nuclear power plants to perform seismic walkdowns to verify the current plant configuration is within the current seismic licensing basis and identify and address degraded, non-conforming or unanalyzed conditions found. This report documents the seismic walkdowns performed at Turkey Point Unit 3 in response, in part, to the 50.54(f) letter issued by the NRC.The Nuclear Energy Institute (NEI), supported by industry personnel, cooperated with the NRC to prepare guidance for conducting seismic walkdowns as required in the 50.54(f) letter, Enclosure 3, Recommendation 2.3: Seismic. (Ref.12).
The guidelines and procedures prepared by NEI and endorsed by the NRC were published through the Electric Power Research Institute (EPRI) as EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012; henceforth, referred to as the "EPRI guidance document." (Ref. 1) Turkey Point has utilized this NRC endorsed guidance as the basis for the seismic walkdowns and this report. (Ref. 1)The EPRI guidance document was used to perform the engineering walkdowns and evaluations described in this report. In accordance with the EPRI guidance document, the following topics are addressed in the subsequent sections of this report." Seismic Licensing Basis* Personnel Qualifications
* Selection of Systems, Structures, and Components (SSC)* Seismic Walkdowns and Area Walk-Bys* Seismic Licensing Basis Evaluations" IPEEE Vulnerabilities Resolution Report" Peer Review Seismic Licensing Basis The safe shutdown earthquake for the Turkey Point site is 0.1 5g horizontal ground acceleration and 0.10 g vertical ground acceleration. (Ref. 2, Section 2)iv Personnel Qualifications The walkdown team consisted of experienced site personnel with Civil/Structural or Mechanical Engineering, Operations and PRA backgrounds.
Tile site personnel were supplemented by two vendors with significant experience in the area of seismic design and the performance of seismic walkdowns.
The personnel who performed the key activities required to fulfill the objectives and requirements of the 50.54(f) letter are qualified and trained as required in the EPRI guidance document (Ref. 1).Selection of SSCs One hundred (100) components were selected for the walkdown effort, including spent fuel pool items. These components were selected using the process described in detail in the EPRI guidance document, Section 3: Selection of SSCs. (Ref. 1)Seismic Walkdowns and Area Walk-Bys Section 5, Appendix C, and Appendix D of this report documents the equipment Seismic Walkdowns and the Area Walk-Bys.
The online seismic walkdowns for Turkey Point Unit 3 were performed September 10-14, 2012. The walkdown team consisted of two 2-person Seismic Walkdown Engineer (SWE) teams.The seismic walkdown team inspected 90 of the 100 components on the seismic walkdown equipment list (comprised of SWEL 1 and SWEL 2). Ten components were inaccessible and future walkdowns are planned for these items. Follow-up inspections are also to be performed on electrical panels that could not be opened at the time of the initial walkdown.Equipment Seismic Walkdowns included anchorage inspections and checks to verify as-found anchorages are consistent with design documents.
The walkdown found cases where the as-found anchorage was not consistent with the design document.
In other cases the document identifying anchorage design could not be identified.
Instances of anchor corrosion were cited, but the extent of corrosion is not a seismic capacity concern at this time. Except for the item E16B air handling unit (AH U), no concerns with overall anchorage strength were identified.
The E16B AHU was found to be lacking positive base anchorage.
The operability of the unit was addressed and the unit was found to be operable.Potential seismic interaction concerns were identified but none of the issues were considered to be hazards that rendered equipment inoperable.
Other equipment interaction issues are related to clearances between equipment and adjacent items and improper seismic housekeeping.
Loose or missing hardware, such as loose thumbscrews or latches, were found and cited under "Other" potentially adverse conditions.
Area Walk-Bys identified potentially adverse conditions -relate to improper seismic housekeeping.
Potential seismic interaction concerns were also identified but none of the issues were considered to be significant immediate hazards. In some cases potential relay chatter due to bumping of equipment is cited. Potential relay chatter issue is undesirable but the overall plant hazard related to relay chatter is typically low.For the Turkey Point USI A-46 evaluation (Reference 9), relay chatter was dismissed as a concern. One potential seismically-induced spray hazard was cited as requiring evaluation.-
v Seismic Licensing Basis Evaluations Conditions identified during the walkdowns were documented on the Seismic Walkdown Checklists (SWCs) and the Area Walkdown Checklists (AWCs), and entered into the CAP. For those conditions that operability or functionality could not be screened as acceptable, evaluations were initiated to demonstrate that the current licensing basis was met. Tables 5-2 and 5-3 in the report provide a summary of the conditions and the actions taken.IPEEE Vulnerabilities In lieu of a full IPEEE seismic analysis, FPL opted to submit a "scaled back" program to resolve USI A-46 and Generic Letter 87-02 as allowed by the NRC in a letter dated November 4, 1998 (Ref. 13) issued for the review of Turkey Point IPEEE evaluations.
The final results of this scaled back program for the A-46 program were submitted in a letter to the NRC, L-93-155, "Final Report of Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolved USI A-46 and GL 87-02" (Ref. 14). The components selected for this analysis were also included in the SWEL in order to verify no outlier issues persisted.
Peer Reviews The Peer Review of the walkdowns consisted of two teams made up of Operations and PRA representatives and engineers with knowledge and experience in seismic inspections and assessments.
The engineers made up the SWE teams, but also served to peer review each other's work. The Operations and PRA representatives also participated in some of the walkdowns for logistical support as well as peer review.Appendix F of this report contains a summary of the Peer Review. The Peer Review determined that the objectives and requirements of the 50.54(f) letter are met. Further, it was concluded by the peer reviews that the efforts completed and documented within this report are in accordance with the EPRI guidance document.Summary In summary, seismic walkdowns have been completed at Turkey Point Unit 3 in accordance with the NRC endorsed walkdown methodology.
All potentially degraded, nonconforming, or unanalyzed conditions identified as a result of the seismic walkdowns have been entered into the corrective action program. None of the conditions found resulted in loss of operability or functionality of any structures, systems or components.
Follow-on activities required to complete the efforts to address Enclosure 3 of the 50.54(f) letter include inspection of items deferred due to inaccessibility along with supplemental inspections of electrical cabinets.
Area Walk-Bys will be complete, as required, during these follow-on activities.
vi I Introduction
 
==1.1 BACKGROUND==
 
In response to Near-Term Task Force (NTTF) Recommendation 2.3, the Nuclear Regulatory Commission (NRC) issued a 10CFR50.54(f) letter on March 12, 2012 requesting that all licensees perform seismic walkdowns to identify and address plant degraded, non-conforming, or unanalyzed conditions, with respect to the current seismic licensing basis. The Nuclear Energy Institute (NEI), through the Electric Power Research Institute (EPRI), prepared industry guidance to assist licensees in responding to this NRC request. The industry guidance document, EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012 (Reference 1), was endorsed by the NRC on May 31, 2012. NextEra/Florida Power & Light Company (FPL) has committed to using this guidance as the basis for completing the walkdown effort.1.2 PLANT OVERVIEW The Turkey Point (PTN) site is located on the west shore of Biscayne Bay in Dade County, Florida. The site is 25 miles south of Miami and eight miles east of Florida City.The site contains two fossil units (Unit 1 and 2), two nuclear units (Units 3 and 4), and one combined cycle gas-powered unit (Unit 5). The plant's nuclear steam supply system (NSSS). was designed by Westinghouse Electric Corporation.
The Containment structure and balance of plant was designed by Bechtel Corporation.
The general description of the plant given above is based on the information in the UFSAR (Reference 2).1.3 APPROACH The EPRI Seismic Walkdown Guidance (Reference
: 1) was used for the seismic walkdowns and evaluations described in this report. In accordance with Reference 1, the following topics are addressed in the subsequent sections of this report: " Seismic Licensing Basis* Personnel Qualifications" Selection of SSCs" Seismic Walkdowns and Area Walk-Bys" Licensing Basis Evaluations
* IPEEE Vulnerabilities Resolution Report" Peer Review 1 2 Seismic Licensing Basis 2.1 SITE SEISMICITY Site seismicity is discussed in UFSAR (Reference
: 2) Section 2. On the basis of historical or statistical seismic activity, Turkey Point is located in a seismically inactive area, far from any recorded damaging shocks. Even though several of the larger historical earthquakes may have been felt in southern Florida, the amount of ground motion caused by them was not great enough to cause damage to any moderately well-built structure.
Predicated on history, building codes, geologic conditions, and earthquake probability, the design earthquake was conservatively established as 0.05 g horizontal ground acceleration.
The nuclear units have also been evaluated for a 0.15 g ground acceleration to assure no loss of function of the vital systems and structures.
Vertical acceleration is taken as 2/3 of the horizontal value and is considered to act concurrently.
 
===2.2 SEISMIC===
DESIGN BASIS The seismic design was based on the acceleration ground response spectrum curves shown in UFSAR Figures 5A-1 and 5A-2. The curves were derived from the "Housner Spectrum" normalized to 0.05g for the design earthquake and 0.15g for the maximum earthquake.
The UFSAR commitment for a maximum earthquake was determined at a time when probabilistic definition of seismic input had not been developed with any degree of consistency or confidence.
Therefore, the 0.15g PGA was conservatively estimated based on very limited data available at the time.The original design basis commits Turkey Point to the 1967 proposed version of General Design Criterion (GDC) Number 2 that relates to earthquake natural phenomena as identified below and is as follows: "Those systems and components of reactor facilities which are essential to the prevention or to the mitigation of the consequences of nuclear accidents which could cause undue risk to the health and safety of the public shall be designed, fabricated, and erected to performance standards that will enable such systems and components to withstand, without undue risk to the health and safety of the public the forces that might reasonably be imposed by the occurrence of an extraordinary natural phenomenon such as earthquake, tornado, flooding condition, high wind or heavy ice.The design bases so established shall reflect: (a) appropriate consideration of the most severe of these natural phenomena that have been officially recorded for the site and the surrounding area and (b) an appropriate margin for withstanding forces greater than those recorded to reflect uncertainties about the historical data and their suitability as a basis for design." 2 AEC Publication TID-7024 (Reference
: 4) was used as the basic design guide for earthquake analysis.
Floor response spectra were developed from the ground spectra for the Containment Buildings and Control Building to evaluate structures, systems, and components at the various elevations of those structures.
Earthquake forces were applied simultaneously in the vertical and any horizontal direction.
The vertical component of acceleration at any level was taken as two-thirds of the horizontal ground acceleration.
The damping factors for various types of construction are listed in Reference 2, Appendix 5A.For concrete structures and components, the basic code for determining the section strengths for original design was ACI 318-63 (Reference 5). For steel structures and components, the basic code for determining the section strengths was the AISC Steel Construction Manual, 6th Edition (Reference 6). Later codes were used for plant upgrades.
Design requirement for equipment varied by equipment type. The mechanical and electrical equipment were purchased under specifications that include a description of the seismic design criteria for the plant. Motor control centers and load centers were shake table tested to demonstrate no-loss-of-function capacity under the maximum hypothetical earthquake.
The Turkey Point units were within the scope of NRC unresolved safety issue (USI) A-46 (Reference 7), which required a re-evaluation of safety-related mechanical and electrical equipment.
At about the same time the NRC asked all operating power plants to undertake an investigation of design capability to extreme external events (Reference 8).Turkey Point resolved these issues as discussed in the next section. Resolution included implementation of seismic design improvements.
2.3 USI A-46 AND SEISMIC IPEEE Generic Letter 87-02, "Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46" (Reference 7)addressed seismic adequacy of equipment at older nuclear plants. Turkey Point Units 3 and 4 were within the scope of USI A-46.The evaluation of Turkey Point for resolution of USI A-46 is reported in Reference 9.FPL developed and implemented a plant specific program to satisfy requirements of USI A-46 as agreed between FPL and the USNRC. The program consisted of developing a walkdown procedure that concentrated on anchorage concerns of USI A-46, the seismic spatial interaction concerns of USI A-17 and the design concerns for large tanks in USI A-40. The program was developed by FPL to be appropriate and cost effective for addressing GL87-02 concerns at its low seismic sites. The basic requirement for the walkdown was that the equipment be able to withstand the design basis SSE at the plant and still provide its safe shutdown function.
The procedure used relied on the judgment of an expert team to meet the basic requirement.
A success path of equipment using safety and non-safety equipment was selected for achieving hot shutdown of the plant within a period of 8 hours.An assessment of the anchorage adequacy was performed on each equipment item included on the safe shutdown list. This included an assessment of the seismic demand on the equipment anchorage (forces and stresses on the anchorage), the seismic capacity of the anchorage components (attachment of the equipment to the anchorage, 3 the anchorage itself, and the development of the anchorage to the foundation), and whether the capacity of the weak link of the anchorage system exceeded the demand.A seismic spatial interaction assessment was performed on each equipment item included on the safe shutdown list. The following seismic spatial interaction issues were evaluated:
: 1) heavy objects falling (sometimes referred to as II over .I interactions), 2)heavy objects sliding, swinging, vibrating or tipping (proximity interactions) and 3)inadequate flexibility of lines to accommodate seismic-induced relative movements between utility support points. An assessment was made as to whether possible interactions existed, and if it did, could the interaction preclude the equipment item from performing a safe shutdown function.
Those interactions identified as possibly precluding the equipment item's safe shutdown function were identified as outliers.The walkdown resulted in the identification of outlier equipment items with the majority of the outliers being lack of anchorage for electrical cabinets which were not previously required to be anchored.
FPL addressed all outlier issues listed and the actions taken are listed in Reference 9 Table 5.0. In many cases, FPL engineering generated Plant Change/Modification (PC/M) Packages which provided for physical modification to plant equipment resulting in additional seismic "hardening" of the equipment.
Generic Letter 88-20, Supplement 4, "Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities" (Reference
: 8) addressed plant-specific vulnerabilities to severe accidents.
For implementation of the IPEEE, Turkey Point was classified as a "reduced scope" plant per NUREG-1407 (Reference1O).
As such, the review level earthquake was equal to the site SSE and completion of the USI A-46 assessment largely satisfied the seismic IPEEE requirements.
FPL informed the NRC that the plant specific program developed for USI A-46 would be used to resolve GL 88-20 Supplement 4 at Turkey Point (see Reference 11).4 3 Personnel Qualifications
 
===3.1 OVERVIEW===
This section of the report identifies the personnel who participated in the NTTF 2.3 Seismic Walkdown efforts. A description of the responsibilities of each Seismic Walkdown participant's role(s) is provided in Section 2 of the EPRI Seismic Walkdown Guidance (Reference 1). Resumes contained in Appendix A provide detailed personnel qualifications information.
 
===3.2 PROJECT===
PERSONNEL Table 3-1 below summarizes the names and corresponding roles of personnel who participated in the NTTF 2.3 Seismic Walkdown effort.Table 3-1. Personnel Roles Equipment Seismic Licensing Name Selection Plant Walkdown Besin IPEEE Peer Ops. :Engineer Reviewer Reviewer Engineer (SWE) Reviewer C. Figueroa X X X X(note 2)T. Satyan- X X X X(note 2)Sharma G. Tullidge X X A. Restrepo X X X(note 1)T. Jones X X J. O'Sullivan X X X(note 2)S. Baker X X X(note 2)Notes: 1. Peer Review Team Leader 2. Provided peer review of a sample of other SWE team's SWCs & AWCs.5
 
===3.3 EQUIPMENT===
 
SELECTION PERSONNEL The SWEL development was performed by the Peer Review Team Lead member of the PRA Group. The SWEL was then independently reviewed by another member of the PRA Group, by Operations, and finally by Peer Reviewers from Engineering.
 
===3.4 SEISMIC===
WALKDOWN ENGINEERS The seismic walkdowns were performed by four seismic walkdown engineers (SWEs)grouped into two seismic walkdown teams (SW-Ts).The lead SWEs are engineers from Stevenson and Associates (S&A). S&A is recognized internationally as a leading seismic consultant to the nuclear industry and as a regular contributor to the advancement of earthquake engineering knowledge through funded research projects.
The professional staff has expertise and capabilities in earthquake enginee.ing, -structural dynamics, and structural design. S&A has performed seismic evaluatiblis of US nuclear power plants, using either Seismic Probabilistic Risk Assessment (PRA) or Seismic Margin Assessment, to address US Nuclear Regulatory Commission (NRC) Individual Plant Evaluation for External Events (IPEEE) for over 35 US and European plants.3.5 LICENSING BASIS REVIEWERS The Licensing Basis Reviewers consisted of the four seismic walkdown engineers.
The FPL engineers had the lead in licensing basis determinations, with support from the S&A engineers.
 
===3.6 IPEEE===
REVIEWERS IPEEE reviewers were engineers familiar with implementation of IPEEE at the Turkey Point site. The IPEEE Reviewers also participated in the SWEL preparation and seismic walkdowns.
3.7 PEER REVIEW TEAM The Peer Review Team is listed, along with their roles and qualifications, in the Peer Review Report included in Appendix F.3.8 ADDITIONAL PERSONNEL Operations personnel also provided support to the walkdown by reviewing the list of components for accessibility and accompanying the SWTs to open cabinet doors for accessibility to anchorage.
6 4 Selection of SSCs The Seismic Walkdown Equipment List is documented in the SWEL Selection Report, provided in Appendix B. This report describes how the SWEL was developed to meet the requirements of EPRI Seismic Walkdown Guidance (Reference 1). The summary of the Seismic Walkdown Equipment List is included in Appendix C under Table C-1 Summary of Seismic Walkdown Checklists.
The final SWEL (both SWEL 01 & SWEL 02)which details all of the component attributes used in the screening process, as well as the Master Component List, are on-file.7 5 Seismic Walkdowns and Area Walk-Bys 5.1 OVERVIEW The Seismic Walkdowns and Area Walk-Bys were conducted by 2-person teams of trained Seismic Walkdown Engineers, in accordance with the EPRI Seismic Walkdown Guidance (Reference 1). The walkdowns occurred on September 10-14, 2012.Components in the Containment building were inaccessible and will be inspected during the next refueling outage, currently scheduled for early 2014. The Seismic Walkdowns and Area Walk-Bys are discussed in more detail in the following sections.5.2 SEISMIC WALKDOWNS The Seismic Walkdowns focused on the seismic adequacy of the items on the SWEL as provided in Appendix B of this report. The Seismic Walkdowns also evaluated the potential for nearby SSCs to cause adverse seismic interactions with the SWEL items.The Seismic Walkdowns focused on the following adverse seismic conditions associated with the subject item of equipment: " Adverse anchorage conditions" Adverse seismic spatial interactions" Other adverse seismic conditions The results of the Seismic Walkdowns have been documented on the Seismic Walkdown Checklist (SWC) provided in the EPRI guidance document, Appendix C.Seismic Walkdowns were performed for 90 of the 100 items identified on the Turkey Point Unit 3 SWEL. The remaining items will be inspected in the refueling outage as previously noted. The associated SWCs are provided in Appendix C of this report.Additionally, photos have been included with most SWCs to provide a visual record of the item along with any comments noted on the SWC. These photos are not included to limit the size of this report but are on file. Drawings and other plant records are cited in some of the SWCs, but are not included with the SWCs because they are readily retrievable documents through the station's document management system.Inspection for certain items could not be completed due to access restrictions.
Appendix E of this report identifies the inaccessible equipment along with the plan for future Seismic Walkdowns.
The following subsections describe the approach followed by the SWEs to identify potentially adverse anchorage conditions, adverse seismic interactions, and other adverse seismic conditions during the Seismic Walkdowns.
8
 
====5.2.1 Adverse====
Anchorage Conditions
* Guidance for identifying anchorage that could be degraded, non-conforming, or unanalyzed relied on visual inspections of the anchorage and verification of anchorage configuration.
Details for these two types of evaluations are provided in the following two subsections.
The evaluation of potentially adverse anchorage conditions described in this subsection applies to the anchorage connections that attach the identified item of equipment to the civil structure on which it is mounted. For example, the welded connections that secure the base of a Motor Control Center (MCC) to the steel embedment in the concrete floor would be evaluated in this subsection.
Evaluation of the connections that secure components within the MCC is covered later in the subsection "Other Adverse Seismic Conditions." Visual Inspections The purpose of the visual inspections was to identify whether any of the following potentially adverse anchorage conditions were present:* Bent, broken, missing, or loose hardware" Corrosion that is more than mild surface oxidation" Visible cracks in the concrete near the anchors* Other potentially adverse seismic conditions Based on the results of the visual inspection, the SWEs judged whether the anchorage was potentially degraded, non-conforming, or unanalyzed.
The results of the visual inspection were documented on the SWC, as appropriate.
If there was clearly no evidence of degraded, nonconforming, or unanalyzed conditions, then it was indicated on the checklist and a licensing basis evaluation was not necessary.
However, if it was not possible to judge whether the anchorage is degraded, nonconforming, or unanalyzed, then the condition was entered into the Corrective Action Program as a potentially adverse seismic condition for further evaluation.
Additionally, any significant comments are noted on the SWCs. Drawings and other plant design documents are cited in some of the SWCs, but they are not included with the SWCs because they are readily available in the plant's electronic document management system.5.2.2 Anchorage Configuration Confirmation As required by the EPRI Seismic Walkdown Guidance (Reference 1, page 4-3), at least 50% of the items were confirmed to be anchored consistent with design drawings.
Line-mounted equipment (e.g., valves mounted on pipelines without separate anchorage) was not evaluated for anchorage adequacy and was not counted in establishing the 50%sample size.Examples of documentation that was considered to verify that the anchorage installation configurations are consistent with the plant documentation include! the following:
o Design drawings" Seismic qualification reports of analyses or shake table tests 9 The SWC listed in Appendix C indicate the anchorage verification status for components as follows: N/A: component that is line-mounted and/or is not anc'hored to the civil structure and therefore does not count in the anchorage confirmation total.Y: component that is anchored to the civil structure and was chosen for anchorage configuration confirmation.
N: component which had anchorage but was not chosen for anchorage configuration confirmation.
See Table 5-1 below for the accounting of the 50% anchorage configuration confirmations, and the individual SWC forms in Appendix C for the specific documents used in each confirmation.
Total Items Chosen includes two deferred items.Table 5-1 :Anchorage Configuration Confirmation Total SWEL SWEL Items Minimum Total Items Items without R d ReieAnchorage (N/A) RequidChosen B 100 29 36 37 5.2.3 Adverse Seismic Spatial Interactions An adverse seismic spatial interaction is the physical interaction between the SWEL item and a nearby SSC caused by relative motion between the two during an earthquake.
An inspection was performed in the area adjacent to and surrounding the SWEL item to identify any seismic interaction conditions that could adversely affect the capability of that SWEL item to perform its intended safety-related functions.
The three types of seismic spatial interaction effects that were considered are: o Proximity a Failure and falling of SSCs (Seismic II over I)* Flexibility of attached lines and cables Detailed guidance for evaluating each of these types of seismic spatial interactions is described in the EPRI guidance document, Appendix D: Seismic Spatial Interaction.
The Seismic Walkdown Engineers exercised their judgment to identify seismic interaction hazards. Section 5.2.5 provides a summary of issues identified during the Seismic Walkdowns.
 
====5.2.4 Other====
Adverse Seismic Conditions In addition to adverse anchorage conditions and adverse seismic; interactions, described* above, other potentially adverse seismic conditions that could challenge the seismic adequacy of a SWEL item were evaluated.
These inspections were mostly associated 10 with in-cabinet inspections of selected electrical equipment.
Examples of the types of conditions that could pose potentially adverse seismic conditions include the following:
* Degraded conditions
* Loose or missing fasteners that secure internal or external components to equipment* Large, heavy components mounted on a cabinet that are not typically included by the original equipment manufacturer
* Cabinet doors or panels that are not latched or fastened Any identified other adverse seismic conditions are documented on the items' SWC and Table 5-2, as applicable.
 
====5.2.5 Issues====
Identification during Seismic Walkdowns Table 5-2 provides a summary of issues identified during the equipment Seismic Walkdowns and recorded on SWCs. The tracking of issue resolution is identified in the table. Items are grouped based on the walkdown issue cited: " Anchorage issues* Seismic interaction issues" Other conditions
* Anchorage documentation not available* Anchorage inspection could not be fully completed The majority of potentially adverse anchorage conditions found are related to documentation of as-found anchorage.
In those cases either the as-found anchorage was not consistent with the available document, or the document identifying the anchorage design could not be identified.
Except for the item E16B air handling unit (AHU), no concerns with overall anchorage strength were identified.
There was one instance where anchor corrosion was cited, but the extent of corrosion is minor at this time. The E16B AHU was found to be lacking positive base anchorage.
Low seismic ruggedness of attached piping was also cited as a concern. The operability of the unit was addressed and the unit was found to be operable.Potential seismic interaction concerns were identified but none of the issues were considered to be significant hazards but will be addressed to reduce risk. Most equipment interaction issues are related to clearances between equipment and adjacent items and improper seismic housekeeping.
Under good seismic housekeeping practice, transient and moveable items (e.g., ladders) should be restrained or stowed such that they will not slide into or fall against important plant equipment.
Items considered minor maintenance issues, such as loose or missing thumbscrews or latches, were found and cited under "Other" potentially adverse conditions.
In addition, these items were entered into the Corrective Action Program under separate Action Requests (ARs). None of these items affect component anchorage.
For items requiring anchorage verification, the SWC anchorage verification checklist item was set to "Unknown" if an anchorage design document could not be found.Notwithstanding, the configuration was assessed to ensure that there was no immediate 11 operability concern. Also, anchorage checklist items were set to "Unknown" when the walkdown team could not see all anchors., For example, some anchors (relatively few)of control cabinets were covered by wiring. A comment is included on the corresponding SWC to explain that certain anchors out of the group could not be seen. Again, the configuration was assessed to establish that there was no immediate operability concern.12 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Anchorage issues As-found anchorage determined to be 3B EDG FAN Anchorage does not match pattern adequate given the size and geometry ASSEMBLIES shown on drawing 5610-C-379 Sh. 1. of fan assemblies.
Also, item was Item was entered into the Unknown if more recent anchorage reviewed for USI A-46 (Ref. 9). corrective action program to documentation exists. Also, one anchor Anchorage found to be acceptable.
YES document the condition and at a support for the north fan appears to update the documentation as be missing. Revise drawings to match as-found warranted.
condition.
As-found anchorage is approximately 3D03 Anchorage seen to be a mix of 5/8 and equivalent to that shown on drawing.1/2 diameter concrete expansion Also, Item was reviewed for USI A-46 Item was entered into the 3A BATTERY anchors (CEA's) for each rack. and anchorage was found to be corrective action program to RACK acceptable.
YES document the condition and Anchorage does not match drawing update the documentation as 5610-C-1369.
Revise drawings to match as-found warranted.
condition.
As-found anchorage is similar to ,_,,IUi., U 1U1 ULI0I V, i, L ULJQ ,L), Item was entered into the chargers and therefore judged to be Anchorage configuration differs from adequate.
corrective action program to CHARGER drawing 5610-C-652 Sh. 1. YES document the condition and Revise drawings to match as-found update the documentation as condition.
warranted.
13 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Anchorage is by cast-in-place (CIP)3E207B Concrete is cracked and spalling, with anchors embedded in concrete Item was entered into the exposed reinforcement, at north-east pedestals, and was judged to be corrective action program to COMPONENT anchor. The spalled area is not currently acceptable.
YES document the condition and COOLING HEAT tagged in the field. repair the concrete.EXCHANGER B Repair concrete.3S77 Item is a medium size wall mounted Three anchors along right edge covered panel with substantial anchorage and Item was entered into the 100 AMP 2- by whitish corrosion product; lower was judged to be acceptable.
corrective action program to POLE, anchor may have more than minor YES document the condition and AUTOMATIC corrosion of nut. Evaluate and take corrective action to TRANSFER repair corroded area. ...SWITCH CONSOLE Item is a low-height cabinet with substantial anchorage.
As-found CONTROL anchorage is judged to be adequate Item was entered into the ROOM Anchors along the cabinet front are given the overall capacity of the corrective action program to CONTROL typically 2' on center. One anchor along anchorage and the configuration of the YES document the condition and CONSOLE the front appears to be missing. cabinets.
update the documentation as Plant drawings and documents need to warranted.
be changed to reflect as-built configuration.
14 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status An analysis of the as-found condition Item was entered in the E16B was performed and determined to be Ite actin the acceptable for its functionality for the CONTROL Unit appears to be unanchored.
Feet of seismic loading. Operability of unit Per POD, the AHU is ROOM AIR unit appear to sit on vibration isolation confirmed by prompt operability YES considered operable.
Further HANDLING UNIT pads (4 places). determination (POD). evaluation will be performed to determine if anchorage is Evaluate and take corrective action. needed to improve design margin.As-found anchorage was judged to be X05 adequate based on the amount of weld Anchorage is welded to embedded steel. provided in comparison to the Item was entered into the 4160/480V Find that 4 of 6 welds are 4" long and 2 configuration and mass of the corrective action program to TRANSFORMER of 6 welds are about 2" long. Anchorage transformer.
YES document the condition and FOR 480V LC 3B does not match drawing 561 O-E-9-35.
update the documentation as Plant drawings and documents need to warranted.
be changed to reflect as-found anchorage configuration.
Seismic interaction issues 3C04 ........le... During A-46 walkdown, there ,..ljng tiles1 V PIC1,31-C1, 1Uand l ILt were metal crate ceilings.
It VERTICAL weight. Therefore, the hazard imposed has been replaced with light PANEL A Egg crate ceiling tiles above are not tied is judged to be low. weight plastic.to framing and can fall on operators and soft targets. This issue was cited in USI Review indicates that after USI A-46 YES Documents retrieval for the A-46 inspection, inspection, metal ceiling tiles were closeout is being tracked in replaced with plastic ones. AR was the corrective action written to verify issue close-out.
program.15 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status 3C06_3C05 Ceiling tiles are plastic and light During A-46 walkdown, there Ceilng ilesareplasic nd lghtwere metal crate ceilings.
It VERTICAL Egg crate ceiling tiles above are not tied weight. Therefore, the hazard imposed has been replaced with light PANEL to framing and can fall on operators and is judged to be low. weight plastic.PANEL B soft targets. This issue was cited in USI A-46 inspection.
Review indicates that after USI A-46 YES D inspection, metal ceiling tiles werethe inspctio, mtal eilig tles erecloseout is being tracked in replaced with plastic ones. AR was corective actio n written to verify issue close-out.
proram.program.CONSOLE Egg crate ceiling tiles above are not tied Ceiling tiles are plastic and light During A-46 walkdown, there to framing and can fall on operators and were metal crate ceilings.
It CONTROL soft targets. This issue was cited in USI weight. Therefore, the hazard imposed has been replaced with light ROOM A-46 inspection, is judged to be low. weight plastic.CONTROL Review indicates that after USI A-46 YES CONSOLE iDocuments retrieval for the CNOEinspection, metal ceiling tiles were closeout is being tracked in replaced with plastic ones. AR was the corrective action written to verify issue close-out.
program.16 table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status HCV-3-121 CHG TO RCS HCV-3-121 is within 1/2" of the structural Based on the difference in mass CONTROL support for a nearby limit switch. between the valve and the tubing, it is Item was entered into the VALVE Potential for seismic interaction.
A judged that the hazard to valve corrective action program to possible method of increasing clearance functionality is low. document the condition and would be to cut the extended part of the YES evaluate to determine if level transmitter bolt. Evaluate and increase the clearance increased clearance is as needed. warranted.
MOV-3-350 EMERGENCY The gearbox of MOV-3-350 is Based on the difference in mass BORATION approximately 1/4" from a vertical conduit between the valve and the conduit, it is.CONTROL (possibly abandoned).
judged that the hazard to valve VALVE functionality is low.Item was entered into the Evaluate and increase the clearance corrective action program to as needed. YES document the condition and evaluate to determine if increased clearance is warranted.
17 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Condition Resolution Entered Current Status into CAP Other conditions 3B50 Per field walkdown post-inspection it was determined that the subject lift 3H trolley and the associated metal hook LOADCENTERLift trolley on roof of cabinet was found are always retracted into the rail (CABINET) unrestrained side-to-side and may bang housing. As such, a banging against agetainstedtThis could be a relay the stop is unlikely to occur. In against stop. addition, the stop is welded to the rail chatter issue. housing. Therefore, isolated from the Item was entered into the Provide positive restraint to roof trolley to rigid upper frame of the cabinet with corrective action program to prevent impact against stops, OR electrical equipment inside. YES document the condition and evaluate to provide positive As such, this condition was considered restraint.
Verify there are no essential relays or tontrpentaoetilr other chatter-prone devices in the immditeperability or cabinetimmediate operability concern cabinet Recommended to provide positive restraint to roof trolley to prevent impact against stops.Per field walkdown post-inspection it 3C23B Potential impact wih independent tube was determined that the subject Item was entered into the steel support crossing near the top of the cabinet is top-supported and effectively corrective action program to SEQUENCER cabinet in front. The gap to the TS is rigid as well as the TS support. YES document the condition and 3C23B about 1/8" on one side, increasing to implement the resolution as about 1/2" on the opposite side. noted.18 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Best seismic practice for battery racks 3D03 is to make batteries snug against rails or spacers in all lateral directions.
3A BATT-IERY RACK Typically there is a 3/8 to 1/2" (approx.)
Similar conditions were identified Item was entered into the gap between front of batteries and durindithe were identiand corrective action program to horizontal rail. Condition is common for during the A-46 assessment and YES document the condition and all inspected racks (batteries can slide judged to be acceptable for operability, implement the resolution as forward to rail). Further evaluation of the as-qualified, noted condition is to be performed to determine if spacers should be installed to increase margin.3D24 Typically there is a 3/8 to 1/2" (approx.)
Best seismic practice for battery racks gap between front of batteries and is to make batteries snug against rails 3B BATTERY horizontal rail. Condition is common for or spacers in all lateral directions.
RACK all inspected racks (batteries can slide forward to rail). Similar conditions were identified Item was entered into the during the A-46 assessment and corrective action program to judged to be acceptable for operability.
YES document the condition and Further evaluation of the as-qualified implement the resolution as condition is to be performed to noted determine if spacers should be instaiied to increase margin.19 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Potential relay chatter was addressed 3QR35 in the PTN USI A-46 evaluation.
It was concluded that the potential for relay CONTROL chatter was very low and that any ROOM chatter would be managed by PROTECTION Zero gap at left end to adjacent cabinet identifying the effect and taking RACK 3QR80A (next to line-up).
Suspect appropriate action to mitigate the Item was entered into the 3QR80A is not bolted to adjacent 3QR32 effect. Therefore there is no immediate cte actinpo to cabinet (see gaps a mid-height).
Unable operability concern. YES document the condition and to fully inspect interior due to access implement the rolution as limitations.
This may be a relay chatter The resolution will be to verify that tops implement the resolution as concern, of cabinets are bolted together such noted that impact is prevented, OR Verify there are no essential relays or other chatter-prone devices in the cabinets.20 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status 3T36 Based on field walk down, the tank EDG DIESEL integrity would not be adversely OILBase plate at east and west anchors has affected by the condition above the Item was entered into the TANK corrosion olaexatension bnd wetanclhase amount of material left in the base corrective action program to S corrosion of extension beyond wall/base plate is judged to be adequate for the YES document the condition and weld at two locations.
Not a capacity component to withstand its design implement the resolution as concern at this time. las oe loads. noted This is a maintenance issue. Perform maintenance as needed per final resolution determined under CAP.E16B Operability of unit confirmed by prompt CONTROL operability determination (POD).ROOM AIR HANDLING UNIT There is non-rugged rod hung copper The impact of spray was evaluated and Item was entered into the tubing in the area and tubing is attached it would not adversely affect the corrective action program to tofunction of the air handlerm be document the condition and determine if additional hazard. Also, leakage from tubing may An additional AR was written to measures are warranted to impair function of E16B. address this specific condition and to restrain the tubing.review adverse effects, if any of the copper tubing on the functionality of the air handlers.
The operability screening of the AR determined that the AHU remain Operable.21 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered CretSau Equipment ID Potentially Adverse Seismic Condition Resolution intoeCA Current Status Anchorage documentation not available Control panel has been confirmed to 3C12B be welded to an embedded metal Item is designated for anchorage frame at various locations.
As such, it 3B EDG verification; a document that identifies would not be adversely affected by CONTROL anchorage design was not located, seismic loads. The anchorage currently PANEL installed is judged to be adequate to Item was entered into the withstand its design loads based on YES corrective action program to the capacity of the anchorage in document the condition and comparison to the mass and update the documentation as configuration of the panel. warranted Design drawings will be updated to document the as-built configuration of the anchorage.
22 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered CretSau Equipment ID Potentially Adverse Seismic Condition Resolution intoeCA Current Status Based on field walkdown, the 3D01 associated distribution panel has been Item is designated for anchorage confirmed to have anchor bolts (Sketch (DISTRIBUTION verification; a document that identifies provided in the Checklist) at various PANEL) anchorage design was not located, locations.
As such, it would not be adversely affected by seismic loads. Item was entered into the The anchorage currently installed is corrective action program to judged to be adequate to withstand its YES document the condition and design loads based on the capacity of update the documentation as the anchorage in comparison to the mass and configuration of the panel. warranted Design drawings will be updated to document the as-built configuration of the anchorage.
23 Table 5-2: Table of Actions Resultina from Seismic Walkdown InsDection
* ~~~~Entered CretSau Equipment ID Potentially Adverse Seismic Condition Resolution Entereo Current Status Heat exchanger has been confirmed to 3E208A have anchors bolts to a concrete pedestal. (Sketch provided in the SPENT FUEL Checklist).
As such, it would not be PIT HEAT adversely affected by seismic loads.EXCHANGER The anchorage currently installed is Item was entered into the judged to be adequate to withstand its cte actinpo to Item is designated for anchorage design loads based on the capacity of YES corrective action program to verification; a document that identifies the anchorage in comparison to the document the condition and anchorage design was not located, mass and configuration of the heat update the documentation as exchanger.
warranted Design drawings and calculations will be updated to document the as-built configuration of the anchorage.
24 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition StResolution ino Status Chiller package has been confirmed to 3E239B have anchor bolts to a welded steel frame (Sketch provided in the LC & SWGR Checklist).
As such, it would not be ROOMS A/C adversely affected by seismic loads.SYSTEM- The anchorage currently installed is Item was entered into the CHILLER Item is designated for anchorage judged to be adequate to withstand its corrective action program to PACKAGE 1B verification; a document that identifies design loads based on the capacity of YES document the condition and (TRAIN-B) anchorage design was not located, the anchorage in comparison to the update the documentation as mass and configuration of the chiller warranted.
unit.Design drawings and calculations will be updated to document the as-built configuration of the anchorage.
25 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Based on field walkdown, the 3P212A associated pump frame has been confirmed to have anchor bolts to a SFP CLG WTR concrete pedestal (Sketch provided in PMP A the Checklist).
As such, it would not be Item is designated for anchorage adversely affected by seismic loads. Item was entered into the verification; a document that identifies The anchorage currently installed is corrective action program to anchorage design was not located, judged to be adequate to withstand its YES document the condition and design loads based on the capacity of update the documentation as the anchorage in comparison to the warranted.
mass and configuration of the pump..Design drawings and calculations will be updated to document the as-built configuration of the anchorage.
26 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Based on field walkdown, the 3QR35 associated protection rack has been confirmed to have anchor bolts (Sketch CONTROL provided in the Checklist) at various ROOM locations.
As such, it would not be PROTECTION Item is designated for anchorage adversely affected by seismic loads. Item was entered into the RACK verification; a document that identifies The anchorage currently installed is corrective action program to anchorage design was not located, judged to be adequate to withstand its YES document the condition and design loads based on the capacity of the anchorage in comparison with the update the documentation as warranted.
mass and configuration of the cabinet.Design drawings will be updated to document the as-built configuration of the anchorage.
27 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Based on field walkdown, the D51 associated battery charger has been confirmed to be anchor bolted to an SPARE embedded steel frame (Sketch BATTERY provided in the Checklist).
As such, it CHARGER would not be adversely affected by seismic loads. The anchorage currently Item was entered into the Item is designated for anchorage installed is judged to be adequate to corrective action program to verification; a document that identifies withstand its design loads based on YES document the condition and anchorage design was not located, the capacity of the anchorage in update the documentation as comparison with the mass and waranted.configuration of the cabinet. warranted.
This is a configuration control issue.Design drawings will be updated to document the as-built configuration of the anchorage.
Anchorage inspection could not be fully completed Estimated that 70% or more of anchors 3C04 A limited number of anchors are not were inspected and all visible anchors visible (blocked by cables, wires, etc.). were found acceptable.
Item was entered into the VERTICAL Therefore SWC anchorage checks could The anchorage currently installed is corrective action program to PANEL A not be fully completed.
Also, concrete is judged to be adequate to withstand its YES document the assessment not visible (covered by carpet) and design loads. performed for the visible concrete crack check could not be This condition does NOT represent a anchors.completed.
potential or immediate operability concern based on as-found condition of inspected anchorage.
28 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status Estimated that 70% or more of anchors 3C06_3C05 A limited number of anchors are not were inspected and all visible anchors visible (blocked by cables, wires, etc.). -were found acceptable.
Item was entered into the VERTICAL Therefore SWC anchorage checks could The anchorage currently installed is corrective action program to PANEL B not be fully completed.
Also, concrete is judged to be adequate to withstand its YES document the assessment not visible (covered by carpet) and design loads. performed for the visible concrete crack check could not be This condition does NOT represent a anchors.completed.
potential or immediate operability concern based on as-found condition of inspected anchorage.
Estimated that 70% or more of anchors CONSOLE A limited number of anchors are not were inspected and all visible anchors visible (blocked by cables, wires, etc.). were found acceptable.
Item was entered into the CONTROL Therefore SWC anchorage checks could The anchorage currently installed is corrective action program to ROOM not be fully completed.
Also, concrete is judged to be adequate to withstand its YES document the assessment CONTROL not visible (covered by carpet) and design loads.. performed for the visible CONSOLE concrete crack check could not be This condition does NOT represent a anchors.completed.
potential or immediate operability a concern based on as-found condition of inspected anchorage.
3T269B 75% of anchors were inspected and all visible anchors were found acceptable.
EDG 3B 3 of 4 anchors are visible. All visible The anchorage currently installed is STARTING AIR anchors found acceptable.
One anchor is judged to be adequate to withstand its ACCUMULATOR buried in a concrete curb and cannot be design loads. NO CLOSED TANK inspected.
This condition does NOT represent a potential or immediate operability concern based on as-found condition of inspected anchorage.
29 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Entered Equipment ID Potentially Adverse Seismic Condition Resolution into CAP Current Status TIS-3-6413B Wall mounted unit; cannot see wall Based on engineering judgment and anchorage fully unless switch is cosideringiteelig weight oth SWGR RM 3D disassembled.
After removal of cover, considering the light weight of the NO CLOSED FAN 3V65B can only see studs to mounting plate. switch, the as-found anchorage is TEMP SWITCH considered acceptable.
V76 Only able to confirm anchorage on one side of cabinet base. Per drawing 5610- Seismic Review Team judged that the UNIT FOR ELEC C-1701 Sh. 5, expect that remaining cabinet has a welded anchorage and is NO CLOSED EQUIP RM A/C anchorage is hidden from view (weld to acceptable based on conformance of inside of base frame, not visible unless the visible side of the cabinet.E232 housing is disassembled).
30 5.3 AREA WALK-BYS The purpose of the Area Walk-Bys is to identify potentially adverse seismic conditions associated with other SSCs located in the vicinity of the SWEL items. Vicinity is generally defined as the room containing the SWEL item. If the room is very large (e.g., Turbine Hall), then the vicinity is identified based on judgment, e.g., on the order of about 35 feet from the SWEL item. This vicinity is described on the Area Walk-By Checklist (AWC), shown in Appendix D of this report. A total of 45 AWCs were completed for Turkey Point Unit 3. Note that additional AWCs will be completed, as required, when deferred inspections are completed.
The key examination factors that were considered during Area Walk-Bys include the following:
* Anchorage conditions (if visible without opening equipment)
* Significantly degraded equipment in the area" A visual assessment (from the floor) of cable/conduit raceways and HVAC ducting (e.g., condition of supports or fill conditions of cable trays)" Potentially adverse seismic interactions including those that could cause flooding, spray, and fires in the area* Other housekeeping items that could cause adverse seismic interaction (including temporary installations and equipment storage)* Scaffold construction was inspected for adequate bracing and anchorage" Hazards from temporary equipment were evaluated and overall seismic housekeeping was evaluated The Area Walk-Bys are intended to identify adverse seismic conditions that are readily identified by visual inspection, without necessarily stopping to open cabinets or taking an extended look. If a potentially adverse seismic condition was identified during the Area Walk-By, then additional time was taken, as necessary, to evaluate adequately whether there Was an adverse condition and to document any findings.The results of the Area Walk-Bys are documented on the AWCs included:
in Appendix D of this report. A separate AWC was filled out for each area inspected.
A single AWC was completed for areas where more than one SWEL item was located.Additional details for evaluating the potential for adverse seismic interactions that could cause flooding, spray, or fire in the area are provided in the following two subsections.
Seismically-Induced Floodinc/Spray Interactions Seismically-induced flooding/spray interactions are the effect of possible ruptures of vessels or piping systems that could spray, flood or cascade water into the area where SWEL items are located. This type of seismic interaction was considered during the IPEEE program. Those prior evaluations were considered, as applicable, as information for the Area Walk-Bys.One area of particular concern to the industry is threaded fire protection piping with long unsupported spans. If adequate seismic supports are present or there are isolation valves near the tanks or charging sources, flooding may not be a concern. Numerous 31 failures have been observed in past earthquakes resulting from sprinkler head impact.Less frequent but commonly observed failures have occurred due to flexible headers and stiff branch pipes, non-ductile mechanical couplings, seismic anchormotion and failed supports.Examples where seismically-induced flooding/spray interactions could occur include the following:
* Fire protection piping with inadequate clearance around fusible-link sprinkler heads* Non-ductile mechanical and threaded piping couplings can fail and lead to flooding or spray of equipment" Long, unsupported spans of threaded fire protection piping* Flexible headers with stiffly supported branch lines" Non-Seismic Category I tanks The SWEs exercised their judgment to identify only those seismically-induced interactions that could lead to flooding or spray. Fire protection piping at Turkey Point Unit 3 was found to be sufficiently restrained in areas where SC-I equipment items are located and no concerns were identified with fire protection piping.One potential seismic-induced spray interaction was identified at Turkey Point Unit 3 and included as an issue to be resolved.
This is related to the E16B AHU discussed in Section 5.2.Seismically-Induced Fire Interactions Seismically-induced fire interactions can occur when equipment or systems containing hazardous/flammable material fail or rupture. Examples where seismically-induced fire interactions could occur include the following: , Hazardous/flammable material stored in inadequately anchored drums, inadequately anchored shelves, or unlocked cabinets* Natural gas lines and their attachment to equipment or buildings* Bottles containing acetylene or similar flammable chemicals* Hydrogen lines and bottles Another example where seismically-induced fire interaction could occur is when there is relative motion between a high voltage item of equipment (e.g., 4160 volt transformer) and an adjacent support structure when they have different foundations.
This relative motion can cause high voltage busbars,ý which pass between the two, to short out against the grounded bus duct surrounding the busbars and cause a fire.The Seismic Walkdown Engineers exercised their judgment to identify only those seismically-induced interactions that could lead to fires.One potential seismic-fire interaction was identified at Turkey Point Unit 3 and included as an issue to be resolved.
Valve POV-3-4883 is located in the vicinity of a main station transformer and the transformer is considered a potential fire source.32 Area Walk-By Results Table 5-3 provides a summary of issues identified during the Area Walkdowns and recorded on AWCs. The tracking of issue resolution is identified in the table. Items are grouped based on the walkdown issue cited: " Seismic housekeeping issues* Other seismic interaction issues" Other conditions The majority of potentially adverse conditions found are related to seismic housekeeping.
Potential seismic interaction concerns were identified but none of the issues were considered to be significant immediate hazards. III some cases potential relay chatter due to bumping of equipment is cited. Potential relay chatter issue is undesirable but the overall plant hazard related to relay chatter is typically low. For the Turkey Point USI A-46 evaluation (Reference 9), relay chatter was dismissed based on the low probability along with being able to manage the effects if they were to occur. As stated, one potential seismic-induced spray hazard and one potential seismic-induced fire hazard are cited as items requiring evaluation.
33 Table 5-3: Table of Actions Resultinca from Area Walk-by Inspections Area ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Seismic Housekeeping Issues No soft targets are vulnerable.
This is Area 200 a seismic housekeeping issue.Item was entered into the BORIC ACID TANK Large cover plates for nearby recessed Condition was not considered to be corrective action program ROOM area are stored adjacent to pump an immediate hazard. YES to document the condition 4P203B. and implement the Take actions to ensure existing resolution as noted seismic housekeeping procedures are followed.Pump casing is considered a rigid Temporary light near one of the Pumponeting interedtion igid Item was entered into the Area 201 charging pumps is not properly secured component and interaction with temp corrective action program CHARGING PUMP A ladder near RCS filters is not tied off. light risk is low. YES to document the condition ROOM Restrain OR Remove the temp light and implement the and ladder. resolution as noted Area 310C -CABLE No soft targets are vulnerable.
This is lR_ , EADv, a seismic housekeeping issue.M ROOU Mu a s MECH.EQ ROOM Item was entered into the Loose cover panels leaning against wall Condition was not considered to be corrective action program in front of air handlers.
Potential to fall an immediate hazard. YES to document the condition on piping and conduit. and implement the Take actions to ensure existing resolution as noted seismic housekeeping procedures are followed.34 Table 5-3: Table of Actions Resulting from Area Walk-by Inspections Area ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Area 343 -3B MCC This is a seismic housekeeping issue.ROOM Potential relay chatter issue is undesirable but the overall plant Item was entered into the A cart (breaker lift cart) behind 3A MG hazard related to relay chatter is corrective action program Set Controls cabinet is unrestrained and typically low as previously discussed.
may hit that cabinet during earthquake.
and implement the This may be a relay chatter concern. Take actions to ensure existing resolution as noted.seismic housekeeping procedures are followed.Adjacent static inverters are not Area 347B considered soft targets relative to the resistive load bank. This is a seismic Item was entered into the BATTERY CHARGER Temporary resistive load bank is stored housekeeping issue. Condition was corrective action program within 1/4" of 3Y05. This is judged to be hazard. YES to document the condition a housekeeping issue. and implement the Take actions to ensure existing resolution as noted seismic housekeeping procedures are followed.35 Table 5-3: Table of Actions Resulting from Area Walk-by Inspections Area ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Loose ladders behind 3QR50; ladders This is a seismic housekeeping issue.Area 360 have minor impact potential against Potential relay chatter issue is CONTROL ROOM undesirable but the overall plant base of cabinet after falling then sliding hazard related to relay chatter is Area362typiall lo as revousy dicused.Item was entered into the Area 362 A tool cart on locked wheels is directly typically low as previously discussed.
corrective action program CONTROL ROOM next to cabinet "Rack No. 26 Prot. Take actions to ensure existing YES to document the condition and implement the GENERAL Channel Set I1". Potential for impact on seismic housekeepin procedures are implemen te cabinet. A loose printer on floor is next followed.
kpg resolution as noted to cabinet "Rack No. 26 Control".
Minor impact potential against base of cabinet.No soft targets are vulnerable in this Area 370 area. This is a scaffold interaction issue. Condition was not considered INTAKE AREA to be an immediate hazard.Large scaffold assembly in area has Take actions to ensure existing Item was entered into the bracing but does not appear to have seismic housekeeping procedures are corrective action program sufficient east/west anchorage near followed.
YES to document the condition pump 3P9B. Spacing between e/w and 'implement the anchors is too far (about 40'). N/S resolution as noted anchorage of scaffold was OK.36 Table 5-3: Table of Actions Resulting from Area Walk-by Inspections Area ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Other seismic interaction issues Operability of unit confirmed by Area 310C prompt operability determination (POD).CABLE SPREADING ROOM, MECH.EQ The impact of spray was evaluated ROOM Rod hung copper tubing ("Service and it would not adversely affect the item was entered into the ROOMRodhun coper ubig (Serice function of the air handler.Water" tag seen) appears to be non- corrective action program seismic. Appears to be a spray hazard. An additional AR was written to YES to document the condition This issue is tracked under component address this specific condition and to and implement the El16B. adrs hsseii odto n oresolution as noted review adverse effects, if any of the copper tubing on the functionality of the air handlers.
The operability screening of the AR determined that the AHU remain Operable.Condition was not considered to be Area 334 an immediate hazard. A condition of seismic-then-fire event is low snd fire TURBINE PLANT Main transformer is about 20' to south of hazard would take time to develop. Item was entered into the HEAT EXCHANGER POV-3-4883 valve. Transformer is a corrective action program fire risk and is relatively close to the The POV would only need to close YES to document the condition valve. under LOCA conditions to maximize and implement the flow to the CCW heat exchangers.
resolution as noted Evaluate fire hazard with respect to nearby SC-I equipment.
37 Table 5-3: Table of Actions Resulting from Area Walk-by Inspections Area ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Other conditions Item was entered into the Area 220 Bent hanger rods on overhead lights in Condition was not considered to be corrective action program an immediate hazard. Evaluate YES to document the condition AUXILIARYBUILDING hanger rods for strength.
and implement the resolution as noted 38 6 Licensing Basis Evaluations Potentially adverse conditions identified during the walkdowns were documented on the seismic walkdown and area walk-by checklists, as appropriate, and entered into the corrective action process. For those conditions that required a seismic licensing basis evaluation, an operability screening has been performed and an evaluation will be performed to provide the final resolution to be documented within the corresponding condition reports. Table 5-2 and 5-3 of this report provide the status of the subject evaluations as applicable.
39 IPEEE Vulnerabilities Resolution Report As discussed in previously Section 2.3, for implementation of the IPEEE Turkey Point was classified as a "reduced scope" plant per NUREG-1407 (Ref. 10). As such, the review level earthquake was equal to the site SSE and completion of the USI A-46 assessment largely satisfied the seismic IPEEE requirements.
In lieu of a full IPEEE seismic analysis, FPL opted to submit a "scaled back" program to resolve USI A-46 and Generic Letter 87-02 as allowed by the NRC in a letter dated November 4, 1998 (Ref. 13) issued for the review of Turkey Point IPEEE evaluations.
The final results of this scaled back program for the A-46 program were submitted in a letter to the NRC, L-93-155, "Final Report of Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolved USI A-46 and GL 87-02" (Ref. 14). The components selected for this analysis were also included in the SWEL in order to verify no outlier issues persisted.
The actions taken for USI A-46 outlier resolution are summarized in Table 7-1.40 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 1 6 3P9B 3B Intake Cooling Pump shaft length Evaluate Shaft for adequate length Documentation could not be Water Pump longer than can be and clearance, found. A new item has been screened by SSRAP generated to find and/or recreate report. the required documentation.
2 6 3P9B 3B Intake Cooling Cast iron fittings on Check stresses on fittings from Documentation could not be Water Pump pump. loads of attached piping. found. A new item has been generated to find and/or recreate the required documentation.
3 6 3P9B 3B Intake Cooling Anchorage needs Verify anchorage with calculation.
Anchorage adequate per PTN-Water Pump verification.
3FSC-87-020, anchorage replacement.
4 6 3P9B 3B Intake Cooling Interaction
-Fossil Unit Check adequacy of fossil stack. Fossil stack adequate per FPL Water Pump Stack may fall. Safety Evaluation.
5 6 4P9B 4B Intake Cooling Pump shaft length Evaluate Shaft for adequate length Documentation could not be Water Pump longer than can be and clearance, found. A new item has been screened by SSRAP generated to find and/or recreate report. the required documentation.
6 6 4P9B 4B Intake Cooling Cast iron fittings on Check stresses on fittings from Documentation could not be Water Pump pump. loads of attached piping. found. A new item has been generated to find and/or recreate the required documentation.
7 6 4P9B 4B Intake Cooling Anchorage needs Verify anchorage with calculation.
Anchorage adequate per REA-Water Pump verification.
TPN- 88-320, foundation repair and anchorage replacement.
8 6 4P9B 4B Intake Cooling Interaction
-Fossil Unit Check adequacy of fossil stack. Fossil stack adequate per FPL Water Pump Stack may fall. Safety Evaluation.
9 21 3T36 U3 Diesel Oil Anchorage adequacy.
Replace chair plates with 1 Y4" Chair plates upgraded per PCM Storage Tank thick plates and evaluate further. 91-169.10 21 3T36 U3 Diesel Oil Interaction
-Fossil Unit Check adequacy of fossil stack. Fossil stack adequate per FPL Storage Tank Stack may fall. Safety Evaluation.
41 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 11 21 T205B B Boric Acid Platform adequacy for Check platform adequacy for Platform upgraded per PCMs 90-Storage Tank torsional loads, torsion, and upgrade if required.
440 and 90-441 12 21 3T8 U3 Condensate Anchorage adequacy.
Replace chair plates with 1 Y 4" Chair plates upgraded per PCM Storage Tank thick plates and evaluate further. 91-170.13 21 4T8 U4 Condensate Anchorage adequacy.
Replace chair plates with 1 Y 4" Chair plates upgraded per PCM Storage Tank thick plates and evaluate further. 91-171.14 21 3T1 U3 Refueling Anchorage adequacy.
Replace chair plates with 1 Y4" Chair plates upgraded per PCM Water Storage thick plates and evaluate further. 91-172.Tank 15 21 4T1 U4 Refueling Anchorage adequacy.
Replace chair plates with 1 Y4" Chair plates Upgraded per PCM Water Storage thick plates and evaluate further. 91-173.Tank 16 21 3T23B 3B EDG Day Tank Glass sight tube. Replace glass sight tube with non- Addressed by CR 95-1219.I breakable material.17 21 3T218 U3 Component Platform adequacy.
Check platform adequacy, and Platform to be upgraded per PCM Cooling Water upgrade if required.
90-471.Surge Tank 18 21 4T218 U4 Component Platform adequacy.
Check platform adequacy, and Platform to be upgraded per PCM Cooling Water upgrade if required.
90-472.Surge Tank 19 17 3K4B 3B EDG Skid Glass sight tube. Replace glass sight tube with non- Addressed by CR 95-1219.breakable material.20 21 3T269B 3B EDG Air Start Seismic interaction
-Complete plant work order (PWO) Air supply and supports replaced Tanks threaded pipe for air already written for the support. per PCMs 86-155 and 86-190.supply not rigidly supported.
21 5 3B06 3B 480V Motor Seal welded anchorage, Upgrade anchorage.
Anchorage upgraded per PCM 91-Control Center inadequate in tension. 178.22 5 4B06 4B 480V Motor No anchorage.
Add anchorage.
Anchorage upgraded per PCM 91-Control Center 179.23 5 3B08 3D 480V Motor Inadequate anchorage Brace top of MCC to concrete wall. Anchorage upgraded per PCM 91-Control Center for overturning.
178.42 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 24 5 3AB 3B 4.16kV No anchorage.
Add anchorage.
Anchorage upgraded per PCM 91-Switchgear 174.25 5 4AB 4B 4.16kV No anchorage.
Add anchorage.
Anchorage upgraded per PCM 91-Switchgear 175.26 5 3802 3B 480V HVPDS Cannot determine Add anchorage.
New load center installed per Load Center anchorage.
PCM 89-532 and new anchorage (Includes installed per PCM 91-1.76: Transformer) 27 3804 3D 480V HVPDS Cannot determine Verify anchorage and upgrade if New load center installed per Load Center anchorage.
required.
PCM 89-532 and new anchorage (Includes installed per PCM 91-176.Transformer) 28 T402 4B 480V HVPDS No anchorage.
Add anchorage.
New load center installed per Load Center PCM 89-533 and new anchorage (Includes installed per PCM 91-177.Transformer) 29 5 4B04 4D 480V HVPDS No anchorage.
Add anchorage.
New load center installed per Load Center PCM 89-533 and new anchorage (Includes installed per PCM 91-177.Transformer) 30 15 3D03 Battery Rack 3A No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).31 15 3D03 Battery Rack 3A Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-182.and fall on batteries.
32 15 3D03 Battery Rack 3A Block walls not Verify block wall included in FPL FPL verified wail included in iE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls C30-1, C30-2, C30-4.33 15 3D24 Battery Rack 3B No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).34 15 3D24 Battery Rack 3B Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-182.1 and fall on batteries.
43 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 35 15 3D24 Battery Rack 3B Block walls not Verify block wall included in FPL FPL verified wall included in IE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls A42-2, C42-16, C42-17, C42-18.36 15 4D24 Battery Rack 4B No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).37 15 4D24 Battery Rack 4B Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-183.and fall on batteries.
38 15 4D24 Battery Rack 4B Block walls not Verify block wall included in FPL FPL verified wall included in IE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls C30-2, C30-3, C30-4.39 15 4D03 Battery Rack 4A No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).40 15 4D03 Battery Rack 4A Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-182.and fall on batteries.
41 15 4D03 Battery Rack 4A Block walls not Verify block wall included in FPL FPL verified wall included in IE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls A42-2, C42-15, C42-16, C42-18.42 14 3D01 3A Distribution One loose anchor bolt. Tighten loose bolt. Bolt disposition per PWO 93-Panels/Bus 010843.43 14 4D01 4B Distribution Three loose anchor Tighten loose bolt. Bolt disposition per PWO 93-Panels/Bus bolts. 010844.44 20 3C23B 3B Sequencer Additional top bracket as Add top bracket as found for Bracket added per PCM 91-1 80.found for sequencer 3A sequencer 3A.would provide added assurance and strength.This item had only one bracket.45 20 4C23A 4A Sequencer Additional top bracket as Add two top brackets as found for Bracket added per PCM 91-181.found for sequencer 3A sequencer 3A.would provide added assurance and strength.This item had only one bracket.44 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 46 20 4C23B 4B Sequencer Additional top bracket as Add two top brackets as found for Bracket added per PCM 91-181.found for sequencer 3A sequencer 3A.would provide added assurance and strength.This item had only one bracket.47 21 3E207B 3B CCW Heat SRT could not verify Verify adequacy of pedestal FPL verified pedestal adequacy by Exchanger reinforcement steel design. calculations C-SJ511-01 and 02.design of pedestal.48 21 4E207B 4B CCW Heat SRT could not verify Verify adequacy of pedestal FPL verified pedestal adequacy by Exchanger reinforcement steel design. similarity with Item 53.design of pedestal.49 20 3C06 3B Vertical Panel Interaction metal egg Clip in metal egg crate sections of Currently light weight plastic egg crate ceiling may fall on ceiling, crate is installed.
operators.
50 20 4C06 4B Vertical Panel Interaction metal egg Clip in metal egg crate sections-of Currently light weight plastic egg crate ceiling may fall on ceiling, crate is installed.
operators.
45 8 Peer Review The Peer Review Report is included as Appendix F. This includes the peer review of the SWEL selection, peer review of the seismic walkdown, and peer review of this final report.46 9 References
: 1. EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012.2. Turkey Point Updated Final Safety Analysis Report (UFSAR): Section 1, Section 2, and Section 5.3. Not used.4. AEC Publication TID 7024, "Nuclear Reactors and Earthquakes", August 1963.5. ACI 318-63, Building Code Requirements for Reinforced Concrete.6. AISC, "Specifications for the Design, Fabrication and Erection of Structural Steel for Buildings", adopted April 17, 1963.7. USNRC, "Verification Of Seismic Adequacy Of Mechanical And Electrical Equipment In Operating Reactors, Unresolved Safety Issue (USI) A-46", Generic Letter 87-02.8. USNRC, "Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities", Generic Letter 88-20, Supplement
 
===4.9. Stevenson===
 
& Associates report, "Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 & 4 to Resolve Unresolved Safety Issue (USI) A-46 and Generic Letter (GL) 87-02," dated April 30, 1993.10. USNRC, "Procedural and Submittal Guidance for the IPEEE for Severe Accident Vulnerabilities", NUREG-1407, June, 1991.11. FPL Letter L-92-222, "Individual Plant Examination of External Events (IPEEE)," letter to USNRC, August 31, 1992.12. NRC (E Leeds and M Johnson) Letter to All Power Reactor Licensees et al., "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding Recommendation 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," Enclosure 2.3, "Recommendation 2.3: Seismic," dated March 12, 2012 13. NRC Letter to FPL, "Generic Letter 88-20, Supplement 4, -Individual Plant Examination For External Events For Severe Accident Vulnerabilities-Turkey Point Nuclear Plant.Units 3 And 4", dated November 4, 1998.14. FPL Letter L-93-155, "Final Report of Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolved USI A-46 and GL 87-02".47 A Project Personnel Resumes and SWE Certificates A.1 INTRODUCTION Resumes for the following personnel that contributed to the seismic walkdown and/or peer review are included in this Appendix: " FPL: C. Figueroa, T. Satyan-Sharma, A. Restrepo, George Tullidge, T. Jones" Stevenson
& Associates:
J. O'Sullivan, S. Baker In addition, certificates from the EPRI Walkdown Training Course are included for each of the designated SWEs: C. Figueroa, T. Satyan-Sharma, J. O'Sullivan and S. Baker.A.2 RESUMES Carlos Andres Figueroa Mr. Figueroa is a Mechanical and Civil Design Engineer I in the Turkey Point Nuclear Station at Florida Power & Light. He has one year of Mechanical Systems Engineering experience at Entergy's River Bend Station in St. Francisville, LA. Mr. Figueroa.also has three years of Operations experience and four years of Civil Design Engineering experience at FPL's Turkey Point Station in South Florida. He holds a BS in Mechanical Engineering from the University of Los Andes (Bogota, Colombia) and a MS in Mechanical Engineering, from the University of Florida. He completed Training on the Near Term task Force Recommendation 2.3 -Plant Seismic Walkdowns.
T. Satyan-Sharma, P.E.Mr. Satyan Sharma is a Consultant to Florida Power and Light for Turkey Point Station.He has managed and was the technical lead for the SQUG Project at a Nuclear Utility.He was a Peer Reviewer on the SQUG project at other Nuclear Plants and provided third party reviews. Mr. Satyan Sharma has 40 years of experience in Nuclear Industry in both Consulting (6 years) and Utility (34 years ) supporting plant operations.
Mr.Satyan Sharma has a Master of Science in Structural/Engineering Mechanics from New York University.
He was a member of the SQUG Team in the development of the Generic Implementation Procedures (GIP). He has received industry training as Seismic Capability Engineer (EPRI 5-Day Training), SQUG New and Replacement Equipment and Parts (NARE) Training, and SQUG Equipment Selection
& Relay Evaluation Training.A-1 Alexander Restrepo Mr. Restrepo is an Engineer I in the PRA Group at NextEra Energy, working primarily on Turkey Point Nuclear Station. He has three years of Operations experience at Turkey Point and two years of PRA experience.
He has completed the necessary requirements and qualifications for a PRA engineer.
Recently he completed Training on the Near Term task Force Recommendation 2.3 -Plant Seismic Walkdowns.
He holds a BS and MS in Nuclear Engineering, both from the University of Florida.George Tullidge Mr. Tullidge is a Staff Engineer in the PRA Group at NextEra Energy Juno Beach office.He has over 30 years of commercial nuclear power experience.
Mr. Tullidge has a degree in Physics from Pennsylvania State University.
His years of experience include Operations, Maintenance, and Engineering.
He also held an active Senior Reactor Operator license at St. Lucie and was a qualified Operations Shifi: Manager.Tim Jones Mr. Jones is an Operations Department Shift Manager at Turkey Point Nuclear. He has over 26 years of experience in the Operations Department and was licensed in 1994 as Reactor Operator.
He received his SRO license in 1998. His years of experience include Operations, Maintenance, and Security.John J. O'Sullivan, P.E.Mr. O'Sullivan is a Senior Consultant in the S&A Boston office. He has managed and led seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments.
Mr. O'Sullivan has 24 years of seismic experience serving the nuclear industry.
Mr. O'Sullivan has participated in more than 10 USI A-46 and IPEEE projects in response to the requirements of Generic Letters 87-02 and 88-20.Mr. O'Sullivan has a Master of Science in Structural Engineering from the Massachusetts Institute of Technology.
He has received industry training as Seismic Capability Engineer (EPRI 5-day SQUG training), EPRI IPEEE Add-on, and Seismic Fragility training.Seth Baker Mr. Baker is a Senior Engineer in the S&A Boston office. He has performed structural engineering analysis & design, finite element analysis, structural mechanics evaluations, seismic qualification managed and seismic walkdowns.
Mr. Baker has a Master of A-2 Science in Civil/Structural Engineering from Stanford University.
He completed the EPRI training for NTTF 2.3 plant seismic walkdowns.
A-3 A.3 CERTIFICATES Certificate of Completion Carlos Figueroa Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns July 27, 2012 EPRJ Or-o-tKiRb4 -ttgIy A-4 U Presents this Certificate of Achievement To Certify7 hat Ti umn Saa Sham Sa]has Completedthe SQUG Walkdown Screening andSeismic Evaluatwn Training Course..feldJune 17-22, 1992 Rr P. K~ud an EI-mý(Presents thfs Certificate ofAclhievement To Certify .That Hi l J6hn O"SuIllivan has Completed the S0QUGW Walkdown Screening andSeismic Evafuation Training Course!I-fefdUeugust 10-15, 1992 NM.I P. SRbý C Ea..SQUO C.h L~tG T- C.ob,&______
SQUJOP mg-Mimg A-5 IA IL Certificate of Completion Seth Baker Success'l 1 .Gsmpleted Training on NearT', rm Task Force Recommendation 2.3 -Plant Seim1iic Walkdowns M..Ll.. st.wd, F Date: 0612612 Bruce M. Lory3Alnstructor NTTF 2.3 Seismic Walkdown Course Ii -I, /A-6 B SWEL Selection Report 0 FPL~.Florida Power & Light Selection of the Seismic Walkdown Equipment List (SWEL) for the Requirement
 
===2.3 Walkdown===
Turkey Point Nuclear Station Prepared by Reviewed by Reviewed by.Reviewed by A.lexn-de estrepo (PO Group)Ge lige (PRA Group)Tim Jones'( perations)
Carlos Figueroa (brgineering)
Date Dafe Date Sh/I/ I l.Date B-1 1 Introduction This document contains the information used to develop the Seismic Walkdown Equipment List (SWEL) at Turkey Point (PTN) in accordance with EPRI Report 1025286, "Seismic Walkdown Guidance," dated June 2012 [1].The selection process was completed by applying separate screening criteria to develop SWELs 1 and 2. The documentation is laid out by first providing the screening criteria requirements, and then providing the implementation of how PTN applied that screening criteria.2 Process The general process focused first on building a Master Component List, with attributes to support the sample selection process (Sections 3 and 4). This list was obtained by generating a NAMS query of the entire PTN Equipment Database for all components along with data such as system code, component type, location, etc. Then the screening criteria below were applied to arrive at a final SWEL 1 and SWEL 2 comprised of about 92 items and 8 items, respectively.
The process also included identifying a set of plant locations around which the walkdown was organized (Section 5). The plant locations were also used to support the "walk-by" process to assess cable trays and ventilation ducts and the potential for seismic spatial interactions (Section 6).Finally, Section 6 identifies several evaluations that supported the identification of targets for the walkdown and the specific attributes that needed to be examined.Because the SWEL needs to address a number of attributes, the selection was performed and reviewed by a team that includes representatives from PRA, Operations, and Engineering.
This was done systematically by performing table-top virtual walkdowns and pre-walkdowns of each location to identify candidates for the SWEL as well as other issues (e.g., seismic-flood) that needed to be inspected by the walk-by.3 SWEL 1 Screening Criteria The final SWEL 1 is contained in the Microsoft Excel workbook, "U3 (U4) PTN Fukushima SWEL" [2], in the "SWEL 1" spreadsheet on file. Each iteration of the screening process described below is contained in the Microsoft Access database, "SWEL 1"[3]. These final SWEL (both SWEL 01 & SWEL 02), as well as the Master Component List, are available in. Excel format on file at Turkey Point.3.1 Screening Criteria 1 -Seismic Category I Requirement The scope of SSCs (Systems, Structures, and Components) in the plant ýare limited to those that are designed to Seismic Category (SC) I requirements.
This is done because only such items have a defined seismic licensing basis against which to evaluate the as-installed configuration.
B-2 Selecting these items is intended to comply with the request in the NRC 50.54(f) Letter, under the "Requested Actions" section, to "verify current plant configuration with the current license basis." Application Seismic Class 1 SSCs include over 20,000 items in the PTN equipment database.
A complete equipment list from the PTN equipment database was obtained via a NAMS query ran in June 2012. The Seismic Class 1 SSCs were queried from the report by choosing only those SSCs where the Seismic Class was designated with an I.3.2 Screening Criteria 2 -Equipment or Systems Requirement The scope of SSCs included selecting only those that do not regularly undergo inspections to confirm that their configuration continues to be consistent with the plant licensing basis.Cable/conduit raceways and HVAC ductwork were not included as "equipment" in the SWEL 1, and were instead left to be reviewed during area walk-bys of the spaces containing items on the SWEL 1. Also omitted were SC 1 structures, containment penetrations, and SC1 piping systems.Application The list of all SCI SSCs was further reduced by including only "active" components, removing all items classified as "design" or "non-equip".
 
===3.3 Screening===
 
Criteria 3 -Supports 5 Safety Functions Requirement The scope of SSCs to be included in SWEL 1, are those SSCs associated with maintaining the five safety functions.
These five safety functions include the four safe shutdown functions (reactor reactivity control, reactor coolant pressure control, reactor coolant inventory control, and decay heat removal, which includes the Ultimate Heat Sink), plus the containment functions.
Application Since the PRA risk model represents the five safety functions listed above, a list of all PRA component tags was compared to the remaining SSCs. Items not included in the PRA model were removed.3.4 Screening Criteria 4 -Sample Considerations Requirement It was expected that SWEL 1, taken as a whole, would include representative items from some of the variations within each of the following five attributes:
A variety of types of systems B-3 Major new and replacement equipment* A variety of types of equipment* A variety of environments
* Equipment enhanced due to vulnerabilities identified during the IPEEE program Application The seismic aspects of the PTN IPEEE were resolved by the use of the FPL site-specific Seismic Program associated with Unresolved Safety Issue (USI) A-46 [4]. The equipment analyzed in this program was used as a base and compared to the screening criteria above.The remaining components in the Master Component List were reordered according to system code, component type, and then location in order to obtain a broad sample. Operations personnel were consulted with to identify new or replaced equipment that were on the truncated Master Component List.4 SWEL 2 Screening Criteria SWEL 2 began with the same Master Component List as SWEL 1. An initial screening was done retaining only SSCs related to the Spent Fuel Pool system. Screening criteria 1, 2, and 3 for SWEL 2 were performed identically to that of screening criteria 1,2, and 4 for SWEL 1, respectively.
The final SWEL 2 is contained in the Microsoft Excel workbook, "U3 (U4) PTN Fukushima SWEL" [2], in the "SWEL 2" spreadsheet on file. Each iteration of the screening process is contained in the Access database, "SWEL 2" [5]. These Microsoft Excel Workbooks, as well as the Master Component List are available in Excel format on file at Turkey Point.4.1 Screening Criteria 4- Cause Rapid Drain-Down Requirement The EPRI guidance requires assessment of the potential for Spent Fuel Pool (SFP) rapid draindown, specifically the identification of SFP penetrations below about 10 feet above the top of the fuel assemblies.
Application There are only two penetrations in the SFP below this level. One is a lower suction valve (*-797), the other is the fuel transfer tube, used to move fuel from containment to the SFP. During normal operation, this tube is isolated by a blind flange on the containment side and a manual valve on the Fuel Storage Building side. Other components were included in this screening based on their importance in maintaining spent fuel pool inventory and cooling.B-4 5 Walk-By Table Each location will also be subject to a walk-by, an examination (in less detail) of the other PRA components, as well as an inspection for other seismic issues:* Several other passive component types: cable trays & ventilation ducts.* Seismic-induced fire. This includes all flammable materials in each location such as hydrogen lines, gas bottles (acetylene, hydrogen), natural gas lines, and hazardous/flammable material stored in the location.* Seismic-induced flood. This includes all flood/spray sources (tanks, piping) originating in each location, based on the Internal Flood PRA. Note, the flood sources of interest are only those originating in the location, not those coming from another location.
The potential for flood propagation will be addressed in the seismic/flood analysis.* Spatial interactions (2 / 1). This includes adverse physical interaction due to proximity, failing of other components or structures (e.g., cranes), and flexibility of attached lines and cables.The final Walk-By Table is contained in the Microsoft Excel workbook, "U3 PTN Fukushima SWEL" [21, in the "Walkby Table" spreadsheet as well as the Master Component List are available in Excel format at Turkey Point on file.6 Evaluations The following evaluations were performed prior to and during the walkdown to assess specific issues that may add to the walkdown scope or the inspection criteria.6.1 IPEEE or USI A-46 Vulnerabilities The seismic assessment performed for PTN USI A-46 was reviewed for any seismic vulnerability identified.
These issues were included in the SWEL table.6.2 Configuration Verification The EPRI guidance identifies two types of inspection for the walkdown: (a) visual inspection and (b) configuration verification.
Visual inspection is typically what is performed in a walkdown, looking for obvious degraded conditions in equipment anchorage.
However, configuration verification is a more involved inspection consistent with the existing plant documentation of the design basis. This is required in at least 50% of the SWEL items with anchorage.
Since 28 SWEL components are MOVs (Class 8) or AOVs (or similar Class 7 components) which do not have anchorage, this leaves 50% of 72, or at least 36 components to be included in the configuration verification.
For those components, the design basis was reviewed and the key attributes included in the walkdown forms to assist the inspection.
6.3 New Equipment B-5 The EPRI Guidance directs that the SWEL should include a "robust sampling of the major new or replacement equipment installed within the past 15 years (i.e., since the approximate completion of the seismic IPEEE evaluation)".
Based on discussion with Operations and Engineering, major new or replacement equipment was identified and noted as such in the SWEL spreadsheet.
 
===6.4 Modifications===
The walkdown team allowed for changes to be made to the SWEL mid-walkdown.
Many components were changed from 'B' train to 'A' train as the former was the protected train, precluding the thorough inspection of some components.
Various items were also replaced or removed because they were common components already on the other unit's SWEL or the component was no longer installed in the plant.7 References
: 1. "Final Report of Plant Specific Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolve Unresolved Safety issue (USI) A-46 and Generic Letter (GI-) 87-02," Stevenson& Associates, April 1993.2. "PTN Fukushima SWEL," FPL, August 2012.3. "SWEL 1," FPL, August 2012.4. EPRI TR-1 025286, "Seismic Walkdown Guidance," June 2012.5. "SWEL 2," FPL, August 2012.B-6 C Seismic Walkdown Checklists (SWCs)Table C-1. Summary of Seismic Walkdown Checklists
##- Anchorage Co figuration Confirmation Performed Equip. Pg Tag ID Component Description Area Class Page 3B05 A-MCC (CABINET) 342 -3A MCC 1 C-5## 3B06 B-MCC (CABINET) 343 -3B MCC ROOM 1 C-7 3B07 C-MCC (CABINET) 220 -AUXILIARY BUILDING 1 C-10## 3B08 D-MCC (CABINET) 220 -AUXILIARY BUILDING 1 C-12 3B02 3B02 480V HVPDS LOAD CENTER 3B 341 -480V LC ROOM 2 C-14 (CABINET)## 3B04 3D LC (Part of B train) (CABINET) 341 -480V LC ROOM 2 C-16 3B50 3H LOAD CENTER (CABINET) 234 -NEW ELECTRICAL EQUIPMENT 2 C-18 ROOM## 3AA 3AA 4.16V SWITCHGEAR 3A (CABINET) 368 -4160V SWITCHGEAR ROOM 3 C-20 3AD 4.16KV SWITCHGEAR 3AD FOR BUS 3D 429 -SWITCHGEAR ROOM 3D 3 C-22 X05 4160/480VTRANSFORMER FOR 480V LC 341 -480V LC ROOM 4 C-24 3B# 3P10B EDG 3B OIL TRANSFER PUMP 293 -GENERAL OUTDOORS 5 C-26# 3P201B CHARGING PUMP B 201 -CHARGING PUMP ROOM 5 C-28# 3P203B BORIC ACID TRANSFER PUMP B 200 -BORIC ACID TANK ROOM 5 C-30 3P211 B COMPONENT COOLING PUMP B 202 -COMPONENT COOLING PUMP 5 C-32 ROOM 3P212A SFP CLG WTR PMP A 223 -SPENT FUEL PIT PUMP/HEAT 5 C-34 EXCHANGER ROOM 3P214B CONTAINMENT SPRAY PUMP B 203 -CONTAINMENT SPRAY PUMP ROOM 5 C-36 3P215B HI HEAD SAFETY INJECTION PUMP 3B 206 -HI-HEAD SIS PUMP ROOM 5 C-38 EMERG SFP EMERGENCY SPENT FUEL PIT COOLING 223 -SPENT FUEL PIT PUMP/HEAT 5 C-40 CLG PMP PUMP EXCHANGER ROOM## P2B AUXILIARY FEEDWATER PUMP B 306 -AUX FEED PUMP AREA 5 C-42 3P210B RHRPUMPB 211 -RHR PUMP ROOM 6 C-44 3P9B INTAKE COOLING WATER PUMP B 370 -INTAKE AREA 6 C-46 CV-3-1607 MAIN STEAM LINE A STM DUMP TO 300 -STEAM DECK 7 C-48 ATMOS CNTL VALVE CV-3-2816 TRAIN 1 S/G B FEED FLOW CONTROL 302 -FEEDWATER DECK 7 C-50 VALVE FCV-3-113A BORIC ACID TO BLENDER FLOW CNTL 201 -CHARGING PUMP ROOM 7 C-52 VLV HCV-3-121 CHG TO RCS CONTROL VALVE 209 -PIPE & VALVE ROOM 7 C-54 HCV-3-758 HAND CNTL VLV FOR RHR HX FLOW 210 -RHR HEAT EXCHANGER ROOM 7 C-56 CNTL PCV-3-4885 PRZR PORV N2 BACKUP SUPPLY 123 -CONTAINMENT 58 FOOT ELEVATION 7 Defer PRESSURE REGULATOR POV-3-2605 MN STM ISO VLV FROM S/G B 300 -STEAM DECK 7 C-58 POV-3-487 S/G B BYPASS FW Isolation VLV 302 -FEEDWATER DECK 7 C-60 C-1 Tag ID Component Description Area Equip. Page Class POV-3-4883 TPCW HEAT EXCHANGERS ISOLATION 334 -TURBINE PLANT HEAT EXCHANGER 7 C-62 VALVE AREA SV-3-455C PRESSURIZER PORV SOLENOID VALVE 103 -PRESSURIZER CUBICLE 7 Defer TCV-3-143 NON REGEN HX OUTLET TO VCT OR 201 -CHARGING PUMP ROOM 7 C-64 DEMIN TEMP CNTL VLV MOV-3-1404 MTR OPERATED VALVE FROM STEAM 301 -BELOW STEAM DECK 8 C-66 GENERATOR A TO AUX FW PP TURBINES MOV-3-350 EMERGENCY BORATION CONTROL 201 -CHARGING PUMP ROOM 8 C-68 VALVE MOV-3-535 PRESSURIZER PORV BLOCK VALVE 103 -PRESSURIZER CUBICLE 8 Defer MOV-3-744A RHR LO HEAD SI TO LOOP A MOTOR 121 -CONTAINMENT 14 FOOT ELEVATION 8 Defer OPERATED VLV OUTSIDE BIO-WALL MOV-3-751 NORMAL RHR INLET FROM RCS MOTOR 121 -CONTAINMENT 14 FOOT ELEVATION 8 Defer OPERATED VLV OUTSIDE BIO-WALL MOV-3-843B HHSI TO COLD LEG MOV 203 -CONTAINMENT SPRAY PUMP ROOM 8 C-70 MOV-3-860B RECIRC SUMP TO RHR PUMP SUCTION 210 -RHR HEAT EXCHANGER ROOM 8 C-72 MOTOR OPERATED VALVE MOV-3-861 B RECIRC SUMP TO RHR PUMP SUCTION 211 -RHR PUMP ROOM 8 C-74 MOTOR OPERATED VALVE MOV-3-862A RWST TO RHR PUMP SUCTION VALVE 211 -RHR PUMP ROOM 8 C-76 MOV-3-863B RHR PUMP RECIRC TO RWST 210 -RHR HEAT EXCHANGER ROOM 8 C-78 MOV-3-864B RWST MTR OP ISO VALVE TO SI & RHR 217 -RWST AREA 8 C-80 PUMPS MOV-3-865A SI ACCUM A DISCH MOTOR OPERATED 121 -CONTAINMENT 14 FOOT ELEVATION 8 Defer VLV OUTSIDE BIO-WALL MOV-3-869 SI TO LOOP A&B HOT LEG MTR OP ISO 209 -PIPE & VALVE ROOM 8 C-82 VLV MOV-3-880B CTMT SPRAY PMP B DISCH ISO VLV 203 -CONTAINMENT SPRAY PUMP ROOM 8 C-84 SV-3-2046B EDG 3B OIL DAY TANK INLET CONTROL 408 -B DIESEL GENERATOR BUILDING 8 C-86 SOLENOID VALVE (UPPER LEVEL)N/A EDG FAN ASSEMBLIES (RADIATOR FAN) 309 -DIESEL GENERATOR BUILDING 9 C-88 (LOWER LEVEL)3V34B 3B EDG ROOM VENT EXHAUST FAN 409 -B DIESEL GENERATOR BUILDING ( 9 C-90 LOWER LEVEL)3V65B AXIAL FLOW VENTILATION FAN 429 -SWITCHGEAR ROOM 3D 9 C-92 3E241B LOAD CENTER ROOM 3NB -AIR 341 -480V LOAD CENTER ROOM 10 C-94 HANDLING UNIT 3E242B LOAD CENTER ROOM 3C/D -AIR 341 -480V LOAD CENTER ROOM 10 C-96 HANDLING UNIT (TRAIN-B)3E243A SWITCHGEAR ROOM 3A- AIR HANDLING 368.- 4160 V SWITCHGEAR ROOM 10 C-98 UNIT E16B CONTROL ROOM AIR HANDLING UNIT 310 -CABLE SPREADING ROOM 10 C-100 V76 AIR HANDLER UNIT FOR ELEC EQUIP RM 234 -NEW ELECTRICAL EQUIPMENT 10 C-102 A/C CONDENSER E232 ROOM 3E239B LC & SWGR ROOMS A/C SYSTEM -315 -LP TURBINE NORTH AREA 11 C-104 CHILLER PACKAGE 1B (TRAIN-B)3C2B EDG 3B AIR COMPRESSOR 409 -B DIESEL GENERATOR BUILDING ( 12 C-106 COMPRESSOR LOWER LEVEL)3D01 3D01 (DISTRIBUTION PANEL) 310 -CABLE SPREADING ROOM 14. C-108 3D23 3D23 (DISTRIBUTION PANEL) 347 -CONTROL ROOM INVERTER ROOM 14 C-111 3S77 100 AMP 2-POLE AUTOMATIC TRANSFER 234 -NEW ELECTRICAL EQUIPMENT 14 C-1 13 SWITCH ROOM 3D03 3A BATTERY RACK 310 -CABLE SPREADING ROOM 15 C-115 3D24 3B BATTERY RACK 347 -CONTROL ROOM INVERTER ROOM 15 C-117 3D25 3B1 BATTERY CHARGER 347 -CONTROL ROOM INVERTER ROOM 16 C-119 3D25A 3B2 BATTERY CHARGER 234 -NEW ELECTRICAL EQUIPMENT 16 C-121 ROOM C-2
######Tag ID Component Description Area Equ Page Class Pg 3Y05 STATIC INVERTER 3C 125 VDC/120 VAC 347 -CONTROL ROOM INVERTER ROOM 16 C-123 7.5 KVA 3Y07 STATIC INVERTER 3D 125 VDC/120 VAC 347 -CONTROL ROOM INVERTER ROOM 16 C-125 7.5 KVA.D51 SPARE BATTERY CHARGER 234 -NEW ELECTRICAL EQUIPMENT 16 C-127 ROOM 3K4B 3B DIESEL GENERATOR 409 -DIESEL GENERATOR BUILDING 17 C-129 (LOWER LEVEL)3QR35 CONTROL ROOM PROTECTION RACK 310 -CABLE SPREADING ROOM 18 C-131 TIS-3-6413B SWGR RM 3D FAN 3V65B TEMP SWITCH 429 -SWITCHGEAR ROOM 3D 19 C-134 TW-3-412C DELTA T-TAVG CH I COLD LEG 1 104 -RCP A CUBICLE 19 Defer THERMOWELL 3C04 VERTICAL PANEL A 360 -CONTROL ROOM, VERTICAL PANEL 20 C-136 3C06/3C05 VERTICAL PANEL B 360 -CONTROL ROOM VERTICAL PANEL 20 C-138 3C12B 3B EDG CONTROL PANEL 409 -DIESEL GENERATOR BUILDING 20 C-140 (LOWER LEVEL)3C23A SEQUENCER 3C23A -CABINET 368- 4160 V SWITCHGEAR ROOM 20 C-142 3C23B SEQUENCER 3C23B -CABINET 368- 4160 V SWITCHGEAR ROOM 20 C-144.3C264 3C264 -ALTERNATE SHUTDOWN PANEL 368- 4160 V SWITCHGEAR ROOM 20 C-146 CONSOLE CONTROL ROOM CONTROL CONSOLE 362 -CONTROL ROOM CONTROL 20 C-148 CONSOLE 3E206B RHR HEAT EXCHANGER B 210 -RHR HEAT EXCHANGER ROOM 21 C-151 3E207B COMPONENT COOLING HEAT 202 -COMPONENT COOLING PUMP 21 C-153 EXCHANGER B -ROOM 3E208A SPENT FUEL PIT HEAT EXCHANGER 223 -SPENT FUEL PIT PUMP/HEAT 21 C-155 EXCHANGER ROOM 3P214B HEAT SEAL WATER HEAT EXCHANGER FOR 203 -CONTAINMENT SPRAY PUMP ROOM 21 C-157 EXCHANGER CONTAINMENT SPRAY PUMP B 3T1 REFUELING WTR STORAGE TK 217 -RWST 21 C-159 3T218 COMPONENT COOLING SURGE TANK 212 -SPENT FUEL PIT ROOM 21 Defer 3T229B SI ACCUM B 114 -ACCUMULATOR B AREA 21 Defer 3T23B EDG 3B FUEL OIL DAY TANK 408 -B DIESEL GENERATOR BUILDING 21 C-161 (UPPER LEVEL)3T269B EDG 3B STARTING AIR ACCUMULATOR 409- B DIESEL GENERATOR BUILDING 21 C-163 TANK (LOWER LEVEL)3T36 EDG DIESEL OIL STORAGE TANK 293 -GENERAL OUTDOORS 21 C-165 3T8 CONDENSATE STORAGE TANK 331 -CONDENSATE STORAGE: TANK 21 C-167 3V30B EMERGENCY CONTAINMENT COOLER B 123 -CONTAINMENT 58 FOOT ELEV. 21 Defer T205B BORIC ACID STORAGE TANK B 200 -BORIC ACID TANK ROOM 21 C-169 3-12-031 TUBE GATE ISOLATION VALVE 212 -SPENT FUEL PIT ROOM 0 C-171 3-797 SFP COOLING WATER PUMP LOW 223 -SPENT FUEL PIT PUMP/HEAT 0 C-173 SUCTION VALVE EXCHANGER ROOM (Cask Wash Area)3-910 SFP CLG PMP A SUCT ISO VLV 223 -SPENT FUEL PIT PUMP/HEAT 0 C-175 EXCHANGER ROOM 3K200 BORIC ACID BLENDER 201 -CHARGING PUMP ROOM 0 C-177 3NP212 SPENT FUEL PIT COOLING PUMP 223 -SPENT FUEL PIT PUMP/HEAT 0 C-179 TRANSFER SWITCH EXCHANGER ROOM BD-2 CREVS INTAKE BALANCING DAMPER 347 -CONTROL ROOM INVERTER RM 0 C-181 BS-3-1402 BASKET STRAINER TO INTAKE COOLING 202 -COMPONENT COOLING PUMP 0 C-183 WTR SUPPLY FOR CCW HX A ROOM CFU-1 COMPENSATORY FILTER UNIT 347 -CONTROL ROOM INVERTER RM 0 C-185 LT-3-651 SPENT FUEL PIT LEVEL TRANSMITTER , 212 -SPENT FUEL PIT ROOM 0 C-187=. .Note: Detailed signed records of the checklists are available at the site.C-3 Per the EPRI guidance document, the top row of each checklist summarizes the status as follows: Status Meaning Y All relevant checks were answered Yes and no further action is required.N At least one check is answered No and follow-up is required.U At least one check could not be answered due to lack of information and follow-up is required.Section 5.2.5 of this report identifies planned actions for items requiring follow-up.
C-4 Class (01) Motor Control Centers 3B05 SWC Status: Seismic Walkdown Checklist (SWC)T]N U Equipment ID No.: Equipment Class: 3B05 (1) Motor Control Centers Equipment
 
==
Description:==
 
A-MCC (CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 342 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?MCC is within environmental enclosure.
See external anchorage of welded tabs in front and fillet welds in rear.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-5 Status: Seismic Walkdown Checklist (SWC)N U Equipment ID No.: Equipment Class: 3B05 (1) Motor Control Centers Equipment
 
==
Description:==
 
A-MCC (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?.There may be spray sources for non-SC-I piping nearby, but MCC is protected by enclosure.
Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Opened enclosure doors and inspected front of MCC. Saw one broken thumbscrew in Section 30524, not considered an adverse condition because this is a spare compartment and broken screw is middle one of three locations along door edge.Comments Walkdown by Team B C-6 3B06 SWC Status: Seismic Walkdown Checklist (SWC)Y F-]U Equipment ID No.: Equipment Class: 3B06 (1) Motor Control Centers Equipment
 
==
Description:==
 
B-MCC (CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 343 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Opened bottom kick-panels to view base anchorage and viewed top supports from ladder. MCC welded at the base by (12) x 3" long welds to embedded steel. Max. weld spacing is 36". MCC has three top supports with two 5/8 CEA per support. Anchorage matches drawing 5613-C-1790 Sh. 2.Yes Yes Yes Yes C-7 Status: Seismic Walkdown Checklist (SWC)Y. MU Equipment ID No.: Equipment Class: 3B06 (1) Motor Control Centers Equipment
 
==
Description:==
 
.B-MCC (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
No Loose thumbscrews seen on section 30618, 30652 (cited as potential adverse).Other MCC rear face is close to wall, but top support will limit seismic front/back displacement to a very low magnitude, so judged acceptable.
In the side/side direction, an approximately 1-1/4" gap exists to cabinet TB3829. acceptable for side/side response.No C-8 Status: Seismic Walkdown Checklist (SWC)Yl F U Equipment ID No.: Equipment Class: EauiDment DescriDtion:
3B06 (1) Motor Control Centers B-MCC (CABINET)Comments Walkdown by Team B C-9 3B07 SWC Status: Seismic Walkdown Checklist (SWC)[NU Equipment ID No.: Equipment Class: 3B07 (1) Motor Control Centers Equipment
 
==
Description:==
 
C-MCC (CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 220 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?'(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-10 Status: Seismic Walkdown Checklist (SWC)YNU Equipment ID No.: Equipment Class: 3B07 (1) Motor Control Centers Equipment
 
==
Description:==
 
C-MCC (CABINET)MCC kick plates (lower plates) were opened and the internal anchorage was inspected.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
MCC kick plates (lower plates) were opened and the interior was inspected.
No other adverse conditions were found inside the MCC.Opening the remaining cubicles would require significant dismantling.
Comments Walkdown by Team A C-11 3B08 SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: 31B08 (1) Motor Control Centers Equipment
 
==
Description:==
 
D-MCC (CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 220 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Bracing from the top of the cabinet to the wall was verified as consistent with drawing 5613-C-1790 Sh. 4 Rev. 0. Internal base anchorage was inspected by opening kick plates and was found to be consistent with PTN-C-91-178-001 Rev. 0.6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-12 Status: Seismic Walkdown Checklist (SWC)F--]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3B08 (1) Motor Control Centers D-MCC (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Adjacent overhead light is approximately 2" from the MCC. The light is hung from a ceiling mounted unistrut support with a 5" long threaded rod. The rod-to-unistrut connection is rigid enough to preclude any pendulum action. No risk of seismic interaction.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
MCC kick plates (lower plates) were opened and the interior was inspected.
No other adverse conditions were found inside the MCC.Opening the remaining cubicles would require significant dismantling.
Comments Walkdown by Team A C-13 Class (02) Low Voltage Switchgear 3B02 SWC Status: Seismic Walkdown Checklist (SWC)[Y]NU Equipment ID No.: Equipment Class: 31B02 (2) Low Voltage Switchgear Equipment
 
==
Description:==
 
3B02 480V HVPDS LOAD CENTER 3B (CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinc other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Small crack in floor at rear but stops short of cabinet pad.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See 1-1/2" fillet welds at base at 12" o/c or less front and rear. No shims installed.
Matches 5613-C-1789.
Yes Yes Yes Yes Yes C-14 Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: 3B02 (2) Low Voltage Switchgear Equipment
 
==
Description:==
 
3B02 480V HVPDS LOAD CENTER 3B (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
* Inspected exterior of cabinet. No loose or missing hardware.
Also opened I of 3 lower doors and found no loose or missing hardware.Comments Walkdown by Team B C-1 5 3B04 SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: 31 04 (2) Low Voltage Switchgear Equipment
 
==
Description:==
 
3D LC (Part of B train) (CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Welds along base, front and rear, 1-1/2" long and 12" o/c or less.Matches 5613-C- 1789.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-16 Status: Seismic Walkdown Checklist (SWC)FY ]N U Equipment ID No.: Equipment Class: Eauinment Descrir)tion:
3B04 (2) Low Voltage Switchgear 3D LC (Part of B train) (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet. No loose or missing hardware.
Also opened 2 of 3 lower doors and found no loose or missing hardware.Comments Walkdown by Team B C-17 3B50 SWC Status: Seismic Walkdown Checklist (SWC)Y lNU Equipment ID No.: Equipment Class: 31B50 (2) Low Voltaqe Switchqear Equipment
 
==
Description:==
 
3H LOAD CENTER (CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet is welded to steel base frame and frame is anchored to concrete floor with CEA's.Inspected steel frame anchorage to concrete floor. Also opened front lower doors and saw stitch weld of cabinet base to base frame.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-18 Status: Seismic Walkdown Checklist (SWC)Y.] U Equipment ID No.: Equipment Class: 3B50 (2) Low Voltace Switchaear Equipment
 
==
Description:==
 
3H LOAD CENTER (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
No Inspected exterior and lower interior of cabinet (opened all lower doors). One loose thumbscrew in front lower door (later tightened).
One loose thumbscrew in rear door.Also, lift trolley on roof of cabinet appears unrestrained side-to-side and may bang against stop. This may be a relay chatter issue.Comments Walkdown by Team B C-19 Class (03) Medium Voltage Switchgear.
3AA SWC Status: Seismic Walkdown Checklist (SWC)Y N [V]Equipment ID No.: Equipment Class: 3AA (3) Medium Voltaqe Switchqear Equipment
 
==
Description:==
 
3AA 4.16V SWITCHGEAR 3A (CABINET), Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet has internal anchorage.
No permission to open cabinet.Defer inspection.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to 5613-C-1791 for anchorage design basis.Yes Unknown Unknown Unknown Unknown C-20 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: 3AA (3) Medium Voltage Switchgear Equipment
 
==
Description:==
 
3AA 4.16V SWITCHGEAR 3A (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet; no loose or missing hardware found.Comments Walkdown by Team B C-21 3AD SWC Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: 3AD (3) Medium Voltage Switchgear Equipment
 
==
Description:==
 
4.16KV SWITCHGEAR 3AD FOR BUS 3D Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 429.Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet anchorage is internal; not permitted to open cabinet at this time. Defer inspection.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Unknown Unknown Unknown 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Unknown C-22 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
3AD (3) Medium Voltage Switchgear 4.16KV SWITCHGEAR 3AD FOR BUS 3D Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Light are well supported; cable tray is lightly loaded.9. Do attached lines'have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
A door thumb screw was not engaged, section 3AD02. Also a number of thumb screws on back panels were not snug.Comments Walkdown by Team B C-23 Class (04) Transformers X05 SWC Status: Seismic Walkdown Checklist (SWC)Y1 u Equipment ID No.: Equipment Class: X05 (4) Transformers Equipment
 
==
Description:==
 
4160/480VTRANSFORMER FOR 480V LC 3B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinql other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Welds to embedments.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See field sketch, 4 of 6 welds are 4" long and 2 of 6 welds are about 2"long. Does not match drawing 5610-E-9-35 (also see 5160-C-114 Sh. 2 Note 8).Yes Yes Yes Yes No C-24 Status: Seismic Walkdown Checklist (SWO)Y Fu Equipment ID No.: Equipment Class: X05 (4) Transformers Equipment
 
==
Description:==
 
4160/480VTRANSFORMER FOR 480V LC 3B 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-25 Class (05) Horizontal Pumps 3P10B SWC Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: 3P10B (5) Horizontal Pumps Equipment
 
==
Description:==
 
EDG 3B OIL TRANSFER PUMP Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 293 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (4) x 1/2 diameter anchors at base of steel pedestal into concrete pad. Anchorage matches 5610-C-1694.
Yes Yes Yes Yes Yes C-26 Status: Seismic Walkdown Checklist (SWC)Y NF-U]Equipment ID No.: Equipment Class: 3P1OB (5) Horizontal Pumps Equipment
 
==
Description:==
 
EDG 3B OIL TRANSFER PUMP 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Fire pipe main nearby is well supported and not a concern.Comments -Walkdown by Team B C-27 3P201B SWC Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: 3P201B (5) Horizontal Pumps Equipment
 
==
Description:==
 
CHARGING PUMP B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawing 5610-C-375 Sh. I Rev. 8 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-28 Status: Seismic Walkdown Checklist (SWC)F-IN U Equipment ID No.: Equipment Class:
DescriDtion:
3P201 B (5) Horizontal Pumps CHARGING PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-29 3P203B SWC Status: Seismic Walkdown Checklist (SWC)YJ]N U Equipment ID No.: Equipment Class: 3P203B (5) Horizontal Pumps Equipment
 
==
Description:==
 
BORIC ACID TRANSFER PUMP B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 200 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
I 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-254 Sh. 2 Rev. 0 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-30 Status: Seismic Walkdown Checklist (SWC)FT]N U Equipment ID No..: Equipment Class: Eauii)ment
 
==
Description:==
 
3P203B (5) Horizontal Pumps BORIC ACID TRANSFER PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-31 3P211B SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: 3P21 1 B (5) Horizontal Pumps Equipment
 
==
Description:==
 
COMPONENT COOLING PUMP B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 202 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-277 Rev. 13 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-32 Status: Seismic Walkdown Checklist (SWC)F--] N U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
3P211B (5) Horizontal Pumps COMPONENT COOLING PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-33 3P212A SWC Status: Seismic Walkdown Checklist (SWC)Y NI-]Equipment ID No.: Equipment Class: 3P212A (5) Horizontal Pumps Equipment
 
==
Description:==
 
SFP CLG WTR PMP A Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Need to verify anchorage with plant documentation.
Noted 6 -1/2" diameter anchor bolts in the field (see sketch).6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Unknown Unknown C-34 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3P212A (5) Horizontal Pumps SEP CLG WTR PMP A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, coiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-35 3P214B SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: 3P214B (5) Horizontal Pumps Equipment
 
==
Description:==
 
CONTAINMENT SPRAY PUMP B Project: Turkey Point 3 SWEL'Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of'the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-36 Status: Seismic Walkdown Checklist (SWC)IF-]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3P214B (5) Horizontal Pumps CONTAINMENT SPRAY PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-37 3P215B SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3P21 Y]N U 5 B Equipment Class: (5) Horizontal Pumps Equipment
 
==
Description:==
 
HI HEAD SAFETY INJECTION PUMP 3B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 206 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-38 Status: Seismic Walkdown Checklist (SWC)MN U Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
3P215B (5) Horizontal Pumos HI HEAD SAFETY INJECTION PUMP 3B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-39 EMERG SFP CLG PMP SWC Status: [- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: EMERG SFP CLG PMP (5) Horizontal Pumps Equipment
 
==
Description:==
 
EMERGENCY SPENT FUEL PIT COOLING PUMP Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-40 Status: Seismic Walkdown Checklist (SWC)IY N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
EMERG SFP CLG PMP (5) Horizontal Pumps EMERGENCY SPENT FUEL PIT COOLING PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Pump is approximately 3/4" vertical distance from nearby wall mounted bracing. Due to the rigidity of the pump assembly and the bracing the gap is deemed adequate to preclude seismic interaction.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-41 P2B SWC Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: P21B (5) Horizontal Pumps Equipment
 
==
Description:==
 
AUXILIARY FEEDWATER PUMP B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 306 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (6) x 3/4 diameter C/P bolts. Matches 5160-C-375 Sh. 1.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-42 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
P21B (5) Horizontal Pumps AUXILIARY FEEDWATER PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Grating above OK, see AWC.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-43 Class (06) Vertical Pumps 3P210B SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3P210B Y]N U Equipment Class: (6) Vertical Pumps Equipment
 
==
Description:==
 
RHR PUMP B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 4.00 ft, 211 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-44 Status: Seismic Walkdown Checklist (SWC)[NU Equipment ID No.: Equipment Class: 3P2 lOB (6) Vertical Pumps Equipment
 
==
Description:==
 
RHR PUMP B 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Gap between pump control panel/cabinet and staircase is adequate (approx. 3").8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Pump control panel/cabinet has two loose bolts and one missing on the cover plate. Does not present a seismic hazard.Comments Walkdown by Team A C-45 3P9B SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: 3P9B (6) Vertical Pumps Equipment
 
==
Description:==
 
INTAKE COOLING WATER PUMP B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 370 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Surface rust seen. Southeast bolt has most rust but no significant degradation of capacity at this time.4. Is the anchorage free of visible cracks in the concrete near the anchors?Visual cracks are present in pad and top of slab but judged to be of minor significance.
Pump is anchored with deeply embedded cast-in-place bolts and anchorage strength not significantly affected.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (4) x 1-1/4 diameter bolts (appear to be cast-in-place).
Matches 5610-C-61 Shl (see also Note 10 of that drawing).6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-46 Status: Seismic Walkdown Checklist (SWC)F]NU Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
3P9B (6) Vertical Pumps INTAKE COOLING WATER PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Braced scaffold around pump with >= 2-1/2" clearance; no impact on soft targets even if scaffold displaces.
See AWC for scaffold evaluation.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate.flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-47 Class (07) Fluid-Operated Valves CV-3-1607 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: CV-3 WNU-1607 Equipment Class: (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
MAIN STEAM LINE A STM DUMP TO ATMOS CNTL VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 300 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?N 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable C-48 Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: CV-3-1607 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
MAIN STEAM LINE A STM DUMP TO ATMOS CNTL VALVE 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-49 CV-3-2816 SWC Status: Seismic Walkdown Checklist (SWC)F-JN U Equipment ID No.: Equipment Class: CV-3-2816 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
TRAIN 1 S/G B FEED FLOW CONTROL VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 302 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-50 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
CV-3-2816 (7) Fluid-Operated Valves TRAIN 1 S/G B FEED FLOW CONTROL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
SOV for valve is near adjacent insulation cap (see photos);configuration is OK because support configuration is very stiff Valve body is also near cap but the body is very rugged and not vulnerable.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Valve is within missile-shielded outdoor area.Comments Walkdown by Team B C-51 FCV-3-113A SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: FCV-3-113A (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
BORIC ACID TO BLENDER FLOW CNTL VLV Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-52 Status: Seismic Walkdown Checklist (SWC)LENU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
FCV-3-113A (7) Fluid-Operated Valves BORIC ACID TO BLENDER FLOW CNTL VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-53 HCV-3-121 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: HCV-Y¥ u-3-121 Equipment Class: (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
CHG TO RCS CONTROL VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 209 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corriosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-54 Status: Seismic Walkdown Checklist (SWC)Y E-N-I u Equipment ID No.: Equipment Class: Eauinment Descriotion:
HCV-3-121 (7) Fluid-Operated Valves CHG TO RCS CONTROL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
HCV-3-121 is within 1/2" of the structural support for a nearby limit switch. Potential for seismic interaction.
A possible method of increasing clearance would be to cut the extended part of the level transmitter bolt.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Yes Yes No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-55 HCV-3-758 SWC Status: Seismic Walkdown Checklist (SWC)FY1N U Equipment ID No.: Equipment Class: HCV-3-758 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
HAND CNTL VLV FOR RHR HX FLOW CNTL Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 10.00 ft, 210A Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-56 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
HCV-3-758 (7) Fluid-Operated Valves HAND CNTL VLV FOR RHR HX FLOW CNTL I I I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-57 POV-3-2605 SWC Status: Seismic Walkdown Checklist (SWC)FYýN U Equipment ID No.: Equipment Class: POV-3-2605 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
MN STM ISO VLV FROM S/G B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 300 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-58 Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
POV-3-2605 (7) Fluid-Operated Valves MN STM ISO VLV FROM SIG B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the. above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-59 POV-3-487 SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: POV-3-487 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
S/G B BYPASS FW Isolation VLV Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 302 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-60 Status: Seismic Walkdown Checklist (SWC)I -N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
POV-3-487 (7) Fluid-Operated Valves S/G B BYPASS FW Isolation VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes One section of operator is against insulation of adjacent pipe. Judged acceptable because contact area is relatively soft and pipes are very stiff.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Light are rigidly fixed.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?There is scaffold in the area; see AWC for comments.Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-61 POV-3-4883 SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: POV-3-4883 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
TPCW HEAT EXCHANGERS ISOLATION VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 334 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-62 Status: Seismic Walkdown Checklist (SWC)[T]-NU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
POV-3-4883 (7) Fluid-Operated Valves TPCW HEAT EXCHANGERS ISOLATION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Main transmission lines are overhead but valve is screened by steel framing and pipes if cable breaks and falls.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Some non-SC-I piping in area, see AWC for comments.Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-63 TCV-3-143 SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: TCV-3-143 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
NON REGEN HX OUTLET TO VCT OR DEMIN TEMP CNTL VLV Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3,18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis.
Additional soace is orovided at the end of this checklist for documentinc other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6., Based on the above anchorage evaluations, is the anchorage free of potentiallv adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-64 Status: Seismic Walkdown Checklist (SWC)]NU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
TCV-3-143 (7) Fluid-Operated Valves NON REGEN HX OUTLET TO VCT OR DEMIN TEMP CNTL VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-65 Class (08) Motor-Operated and Solenoid-Operated Valves MOV-3-1404 SWC Status: Seismic Walkdown Checklist (SWC)F7N U Equipment ID No.: Equipment Class: MOV-3-1404 (8) Motor-Operated and Solenoid-Operated Valves MTR OPERATED VALVE FROM STEAM GENERATOR A TO AUX FW PP Equipment
 
==
Description:==
 
TURBINES Project: Turkey Point 3 SWEL Location (BIdg, Elev, Room/Area):
Unit 3, 42.00 ft, 301 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchoragefree of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable C-66 Status: Seismic Walkdown Checklist (SWO)WNU Equipment ID No.: MOV-3-1 404 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MTR OPERATED VALVE FROM STEAM GENERATOR A TO AUX FW PP Equipment
 
==
Description:==
 
TURBINES 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-67 MOV-3-350 SWC Status: Seismic Walkdown Checklist (SWC)YL FU Equipment ID No.: Equipment Class: MOV-3-350 (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
EMERGENCY BORATION CONTROL VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-68 Status: Seismic Walkdown Checklist (SWC)Y F7U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-3-350 (8) Motor-Operated and Solenoid-Operated Valves EMERGENCY BORATION CONTROL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
The gearbox of MOV-3-350 is approximately 1/4" from a vertical conduit (possibly abandoned).
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Yes Yes No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-69 MOV-3-843B SWC Status: Seismic Walkdown Checklist (SWC)F-]N U Equipment ID No.: Equipment Class: MOV-3-843B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
HHSI TO COLD LEG MOV Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-70 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
MOV-3-843B (8) Motor-Operated and Solenoid-Operated Valves HHSI TO COLD LEG MOV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-71 C MOV-3-860B SWC Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: MOV-3-860B (8) Motor-Orerated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 10.00 ft, 210B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage I 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-72 Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
MOV-3-860B (8) Motor-Operated and Solenoid-Operated Valves RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE I I I Interaction Effects 7. Are soft targets free from impact by nearby equipment-or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-73 MOV-3-861 B SWC Status: Y-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-3-861 B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 4.00 ft, 211 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4.'- -Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-74 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-3-861 B (8) Motor-Operated and Solenoid-Operated Valves RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-75 MOV-3-862A SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: MOV-3-862A (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RWST TO RHR PUMP SUCTION VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 4.00 ft, 211 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-76 Status: Seismic Walkdown Checklist (SWC)Y NU Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
MOV-3-862A (8) Motor-Operated and Solenoid-Operated Valves RWST TO RHR PUMP SUCTION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-77 MOV-3-863B SWC Status: ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-3-863B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RHR PUMP RECIRC TO RWST Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 10.00 ft, 210A Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-78 Status: Seismic Walkdown Checklist (SWC)I-W-I NU Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
MOV-3-863B (8) Motor-Operated and Solenoid-Operated Valves RHR PUMP RECIRC TO RWST Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-79 MOV-3-864B SWC Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: MOV-3-864B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RWST MTR OP ISO VALVE TO SI & RHR PUMPS Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 217 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-80 Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: EauiDment Descriotion:
MOV-3-864B (8) Motor-Operated and Solenoid-Operated Valves RWST MTR OP ISO VALVE TO SI & RHR PUMPS I I I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-81 MOV-3-869 SWC Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-3-869 (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
SI TO LOOP A&B HOT LEG MTR OP ISO VLV Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 209 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-82 r, Status: Seismic Walkdown Checklist (SWC)IN N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-3-869 (8) Motor-Operated and Solenoid-Operated Valves SI TO LOOP A&B HOT LEG MTR OP ISO VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipm'ent, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-83 MOV-3-880B SWC Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-3-880B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
CTMT SPRAY PMP B DISCH ISO VLV Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3. Is the anchorage free of corrosion that is more than mild surface Not Applicable oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-84 Status: Seismic Walkdown Checklist (SWC)IT] NU Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
MOV-3-880B (8) Motor-Operated and Solenoid-Operated Valves CTMT SPRAY PMP B DISCH ISO VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-85 SV-3-2046B SWC Status: Seismic Walkdown Checklist (SWC)F7N U Equipment ID No.: Equipment Class: SV-3-2046B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
EDG 3B OIL DAY TANK INLET CONTROL SOLENOID VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 408 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?,3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-86 Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
SV-3-2046B (8) Motor-Operated and Solenoid-Operated Valves EDG 3B OIL DAY TANK INLET CONTROL SOLENOID VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Nothing overhead.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Pipe support conditions were reviewed and judged OK.Comments Walkdown by Team B C-87 Class (09) Fans 3B EDG FAN ASSEMBLIES SWC Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 3B EDG FAN ASSEMBLIES Equipment Class: (9) Fans Equipment
 
==
Description:==
 
EDG FAN ASSEMBLIES (RADIATOR FAN)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3,18.00 ft, 309 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
No See sketch. One anchor on support "A" on north fan is broken.3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
Mild rust seen, acceptable.
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See field sketch for anchorage.
For south fan see (3) x 3/4" anchors at support A, (4) x 1/2" CEA's at support B and no anchors visible at support C.C-88 Status: Seismic Walkdown Checklist (SWC)Y [7R -u Equipment ID No.: Equipment Class: 3B EDG FAN ASSEMBLIES (9) Fans Equipment
 
==
Description:==
 
EDG FAN ASSEMBLIES (RADIATOR FAN)Anchorage of north fan is similar except for one A anchor stud appears to be broken off (no nut seen).Anchorage does not match patterns shown on 5610-C-379 Sh. 1.6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Overhead duct spans across room, wall to fans. Supportjudged OK (short span).9. Do attached lines have adequate flexibility to avoid damage? Yes Flexible connections for coolant lines.10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Support of coolant lines inspected andjudged acceptable.
Comments Walkdown by Team B C-89 3V34B SWC Status: Seismic Walkdown Checklist (SWC), MNU Equipment ID No.: Equipment Class: 3V34B (9) Fans Equipment
 
==
Description:==
 
3B EDG ROOM VENT EXHAUST FAN Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?See (7) x 1/2 diameter (estimate)
CEA around perimeter (see photo).Unused holes near some anchors judged OK (udged anchor was moved to avoid rebar interference).
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-90 Status: Seismic Walkdown Checklist (SWC)FNU Equipment ID No.: Equipment Class: 3V34B (9) Fans Equipment
 
==
Description:==
 
3B EDG ROOM VENT EXHAUST FAN See about 3/8 gap between wall and base at lower right anchor.Judged not significant based on very good overall anchorage capacity.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-91 3V65B SWC Status: Seismic Walkdown Checklist (SWC)F-]N U Equipment ID No.: Equipment Class: 3V65B (9) Fans Equipment
 
==
Description:==
 
AXIAL FLOW VENTILATION FAN Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 429 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?See (4) thru bolts to steel frame (estimate as 1/2 diameter).
Frame is hung from above 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-92 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3V65B (9) Fans AXIAL FLOW VENTILATION FAN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-93 Class (10) Air Handlers 3E241 B SWO Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3E24[Y]N U 1lB Equipment Class: (10) Air Handlers Equipment
 
==
Description:==
 
LOAD CENTER ROOM 3A/B -AIR HANDLING UNIT Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-94 Status: Seismic Walkdown Checklist (SWC)Y ]N U Equipment ID No.: Equipment Class: 3E241B (10) Air Handlers Equipment
 
==
Description:==
 
LOAD CENTER ROOM 3A/B -AIR HANDLING UNIT 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Anchorage very similar to 3E242B.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverseseismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Rear face is 3-1/4" from wall, OK.Comments Walkdown by Team B C-95 3E242B SWC Status: Seismic Walkdown Checklist (SWC)`N U Equipment ID No.: Equipment Class: 3E242B (10) Air Handlers Equipment
 
==
Description:==
 
LOAD CENTER ROOM 3C/D -AIR HANDLING UNIT (TRAIN-B)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-96 Status: Seismic Walkdown Checklist (SWC)I-- N U Equipment ID No.: Equipment Class: 3E242B (10) Air Handlers Equipment
 
==
Description:==
 
LOAD CENTER ROOM 3C/D -AIR HANDLING UNIT (TRAIN-B)Anchorage very similar to 3E242A.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Very little overhead.9. Do attached lines have adequate flexibility to avoid damage?Flexible conduit runs tight between fan housing and pipe, but pipe has soft insulation so judged acceptable.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-97 3E243A SWC Status: Seismic Walkdown Checklist (SWC)YNU Equipment ID No.: Equipment Class: 3E243A (10) Air Handlers Equipment
 
==
Description:==
 
SWITCHGEAR ROOM 3A -AIR HANDLING UNIT Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Mild surface rust seen on connection hardware.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage found is (6) x 1/2" diameter concrete expansion anchor (CEA) thru steel plate embedded in grout pad. Anchorage matches drawing 5613-C-1738 Sh. 3.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-98 Status: Seismic Walkdown Checklist (SWC)FNU Equipment ID No.: Equipment Class: Eauir)ment Descrirtion:
3E243A (10) Air Handlers SWITCHGEAR ROOM 3A-AIR HANDLING UNIT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Cabletray on rigid wall brackets above.9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-99 E16B SWC Status: Seismic Walkdown Checklist (SWC)Y [K u Equipment ID No.: Equipment Class: E16B (10) Air Handlers Equipment
 
==
Description:==
 
CONTROL ROOM AIR HANDLING UNIT Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or'loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable No C-100 Status: Seismic Walkdown Checklist (SWC)Y W7NU Equipment ID No.: Equipment Class: E16B (10) Air Handlers Equipment
 
==
Description:==
 
CONTROL ROOM AIR HANDLING UNIT Unit appears to be unanchored.
Feet of unit appear to sit on vibration isolation pads (4 places).Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are a masonry walls in the area. See AWC for comments.Air duct is supported by floor framing, OK.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
There is non-rugged rod hung copper tubing in the area and tubing is attached to E16B. Unlikely that this piping is seismically designed.Comments Covered by Area 310C AWC.C-101 V76 SWC Status: Seismic Walkdown Checklist (SWC)YN FU Equipment ID No.: Equipment Class: V76 (10) Air Handlers Equipment
 
==
Description:==
 
AIR HANDLER UNIT FOR ELEC EQUIP RM A/C CONDENSER E232 Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?See below.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Unknown Unknown Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Unknown C-102 Status: Seismic Walkdown Checklist (SWC)Y NFU-]Equipment ID No.: Equipment Class: V76 (10) Air Handlers Equipment
 
==
Description:==
 
AIR HANDLER UNIT FOR ELEC EQUIP RM A/C CONDENSER E232 Only able to confirm anchorage on one side of cabinet base. Per drawing 5610-C-1701 Sh. 5, expect that remaining anchorage is hidden from view (weld to inside of base frame, not visible unless housing is disassembled.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
2" clearance to the wall behindjudged to be sufficient.
Comments Walkdown by Team B C-103 Class (11) Chillers 3E239B SWC Status: Seismic Walkdown Checklist (SWC)Y NFU Equipment ID No.: Equipment Class: 3E239B (11) Chillers Equipment
 
==
Description:==
 
LC & SWGR ROOMS A/C SYSTEM -CHILLER PACKAGE 1B (TRAIN-B)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 315 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (10) x 5/8 diameter thru bolts to steel platform.
See field sketch. Need correct anchor drawing to verify (unknown).
Yes Yes Yes Yes Unknown C-104 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3E2'Y N I-0-39B Equipment Class: (11) Chillers Equipment
 
==
Description:==
 
LC & SVVGR ROOMS A/C SYSTEM -CHILLER PACKAGE 1B (TRAIN-B)6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Light pole adjacent to 3E239B is welded to platform, OK.9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-105 Class (12) Air Compressors 3C2B COMPRESSOR SWC Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: 3C2B COMPRESSOR (12) Air Compressors Equipment
 
==
Description:==
 
EDG 3B AIR COMPRESSOR Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (6) x 1/2 diameter anchors (3 per side). Matches drawing 5610-C-379 Sh. 2.Yes Yes Yes Yes C-106 Status: Seismic Walkdown Checklist (SWC)F ]N U Equipment ID No.: Equipment Class: 3C2B COMPRESSOR (12) Air Compressors Equipment
 
==
Description:==
 
EDG 3B AIR COMPRESSOR
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact-by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Flexible connection for air line, see photo.10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Scaffold around compressor, OK. See AWC for comments.Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-107 Class (14) Distribution Panels 3D01 SWC Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: 3D01 (14) Distribution Panels Equipment
 
==
Description:==
 
3D01 (DISTRIBUTION PANEL)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchora-ie
: 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Unk See apparent anchor locations missing anchor bolts; unknown if this is OK per design basis.3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Unk (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Opened all kick panels, saw bolt heads (apparent anchorage);
see field sketch. Need correct anchor drawing to verify (unknown).
nown nown C-1 08 Status: Seismic Walkdown Checklist (SWC)Y NF--Equipment ID No.: Equipment Class: 3DO1 (14) Distribution Panels Equipment
 
==
Description:==
 
3D01 (DISTRIBUTION PANEL)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are a masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes ,-of potentially adverse seismic interaction effects?About 1-1/8" gap to wall behind; judged OK for shake space.Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
No No Inspected exterior.
Saw missing screws in cover panel. Also saw some loose thumb screws in line-up.Other Inspected exterior.
Front grill of distribution panel may rattle, but very minor issue, OK.Inspected interior from open kick panels. No anomalies.
Comments C-109 Status: Seismic Walkdown Checklist (SWC)Y NFU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
Walkdown by Team B 3D01 (14) Distribution Panels 3D01 (DISTRIBUTION PANEL)C-110 3D23 SWC Status: Seismic Walkdown Checklist (SWC)Y NF- ]Equipment ID No.: Equipment Class: 3D23 (14) Distribution Panels Equipment
 
==
Description:==
 
3D23 (DISTRIBUTION PANEL)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 347B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Unknown Unknown Unknown 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Unknown C-111 Status: Seismic Walkdown Checklist (SWC)Y N F--Equipment ID No.: Equipment Class: 3D23 (14) Distribution Panels Equipment
 
==
Description:==
 
3D23 (DISTRIBUTION PANEL)Cabinet has internal anchorage.
Not possible to open cabinet at power per Turkey Point Operations.
Defer to bus outage to check anchorage and interior.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Some rigid lines going into the cable tray overhead, but the tray is flexible.10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-112 3S77 SWC Status: Seismic Walkdown Checklist (SWC)Y F]u Equipment ID No.: Equipment Class: 3S77 (14) Distribution Panels Equipment
 
==
Description:==
 
100 AMP 2-POLE AUTOMATIC TRANSFER SWITCH'Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Three anchors along right edge covered by whitish corrosion product;lower anchor may have more than minor corrosion of nut.4. Is the anchorage free of visible cracks in the concrete near the anchors?See one crack near top of cabinet, but not close to anchor.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Yes No Yes Not Applicable No C-113 Status: Seismic Walkdown Checklist (SWC)Y WIu f Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3S77 (14) Distribution Panels 100 AMP 2-POLE AUTOMATIC TRANSFER SWITCH Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?There were lightweight portable work lamps (plastic housing) hung near cabinet, not considered a credible hazard, Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened front doors). No loose or missing hardware.Comments Walkdown by Team B C-1 14 Class (15) Batteries on Racks 3D03 SWC Status: Seismic Walkdown Checklist (SWC)YL- u Equipment ID No.: Equipment Class: 3D03 (15) Batteries on Racks Equipment
 
==
Description:==
 
3A BATTERY RACK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage seen to be a mix of(12) x 5/8 and (4) x 1/2 diameter CEA's for each rack. See field sketch. Anchorage does not match 5610-C-1369.Yes Yes Yes Yes No C-115 Status: Seismic Walkdown Checklist (SWC)Y F-Wi u Equipment ID No.: Equipment Class: 3D03 (15) Batteries on Racks Equipment
 
==
Description:==
 
3A BATTERY RACK 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are a masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Typically there is a 3/8 to 1/2" (approx.)
gap between front of batteries and horizontal rail. Issue is common for all inspected racks. Unknown if this is acceptable (batteries can slide forward to rail).Comments Walkdown by Team B C-116 3D24 SWC Status: Seismic Walkdown Checklist (SWC)YLN]U Equipment ID No.: Equipment Class: 3D24 (15) Batteries on Racks Equipment
 
==
Description:==
 
3B BATTERY RACK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 347D Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and flndinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawing 5610-C-1369 Rev. 5 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-1 17 Status: Seismic Walkdown Checklist (SWC)Y N-]Iu Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3D24 (15) Batteries on Racks 3B BATTERY RACK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There is a masonry wall behind the cabinet. Per drawing 5160-C-1728, the wall is safety related and acceptable for design basis.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Typically there is a 3/8 to 1/2" (approx.)
gap between front of batteries and horizontal rail. Issue is common for all inspected racks. Unknown if this is acceptable (batteries can slide forward to rail).Comments Walkdown by Team A C-118 Class (16) Inverters 3D25 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3D21 Yl lu (16) Inverters Equipment Class: (16) Inverters Equipment
 
==
Description:==
 
3B1 BATTERY CHARGER Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 347B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorale 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configuration differs from drawing 5610-C-652 Sh. I (see field sketch).Yes Yes Yes Yes No C-119 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 3D25 (16) Inverters Equipment
 
==
Description:==
 
3B1 BATTERY CHARGER 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes.and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened lower doors). No loose or missing hardware.
The upper panels would require excessive dismantling to remove.Comments Walkdown by Team A C-120 3D25A SWC Status: Seismic Walkdown Checklist (SWC)IYN] U Equipment ID No.: Equipment Class: 3D25A (16) Inverters Equipment
 
==
Description:==
 
3B2 BATTERY CHARGER Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?All anchors were seen (rear anchors viewed from stairway).
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-121 Status: Seismic Walkdown Checklist (SWC)FINU Equipment ID No.: Equipment Class: 3D25A (16) Inverters Equipment
 
==
Description:==
 
3B2 BATTERY CHARGER Battery charger is anchorage to steel frame with thru bolts, similar to D51.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Light above fairly stiff and won't fall. May possibly swing & hit hood over charger, not significant.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and lower interior of cabinet (opened lower doors).No loose or missing hardware.Comments Walkdown by Team .B C-122 3Y05 SWC Status: Seismic Walkdown Checklist (SWC)-lN U Equipment ID No.: Equipment Class: 3Y05 (16) Inverters STATIC INVERTER 3C 125 VDC/120 VAC 7.5 KVA Equipment
 
==
Description:==
(CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 347B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-652 Sh. 2 Rev. 0 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-123 Status: Seismic Walkdown Checklist (SWC)7YN U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
3Y05 (16) Inverters STATIC INVERTER 3C 125 VDC/120 VAC 7.5 KVA (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Temporary resistive load bank is stored within 1/4" of 3Y05. This is judged to be a housekeeping issue and is cited in AWC. Not a credible hazard to 3Y05.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened bottom doors). No loose or missing hardware.
Opening upper panels would require excessive dismantling.
Comments Walkdown by Team A C-124 3Y07 SWC Status: Seismic Walkdown Checklist (SWC)FY-]N U Equipment ID No.ýEquipment Class: 3Y07 (16) Inverters STATIC INVERTER 3D 125 VDC/120 VAC 7.5 KVA Equipment
 
==
Description:==
(CABINET)Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 347A Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-125 Status: Seismic Walkdown Checklist (SWC)FY]NU Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
3Y07 (16) Inverters STATIC INVERTER 3D 125 VDC/120 VAC 7.5 KVA (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are a masonry walls in the area. Per drawing 5160-C-1728 Rev. 0, the walls are safety related and acceptable for design basis.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened all doors). No loose or missing hardware.Comments Walkdown by Team A C-126 D51 SWC Status: Seismic Walkdown Checklist (SWO)Y N FU Equipment ID No.: Equipment Class: D51 (16) Inverters Equipment
 
==
Description:==
 
SPARE BATTERY CHARGER Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (8) x 5/8 diameter thru bolts into steel frame; see field sketch. Need correct anchor drawing to verify (unknown).
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Unknown Unknown C-127 Status: Seismic Walkdown Checklist (SWC)Y N F-U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
D51 (16) Inverters SPARE BATTERY CHARGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Overhead lights are rigid.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and lower interior of cabinet (opened lower doors).No loose or missing hardware.Comments Walkdown by Team B C-128 Class (17) Engine-Generators 3K4B SWC Status: Seismic Walkdown Checklist (SWC)i- -I N U Equipment ID No.: Equipment Class: 31K41B (17) Engine-Generators Equipment
 
==
Description:==
 
3B DIESEL GENERATOR Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincs.
Additional space is provided at the end of this checklist for documentinc other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (7) x 1-1/8 CIP bolts per side, 14 total. Anchorage matches drawings 5610-C-379 Sh. 1 and 561--C-904.
Yes Yes Yes Yes Yes C-129 Status: Seismic Walkdown Checklist (SWC)WTIN U Equipment ID No.: Equipment Class: 3K4B (17) Engine-Generators Equipment
 
==
Description:==
 
3B DIESEL GENERATOR 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Reviewed support conditions for air start and fuel lines in detail; found to be acceptable.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Entire skid appears to be on vibration isolation pads (rubber) with anchor bolts thru the pads (see photos). There also appears to be a rubber plate washer below each anchor nut.The item was reviewed for USI A-46 and both anchorage and support conditions were found to be acceptable.
In addition the load path to anchorage appears rugged and there is no significant concern with functionality of EDG given relatively low seismic load.Comments Walkdown by Team B C-130 Class (18) Instruments on Racks 3QR35 SWC Status: Y N U-Seismic Walkdown Checklist (SWC)Equipment ID No.: 3QR35 Equipment Class: (18) Instruments on Racks Equipment
 
==
Description:==
 
CONTROL ROOM PROTECTION RACK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Unknown See apparent anchor location missing anchor bolt; unknown if this is OK per design basis.3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Some visual crack in vicinity, but not near anchors.5. Is the anchorage configuration consistent with plant documentation?
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (5) x 3/8 anchors at corners of some sections.
See field sketch. Need correct anchor drawing to verify (unknown).
C-131 Status: Seismic Walkdown Checklist (SWC)Y N ¶U-Equipment ID No.: Equipment Class: 3QR35 (18) Instruments on Racks Equipment
 
==
Description:==
 
CONTROL ROOM PROTECTION RACK 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. -Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
No: No Zero gap at left end to adjacent cabinet 3QR80A (next to line-up).Suspect 3QR80A is not bolted to adjacent 3QR32 cabinet (see gaps along length). This may be a relay chatter concern.Other Inspected exterior and interior of cabinet (opened all front doors). No loose or missing hardware.Comments C-132 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
Walkdown bv Team B 3QR35 (18) Instruments on Racks CONTROL ROOM PROTECTION RACK C-133 Class (19) Temperature Sensors TIS-3-6413B SWC Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: TIS-3-6413B (19) Temperature Sensors Equipment
 
==
Description:==
 
SWGR RM 3D FAN 3V65B TEMP SWITCH Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 429 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record theresults of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Wall mounted unit; cannot see wall anchorage fully unless switch is disassembled.
After removal of cover, can only see studs to mounting plate.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Unknown Unknown Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-1 34 Status: Seismic Walkdown Checklist (SWC)Y N [-Equipment ID No.: Equipment Class: TIS-3-6413B (19) Temperature Sensors Equipment
 
==
Description:==
 
SWGR RM 3D FAN 3V65B TEMP SWITCH 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Note: Very light item; anchorage failure not credible.Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-135 Class (20) Instrumentation and Control Panels and Cabinets 3C04 SWC Status: Y N Seismic Walkdown Checklist (SWC)Equipment ID No.: 3C04 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
VERTICAL PANEL A Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 360 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Unknown Yes for visible anchors.Unknown for anchors that are not visible (blocked by cables, wires, etc.). See the field sketch, expect that (2) in rear and (4) in front anchors are present but not visible.3. Is the anchorage free of corrosion that is. more than mild surface Unknown oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?Per PTN-O-J-C-90-0003, expect that anchors are embedded in concrete curb. Cannot see curb, therefore crack inspection results are unknown.5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
C-136 Status: Seismic Walkdown Checklist (SWC)Y NFU Equipment ID No.: Equipment Class: 3C04 (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
VERTICAL PANEL A 6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
Per PTN-O-J-C-90-0003 Sh. 44, expect 1/2" anchors <= 24" o/c.Visible anchors are consistent with this design. See field sketch.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No Egg crateceiling tiles above are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was resolved by analysis.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, No and masonry block walls not likely to collapse onto the equipment?
Ceiling tiles are a concern; see above.9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free No of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet. Back of cabinet is open (no doors). Some hanging loops of cable seen, but not a concern. Also see Dell PC on a shelf The PC is clamped down and shelf is strong;OK (see photo). Also no loose or missing hardware.Comments Walkdown by Team B C-137 3C06_3C05 SWC Status: Y N L--Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 3C063C005 (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
VERTICAL PANEL B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 360 Manufacturer/Model:
(Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for docurnentincj other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes for visible anchors.Unknown for anchors that are not visible (blocked by cables, wires, etc.). See the field sketch, expect that (2) in rear and (3) front anchors are present but not visible.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the anchors?Per PTN-O-J-C-90-0003, expect that anchors are embedded in concrete curb. Cannot see curb, therefore crack inspection results are unknown.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Per PTN-O-J-C-90-0003 Sh. 44, expect 1/2" anchors <= 24" o/c.Visible anchors are consistent with this design. Cannot see all anchors so verification status is unknown. See field sketch.Yes Unknown Unknown Unknown Unknown C-138 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: 3C06_3C05 (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
VERTICAL PANEL B 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No Egg crate ceiling tiles above are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was resolved by analysis.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, No and masonry block walls not likely to collapse onto the equipment?
Ceiling tiles are a concern; see above.9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free No of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet. Back of cabinet is open (no doors). Some hanging loops of cable seen, but not a concern. No loose or missing hardware.Comments Walkdown by Team B C-139 3C12B SWC Status: Seismic Walkdown Checklist (SWC)Y1 Lu Equipment ID No.: Equipment Class: 3C12B (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
3B EDG CONTROL PANEL Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (4) fillet welds to embedded angle at edge of floor penetration, see field sketch. See also 5610-C-379 Sh. 1. Need document to verify weld pattern dimensions (unknown, not shown on 5610-C-397 Sh. 1, may verify against anchorage stress analysis).
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Unknown Yes C-140 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3C12B Y L-1u, Equipment Class: Equipment
 
==
Description:==
 
(20) Instrumentation and Control Panels and Cabinets 3B EDG CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened front door). No loose or missing hardware on exterior.
In interior, for one small plug-in electrical device at lower right corner of compartment device latch was not engaged (similar items above that one all had latches engaged).Comments Walkdown by Team B C-141 3C23A SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3C2, FY]N U A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
SEQUENCER 3C23A -CABINET Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See two top supports anchored to concrete wall (one 1/2 diameter anchor per support).
See (4) x anchor bolts in right section and (1) x anchor bolt in left section (5 total). Anchorage matches calculation PTN-BFJC-92-039 Attach. I Sheet 5.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-142 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3C23A F7N U Equipment Class: Equipment
 
==
Description:==
 
(20) Instrumentation and Control Panels and Cabinets SEQUENCER 3C23A -CABINET Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Cable tray above on rigid wall brackets, good support. Adjacent light on chains won't fall and won't hit cabinet when it swings.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions Yes Yes Yes 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Inspected external of cabinet and internal of cabinet (opened doors on both sections).
No loose or missing hardware.Comments Walkdown by Team B C-143 3C23B SWC Status: Seismic Walkdown Checklist (SWC)Y N I-U]Equipment ID No.: Equipment Class: 3C23B (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
SEQUENCER 3C23B -CABINET Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet anchorage is internal.
No permission to open cabinet. Defer anchorage inspection.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Visual cracks are present but judged to be of minor significance.
Appear to be surface cracks only.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
No Unknown Unknown Yes Not Applicable Unknown C-144 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3C23B Y N F Equipment Class: Equipment
 
==
Description:==
 
(20) Instrumentation and Control Panels and Cabinets SEQUENCER 3C23B -CABINET Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There is a masonry wall behind the cabinet. The wall is safety related and acceptable for design basis (see AWC).9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
No: Potential impact with independent tube steel support crossing near the top of the cabinet in front. The gap to the TS is about 1/8" on one side, increasing to about 1/2" on the opposite side. This may be an issue for relay chatter.There is a 3/8" gap in side/side direction to a Unistrut.
Judged to be acceptable based on high stiffness of items in that direction.
Other: Inspected exterior of cabinet. No loose or missinq hardware.No Comments Walkdown by Team B C-145 3C264 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3C2E-N U 34 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
3C264 -ALTERNATE SHUTDOWN PANEL Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincs.
Additional space is rrovided at the end of this checklist for docurnentina other comments.Anchora-ge
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?See one floor crack in vicinity of right rear anchor (concrete expansion anchor). Not close to CEA, so OK.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (9) x 1/2 CEA's thru steel baseplate; baseplate is welded to embedded steel.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Yes Yes Yes Not Applicable Yes C-146 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3C2(U- ]N 34 Equipment Class: Equipment
 
==
Description:==
 
(20) Instrumentation and Control Panels and Cabinets 3C264 -ALTERNATE SHUTDOWN PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Block walls nearby; walls are safety related so OK (see AWC).9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened all doors). No loose or missing hardware.Overhead threaded pipe found to be drain pipe from air handler; pipe is normally dry so not a spray hazard.Comments Walkdown by Team B C-147 CONSOLE SWC Status: Seismic Walkdown Checklist (SWC)Y lNu Equipment ID No.: Equipment Class: CONSOLE (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
CONTROL ROOM CONTROL CONSOLE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 362 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for docurnentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Based on inspection, nominal anchorage is 1/2 diameter anchor, 24" o/c along sides.Viewed all front anchors except one location was covered by wires.Also, one location seen to be missing an anchor (see empty hole).Most rear anchors cannot be seen, covered by wires.Viewed side anchors, OK.No issues with visible anchors.No: One location known to be missing an anchor bolt; unknown if this is OK per design basis.Can't inspect some anchors, covered by wires.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
No No Unknown C-148 Status: Seismic Walkdown Checklist (SWC)YFN]u Equipment ID No.: Equipment Class: CONSOLE (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
CONTROL ROOM CONTROL CONSOLE No corrosion seen for visible anchors. Unknown for covered anchors.4. Is the anchorage free of visible cracks in the concrete near the anchors?Expect cabinet sits on concrete curb. Cannot see curb & not able to inspect.5. Is the anchorage configuration consistent with plant documentation?(Note:' This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Not Applicable No Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Egg crate ceiling tiles above are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was resolved by analysis.8.. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Ceiling tiles are a concern; see above.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No No Yes No Other Adverse Conditions C-149 Status: Seismic Walkdown Checklist (SWC)YL]U Equipment ID No.: Equipment Class: CONSOLE (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
CONTROL ROOM CONTROL CONSOLE 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened all doors). No loose or missing hardware.Comments Walkdown by Team B C-150 Class (21) Tanks and Heat Exchangers 3E206B SWC Status: Seismic Walkdown Checklist (SWC)-FY N U Equipment ID No.: Equipment Class: 3E206B.(21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
RHR HEAT EXCHANGER B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 4.00 ft, 210 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-271 Sh. 1 Rev. 9 Yes Yes Yes Yes C-151 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: -3E20 FYINU]6B Equipment Class: (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
RHR HEAT EXCHANGER B 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-152 3E207B SWC Status: Seismic Walkdown Checklist (SWC)Y N-U Equipment ID No.: Equipment Class: 3E207B (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
COMPONENT COOLING HEAT EXCHANGER B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 202 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space, below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of.the 50% of'SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Concrete is cracked and spalling, with exposed reinforcement, at north-east anchor. The spalled area is not currently tagged in the field.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Yes Yes No Not Applicable No C-1 53 Status: Seismic Walkdown Checklist (SWC)Y L- -U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3E207B (21) Tanks and Heat Exchanqers COMPONENT COOLING HEAT EXCHANGER B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines haveadequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-154 3E208A SWC Status: Seismic Walkdown Checklist (SWC)Y N FU Equipment ID No.: Equipment Class: 3E208A (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
SPENT FUEL PIT HEAT EXCHANGER Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configuration needs to be verified against plant documentation.
Need to confirm 4 -1" diameter and 4 -3/4" diameter cast in place bolts on the east pedestal and 4 -3/4" diameter cast in place bolts on the west pedestal (see attached sketch).6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Unknown Unknown C-155 Status: Seismic Walkdown Checklist (SWC)YNFU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3E208A (21) Tanks and Heat Exchanqers SPENT FUEL PIT HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-156 3P214B HEAT EXCHANGER SWC Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 3P214B HEAT EXCHANGER (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
SEAL WATER HEAT EXCHANGER FOR CONTAINMENT SPRAY PUMP B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-157 Status: Seismic Walkdown Checklist (SWC)FNU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3P214B HEAT EXCHANGER (21) Tanks and Heat Exchanqers SEAL WATER HEAT EXCHANGER FOR CONTAINMENT SPRAY PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-158 3T1 SWC Status: FN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 3T1 Equipment Class: (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
REFUELING WTR STORAGE TK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 217 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
Some anchor bolts have a reduced cross section due to corrosion.
This condition was identified and analyzed under NCR-92-0315, which shows that sufficient margin still exists.4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-375 Sh. I Rev. 8 and new chair top plates are consistent with PCM 91-172.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-159 Status: Seismic Walkdown Checklist (SWC)Y-] NU Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
3T1 (21) Tanks and Heat ExchanQers REFUELING WTR STORAGE TK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-160 3T23B SWC Status: Seismic Walkdown Checklist (SWC)i-- N U Equipment ID No.: Equipment Class: 3T23B (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
EDG 3B FUEL OIL DAY TANK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 408 Manufacturer/Model:
IIInltUL;LIUIcIt IUI Lr UI Checki IL., II:DL This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at theend of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (4) x 3/4 diameter CIP bolts. Matches drawing 5610-C-379 Sh. 1.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-161 Status: Seismic Walkdown Checklist (SWC)WN N U Equipment ID No.: Equipment Class: Eauioment
 
==
Description:==
 
3T23B (21) Tanks and Heat Exchanqers EDG 3B FUEL OIL DAY TANK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-162 3T269B SWC Status: Seismic Walkdown Checklist (SWC)Y NI-7 Equipment ID No.: Equipment Class: 3T269B (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
EDG 3B STARTING AIR ACCUMULATOR TANK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?See 3 of 4 anchors, (1/2 diameter threaded stud visible).
All visible anchors OK. One anchor is buried in a concrete curb and cannot be inspected.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the anchors?No Unknown Unknown Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Unknown C-163 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
3T269B (21) Tanks and Heat Exchangers EDG 3B STARTING AIR ACCUMULATOR TANK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Scaffold around tank OK; see AWC for comments.Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-164 3T36 SWC Status: Seismic Walkdown Checklist (SWC)Y F-N-] U Equipment ID No.: Equipment Class: 3T36 (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
EDG DIESEL OIL STORAGE TANK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 293 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
See some rust on base plate, addressed in "Other" below.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (6) x 1-1/4 diameter CIP anchors. Matches 5610-C-375 Sh. 1.Bolt chair top plates are thickened, consistent with calculation PTN-BFJC-91-016.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-1 65 Status: Seismic Walkdown Checklist (SWC)Y N -I u Equipment ID No.: Equipment Class: 3T36 (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
EDG DIESEL OIL STORAGE TANK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
/-9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Base plate at east and west anchors (2 places) has significant corrosion of extension beyond wall/base weld. Not a capacity concern at this time but may become a problem if corrosion progresses to weld.Comments Walkdown by Team B C-166 3T8 SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: 3T8 (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
CONDENSATE STORAGE TANK Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 331 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the " anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (16) x 1-3/8 CIP anchors; matches drawing 5610-C-375 Sh. 1.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-167 Status: Seismic Walkdown Checklist (SWC)F-]N U Equipment ID No.: Equipment Class: 3T8 (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
CONDENSATE STORAGE TANK See four thickened chair top plates (t >= 1" visible).
Other top plates are 1/2" thick visible. Per PTN-BFJC-91-016, other plates are thickened and milled to fit into chair side plates so OK.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Overhead grating is a missile shield and will have high ruggedness.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-168 T205B SWC Status: Seismic Walkdown Checklist (SWC)FY -N U Equipment ID No.: Equipment Class: T205B (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
BORIC ACID STORAGE TANK B Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 27.00 ft, 200 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing PTN-C-90-440-004 Rev. 0 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-169
-Status: Seismic Walkdown Checklist (SWC)FY N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
T205B (21) Tanks and Heat Exchangers BORIC ACID STORAGE TANK B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-170 Class (00) Other 3-12-031 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3-12-Equipment Class: (0) 0 FYINU-031 ther Equipment
 
==
Description:==
 
TUBE GATE ISOLATION VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 212B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable C-171 Status: Seismic Walkdown Checklist (SWC)[YN U Equipment ID No.: Equipment Class: 3-12-031 (0) Other Equipment
 
==
Description:==
 
TUBE GATE ISOLATION VALVE 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-172 3-797 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3-79 Equipment Class: (0) C U 7 ther Equipment
 
==
Description:==
 
SFP COOLING WATER PUMP LOW SUCTION VALVE Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 223B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-173 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 3-79 Equipment Class: (0) 0 F J&#xfd;N U 7 ther Equipment
 
==
Description:==
 
SFP COOLING WATER PUMP LOW SUCTION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Valve handwheel is within I" of wall mounted conduit. The valve line penetrates through the wall at a nearby location.
Given that both the valve and conduit are restrained by the wall, there will be no differential movement between the two, thus precluding any potential seismic interaction.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-174 3-910 SWC Status: Seismic Walkdown Checklist (SWC)Y ]N U Equipment ID No.: Equipment Class: 3-9 10 (0) Other Equipment
 
==
Description:==
 
SFP CLG PMP A SUCT ISO VLV Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-175 Status: Seismic Walkdown Checklist (SWC)MNU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
3-910 (0) Other SFP CLG PMP A SUCT ISO VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-176 3K200 SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: 3K200 (0) Other Equipment
 
==
Description:==
 
BORIC ACID BLENDER Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-177 Status: Seismic Walkdown Checklist (SWC)IWIN U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
3K200 (0) Other BORIC ACID BLENDER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-178 3NP212 SWC Status: Seismic Walkdown Checklist (SWC)f]NU Equipment ID No.: Equipment Class: 3NP212 (0) Other Equipment
 
==
Description:==
 
SPENT FUEL PIT COOLING PUMP TRANSFER SWITCH Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to'record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-179 Status: Seismic Walkdown Checklist (SWC)W- -NU Equipment ID No.: Equipment Class: Eauioment Descriptionm 3NP212 (0) Other SPENT FUEL PIT COOLING PUMP TRANSFER SWITCH Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above, seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-180 BD-2 SWC Status: Seismic Walkdown Checklist (SWC)T]N U Equipment I.D No.: Equipment Class: B0D-2 (0) Other Equipment
 
==
Description:==
 
CREVS INTAKE BALANCING DAMPER Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 347C Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may beused to record the results of judgments and findinas.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-181 Status: Seismic Walkdown Checklist (SWC)l NU Equipment ID No.: Equipment Class: Equipment Descrirption:
BD-2 (0) Other CREVS INTAKE BALANCING DAMPER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-182 BS-3-1402 SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: BS-3-1402 (0) Other BASKET STRAINER TO INTAKE COOLING WTR SUPPLY FOR CCW HX Equipment
 
==
Description:==
 
A Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 18.00 ft, 202 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Southwest base plate appears more corroded than others. Difficult to assess the severity of corrosion due to painting and residue buildup.4. Is the anchorage free of visible cracks in the concrete near the anchors?Visual cracks are present but judged to be of minor significance.
Appear to be surface cracks only.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Yes Yes Yes Not Applicable Yes C-183 Status: Seismic Walkdown Checklist (SWC)F7N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
BS-3-1402 (0) Other BASKET STRAINER TO INTAKE COOLING WIR SUPPLY FOR CCW HX A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-184 CFU-1 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: CFU Equipment Class: (0) C U-1)ther Equipment
 
==
Description:==
 
COMPENSATORY FILTER UNIT Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 30.00 ft, 347 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentiallv adverse seismic conditions?
Not Applicable Yes C-185 Status: Seismic Walkdown Checklist (SWC)FY -N U Equipment ID No.: Equipment Class: Eauirment DescriDtion:
CFU-1 (0) Other COMPENSATORY FILTER UNIT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. Per drawing 5160-C-1728, the walls are safety related and acceptable for design basis 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-186 LT-3-651 SWC Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: LT-3-651 (0) Other Equipment
 
==
Description:==
 
SPENT FUEL PIT LEVEL TRANSMITTER Project: Turkey Point 3 SWEL Location (Bldg, Elev, Room/Area):
Unit 3, 42.00 ft, 212A Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for docurmentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-187 Status: Seismic Walkdown Checklist (SWC)Y NU Equipment ID No.: Equipment Class: EauiDment DescriDtion:
LT-3-651 (0) Other SPENT FUEL PIT LEVEL TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes The cantilever tube support for the transmitter rests on the lip of the spent fuel pool, but is not attached to it. Based on the rigidity of the support, low mass of the support, and low zpa, the cantilever support will not vibrate/tap against the lip of the spent fuel pool.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-188 D Area Walk-By Checklists (AWCs)Table D-1. Summary of Area Walkdown Checklists Area Walk-by Description ID Page Area 200 Area 200 -BORIC ACID TANK T205B D-4 ROOM 3P203B Area 201 Area 201 -CHARGING PUMP ROOM MOV-3-350 D-6 3P201B FCV-3-113A 3K200 TCV-3-143 Area 202 Area 202 -COMPONENT COOLING 3P21 1 B D-8 PUMP ROOM BS-3-1402 3E207B Area 203 Area 203 -CONTAINMENT SPRAY MOV-3-880B D-10 PUMP ROOM MOV-3-843B 3P214B 3P214B HEAT EXCHANGER Area 206 Area 206 -HI-HEAD SIS PUMP 3P215B D-12 ROOM Area 209 Area 209 -PIPE & VALVE ROOM HCV-3-121 D-14 MOV-3-869 Area 210A Area 210 -RHR HEAT EXCHANGER 3E206B D-16 ROOM HCV-3-758 MOV-3-863B Area 210B Area 210B -RHR HEAT MOV-3-860B D-18 EXCHANGER UPPER ROOM Area 211 Area 211 -RHR PUMP ROOM MOV-3-862A D-20 3P210B MOV-3-861 B Area 212A Area 212A- SPENT FUEL PIT 3T218 D-22 ROOM NORTH SIDE LT-3-651 Area 212B Area 212B -SPENT FUEL PIT 3-12-031 D-24 ROOM SOUTH SIDE Area 217 Area 217 .- RWST AREA MOV-3-864B D-26 3T1 Area 220 Area 220 -AUXILIARY BUILDING 3B08 D-28 3B07 D-1 Area Walk-by Description ID Page Area 223 Area 223 -SPENT FUEL PIT 3-910 D-30 PuMP/HEAT EXCHANGER ROOM 3E208A EMERG SFP CLG PMP 3NP212 3P212A Area 223B Area 223B -CASK WASH AREA 3-797 D-32 Area 234A Area 234A -NEW ELECTRICAL 3S77 D-34 EQUIPMENT ROOM, 18' LEVEL 3B50 V76 Area 234B Area 234B -NEW ELECTRICAL 3D25A D-36 EQUIPMENT ROOM, 27' PLATFORM D51 Area 293 Area 293 -GENERAL OUTDOORS 3P10B D-38 3T36 Area 300 Area 300 -STEAM DECK CV-3-1607 D-40 POV-3-2605 Area 301 Area 301 -BELOW STEAM DECK MOV-3-1404 D-42 Area 302 Area 302 -FEEDWATER DECK POV-3-487 D-44 CV-3-2816 Area 306 Area 306 -AUX FEED PUMP AREA P2B D-46 Area 309 Area 309 -DIESEL GENERATOR 3B EDG FAN D-48 BUILDING (LOWER LEVEL) ASSEMBLIES Area 310A Area 310A -CABLE SPREADING 3D03 D-50 ROOM, 3A BATTERY ROOM Area 310B Area 310B -AREA NEAR MG SET 3D01 D-52 Area 310C Area 310C -CABLE SPREADING E16B D-54 ROOM, MECH.EQ ROOM (E16 AIR HANDLERS)Area 310D Area 310D -CABLE SPREADING 3QR35 D-56 ROOM, AREA NEAR 3QR35 Area 315 Area 315 -LP TURBINE NORTH 3E239B D-58 AREA Area 331 Area 331 -CONDENSATE 3T8 D-60 STORAGE TANK Area 334 Area 334 -TURBINE PLANT HEAT POV-3-4883 D-62 EXCHANGER AREA Area 341 Area 341 -480V LC ROOM 3B04 D-64 3B02 X05 3E242B 3E2411B Area 342 Area 342 -3A MCC 3B05 D-66 Area 343 Area 343 -3B MCC ROOM 3B06 D-68 D-2 Area Walk-by Description ID Page Area 347A Area 347 -CONTROL ROOM 3Y07 D-70 INVERTER ROOM Area 347B Area 347B -BATTERY CHARGER 3Y05 D-72 ROOM 3D23 3D25 Area 347C Area 347C -CREVS ROOM CFU-1 D-74 BD-2 Area 347D Area 347D -3B BATTERY ROOM 3D24 D-76 Area 360 Area 360 -CONTROL ROOM 3C06_3C05 D-78 3C04 Area 362 Area 362 -CONTROL ROOM CONSOLE D-80 Area 368A Area 368A -4160V SWITCHGEAR 3AA D-82 ROOM A ,3E243A 3C23A Area 368B Area 368A -4160V SWITCHGEAR 3C264 D-84 ROOM B 3C23B Area 370 Area 370 -INTAKE AREA 3P9B D-86 Area 408 Area 408 -B DIESEL GENERATOR SV-3-2046B D-88 BUILDING (UPPER LEVEL) 3T23B Area 409 Area 409 -B DIESEL GENERATOR 3K4B D-90 BUILDING (LOWER LEVEL) 3C2B COMPRESSOR 3V34B 3C12B 3T269B Area 429 Area 429 -SWITCHGEAR ROOM 3D TIS-3-6413B D-92 3V65B 3AD Note: Detailed signed records of the checklists are available at the site.Per the EPRI guidance document, the top row of each checklist summarizes the status as follows: Status Meaning Y All relevant checks were answered Yes and no further action is required.N At least one check was answered No and follow-up is required.U At least one check could not be answered due to lack of information and follow-up is required.Section 5.3 of this report identifies planned actions for items requiring follow-up.
D-3 Area 200 Status: Y FN] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 200 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-4 Status: Y F U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 200 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Large cover plates for nearby recessed area are stored adjacent to pump 4P203B.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-5 Area 201 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 201 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes ,spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-6
* Status: Y ] U Area Walk-By Checklist (AWC)Location (bldg; Elev, Room/Area):
Area 201 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary light near one of the charging pumps is not properly secured.Ladder near RCS filters is not tied off 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-7 Area 202 Status: Y[ IN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 202 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
Platform adjacent to BS-3-1402 basket strainer has cracked grouting at anchorage.
This is not a seismic concern as the concrete remains uncracked.
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-8 Status: -Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 202 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-9 Area 203 Status: [-Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 203 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-1 0 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 203 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-11 Area 206 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 206 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-12 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 206 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-13 Area 209 Status: LYi N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 209 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-14 Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 209 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-1 5 Area 210A Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily' opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-16 Status: IY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-17 Area 210B Status: N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-1 8 Status: 7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-19 Area 211 Status: Y E-7 U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 211 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-20 Status: Y IN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 211 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Large piece of insulation stored on scaffold above sump pumps. The insulation could potentially slide off the scaffold and impact the pumps during a seismic event.Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-21 Area 212A Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 212A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-22 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 212A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-23 Area 212B Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 212B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-24 Status: N Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 212B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-25 Area 217 Status: 7Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 217 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-26 Status: I N U Area Walk-By Checklist (AWC)Location (bldg, Elev, Room/Area):
Area 217 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffolding is adequately braced and tied off to adjacent structures.
Portable electric load center has all wheels locked.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-27 Area 220 Status: Y N] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 220 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit No raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Bent hanger rods on overhead lights in front of D-MCC and LP 38.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-28 Status: Y FN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 220 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Door on LP 38 is not closed and latched. This is a non-safety panel &not an adverse seismic issue.Comments Walkdown by Team A D-29 Area 223 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes.raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-30 Status: N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-31 Area 223B Status: Y U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-32 Status: Y U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223B 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Open and unlatched door on distribution panel DP322.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-33 Area 234A Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 234A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Both V76 and V77 air handlers appear to be anchored on one side only but per drawing part of anchorage is hidden from view so OK; see SWC for V76.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area sufficiently supported.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-34 Status: T] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 234A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Large heavy cart, "Continuous Load Unit" on locked wheels 33" from 3B50 cabinet. It is noted that restraint is with plastic strap and this seems too weak as a restraint.
However it is not considered a credible hazard to nearby equipment because of large gap.Loose equipment box in corner >20" from 3B50. Not considered a credible interaction hazard because impact load potential is very low.Chair behind not a credible hazard (won't hit 3B50).8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. The walls are shown on drawing 5160-C-1701 Sh. 1 and 2 and designs are designated as"Seismic Category I" (Sh. 1) and "Seismically Designed" (Sh. 2).Comments Walkdown by Team B D-35 Area 234B Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 234B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Verified air handler V-78, on wall-mounted platform, is anchored to platform.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Support of fire piping main along wall inspected andjudged OK.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-36 Status: I N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 234B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. The walls are shown on drawing 5160-C-1701 Sh. 1 and 2 and designs are designated as"Seismic Category I" (Sh. 1) and "Seismically Designed" (Sh. 2).Comments Walkdown by Team B D-37 Area 293 Status: Ei N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 293 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Outdoor area, not much overhead.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping main near 3PIOB is well supported.
Also equipment (outdoors) is resistant to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?DG fuel lines are SC-I and not a credible fire hazard.D-38 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 293 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-39 Area 300 Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 300 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-40 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 300 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-41 Area 301 Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 301 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear tobe free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-42 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 301 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-43 Area 302 Status: ] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 302 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
There are overhead beams for hoistsitrolleys.
Trolleys are not present. No concerns.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Pipes in the area found to be well supported.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-44 Status: ] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 302 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
One loose small platform (one step) found, far from any equipment, not an issue.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-45 Area 306 Status: EZN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 306 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Checked grating above, saw fillet welds attaching grating to steel beams.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-46 Status: jY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 306 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-47 Area 309 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 309 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Duct overhead OK; see EDG Fan SWC.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Coolant pipes supported by fan and walls, OK.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-48 Status: [-] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 309 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Area near EDG Fan Assemblies.
Walkdown by Team B D-49 Area 310A Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping is the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-50 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There area masonry walls in the area. Per drawing 5160-C-I1727, the, walls are safety related and acceptable for design basis (walls C-30-1, --2,-3).Comments Walkdown by Team B D-51 Area 310B Status: LY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?.No fire piping is the area. See possible sanitary drain line along wall by 3A Battery room, not a concern.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-52 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-1727, the walls are safety related and acceptable for design basis (walls C-30-1, -2, -3, -4)Comments Walkdown by Team B D-53 Area 310C Status: Y jNI U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310C Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of No potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Air handlers appear unanchored, see E16B SWC.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it-appear that the area is free of potentially adverse seismic No interactions that could cause flooding or spray in the area?Rod hung copper tubing ("Service Water" tag seen) appears to be non-seismic.
Connects to air handlers.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-54 Status: Y L-I U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310C 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Loose steel cover panels leaning against wall in front of air handlers.Potential to fall on piping and conduit.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-55 Area 310D Status: [I N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310D Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
No significant concerns.
No apparent hazards from non-safety cabinets.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Floor supported cable tray, OK.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?See red piping in area, well supported.
Per plant engineers, piping is a gas system (expect halon).6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-56 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310D 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No scaffold in the area.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-57 Area 315 Status: L7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 315 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Outdoor location open above. Light pole near 3E239B welded to platform, OK.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Location ensures equipment is resistant to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-58 Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 315 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Checked scaffold southeast of platform.
Good design and well anchored.8. Have you looked for and found noother seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Shed to west of platform judged OK; location ensures good lateral strength (resists high wind loads). Shed is light so seismic load is low.Comments Walkdown by Team B D-59 Area 331 Status: LJ_ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 331 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Grating above is missile shield and is rugged.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?See some possible non SC-I piping in area. Area is open to outdoors and is resistant to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?.D-60 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 331 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-61 Area 334 Status: Y F U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 334 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Nearby tanks, pipe supports, steel framing are well anchored.
Main transformer to south may be unanchored but is far away.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Expect non-SC-I piping is in area, but outdoor location ensures equipment is not vulnerable to spray.6. Does it appear that the area is free of potentially adverse seismic No interactions that could cause a fire in the area?Main transformer is about 20' to south of POV-3-4883 valve.Transformer is a fire risk and relatively close to the valve.D-62 Status: Y N] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 334 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-63 Area 341 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 341 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping is the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-64 Status: L NU Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 341 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Breaker lift cart in corner behind cabinet 3X06 is tied off -OK. Also restrains a small ladder.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-1727, the walls are safety related and acceptable for design basis (walls T-31-1B,-2B, -3B).Comments AWC covers both LC rooms.Walkdown by Team B D-65 Area 342 Status: Y-] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 342 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Small dry transformer (3X031) appears unanchored but far from MCC's and other equipment
(>4'); not considered a credible hazard.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Low concrete slab above, not much above 3A MCC. Cabletray is well supported.
: 4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?MCC is in an enclosure, so not vulnerable to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?No flammables in immediate area. Hydrogen.
lines seen > 35' away from 3A MCC.Bus duct overhead in area is well supported.
D-66 Status: FYI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 342 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-67 Area 343 Status: Y [N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 343 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Lights supported above cabinets on tube hangers.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping is the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-68 Status: Y F U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 343 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No issues near MCC 3B. A cart (breaker lift cart?) behind 3A MG Set Controls cabinet is unrestrained and may hit that cabinet during earthquake.
See photos.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-69 Area 347A Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-70 Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-71 Area 347B Status: Y FL U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-72 Status: Y LN-] u Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347B 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No: Temporary resistive load bank is stored within 1/4" of 3Y05. This is judged to be a housekeeping issue.Other: Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-1 728 Rev. 0, the walls are safety related and acceptable for design basis.Comments Walkdown by Team A D-73 Area 347C Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
/Instructions for Completing Checklist ,rea 347C This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of.significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes Yes Yes Yes Yes Yes D-74 Status: FY] N U Area Walk-By Checklist (AWC)Location (BIdg, Elev, Room/Area):
Area 347C 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Large rectangular steel plate stored on CFU-1 skid is unsecured, but will not impact equipment if sliding occurs.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-75 Area 347D Status: W- N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347D Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes Yes Yes Yes Yes Yes D-76 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347D 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-77 Area 360 Status: Y F] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 360 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic No spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Egg crate ceiling tiles above main area of Control Room are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was resolved by analysis.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-78 Status: Y L-N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 360 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Loose ladders behind 3QR50 have minor impact potential against base of cabinet after failing then sliding.A tool cart on wheels (locked) is directly next to cabinet "Rack No. 26 Prot. Channel Set I1". Potential for impact on cabinet.A loose printer on floor is next to cabinet "Rack No. 26 Control".
Minor impact potential against base of cabinet.Some loose plastic chairs on wheels seen; minor impact potential against cabinets.All of the above are housekeeping issues related to potential relay chatter. Unknown if relay chatter concerns are relavant to the above cabinets.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There is a masonry wall in the area. Per drawing 5160-C-1728, the wall is safety related and acceptable for design basis (walls A-42-2).Comments Walkdown by Team B D-79 Area 362 Status: Y ENU Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 362 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic No spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Egg crate ceiling tiles may fall; see Area 360 AWC.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-80 Status: Y LI U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 362 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-81 Area 368A Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Assumed that MCC 3L behind 3AA (along wall) is anchored).
Opened 3C23A-1 and saw it was well anchored.Small dry transformer 3X034 appears to be unanchored, but is >42" from 3AA. Not a credible hazard.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse*seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Some chain hung lights. One light behaind 3AA can swing and hit conduit entry box atop 3AA (6-3/4" gap). Not a credible hazard because gap is large and any impact is remote from devices.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-82 Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368A Small dry transformer 3X034 appears to be unanchored, but not a credible fire hazard (won't topple).7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Loose spear breakers in front of 3AA ablong wall >35" from 3AA. Not a credible hazard.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-I1730, the walls are safety related and acceptable for design basis (walls T-18-5A,-6A, -7A).Comments Add sub-areas for AWC: 368A, 368B Walkdown by Team B D-83 Area 368B Status: EY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Assumed that MCC 3M adjacent to 3AB is anchored.2. Does anchorage of equipment in the area appear to be free of Yes.significant degraded conditions?
3: Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
There are chain hung lights; no concerns to note.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in area. Also saw threaded drain lines from room cooler. Drain lines are dry and not a hazard.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-84 Status: [I N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Loose breakers, similar to 368A area. Not a credible hazard.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Masonry walls between 368A and 368B areas are safety related. See 368A A WC.Comments Walkdown by Team B D-85 Area 370 Status: Y LN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 370 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Crane runway structure is braced and appears rugged.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Pump is in and outdoors area, open above; equipment is resistance to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-86 Status: Y U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 370 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Large scaffold assembly in area has bracing but does not appear to have sufficient east/west anchorage near pump 3P9B. Spacing between e/w anchors is too far (about 40). N/S anchorage of scafflod was OK.See 3P9B SWC for photos..8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-87 Area 408 Status: T] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 408 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping is room is well supported and spray nozzles are not vulnerable.
See photos for 3T23B.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?DG fuel piping and tank is SC-I and not a credible hazard.D-88 Status: 7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 408 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-89 Area 409 Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 409 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?DG fuel piping and tank is SC-I and not a credible hazard.D-90 Status: FL N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 409 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold over air tanks and compressor found to be well braced and is anchored at two levels. No concerns.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-91 Area 429 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 429 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Lights on Unistrut frames, well supported.
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-92 Status: I N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 429 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Loose breaker in. corner of room, >42" from 3AD and >28" from conduit to 3S75 wall panel, OK.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-93 E Plan for Future Seismic Walkdown of Inaccessible Equipment This appendix identifies equipment that was partly or completely inaccessible for inspection during the walkdown.
The tables below address three categories of equipment:
Table E-1 Item was completely inaccessible due to radiological, safety or other issues. Area corresponding to the item was also inaccessible.
Table E-2 Anchorage of item was internal and team was denied permission to open due to personnel hazard or hazard to plant operation.
Table E-3 Status of inspections of electrical cabinet for "Other Adverse Conditions" under SWC Check 11. For some cabinets, inspection did not include all compartments/sections because of safety concerns or hazard to plant operation.
The inspections for Turkey Point Unit 3 deferred components and inaccessible components will be performed during the Refueling Outage currently scheduled for early 2014. An action request (AR) has been issued to plan for and implement additional Cabinet internal inspections.
E-1 Table E-1. Completely Inaccessible Equipment Component ID Description Reason for Inaccessibility 3T229B SI ACCUM B Item is within Containment and plant was operating at the time of inspection.
3V30B EMERGENCY CONTAINMENT Same as above COOLER B MOV-3-535 PRESSURIZER PORV BLOCK Same as above VALVE MOV-3-744A RHR LO HEAD SI TO LOOP A Same as above MOTOR OPERATED VLV MOV-3-751 NORMAL RHR INLET FROM RCS Same as above MOTOR OPERATED VLV MOV-3-865A SI ACCUM A DISCH MOTOR Same as above OPERATED VLV PCV-3-4885 PRZR PORV N2 BACKUP Same as above SUPPLY PRESSURE REGULATOR SV-3-455C PRESSURIZER PORV SOLENOID Same as above VALVE TW-3-412C DELTA T-TAVG CH I COLD LEG 1 Same as above THERMOWELL 3T218 COMPONENT COOLING SURGE Surge tank area not accessible during TANK walkdown, plant security issues.Table E-2.lnternal anchorage of equipment not accessible for inspection Component ID Description Reason for Inaccessibility 3AA 3AB 4.16V SWITCHGEAR 3A Electrical hazard (CABINET)3AD 4.16KV SWITCHGEAR 3AD Electrical hazard FOR BUS 3D 3D23. 3D23 (DISTRIBUTION PANEL) Electrical hazard SEQUENCER 3C23B- Hazard to plant operation CABINET 0 E-2 Table E-3.Status of internal inspection of electrical cabinets Component ID Description Class Status 3305 A-MCC (CABINET) 01 MCC is within an environment enclosure.
Opened enclosure doors and inspected front of MCC.3B06 B-MCC (CABINET) 01 MCC kick plates (lower plates) were opened and the interior was inspected.
3B07 C-MCC (CABINET) 01 Same as above.3B08 D-MCC (CABINET) 01 Same as above.3B04 3D LC (Part of B train) 02 Permission to open spare compartments.
Opened 2 of 3 lower doors.3B02 3B02 480V HVPDS LOAD CENTER 3B 02 Permission to open spare compartments.
Opened 1 of 3 (CABINET) lower doors.3B50 3H LOAD CENTER (CABINET) 02 Permission to open spare compartments.
Opened 3 of 3 lower doors.3AD 4.16KV SWITCHGEAR 3AD FOR BUS 03 See Table E.2 3D 3AA 3AB 4.16V SWITCHGEAR 3A (CABINET) 03 See Table E.2 3D23 3D23 (DISTRIBUTION PANEL) 14 See Table E.2 3D01 3D01 (DISTRIBUTION PANEL) 14 Not accessible due to plant operation/safety hazard.D51 SPARE BATTERY CHARGER 16 Permission to open lower compartments.
Opened 2 of 2 lower doors.STATIC INVERTER 3C 125 VDC/120 16 Same as above.VAC 7.5 KVA (CABINET)3Y07 STATIC INVERTER 3D 125 VDC/120 16 Same as above.VAC 7.5 KVA (CABINET)3D25A 3B2 BATTERY CHARGER 16 Same as above.3D25 3B1 BATTERY CHARGER 16 Same as above.3C23B SEQUENCER 3C23B -CABINET 20 See Table E.2 E-3 F Peer Review Report Peer Review Report for the Seismic Walkdown Inspection of Turkey Point Nuclear Station (NRC Near Term Task Force Recommendation 2.3)Turkey Point Nuclear Station October 2012 Prepared by Reviewed by Reviewed by Reviewed by Lead)Date
.'~Il /12.Date F-1
: 1. INTRODUCTION This report documents the peer review of the seismic walkdowns performed for Turkey Point Nuclear Station in September 2012, in support of the NRC Near Term Task Force (NTTF)Recommendation 2.3. This document describes the peer review team and process (Section 3), the peer review of the SWEL selection (Section 4), and the peer review of the seismic walkdown (Section 5).The peer review was performed consistent with Section 6 of the EPRI-TR-1 025286 (REF 1)guidance document and addresses the following specific activities:
* Review of the selection of components for the Seismic Walkdown Equipment List (Section 4)" Review of a sample of the checklists prepared for the Seismic Walkdowns
& Walk-Bys (Section 5.1)" Review of any licensing basis evaluations (Section 5.2)" Review of the decisions for entering the potentially adverse conditions in to the plant's Corrective Action Program (Section 5.2)* Review of the final submittal report (Section 6).2. BACKGROUND This peer review covers three portions of the seismic walkdown: (a) the preparation of the SWEL, (b) the actual walkdown, and (c) the final submittal report.The Seismic Walkdown Equipment List (SWEL) was prepared in July and August and finalized in September, based on revisions that occurred during the walkdowns.
Section 3 describes the process of peer reviewing the SWEL.The vast majority of the seismic walkdowns occurred September 11 through September
: 20. The peer review of the walkdowns occurred in the afternoons of those same dates. This portion of the peer review is documented in Section 4.Two entire areas -the containments
-were deferred for each unit for completion during each following respective outage. This allowed the walkdown to occur with less radiation exposure to the walkdown team.Four components could not be examined entirely with the bus powered: Essential 4KV switchgear Buses 3AB and 4AB, and the protected sequencers during walkdowns which were 3C23B and 4C23B. Consequently, the walkdowns for these components were postponed until the next scheduled outage when they. can be scheduled to be removed from service for maintenance.
These inspection deferrals are being tracked under the Corrective Action Program (CAP) by two separate Actions Requests, one for each unit.F-2
: 3. PEER REVIEW TEAM & PROCESS The Turkey Point (PTN) Peer Review Team consisted of individuals from PTN operations, civil engineering, licensing, and PRA as well as structural/seismic engineers from Stevenson
&Associates.
These individuals participated in phases of preparation, performance, and peer review of the seismic walkdowns.
This section documents the peer review process and how the Peer Review Team interacted with the Seismic Walkdown Engineering Teams.3.1 Peer Review Team The affiliation, role, and qualifications for each Peer Review Team member are summarized in the following table.Name Group Role
* Qualifications**
Tim Jones PTN Operations PR -SWEL (e), (f)Tirumani Satyan PTN Licensing SWE Team #1 (a), (b), (c), (d)Sharma PR -SWE Team A Carlos Figueroa PTN Civil Engineering SWE Team #2 (a), (b), (c), (e)PR -SWE Team B John O'Sullivan Stevenson
&Assoc. SWE Team #1 (a), (b), (c)(consultant eng.) PR -SWE Team A Seth Baker Stevenson
&Assoc. SWE Team #2 (a), (b), (c)(consultant eng.) PR -SWE Team B Alexander Restrepo PTN PRA Group PR Team Lead (a), (e)PTN -SWEL George Tullidge PSL PRA Group SWEL Review (e)Notes:* Role: PR (peer review), SWEL (seismic walkdown equipment list), SWE (seismic walkdown engineer)** Qualifications: (a) Completed EPRI NTTF 2.3 Seismic Walkdown Training (b) Seismic engineering experience (c) Degree in mechanical engineering or civil/structural engineering (d) Seismic PRA / IPEEE experience (e) Knowledge of plant operations, documentation (f) Plant Operations member 3.2 Peer Review Process PR Team Lead A. Restrepo served as the Peer Review Team Lead. In that role, he was responsible for coordinating the peer review and assembling this report. As described below, he also performed some additional roles as part of the walkdown team PR. He also had the lead in the SWEL preparation, so he was not part of that PR process. As such, the SWEL was independently reviewed by a PRA Engineer from PSL, a Senior License Operator from PTN and one of the Peer Reviewers from PTN. Finally, he did not participate as an active team member during the seismic walkdown process and did not perform any other work besides the one described above. Therefore, his roll as the lead pear reviewer is considered acceptable F-3 SWEL Preparation The SWEL was prepared by A. Restrepo, who is a PTN PRA engineer, with PTN Operations experience and familiarity with the PTN IPEEE Report and the PTN PRA model.The SWEL was reviewed by a team that included a PRA engineer (G. Tullidge), a licensing engineer (T. Satyan Sharma), a civil engineer (A. Figueroa), and an Operations representative (T. Jones). All of these individuals are familiar with the design and layout of the plant and plant documentation.
Seismic Walkdown The primary seismic walkdown was conducted with two teams, each with two qualified structural/seismic engineers.
The Peer Review of the walkdowns consisted of a Peer Review Team Lead with Operations and PRA knowledge, and structural/seismic engineers.
The structural/seismic engineers made up the SWE teams, but also served to peer review each other's work. The Peer Review Team Lead also participated in many of the walkdowns for logistical support as well as peer review. The ultimate judgments regarding licensing basis were made by qualified PTN structural engineers.
* Seismic Walkdown Engineers (SWE):-SWE Team #1 -J. O'Sullivan (team lead), T. Satyan Sharma-SWE Team #2 -S. Baker (team lead), C. Figueroa* PR Team Lead -A. Restrepo" PR SWE Team A -S. Baker (team lead), C. Figueroa" PR SWE Team B -J. O'Sullivan (team lead), T. Satyan Sharma* Licensing Basis Reviewers
-T. Satyan Sharma, C. Figueroa" IPEEE Reviewers-A. Restrepo Final Report The final seismic walkdown report was prepared by the Stevenson
& Assoc. consultants, with review by Turkey Point representatives from Operations, design structural engineering, and PRA." Preparers-J.
O'Sullivan, S. Baker" Reviewers
-T. Satyan Sharma, C. Figueroa F-4
: 4. PEER REVIEW -SELECTION OF COMPONENTS FOR SWEL The purpose of this section is to describe the process to perform the peer review of the selected components that were included in the Seismic Walkdown Equipment List (SWEL). This peer review was based on review of the SWEL Selection Report (REF 2)The guidance in Section 3: Selection of SSCs of the EPRI Technical Report (REF 1) was used as the basis for this review. Specifically, this peer review utilized the checklist in Appendix F: Checklist for Peer Review of SSC Selection of the EPRI Technical Report in Reference 1.Attachment 1 of this peer review report documents the completed checklist.
This peer review determined that the SSCs selected for the SWEL 1 seismic walkdowns represent a diverse sample of equipment required to perform the five safety functions and to meet the sample selection attributes, including: " Various types of systems" Major new and replacement equipment" Various types of equipment* Various environments" Equipment enhanced based on the findings of the IPEEE" Risk insight consideration For SWEL 2 development, the peer review determined that spent fuel related items were adequately considered and were appropriately included or excluded.This peer review resulted in no additional findings.
All peer review comments requiring resolution were incorporated prior to completion of the SWEL Selection Report.This peer review concludes that the process for selecting SSCs to be included on the Seismic Walkdown Equipment List appropriately followed the process outlined in Reference
: 1. It is further concluded that the SWEL sufficiently represents
: a. broad population of plant Seismic Category 1 equipment and systems to meet the objectives of the NRC 50.54(f) Letter.F-5
: 5. PEER REVIEW -SEISMIC WALKDOWN The peer review of the seismic walkdown was performed by the PR Teams on September 11-20, following the walkdowns for those days. Additional peer reviews occurred following the walkdowns as documented in this report.5.1 Review of Sample Checklists
& Area Walk-bys The peer review meetings consisted of each SWE Team (#1 and #2) presenting samples from their Seismic Walkdown Checklist (SWC) and Area Walk-by Checklist (AWC) that they had completed earlier that day. This peer review meeting following the day's walkdown activities allowed for immediate feedback between each walkdown team as well as common agreement on how some issues would be addressed.
Table 5-1 lists the sample of 14 components from each unit from the Seismic Walkdown Checklist (SWC) that were discussed in the peer review meetings.
These samples represent about 14% of each unit's SWEL population of 100 components.
The sample includes a variety of types of components (heat exchanger, valve, pump, tank, instrument rack, unit sub, transformer, fan, MCC, compressor, power panel, and control panel) and component locations (RHR pits, intake, RCA, DG Bldg, and Essential Switchgear room).Table 5-1 also lists the sample of 6 areas per unit from the Area Walk-by Checklist (AWC) that were discussed in the peer review. These samples represent about 20% of the total AWC population of 30 areas.When reviewing the components and areas during the afternoon peer review sessions, the following topics were addressed:
* Concrete cracks -For each team, concrete cracks were observed in the concrete floors where components were anchored.
Since the guidance does not give discretion for the significance of the crack, the peer review team agreed that the concrete cracks near anchorage should be recorded as "U" (unresolved).
Then, following further review, these findings could be changed to "YES" for minor surface cracks or "NO" for concrete crack near anchorage that may need further review." Physical interaction
-Several of the samples were examples of close spacing between the SWEL component and a hard object (such as a hand rail), with the potential for interaction.
In each case, the spacing was judged adequate, but this did reinforce the importance of careful field examination of each component." Seismic housekeeping
-Seismic housekeeping was assessed in each area and found to be acceptable.
Storage boxes were tied off or separated from equipment in designated areas.The presence of stanchions to rope off the protected train equipment was noted. It was agreed that these do not represent significant seismic risk due to the weight distribution (heavy base) and the light-weight nature of these stanchions.
F-6
" Seismic scaffolding
-A number of areas had scaffolding.
In each case, the scaffolding.
was carefully braced to provide seismic strength and documented on the scaffolding.
This was observed by both walkdown teams." Non-safety piping in SR buildings
-NS piping in all walk-by areas was observed to be well supported.
 
===5.2 Review===
of Licensing Basis Evaluations&
Corrective Action Process The final report provides a list of the anomalies encountered during the Turkey Point seismic walkdown inspections and how they were addressed.
The review of those anomalies demonstrates a thorough and reasonable process for the review of open issues. There were no added comments offered by the peer review team.6. REVIEW FINAL SUBMITTAL REPORT & SIGN-OFF The final submittal report has been reviewed by Turkey Point representatives from structural engineering, Operations, and the PRA Group, and found to meet the requirements of the EPRI 1025286 -Seismic Walkdown Guidance (REF. 1)7. REFERENCES
: 1. EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, June 2012.2. Turkey Point Report, Selection of the Turkey Point Nuclear Station Seismic Walkdown Equipment List (SWEL) for the Requirement 2.3 Walkdown, Rev 01, September 2012.F-7 Table 5-1: Table of Sample Components from Seismic Walkdown Checklist (SWC)Walkdown Team (PR Team) EquipmentiIdentification Walkby Area Identification Unit 3 -SWE Team #1 LT-3-651 (PR Team A) HCV-3-121 209 3B08 220 3P212A EMERG SPF CLG PMP 3-797 3E207B 202 Unit 3 -SWE Team #2 3P9B 370 (PR Team B) 3T36 3C23A 3B05 3K4B 409 3DO3 3S77 234 Unit 4 -SWE Team #1 4B07 (PR Team A) T205C 4E208A 4P212A 223 4E206B 210 4T1 217 4P214B Unit 4 -SWE Team #2 4C23A 368 (PR Team B) 4k4A 4T8 4T259A 432 4X05 4C12A 4QR35 310 F-8 ATTACHMENT 1: PEER REVIEW CHECKLIST Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6:- Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Were the five safety functions adequately represented in the SWEL 1 selection?
YOI NEIl V~equirement met.1 I~mrks: 2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
: a. Various types of systems? YO NEil Fequirement met.!b. Major new and replacement equipment?
YO NEI rrequirement met.]IRemarks.c. Various types of equipment?
YO NEI P~equirement met.] d. Various environments?
YM NEL met.!e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YN NEIl gRequirement metL'Remarks~i F-9 Peer Review Checklist for SWEL f. Were risk insights considered in the development of SWEL 1? YN NO]3. For SWEL 2: a. Were spent fuel pool related items considered, and if applicable included in SWEL 2? Y[ NEI b. Was an appropriate justification documented for spent fuel pool related items not included in SWEL 2?YN NE ReniaetP, 4. Provide any other comments related to the peer review of the SWELs.5. Have all peer review comments been adequately addressed in the final SWEL? YZ NE-Peer Reviewer#1: Peer Reviewer#2: Carlos Figueroa Y~1ytf 2"r-a Date: Vol IzS-\7-F-I 0 12Q4117-RPT-002 Rev. I SEISMIC WALKDOWN REPORT IN RESPONSE TO THE 50.54(f) INFORMATION REQUEST REGARDING FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.3: SEISMIC For TURKEY POINT UNIT 4 NRC Docket No. 50-251 Florida Power & Light Company Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 Prepared by: Stevenson
& Associates 275 Mishawum Road, Suite 200'Wobum, MA 01801 Submittal Date: November 2012 Preparer: Reviewer: Approver: Site Sponsor: Name & Title John J. O'Sullivan Senior Consultant Seth Baker Senior Engineer Walter Djordjevic Senior Consultant Sergio Chaviano Special Projects Manager, Site Fukushima Lead Affiliation Signature S&A S&A S&A FPL c 3)/Date I lai -
Contents L is t o f T a b le s ..............................................................................................
..........
iii Executive Sum mary ..............................................................................................
iv I Introduction
..........................................................................................................................
I 1 .1 B a c k g ro u n d .......................................................................
I .........................................
1 1.2 Plant Overview .....................................................................................................
1 1 .3 A p p ro a c h ....................................................................................................................
1 2 Seism ic Licensing Basis ................................................................................................
2 2.1 Site Seism icity ....................................................................................................
2 2.2 Seism ic Design Basis .............................................................................................
2 2.3 USI A-46 and Seismic IPEEE ...............................................................................
3 3 Personnel Qualifications
...........................................................................
........................
5 3 .1 O v e rv ie w ..............................
.....................................................................................
5 3.2 Project Personnel
...................................................................................................
5 3.3 Equipment Selection Personnel
.............................................................................
6 3.4 Seism ic W alkdown Engineers
................................................................................
6 3.5 Licensing Basis Reviewers
.........................................
 
====6.3.6 IPEEE====
Reviewers
...................................................................................................
6 3.7 Peer Review Team ................................................................................................
6 3.8 Additional Personnel
..............................................................................................
6 4 Selection of SSCs ......................................................................................................
7 5 Seism ic W alkdowns and Area W alk-Bys ....................................................................
8 5 .1 O v e rv ie w ....................................................................................................................
8 5.2 Seism ic W alkdowns ...............................................................................................
8 5.3 Area W alk-Bys .....................................................................................................
29 6 Licensing Basis Evaluations
......................................................................................
34 7 IPEEE Vulnerabilities Resolution Report ................................................................
35 8 Peer Review .....................................................................................................................
41 9 References
.......................................................................................................................
42 A Project Personnel Resumes and SWE Certificates
....................................................
A-1 B SWEL Selection Report .............................................................................................
B-1 C Seismic W alkdown Checklists (SWCs) ...................................................................
C-1 D Area Walk-By Checklists (AWCs) ............................................................................
D-1 E Plan for Future Seismic Walkdown of Inaccessible Equipment
............................
E-1 F Peer Review Report ...................................................................................................
F-1 ii List of Tables T able 3-1: P ersonnel R oles .....................................................................................
5 Table 5-1: Anchorage Configuration Confirmation
................................
10 Table 5-2:Table of Actions Resulting from Seismic Walkdown Inspection
.........................
13 Table 5-3:Table of Actions Resulting from Area Walk-by Inspections
..............................
32 Table 7-1: U SI A-46 O utlier Resolution
.....................................................................
36 iii Executive Summary The purpose of this report is to provide information as requested by the Nuclear Regulatory Commission (NRC) in its March 12, 2012 letter issued to all power reactor licensees and holders of construction permits in active or deferred status. (Ref. 12) In particular, this report provides information requested to address Enclosure 3, Recommendation 2.3: Seismic, of the March 12, 2012 letter. (Ref. 12)The 50.54(f) letter requires, in part, all U.S. nuclear power plants to perform seismic walkdowns to verify the current plant configuration is within the current seismic licensing basis and identify and address degraded, non-conforming or unanalyzed conditions found. This report documents the seismic walkdowns performed at Turkey Point Unit 4 in response, in part, to the 50.54(o letter issued by the NRC.The Nuclear Energy Institute (NEI), supported by industry personnel, cooperated with the NRC to prepare guidance for conducting seismic walkdowns as required in the 50.54(f) letter, Enclosure 3, Recommendation 2.3: Seismic. (Ref.12).
The guidelines and procedures prepared by NEI and endorsed by the NRC were published through the Electric Power Research Institute (EPRI) as EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012; henceforth, referred to as the "EPRI guidance document." (Ref. 1) Turkey Point has utilized this NRC endorsed guidance as the basis for the seismic walkdowns and this report. (Ref. 1)The EPRI guidance document was used to perform the engineering walkdowns and evaluations described in this report. In accordance with the EPRI guidance document, the following topics are addressed in the subsequent sections of this report.* Seismic Licensing Basis" Personnel Qualifications
* Selection of Systems, Structures, and Components (SSC)* Seismic Walkdowns and Area Walk-Bys* Seismic Licensing Basis Evaluations" IPEEE Vulnerabilities Resolution Report" Peer Review Seismic Licensing Basis The safe shutdown earthquake for the Turkey Point site is 0.15g horizontal ground acceleration and 0.10 g vertical ground acceleration. (Ref. 2, Section 2)iv Personnel Qualifications The walkdown team consisted of experienced site personnel with Civil/Structural or Mechanical Engineering, Operations and PRA backgrounds.
The site personnel were supplemented by two vendors with significant experience in the area of seismic design and the performance of seismic walkdowns.
The personnel who performed the key activities required to fulfill the objectives and requirements of the 50.54(f) letter are qualified and trained as required in the EPRI guidance document (Ref. 1).Selection of SSCs Ninety-eight (98) components were selected for the walkdown effort, including spent fuel pool items. These components were selected using the process described in detail in the EPRI guidance document, Section 3: Selection of SSCs. (Ref. 1)Seismic Walkdowns and Area Walk-Bys Section 5, Appendix C, and Appendix D of this report documents the equipment Seismic Walkdowns and the Area Walk-Bys.
The online seismic walkclowns for Turkey Point Unit 4 were performed September 17-21, 2012. The walkdown team consisted of two 2-person Seismic Walkdown Engineer (SWE) teams.The seismic walkdown team inspected 88 of the 98 components on the seismic walkdown equipment list (comprised of SWEL 1 and SWEL 2). Ten components were inaccessible and future walkdowns are planned for these items. Follow-up inspections are also to be performed on electrical panels that could not be opened at the time of the initial walkdown.Equipment Seismic Walkdowns included anchorage inspections and checks to verify as-found anchorages are consistent with design documents.
The walkdown found cases where the as-found anchorage was not consistent with the design document.
In other cases the document identifying anchorage design could not be identified.
Instances of anchor corrosion were cited, but the extent of corrosion is not a seismic capacity concern at this time. Except for the item E16A air handling unit (AH U), no concerns with overall anchorage strength were identified.
The E16A AHU was found to be lacking positive base anchorage.
The operability of the unit was addressed and the unit was found to be operable.Potential seismic interaction concerns were identified but none of the issues were considered to be hazards that rendered equipment inoperable.
Other equipment interaction issues are related to clearances between equipment and adjacent items and improper seismic housekeeping.
Loose or missing hardware, such as loose thumbscrews or latches, were found and cited under "Other" potentially adverse conditions.
Area Walk-Bys identified potentially adverse conditions relate to improper seismic housekeeping.
Potential seismic interaction concerns were also identified but none of the issues were considered to be significant immediate hazards. In some cases potential relay chatter due to bumping of equipment is cited. Potential relay chatter issue is undesirable but the overall plant hazard related to relay chatter is typically low.For the Turkey Point USI A-46 evaluation (Reference 9), relay chatter was dismissed as a concern. One potential seismically-induced spray hazard was cited as requiring evaluation.
v Seismic Licensina Basis Evaluations Conditions identified during the walkdowns were documented on the Seismic Walkdown Checklists (SWCs) and the Area Walkdown Checklists (AWCs), and entered into the CAP. For those conditions that operability or functionality could not be screened as acceptable, evaluations were initiated to demonstrate that the current licensing basis was met. Tables 5-2 and 5-3 in the report provide a summary of the conditions and the actions taken.IPEEE Vulnerabilities In lieu of a full IPEEE seismic analysis, FPL opted to submit a "scaled back" program to resolve USI A-46 and Generic Letter 87-02 as allowed by the NRC in a letter dated November 4, 1998 (Ref. 13) issued for the review of Turkey Point IPEEE evaluations.
The final results of this scaled back program for the A-46 program were submitted in a letter to the NRC, L-93-155, "Final Report of Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolved USI A-46 and GL 87-02" (Ref. 14). The components selected for this analysis were also included in the SWEL in order to verify no outlier issues persisted.
Peer Reviews The Peer Review of the walkdowns consisted of two teams made up of Operations.
and PRA representatives and engineers with knowledge and experience in seismic inspections and assessments.
The engineers made up the SWE teams, but also served to peer review each other's work. The Operations and PRA representatives also participated in some of the walkdowns for logistical support as well as peer review.Appendix F of this report contains a summary of the Peer Review. The Peer Review determined that the objectives and requirements of the 50.54(f) letter are met. Further, it was concluded by the peer reviews that the efforts completed and documented within this report are in accordance with the EPRI guidance document.Summary In summary, seismic walkdowns have been completed at Turkey Point Unit 4 in accordance with the NRC endorsed walkdown methodology.
All potentially degraded, nonconforming, or unanalyzed conditions identified as a result of the seismic walkdowns have been entered into the corrective action program. None of the conditions found resulted in loss of operability or functionality of any structures, systems or components.
Follow-on activities required to complete the efforts to address Enclosure 3 of the 50.54(f) letter include inspection of items deferred due to inaccessibility along with supplemental inspections of electrical cabinets.
Area Walk-Bys will be complete, as required, during these follow-on activities.
vi 1 Introduction
 
==1.1 BACKGROUND==
 
In response to Near-Term Task Force (NTTF) Recommendation 2.3, the Nuclear Regulatory Commission (NRC) issued a 10CFR50.54(f) letter on March 12, 2012 requesting that all licensees perform seismic walkdowns to identify and address plant degraded, non-conforming, or unanalyzed conditions, with respect to the current seismic licensing basis. The Nuclear Energy Institute (NEI), through the Electric Power Research Institute (EPRI), prepared industry guidance to assist licensees in responding to this NRC request. The industry guidance document, EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012 (Reference 1), was endorsed by the NRC on May 31, 2012. NextEra/Florida Power & Light Company (FPL)has committed to using.this guidance as the basis for completing the walkdown effort.-1.2 PLANT OVERVIEW The Turkey Point (PTN) site is located on the west shore of Biscayne Bay in Dade County, Florida. The site is 25 miles south of Miami and eight miles east of Florida City.The site contains two fossil units (Unit 1 and 2), two nuclear units (Units 3 and 4), and one combined cycle gas-powered unit (Unit 5). The plant's nuclear steam supply system (NSSS) was designed by Westinghouse Electric Corporation.
The Containment structure and balance of plant was designed by Bechtel Corporation.
The general description of the plant given above is based on the information in the UFSAR (Reference 2).1.3 APPROACH The EPRI Seismic Walkdown Guidance (Reference
: 1) was used for the seismic walkdowns and evaluations described in this report. In accordance with Reference 1, the following topics are addressed in the subsequent sections of this report: " Seismic Licensing Basis* Personnel Qualifications" Selection of SSCs" Seismic Walkdowns and Area Walk-Bys* Licensing Basis Evaluations
* IPEEE Vulnerabilities Resolution Report" Peer Review 1 2 Seismic Licensing Basis 2.1 SITE SEISMICITY Site seismicity is discussed in UFSAR (Reference
: 2) Section 2. On the basis of historical or statistical seismic activity, Turkey Point is located in a seismically inactive area, far from any recorded damaging shocks. Even though several of the larger historical earthquakes may have been felt in southern Florida, the amount of ground motion caused by them was not great enough to cause damage to any moderately well-built structure.
Predicated on history, building codes, geologic conditions, and earthquake probability, the design earthquake was conservatively established as 0.05 g horizontal ground acceleration.
The nuclear units have also been evaluated for a 0.15 g ground acceleration to assure no loss of function of the vital systems and structures.
Vertical acceleration is taken as 2/3 of the horizontal value and is considered to act concurrently.
 
===2.2 SEISMIC===
DESIGN BASIS The seismic design was based on the acceleration ground response spectrum curves shown in UFSAR Figures 5A-1 and 5A-2. The curves were derived from the "Housner Spectrum" normalized to 0.05g for the design earthquake and 0.15g for the maximum earthquake.
The UFSAR commitment for a maximum earthquake was determined at a time when probabilistic definition of seismic input had not been developed with any degree of consistency or confidence.
Therefore, the 0.15g PGA was conservatively estimated based on very limited data available at the time.The original design basis commits Turkey Point to the 1967 proposed version of General Design Criterion (GDC) Number 2 that relates to earthquake natural phenomena as identified below and is as follows: "Those systems and components of reactor facilities which are essential to the prevention or to the mitigation of the consequences of nuclear accidents which could cause undue risk to the health and safety of the public shall be designed, fabricated, and erected to performance standards that will enable such systems and components to withstand, without undue risk to the health and safety of the public the forces that might reasonably be imposed by the occurrence of an extraordinary natural phenomenon such as earthquake, tornado, flooding condition, high wind or heavy ice.The design bases so established shall reflect: (a) appropriate consideration of the most severe of these natural phenomena that have been officially recorded for the site and the surrounding area and (b) an appropriate margin for withstanding forces greater than those recorded to reflect uncertainties about the historical data and their suitability as a basis for design." 2 AEC Publication TID-7024 (Reference
: 4) was used as the basic design guide for earthquake analysis.
Floor response spectra were developed from the ground spectra for the Containment Buildings and Control Building to evaluate structures, systems, and components at the various elevations of those structures.
Earthquake forces were applied simultaneously in the vertical and any horizontal direction.
The vertical component of acceleration at any level was taken as two-thirds of the horizontal ground acceleration.
The damping factors for various types of construction are listed in Reference 2, Appendix 5A.For concrete structures and components, the basic code for determining the section strengths for original design was ACI 318-63 (Reference 5). For steel structures and components, the basic code for determining the section strengths was the AISC Steel Construction Manual, 6th Edition (Reference 6). Later codes were used for plant upgrades.
Design requirement for equipment varied by equipment type. The mechanical and electrical equipment were purchased under specifications that include a description of the seismic design criteria for the plant. Motor control centers and load centers were shake table tested to demonstrate no-loss-of-function capacity under the maximum hypothetical earthquake.
The Turkey Point units were within the scope of NRC unresolved safety issue (USI) A-46 (Reference 7), which required a re-evaluation of safety-related mechanical and electrical equipment.
At about the same time the NRC asked all operating power plants to undertake an investigation of design capability to extreme external events (Reference 8).Turkey Point resolved these issues as discussed in the next section. Resolution included implementation of seismic design improvements.
2.3 USI A-46 AND SEISMIC IPEEE Generic Letter 87-02, "Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46" (Reference 7)addressed seismic adequacy of equipment at older nuclear plants. Turkey Point Units 3 and 4 were within the scope of USI A-46.The evaluation of Turkey Point for resolution of USI A-46 is reported in Reference 9.FPL developed and implemented a plant specific program to satisfy requirements of USI A-46 as agreed between FPL and the USNRC. The program consisted of developing a walkdown procedure that concentrated on anchorage concerns of USI A-46, the seismic spatial interaction concerns of USI A-17 and the design concerns for large tanks in USI A-40. The program was developed by FPL to be appropriate, and cost effective for addressing GL87-02 concerns at its low seismic sites. The basic requirement for the walkdown was that the equipment be able to withstand the design basis SSE at the plant and still provide its safe shutdown function.
The procedure used relied on the judgment of an expert team to meet the basic requirement.
A success path of equipment using safety and non-safety equipment was selected for achieving hot shutdown of the plant within a period of 8 hours.An assessment of the anchorage adequacy was performed on each equipment item included on the safe shutdown list. This included an assessment of the seismic demand on the equipment anchorage (forces and stresses on the anchorage), the seismic capacity of the. anchorage components (attachment of the equipment to the anchorage, 3 the anchorage itself, and the development of the anchorage to the foundation), and whether the capacity of the weak link of the anchorage system exceeded the demand.A seismic spatial interaction assessment was performed on each equipment item included on the safe shutdown list. The following seismic spatial interaction issues were evaluated:
: 1) heavy objects falling (sometimes referred to as II over I interactions), 2)heavy objects sliding, swinging, vibrating or tipping (proximity interactions) and 3)inadequate flexibility of lines to accommodate seismic-induced relative movements between utility support points. An assessment was made as to whether possible interactions existed, and if it did, could the interaction preclude the equipment item from performing a safe shutdown function.
Those interactions identified as possibly precluding the equipment item's safe shutdown function were identified as outliers.The walkdown resulted in the identification of outlier equipment items with the majority of the outliers being lack of anchorage for electrical cabinets which were not previously required to be anchored.
FPL addressed all outlier issues listed and the actions taken are listed in Reference 9 Table 5.0. In many cases, FPL engineering generated Plant Change/Modification (PC/M) Packages which provided for physical modification to plant equipment resulting in additional seismic "hardening" of the equipment.
Generic Letter 88-20, Supplement 4, "Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities" (Reference 8), addressed plant-specific vulnerabilities to severe accidents.
For implementation of the IPEEE, Turkey Point was classified as a "reduced scope" plant per NUREG-1407 (Reference1O).
As such, the review level earthquake was equal to the site SSE and completion of the USI A-46 assessment largely satisfied the seismic IPEEE requirements.
FPL informed the NRC that the plant specific program developed for USI A-46 would be used to resolve GL 88-20 Supplement 4 at Turkey Point (see Reference 11).4 3 Personnel Qualifications
 
===3.1 OVERVIEW===
This section of the report identifies the personnel who participated in the NTTF 2.3 Seismic Walkdown efforts. A description of the responsibilities of each Seismic Walkdown participant's role(s) is provided in Section 2 of the EPRI Seismic Walkdown Guidance (Reference 1). Resumes contained in Appendix A provide detailed personnel qualifications information.
 
===3.2 PROJECT===
PERSONNEL Table 3-1 below summarizes the names and corresponding roles of personnel who participated in the NTTF 2.3 Seismic Walkdown effort.Table 3-1. Personnel Roles E Seismic Licensing Equipment Plant Walkdown Basis IPEEE Peer Name SelectionBai Engineer Ops. Engineer Reviewer Reviewer Reviewer (SWE)C. Figueroa X X X X(note 2)T. Satyan- X X X X(note 2)Sharma G. Tullidge X X A. Restrepo X X X(note 1)T. Jones X X J. O'Sullivan X X X(note 2)S. Baker X X X(note 2)Notes: 1. Peer Review Team Leader 2. Provided peer review of a sample of other SWE team's SWCs & AWCs.5
 
===3.3 EQUIPMENT===
 
SELECTION PERSONNEL The SWEL development was performed by a the Peer Review Team Lead member of the PRA Group. The SWEL was then independently reviewed by another member of the PRA Group, by Operations, and finally by Peer Reviewers from Engineering.
 
===3.4 SEISMIC===
WALKDOWN ENGINEERS The seismic walkdowns were performed by four seismic walkdown engineers (SWEs)grouped into two seismic walkdown teams (SWTs).The lead SWEs are engineers from Stevenson and Associates (S&A). S&A is recognized internationally as a leading seismic consultant to the nuclear industry and as a regular contributor to the advancement of earthquake engineering knowledge through funded research projects.
The professional staff has expertise and capabilities in earthquake engineering, structural dynamics, and structural design. S&A has performed seismic evaluations of US nuclear power plants, using either Seismic Probabilistic Risk Assessment (PRA) or Seismic Margin Assessment, to address US Nuclear Regulatory Commission (NRC) Individual Plant Evaluation for External Events (IPEEE) for over 35 US and European plants.3.5 LICENSING BASIS REVIEWERS The Licensing Basis Reviewers consisted of the four seismic walkdown engineers.
The FPL engineers had the lead in licensing basis determinations, with support from the S&A engineers.
 
===3.6 IPEEE===
REVIEWERS IPEEE reviewers were engineers familiar with implementation of IPEEE at the Turkey Point site. The IPEEE Reviewers also participated in the SWEL preparation and seismic walkdowns.
3.7 PEER REVIEW TEAM The Peer Review Team is listed, along with their roles and qualifications, in the Peer Review Report included in Appendix F.3.8 ADDITIONAL PERSONNEL Operations personnel also provided support to the walkdown by reviewing the list of components for accessibility and accompanying the SWTs to open cabinet doors for accessibility to anchorage.
6 4, Selection of SSCs The Seismic Walkdown Equipment List is documented in the SWEL Selection Report, provided in Appendix B. This report describes how the SWEL was developed to meet the requirements of EPRI Seismic Walkdown Guidance (Reference 1). The summary of the Seismic Walkdown Equipment List is included in Appendix C under Table C-1 Summary of Seismic Walk~down Checklists.
The final SWEL (both SWEL 01 & SWEL 02)which details all of the component attributes used in the screening process, as well as the Master Component List, are on-file.7 5 Seismic Walkdowns and Area Walk-Bys 5.1 OVERVIEW The Seismic Walkdowns and Area Walk-Bys were conducted by 2-person teams of trained Seismic Walkdown Engineers, in accordance with the EPRI Seismic Walkdown Guidance (Reference 1). The walkdowns occurred on September 17-21, 2012.Components in the Containment building were inaccessible and will be inspected prior to the end of the first quarter in 2013 which falls within the window of the next refueling outage. The Seismic Walkdowns and Area Walk-Bys are discussed in more detail in the following sections.5.2 SEISMIC WALKDOWNS The Seismic Walkdowns focused on the seismic adequacy of the items on the SWEL as provided in Appendix B of this report. The Seismic Walkdowns also evaluated the potential for nearby SSCs to cause adverse seismic interactions with the SWEL items.The Seismic Walkdowns focused on the following adverse seismic conditions associated with the subject item of equipment:
* Adverse anchorage conditions
* Adverse seismic spatial interactions a Other adverse seismic conditions The results of the Seismic Walkdowns have been documented on the Seismic Walkdown Checklist (SWC) provided in the EPRI guidance document, Appendix C.Seismic Walkdowns were performed for 88 of the 98 items identified on the Turkey Point Unit 4 SWEL. The remaining items will be inspected in the refueling outage as previously noted. The associated SWCs are provided in Appendix C of this report.Additionally, photos have been included with most SWCs to provide a visual record of the item along with any comments noted on the SWC. These photos are not included to limit the size of this report but are on file. Drawings and other plant records are cited in some of the SWCs, but are not included with the SWCs because they are readily retrievable documents through the station's document management system.Inspection for certain items could not be completed due to access restrictions.
Appendix E of this report identifies the inaccessible equipment along with the plan for future Seismic Walkdowns.
The following subsections describe the approach followed by the SWEs to identify potentially adverse anchorage conditions, adverse seismic interactions, and other adverse seismic conditions during the Seismic Walkdowns.
8
 
====5.2.1 Adverse====
Anchorage Conditions Guidance for identifying anchorage that could be degraded, non-conforming, or unanalyzed relied on visual inspections of the anchorage and verification of anchorage configuration.
Details for these two types of evaluations are provided in the following two subsections.
The evaluation of potentially adverse anchorage conditions described in this subsection applies to the anchorage connections that attach the identified item of equipment to the civil structure on which it is mounted. For example, the welded connections that secure the base of a Motor Control Center (MCC) to the steel embedment in the concrete floor would be evaluated in this subsection.
Evaluation of the connections that secure components within the MCC is covered later in the subsection "Other Adverse Seismic Conditions." Visual Inspections The purpose of the visual inspections was to identify whether any of the following potentially adverse anchorage conditions were present:* Bent, broken, missing, or loose hardware* Corrosion that is more than mild surface oxidation* Visible cracks in the concrete near the anchors* Other potentially adverse seismic conditions Based on the results of the visual inspection, the SWEs judged whether the anchorage was potentially degraded, non-conforming, or unanalyzed.
The results of the visual inspection were documented on the SWC, as appropriate.
If there was clearly no evidence of degraded, nonconforming, or unanalyzed conditions, then it was indicated on the checklist and a licensing basis evaluation was not necessary.
However, if it was not possible to judge whether the anchorage is degraded, nonconforming, or unanalyzed, then the condition was entered into the Corrective Action Program as a potentially adverse seismic condition for further evaluation.
Additionally, any significant comments are noted on the SWCs. Drawings and other plant design documents are cited in some of the SWCs, but they are not included with the SWCs because they are readily available in the plant's electronic document management system.5.2.2 Anchorage Configuration Confirmation As required by the EPRI Seismic Walkdown Guidance (Reference 1, page 4-3), at least 50% of the items were confirmed to be anchored consistent with design drawings.
Line-mounted equipment (e.g., valves mounted on pipelines without separate anchorage) was notevaluated for anchorage adequacy and was not counted in establishing the 50%sample size.Examples of documentation that was considered to verify that the anchorage installation configurations are consistent with the plant documentation include the following:
* Design drawings" Seismic qualification reports of analyses or shake table tests 9 The SWC listed in Appendix C indicate the anchorage verification status for components as follows: N/A: component that is line-mounted and/or is not anchored to the civil structure and therefore does not count in the anchorage confirmation total.Y: component that is anchored to the civil structure and was chosen for anchorage configuration confirmation.
N: component which had anchorage but was not chosen for anchorage configuration confirmation.
See Table 5-1 below for the accounting of the 50% anchorage configuration confirmations, and the individual SWC forms in Appendix C for the specific documents used in each confirmation.
Total Items Chosen includes two deferred items.Table 5-1 :Anchorage Configuration Confirmation Total SWEL SWEL Items Minimum Total Items Items without Required Chosen Anchorage (N/A)98 29 35 37 5.2.3 Adverse Seismic Spatial Interactions An adverse seismic spatial interaction is the physical interaction between the SWEL item and a nearby SSC caused by relative motion between the two during an earthquake.
An inspection was performed in the area adjacent to and surrounding the SWEL item to identify any seismic interaction conditions that could adversely affect the capability of that SWEL item to perform its intended safety-related functions.
The three types of seismic spatial interaction effects that were considered are: " Proximity" Failure and falling of SSCs (Seismic II over I)o Flexibility of attached lines and cables Detailed guidance for evaluating each of these types of seismic spatial interactions is described in the EPRI guidance document, Appendix D: Seismic Spatial Interaction.
The Seismic Walkdown Engineers exercised their judgment to identify seismic interaction hazards. Section 5.2.5 provides a summary of issues identified during the Seismic Walkdowns.
 
====5.2.4 Other====
Adverse Seismic Conditions In addition to adverse anchorage conditions and adverse seismic interactions, described above, other potentially adverse seismic conditions that could challenge the seismic adequacy of a SWEL item were evaluated.
These inspections were mostly associated 10 with in-cabinet inspections of selected electrical equipment.
Examples of the types of conditions that could pose potentially adverse seismic conditions include the following: " Degraded conditions" Loose or missing fasteners that secure internal or external components to equipment" Large, heavy components mounted on a cabinet that are not typically included by the original equipment manufacturer
* Cabinet doors or panels that are not latched or fastened Any identified other adverse seismic conditions are documented on the items' SWC and Table 5-2, as applicable.
 
====5.2.5 Issues====
Identification during Seismic Walkdowns Table 5-2 provides a summary of issues identified during the equipment Seismic Walkdowns and recorded on SWCs. The tracking of issue resolution is identified in the table. Items are grouped based on the walkdown issue cited: " Anchorage issues* Seismic interaction issues" Other conditions
* Anchorage documentation not available" Anchorage inspection could not be fully completed Many of the potentially adverse anchorage conditions found are related to documentation of as-found anchorage.
In those cases either the as-found anchorage was not consistent with the available document, or the document identifying the anchorage design could not be identified.
Except for the item E16A air handling unit (AHU), no immediate concerns with overall anchorage strength were identified.
There are instances where anchor corrosion is cited, but the extent of corrosion is not an immediate seismic capacity concern. The E16A AHU was found to be lacking positive base anchorage.
Low seismic ruggedness of attached piping was also cited as a concern. The operability of the unit was addressed and the unit was found to be operable.Potential seismic interaction concerns were identified but none of the issues were considered to be significant hazards but will be addressed to reduce risk. Most equipment interaction issues are related to clearances between equipment and adjacent items and improper seismic housekeeping.
Under good seismic housekeeping practice, transient and moveable items (e.g., ladders) should be restrained or stowed such that they will not slide into or fall against important plant equipment.
Loose or missing hardware, such as loose thumbscrews or latches, were found and cited under "Other" potentially adverse conditions.
For items -requiring anchorage verification, the SWC anchorage verification checklist item was set to "Unknown" if an anchorage design document could not be found.Notwithstanding, the configuration was assessed to ensure that there was no immediate operability concern. Also, anchorage checklist items were set to "Unknown" when the walkdown team could not see all anchors. For example, some anchors (relatively few)11 of control cabinets were covered by wiring. A comment is included on the corresponding SWC to explain that certain anchors out of the group could not be seen. Again, the configuration was assessed to establish that there was no immediate operability concern.12 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Potentially Adverse Seismic Entered Equipment IDndition Resolution Current Status Condition into CAP Anchorage Issues This is a top supported MCC located at a low elevation.
Item is subject to relatively low 4B07 seismic load with negligible tension on base Member sizes for struts of upper wall anchors.C-MCC supports are not consistent with The anchorage of the unit was upgraded as (CABINET) drawing 5614-C-1790 Sh. 3. Also, two part of USI A-46 resolution.entered missing bolts are seen internally at the into the corrective base anchorage and anchorage The corrosion is not an immediate capacity action program to configuration cannot be verified document the (required number of base anchors not the base shear load path. condition and identified).
Also there is corrosion at update the the lower back angles inside the MCC. Plant drawings and documents need to be documentation as Also a hairline crack in floor in front of Pla ng s to dcund nchorae warranted.
cubicle 40762 travels into the concrete changed to reflect as-found anchorage pad. configuration.
Perform maintenance to evaluate and correct MCC base corrosion.
As-found anchorage is approx. equivalent to 1tem was entered that shown on drawing. Also, Item was into the corretv 4DO3revewedforUSI
-46and nchragewasinto the corrective 4D03 Anchorage seen to be a mix of 5/8 reviewed for USI A-46 and anchorage was action program to and 3/8 diameter concrete expansion document the 4B BACKERY anchors (CEAs) each rack. Anchorage Plant drawings and documents need to be YES condition and RACK does not match 561 0-C-1 369. cha nge to rf cund nchorae update the changed to reflect as-found anchorage documentation as configuration,.aratd 13 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Entered Condition Resolution intoCurrent Status Item was entered As-found anchorage is approximately into the corrective 4D24 Anchorage seen to be a mix of 5/8 equivalent to that shown on drawing. Also, Item action program to and 1/2 diameter CEA's. Anchorage was reviewed for USI A-46 and anchorage was document the 4A BATTERY does not match 561 0-C-1 369. found to be acceptable.
YES condition and RACK update the Revise drawings to match as-found condition.
documentation as warranted.
Item was entered 4P9B Bolts have rust and there is some As-found anchorage is not significantly into the corrective flaking. Also top of anchor stud has degraded at this time. action program to INTAKE rust beyond surface for some anchors. YES document the COOLING Perform maintenance to clean the bolts. condition and WATER PUMP B address the corroded areas.Per PTN calculation PTN-BFJC-91-016 Item was entered anchorage strength is controlled by concrete into the corrective 4T1 pullout failure and there is substantial margin action program to Moderate corrosion on anchor bolts at with respect to bolt axial stress. Therefore it is YES document the REFUELING several locations., judged that as-found anchorage has not condition and I A, -rr o I &#xfd; .- ig lt-o-flxy r at this time o dto n R JTK .., d at this address the_ _ Perform maintenance.
corroded areas.14 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Entered Condition Resolutioninto CAP Current Status Per PTN calculation PTN-BFJC-91-016 Due to past corrosion, a group of 1-3/8 anc ulation BFJC-91-016 Item was entered anchors at the south and southwest anchorage strength is controlled by concrete into the corrective 4T8 pullout failure and there is substantial margin action program to CN NA with respect to bolt axial stress. Therefore it is dou m to areas where bolts enter the top of the judged that as-found anchorage has not YES condition, update STORAGE pad. The reduced strength of the bolts significantly degraded at this time.TANK needs to be verified as acceptable.
the documentation The bolts have been painted so Update PTN-FJC91016 to reflect as-found as warranted and ongoing corrosion does not appear to ate configura to reflecross address the be an issue. anchorage configuration (reduced cross corroded areas.sections for some bolts).4Y05 Item was entered 4Y05 As-found anchorage has substantial strength into the corrective STATIC and is not deficient given overall capacity of the action program to INVERTER 4C Anchorage is (5) x 5/8 diameter CEAs. currently installed one. document the 125 VDC/120 Anchorage does not match 5610-C- YES condition and VAC 7.5 KVA 652 Sh. 2. Plant drawings and documents need to be update the changed to reflect as-found anchorage update the confguraion.documentation as configuration.
warranted.
CONSOLE Item is a low-height cabinet with substantial Item was entered* into the corrective CONTROL Anchors along the cabinet front are anchorage.
As-found anchorage is judged to be action program to CONTROOM Anchors aong the cabinetwo front are not significantly degraded given overall capacity dcument th ROOM t%/mi~llv 9' nn Twn In in dcmn h CONTROL rear seen to be missing an anchor oY anchorage.
YES condition and CONSOLE (see empty holes). Plant drawings and documents need to be update the changed to reflect as-built configuration.
warranted.
15 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Item was entered in the corrective action E16A An analysis of the as-found condition was program. Per POD, performed and determined to be acceptable for the AHU is CONTROL Unit appears to be unanchored.
Feet its functionality for the seismic loading. considered ROOM AIR of unit appear to sit on vibration Operability of unit confirmed by prompt YES operable.
Further isolation pads (4 places). operability determination (POD). performed to determine if Evaluate and take corrective action, anchorage is needed to improve design margin.Even with floor crack, as-found anchorage has Item was entered 4D25 Floor crack seen in front area, may substantial strength and is not deficient given into the corrective continue near CEA at front. No cracks overall capacity of anchorage.
action program to 4A1 BATTERY seen in rear area.the CABAER Perform evaluation as-found anchorage condition and repair configuration with knockdown for crack. the concrete as needed.Item was entered Anchorage is welded to embedded As-found welded anchorage has substantial ite ete Ag-fiinl wpd~d~nr~n jgt~ni~iinto the corrective X05 steel. 4 of 6 welds are 4" long and 2 of strength and is not deficient given overall action program to 6 welds are about 2" long. capacity of this type of configuration.
dcument th 4160/480V YES cnt and TRANSFORMER Anchorage does not match drawing Plant drawings and documents need to be condition and FOR 480V LC 4B 561 O-E-9-35.
changed to reflect as-found anchorage documentation as configuration.
warranted.
16 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Resolution Entered Current Status SCondition into CAP Seismic Interaction Issues During A-46 4C04 walkdown, there were metal crate VERTICAL Ceiling tiles are plastic and light weight. ceilings.
It has been PANEL A Egg crate ceiling tiles above are not Therefore, the hazard imposed is judged to be replaced with light tied to framing and can fall on low. weight plastic.operators and soft targets. This issue YES was cited in USI A-46 inspection.
Review indicates that after USI A-46 inspection, Documents retrieval metal ceiling tiles were replaced with plastic for the closeout is ones. AR was written to verify issue close-out, being tracked in the corrective action program.During A-46 4C06_4C05 walkdown, there were metal crate VERTICAL E Ceiling tiles are plastic and light weight. As ceilings.
It has been PANEL B Egg crate ceiling tiles above are not such, the hazard imposed is judged to be low. replaced with light tied to framing and can fall onwehtosic operators and soft targets. This issue Review indicates that after USI A-46 inspection, YES w .was cited in USI A-46 inspection, metal ceiling tiles were replaced with plastic Documents retrieval ones. AR was written to verify issue close-out, for the closeout is being tracked in the corrective action program.17 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Potentially Adverse Seismic Resolution Entered Current Status Equipment ID Condition into CAP During A-46 walkdown, there CONSOLE were metal crate Ceiling tiles are plastic and light weight. As ceilings.
It has been CONTROL Egg crate ceiling tiles above are not such, the hazard imposed is judged to be low. replaced with light ROOM tied to framing and can fall onwegtpaic RoL operators and soft targets. This issue YES weight plastic.CONTROL was cited in USI A-46 inspection.
Review indicates that after USI A-46 inspection, CONSOLE metal ceiling tiles were replaced with plastic Documents retrieval ones. AR was written to verify issue close-out, for the closeout is being tracked in the corrective action program.Item was entered 4K4A Two pendulum lights above on-skid The condition is undesirable but the hazard is into the corrective panel at southwest may be a hazard. low. action program to 4A DIESEL Lights will bang against hard surfaces YES document the GENERATOR and light shade may fall and are a Verify shades are rugged and will not fall OR condition and potential hazard to soft targets on DG install safety wires to prevent shade from falling, implement the skid. resolution as noted No soft targets are vulnerable.
This is a seismic 4P203B housekeeping issue. Item was entered Linto the corrective Large cover plates for a nearby Condition was not considered to be an action program to BORIC ACID recessed area are stored next to the imdaehzr.YS dcmn h TRNFRpm.immediate hazard. YES document the TRANSFER pump. condition and Take actions to ensure existing seismic implement the housekeeping procedures are followed, resolution as noted 18 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Resolution Entered Condition into CAP Current Status Item was entered into the corrective HCV-4-121 Based on the difference in mass between the action program to Limit switch electrical elbow is within valve and the tubing, it is judged that the hazard document the CHG TO RCS 1/2" of an adjacent valve, to valve functionality is low. YES condition and CONTROL evaluate to VALVE Evaluate and increase the clearance as determine if needed. increased clearance is warranted.
Item was entered Considering the fact that valves are rugged and Ite correcte HCV-4-758 the difference in mass of the valve and the action program to Valve HCV-4-758 is in contact with the instrument line it was judged that the hazard to doum th HAND CNTL support for instrument air line at the valve functionality is low. YES condition and VLV FOR RHR floor level. evaluateito HX FLOW CNTL Verify valve ruggedness for impact load OR etermine if increase clearance to an acceptable level. increased clearance is warranted.
Considering the fact that gear box is a rugged Item was entered M-OV-4-350 component and the difference in mass of the actiotn prramto gear box and the electrical conduit, it was document the EMERGENCY Gearbox is approximately 3/4" from an judged that the hazard to the gear box YScnt and BORATION adjacent electrical conduit. functionality is low. YES condition and CONTROL ,evaluate to.CONTROLdetermine if VALVE Verify the electrical conduit interface load is low i ederane OR increase clearance to an acceptable level, is warranted.
19 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Potentially Adverse Seismic Resolution Entered Current Status Equipment ID Condition into CAP Other conditions Per field walkdown post-inspection it was determined that the subject lift trolley and the associated metal hook are always retracted into the rail housing. As such, a banging against the stop is unlikely to occur. In addition, the stop is Item was entered 4B50 Lift trolley on roof of cabinet appears welded to the rail housing. Therefore, isolated into the corrective unretraied sde-t-sid andmay from the rigid upper frame of the cabinet withacinpormt 4H LOAD unrestrained side-to-side and may electrical equipment inside, action program to CENTER bang against stop. This may be a YES document the relay chatter issue. condition and (CABINET)
As such, this condition was considered to not evaluate to provide represent a potential or immediate operability positive restraint.
concern Recommended to provide positive restraint to roof trolley to prevent impact against stops.Best seismic practice for battery racks is to A M (M) Typically there is a 3/8 to 1/2" make batteries snug against rails or spacers in Item was entered 4D03%J Pyial heei11/8t
/" a lateral direcrtions.qIe a nee (approx.)
gap between front of into the corrective 4BBATTERY batteries and horizontal rail. Condition Similar conditions were identified during the A- YES action program to RACK is common for all inspected racks. 46 assessment and judged to be acceptable for cdocument the Unknown if this is acceptable operability.
Further evaluation of the as- condition and (batteries can slide forward to rail). qualified condition is to be performed to implement the determine if spacers should be installed to increase margin.20 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP 4D24 Best seismic practice for battery racks is to Same as above, make batteries snug against rails or spacers in Item was entered 4A BATTERY Typically there is a 3/8 to 1/2" all lateral directions.
into the corrective RACK (approx.)
gap between front of Similar conditions were identified during the A- action program to batteries and horizontal rail. Condition 46 assessment and judged to be acceptable for YES document the is common for all inspected racks. 46eabilit F u dger to be as- condition and Unknown if this is acceptable operability.
Further evaluation of the as- implement the (batteriesocan ihslide fwacetoabl), qualified condition is to be performed to rement te (batteries can slide forward to rail). determine if spacers should be installed to resolution as noted increase margin.E16A Operability of unit confirmed by prompt operability determination (POD). Item was entered CONTROL into the corrective ROOM AIR There is non-rugged d thung copper The impact of spray was evaluated and it would action program to HANDLING UNIT ttached to E16A. The tubing may be not adversely affect the function of the air document the tubnghandler.
YES condition and tubing may impair function of Elk6A. determine if An additional AR was written to address this additional measures specific condition and to review adverse effects, are warranted to if any of the copper tubing on the functionality of restrain the tubing.the air handlers.
The operability screening of the AR determined that the AHU remain Operable.21 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Anchorage documentation not available Control panel has been confirmed to be welded 4C13A to an embedded metal frame at various Item was entered locations.
As such, it would not be adversely into the corrective 4A EDG affected by seismic loads. The anchorage CONTROL Item is designated for anchorage cretyisaedsjugdobedqaetoaction program to CONEL verification; a document that identifies withstand its design loads based on the YES document the anchorage design was not located, candcits desanchorase on the condition and capacity of the anchorage in comparison to the update the mass and configuration of the panel. documentation as Design drawings will be updated to document warranted the as-built configuration of the anchorage.
Based on field walkdown, the associated 4D01 distribution panel has been confirmed to have.anchor bolts (Sketch provided in the Checklist)
Item was entered (DISTRIBUTION at various locations.
As such, it would not be into the corrective PANEL) Item is designated for anchorage adversely affected by seismic loads. The action program to verification; a document that identifies anchorage currently installed is judged to be YES document the anchorage design was not located, adequate to withstand its design loads based condition and on the capacity of the anchorage in comparison update the to the mass and configuration of the panel. documentation as warranted Design drawings will be updated to document the as-built configuration of the anchorage.
22 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP Heat exchanger has been confirmed to have 4E208A anchors bolts to a concrete pedestal (Sketch provided in the Checklist).
As such, it would not Item was entered SPENT FUEL be adversely affected by seismic loads. The into the corrective EXCHANGER Item is designated for anchorage anchorage currently installed is judged to be PI ETadequate to withstand its design loads based action program to verification; a document that identifies onute to thetanchoragesin coars YES document the anchorage design was not located, to the mass and configuration of the heat condition and excthager.
mupdate the exchanger.
documentation as Design drawings and calculations will be warranted updated to document the as-built configuration of the anchorage.
Chiller package has been confirmed to have 4E239B anchor bolts to a welded steel frame (Sketch provided in the Checklist).
As such, it would not Item was entered LC & SWGR Item is designated for anchorage be adversely affected by seismic loads. The into the corrective ROOMS A/C verification; a document that identifies anchorage currently installed is judged to be action program to verifianchorage design was not located, adequate to withstand its design loads based document the CHILLER on the capacity of the anchorage in comparison condition and PACKAGE 1B to the mass and configuration of the chiller unit. update the (TRAIN-B) documentation as Design drawings and calculations will be warranted.
updated to document the as-built configuration of the anchorage.
23 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Entered Current Status Condition Resolution into CAP Based on field walkdown, the associated pump 4P212A frame has been confirmed to have anchor bolts to a concrete pedestal (Sketch provided in the Item was entered SFP CLG WTR Checklist).
As such, it would not be adversely into the corrective PMP A Item is designated for anchorage affected by seismic loads. The anchorage action program to verification; a document that identifies currently installed is judged to be adequate to document the anchorage design was not located, withstand its design loads based on the YES condition and capacity of the anchorage in comparison to the update the mass and configuration of the pump. documentation as Design drawings and calculations will be warranted.
updated to document the as-built configuration of the anchorage.
4P241A Based on field walkdown, the associated pump frame has been confirmed to have anchor bolts EDG 4A OIL to a concrete pedestal (Sketch provided in the Item was entered TRANSFER Checklist).
As such, it would not be adversely into the corrective PUMP verification; s designated thatidentifies affected by seismic loads. The anchorage action program to vencaionrag doesgnt tasnt inties. currently installed is judged to be adequate to YES document the anchorage designwasnotiocated, withstand its design loads based on the condition and capacity of the anchorage in comparison to the update the mass and configuration of the pump. documentation as warranted Design drawings will be updated to document the as-built configuration of the anchorage.
24 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Potentially Adverse Seismic Resolution Entered Current Status Equipment ID Condition into CAP 4QR35 Based on field walkdown, the associated protection rack has been confirmed to have CONTROL anchor bolts (Sketch provided in the Checklist)
Item was entered ROOM Item is designated for anchorage at various locations.
As such, it would not be into the corrective PROTECTION item i desig nt for anchrae adversely affected by seismic loads. The action program to RAK verification; a document that identifies dcmn h K anchorage design was not located. anchorage currently installed is judged to be document the adequate to withstand its design loads based YES condition and on the capacity of the anchorage in comparison update the with the mass and configuration of the cabinet, documentation as warranted.
Design drawings will be updated to document the as-built configuration of the anchorage.
Based on field walkdown, the associated 4D02 battery charger has been confirmed to be anchor bolted to an embedded steel frame 4B1 BATTERY (Sketch provided in the Checklist).
As such, it Item was entered CHARGER Item is designated for anchorage would not be adversely affected by seismic into the corrective loads. The anchorage currently installed is action program to anchorage design was not located, judged to be adequate to withstand its design YES document the loads based on the capacity of the anchorage in condition and comparison with the mass and configuration of update the the cabinet, documentation as warranted.
This is a configuration control issue. Design drawings will be updated to document the as-built configuration of the anchorage._
25 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Condition Resolution 4D25 4A1 BATTERY CHARGER Item is designated for anchorage verification; a document that identifies anchorage design was not located.Based on field walkdown, the associated battery charger has been confirmed to be anchor bolted to an embedded steel frame (Sketch provided in the Checklist).
As such, it would not be adversely affected by seismic loads. The anchorage currently installed is judged to be adequate to withstand its design loads based on the capacity of the anchorage in comparison with the mass and configuration of the cabinet.This is a configuration control issue. Design drawings will be updated to document the as-built configuration of the anchorage.
YES Item was entered into the corrective action program to document the condition and update the documentation as warranted.
Anchorage inspection could not be fully completed A limited number of anchors are not Estimated that 70% or more of anchors were Item was entered 4C04 visible (blocked by cables, wires, etc.). inspected and all visible anchors were found i acceptable.
into the corrective action program to VERTICAL Therefore SWC anchorage checks The anchorage currently installed is judged to YES document the PAKN'EL A could not be fully completed.
Also, be adequate to withstand its desian loads assessment concrete is not visible (covered' by This condition does NOT represent a potential form t carpet) and concrete crack check performed for the S could not be completed.
for immediate operability concern based on as-visible anchors._______________________could_______not______e___completed,___________found_______condition______
fo ndco diionofinpetec a ch ra e.__anchorage,_______
___visible________anchors._______
26 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Potentially Adverse Seismic Resolution Entered Current Status Equipment ID Condition into CAP 4C06_4005 A limited number of anchors are not Estimated that 70% or more of anchors were Item was entered-visible (blocked by cables, wires, etc.). inspected and all visible anchors were found into the corrective Therefore SWC anchorage checks acceptable.
action program to VERTICAL could not be fully completed.
Also, The anchorage currently installed is judged to YES document the PANELR B concrete is not visible (covered b be adequate to withstand its design loads. assessment B cacrpet) ad conctvse (corahecby This condition does NOT represent a potential performed for the carpet) and concrete crack check or immediate operability concern based on as- visible anchors.could not be completed.
found condition of inspected anchorage.
visibleanchors.
A limited number of anchors are not Estimated that 70% or more of anchors were Item was entered CONSOLE visible (blocked by cables, wires, etc.). inspected and all visible anchors were found into the corrective Therefore SWC anchorage checks acceptable.
action program to CONTROL could not be fully compee Als The anchorage currently installed is judged to YES document the ROOM concrete is not visible (covered b be adequate to withstand its design loads. assessment C TROLM cacrpet) ad concrtvse (coerahecby This condition does NOT represent a potential performed for the CONTROL carpet) and concrete crack check or immediate operability concern based on as- visible anchors.CONSOLE could not be completed.
found condition of inspected anchorage.
75% of anchors were inspected and all visible 4C23A See both floor anchors in right section anchors were found acceptable.
and one of two in left section. The anchorage currently installed is judged to SEQUENCER Expected floor anchor location in left be adequate to withstand its design loads YES Under evaluation 4C2,A,- section is covered by Wires This rcnnditfinn does NOT represent a ootential CABINET or immediate operability concern based on as-found condition of inspected anchorage.
See base welds to embedment along inner edge for fan assembly.
Welds The visible portion of the as-found anchorage is 4B EDG FAN along outer edges are not accessible consistent with drawing. Therefore, the Seismic NO CLOSED ASSEMBLIES for inspection.
Visible anchorage is Review Team judged that the component's consistent with drawing 5614-C-1589 anchorage is acceptable based on Sh. 1. conformance on the accessible side.27 Table 5-2: Table of Actions Resulting from Seismic Walkdown Inspection Equipment ID Potentially Adverse Seismic Resolution Entered Current Status Condition into CAP TIS-4-6413B Wall mounted unit; cannot see wall anchorage fully unless switch is Based on Engineering judgment and NO CLOSED SWGR RM 4D disassembled.
After removal of cover, considering the light weight of the switch, the FAN 4V65B can only see studs to mounting plate. as-found anchorage is considered acceptable.
TEMP SWITCH V77 Only able to confirm anchorage on one side of cabinet base. Per drawing Seismic Review Team judged that the cabinet AIR HANDLER 5610-C-1 701 Sh. 5, expect that has a welded anchorage and is acceptable NO CLOSED UNIT FOR ELEC remaining anchorage is hidden from based on conformance on the visible side of the EQUIP RM A/C view (welds to inside of base frame; cabinet.CONDENSER welds are not visible unless housing is E233 disassembled).
28 5.3 AREA WALK-BYS The purpose of the Area Walk-Bys is to identify potentially adverse seismic conditions associated with other SSCs located in the vicinity of the SVVEL items. Vicinity is generally defined as the room containing the SWEL item. If the room is very large (e.g., Turbine Hall), then the vicinity is identified based on judgment, e.g., on the order of about 35 feet from the SWEL item. This vicinity is described on the Area Walk-By Checklist (AWC), shown in Appendix D of this report. A total of 47 AWCs were completed for Turkey Point Unit 4. Note that additional AWCs will be completed, as required, when deferred inspections are completed.
The key examination factors that were considered during Area Walk-Bys include the following:
* Anchorage conditions (if visible without opening equipment)
* Significantly degraded equipment in the area" A visual assessment (from the floor) of cable/conduit raceways and HVAC ducting (e.g., condition of supports or fill conditions of cable trays)* Potentially adverse seismic interactions including those that could cause flooding, spray, and fires in the area* Other housekeeping items that could cause adverse seismic interaction (including temporary installations and equipment storage)* Scaffold construction was inspected for adequate bracing and anchorage" Hazards from temporary equipment were evaluated and overall seismic housekeeping was evaluated The Area Walk-Bys are intended to identify adverse seismic conditions that are readily identified by visual inspection, without necessarily stopping to open cabinets or taking an extended look. If a potentially adverse seismic condition was identified during the Area Walk-By, then additional time was taken, as necessary, to evaluate adequately whether there was an adverse condition and to document any findings.The results of the Area Walk-Bys are documented on the AWCs included in Appendix D of this report. A separate AWC was filled out for each area inspected.
A single AWC was completed for areas where more than one SWEL item was located.Additional details for evaluating the potential for adverse seismic interactions that could cause flooding, spray, or fire in the area are provided in the following two subsections.
Seismically-Induced Floodinq/Spray Interactions Seismically-induced flooding/spray interactions are the effect of possible ruptures of vessels or piping systems that could spray, flood or cascade water into the area where SWEL items are located. This type of seismic interaction was considered during the IPEEE program. Those prior evaluations were considered, as applicable, as information for the Area Walk-Bys.One area of particular concern to the industry is threaded fire protection piping with long unsupported spans. If adequate seismic supports are present or there are isolation valves near the tanks or charging sources, flooding may not be a concern. Numerous 29 failures have been observed in past earthquakes resulting from sprinkler head impact.Less frequent but commonly observed failures have occurred due to flexible headers and stiff branch pipes, non-ductile mechanical couplings, seismic anchor motion and failed supports.-
Examples where seismically-induced flooding/spray interactions could occur include the following: " Fire protection piping with inadequate clearance around fusible-link sprinkler heads* Non-ductile mechanical and threaded piping couplings, can fail and lead to flooding or spray of equipment" Long, unsupported spans of threaded fire protection piping" Flexible headers with stiffly supported branch lines" Non-Seismic Category I tanks The SWEs exercised their judgment to identify only those seismically-induced interactions that could lead to flooding or spray. Fire protection piping at Turkey Point Unit 4 was found to be sufficiently restrained in areas where SC-I equipment items are located and no concerns were identified with fire protection piping.One potential seismic-induced spray interaction was identified at Turkey Point Unit 4 and included as an issue to be resolved.
This is related to the E16A AHU discussed in Section 5.2.Seismically-Induced Fire Interactions Seismically-induced fire interactions can occur when equipment or systems containing hazardous/flammable material fail or rupture. Examples where seismically-induced fire interactions could occur include the following: " Hazardous/flammable material stored in inadequately anchored drums, inadequately anchored shelves, or unlocked cabinets* Natural gas lines and their attachment to equipment or buildings* Bottles containing acetylene or similar flammable chemicals* Hydrogen lines and bottles Another example where seismically-induced fire interaction could occur is when there is relative motion between a high voltage item of equipment (e.g., 4160 volt transformer) and an adjacent support structure when they have different foundations.
This relative motion can cause high voltage busbars, which pass between the two, to short out against the grounded bus duct surrounding the busbars and cause a fire.The Seismic Walkdown Engineers exercised their judgment to identify only those seismically-induced interactions that could lead to fires. No potential seismic-fire interactions were identified for Turkey Point Unit 4.Area Walk-By Results Table 5-3 provides a summary of issues identified during the! Area Walkdowns and recorded on AWCs. The tracking of issue resolution is identified in the table. Items are grouped based on the walkdown issue cited: 30
* Seismic housekeeping issues" Other seismic interaction issues* Other conditions The majority of potentially adverse conditions found are related to seismic housekeeping.
Potential seismic interaction concerns were identified but none of the issues were considered to be significant immediate hazards. In some cases potential relay chatter due to bumping of equipment is cited. Potential relay chatter issue is undesirable but the overall plant hazard related to relay chatter is typically low. For the Turkey Point USI A-46 evaluation (Reference 9), relay chatter was dismissed based on the low probability along with being able to manage the effects if they were to occur. As stated, one potential seismic-induced spray hazard was cited as an item requiring evaluation.
31 Table 5-3: Table of Actions Resulting from Area Walk-by Inspections Area Potentially Adverse Seismic Condition Resolution Entered Current Status into CAP Seismic Housekeeping Issues The hazard to valve functionality is Area 223 judged to be low. Verify valve Item was entered into Hand wheel for valve 4-913 is within 1/8" of an ruggedness for impact load OR the corrective action SPENT FUEL adjacent line. Temporary light is hooked to an increase clearance to an acceptable program to document PIT PUMP/HEAT instrument air line on the east side of the heat level, the condition and EXCHANGER exchanger.
Scaffolding above 4-816B is not Yes evaluate to ROOM adequately braced in the east-west direction.
Heat exchanger is considered a rigid determine if component and interaction with temp increased clearance light risk is low. is warranted.
No soft targets are vulnerable.
This is a Area 310C -seismic housekeeping issue.CABLE Item was entered into SPREADING Loose cover panels leaning against wall in Condition was not considered to be an proramcto action ROOM, front of air handlers.
Potential to fall on piping immediate hazard. YES program to document MECH.EQ and conduit. the condition and ROOM Take actions to ensure existing seismic resolution as noted housekeeping procedures are followed.Th, is is a s,.. s.ismic ousekeepingu e.Area 360 Potential relay chatter issue is Item was entered into CONTROL Unrestrained "Man-Machine Interface" cart on undesirable but the overall plant hazard the corrective action ROOM wheels (see photo) is close to Rack No 14, related to relay chatter is typically low proramcto action"Protection Ch. Set III". This is potential relay as previously discussed.
YES program to document chattr conernthe condition and c Take actions to ensure existing seismic implement the housekeeping procedures are followed.
resolution as noted 32 Table 5-3: Table of Actions Resulting from Area Walk-by Inspections Entered Area Potentially Adverse Seismic Condition Resolution into CAP Current Status Remove OR restrain the ladder. Item was entered into Area 425 -12' ladder on wall behind air tanks is stowed the corrective action EMERGENCY program to document DIESEL 4A AIR but can slide on brackets and also swing. Take actions to ensure existing seismic Yes the condition and START AREA. Ladder can hit tubing line near RV-4-1456A.
housekeeping procedures are followed, implement the resolution as noted Other seismic interaction issues Operability of unit confirmed by prompt Area 310C -operability determination (POD). The CABLE impact of spray was evaluated and it SPREADING would not adversely affect the function the corrective action ROOM, MECH. Rod hung copper tubing ("Service Water" tag of the air handler. program to document EQ. ROOM seen) appears to be non-seismic.
Appears to the condition and be a spray hazard. This issue is tracked under An additional AR was written to YES determine if component E16A. address this specific condition and to additional measures review adverse effects, if any of the are warranted to copper tubing on the functionality of the restrain the tubing.air handlers.
The operability screening of the AR determined that the AHU remains Operable.Other conditions Item was entered into Area 203 Two bent hanger rods above Condition was not considered to be an the corrective action CONTAINMENT SPRAY MOV-4-843B.
immediate hazard. Evaluate hanger Yes program to document PUMP ROOM rods for strength.
the condition and implement the resolution as noted 33 6 Licensing Basis Evaluations Potentially adverse conditions identified during the walkdowns were documented on the seismic walkdown and area walk-by checklists, as appropriate, and entered into the corrective action process. For those conditions that required a seismic licensing basis evaluation, an operability screening has been performed and an evaluation will be performed to provide the final resolution to be documented within the corresponding condition reports. Table 5-2 and 5-3 of this report provide the status of the subject evaluations as applicable.
34 7 IPEEE Vulnerabilities Resolution Report As discussed in previously Section 2.3, for implementation of the IPEEE Turkey Point was classified as a "reduced scope" plant per NUREG-1407 (Ref. 10). As such, the review level earthquake was equal to the site SSE and completion of the USI A-46 assessment largely satisfied the seismic IPEEE requirements.
In lieu of a full IPEEE seismic analysis, FPL opted to submit a "scaled back" program to resolve USI A-46 and Generic Letter 87-02 as allowed by the NRC in a letter dated November 4, 1998 (Ref. 13) issued for the review of Turkey Point IPEEE evaluations.
The final results of this scaled back program for the A-46 program were submitted in a letter to the NRC, L-93-155, "Final Report of Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolved USI A-46 and GL 87-02" (Ref. 14). The components selected for this analysis were also included in the SWEL in order to verify no outlier issues persisted.
The actions taken for. USI A-46 outlier resolution are summarized in Table 7-1.35 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 1 6 3P9B 3B Intake Cooling Pump shaft length Evaluate Shaft for adequate length Documentation could not be Water Pump longer than can be and clearance, found. A new item has been screened by SSRAP generated to find and/or recreate report. the required documentation.
2 6 3P9B 3B Intake Cooling Cast iron fittings on Check stresses on fittings from Documentation could not be Water Pump pump. loads of attached piping. found. A new item has been generated to find and/or recreate the required documentation.
3 6 3P9B 3B intake Cooling Anchorage needs Verify anchorage with calculation.
Anchorage adequate per PTN-Water Pump verification.
3FSC-87-020, anchorage replacement.
4 6 3P9B 3B Intake Cooling Interaction
-Fossil Unit Check adequacy of fossil stack. Fossil stack adequate per FPL Water Pump Stack may fall. Safety Evaluation.
5 6 4P9B 4B Intake Cooling Pump shaft length Evaluate Shaft for adequate length Documentation could not be Water Pump longer than can be and clearance, found. A new item has been screened by SSRAP generated to find and/or recreate report. the required documentation.
6 6 4P9B 4B Intake Cooling Cast iron fittings on Check stresses on fittings from Documentation could .not be Water Pump pump. loads of attached piping. found. A new item has been generated to find and/or recreate the required documentation.
6 4P9B 4B Intake Cooling Anchorage needs Verify anchorage with calculation.
Anchorage adequate per REA-Water Pump verification.
TPN- 88-320, foundation repair 8 6 4P9B 4B Intake Cooling Interaction
-Fossil Unit Check adequacy of fossil stack. Fossil stack adequate per FPL Water Pump Stack may fall. Safety Evaluation.
9 21 3T36 U3 Diesel Oil Anchorage adequacy.
Replace chair plates with 1 1/4" Chair plates upgraded per PCM Storage Tank thick plates and evaluate further. 91-169.10 21 3T36 U3 Diesel Oil Interaction
-Fossil Unit Check adequacy of fossil stack. Fossil stack adequate per FPL Storage Tank Stack may fall. Safety Evaluation.
36 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 11 21 T205B B Boric Acid Platform adequacy for Check platform adequacy for Platform upgraded per PCMs 90-Storage Tank torsional loads, torsion, and upgrade if required.
440 and 90-441 12 21 3T8 U3 Condensate Anchorage adequacy.
Replace chair plates with 1 %" Chair plates upgraded per PCM Storage Tank thick plates and evaluate further. 91-170.13 21 4T8 U4 Condensate Anchorage adequacy.
Replace chair plates with 1 %" Chair plates upgraded per PCM Storage Tank thick plates and evaluate further. 91-171.14 21 3T1 U3 Refueling Anchorage adequacy.
Replace chair plates with 1 /" Chair plates upgraded per PCM Water Storage thick plates and evaluate further. 91-172.Tank 15 21 4T1 U4 Refueling Anchorage adequacy.
Replace chair plates with 1 1/4" Chair plates upgraded per PCM Water Storage thick plates and evaluate further. 91-173.Tank 16 21 3T23B 3B EDG Day Tank Glass sight tube. Replace glass sight tube with non- Addressed by CR 95-1219.breakable material.17 21 3T218 U3 Component Platform adequacy.
Check platform adequacy, and Platform to be upgraded per PCM Cooling Water upgrade if required.
90-471.Surge Tank 18 21 4T218 U4 Component Platform adequacy.
Check platform adequacy, and Platform to be upgraded per PCM Cooling Water upgrade if required.
90-472.Surge Tank 19 17 3K4B 3B EDG Skid Glass sight tube. Replace glass sight tube with non- Addressed by CR 95-1219.breakable material.20 21 3T269B 3B EDG Air Start Seismic interaction
-Complete plant work order (PWO) Air supply and supports replaced Tanks threaded pipe for air already written for the support. per PCMs 86-155 and 86-190.supply not rigidly supported.
21 5 3B06 3B 480V Motor Seal welded anchorage, Upgrade anchorage.
Anchorage upgraded per PCM 91-Control Center inadequate in tension. 178.22 5 4B06 4B 480V Motor No anchorage.
Add anchorage.
Anchorage upgraded per PCM 91-Control Center 179.23 5 3B08 3D 480V Motor Inadequate anchorage Brace top of MCC to concrete wall. Anchorage upgraded per PCM 91-Control Center for overturning:
178.37 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 24 5 3AB 3B 4.16kV No anchorage.
Add anchorage.
Anchorage upgraded per PCM 91-Switchgear 174.25 5 4AB 4B 4.16kV No anchorage.
Add anchorage.
Anchorage upgraded per PCM 91-Switchgear 175.26 5 3B02 3B 480V HVPDS Cannot determine Add anchorage.
New load center installed per Load Center anchorage.
PCM 89-532 and new anchorage (Includes installed per PCM 91-176.Transformer) 27 5 3B04 3D 480V HVPDS Cannot determine Verify anchorage and upgrade if New load center installed per Load Center anchorage.
required.
PCM 89-532 and new anchorage (Includes installed per PCM 91-176.Transformer) 28 5 4B02 4B 480V HVPDS No anchorage.
Add anchorage.
New load center installed per Load Center PCM 89-533 and new anchorage (Includes installed per PCM 91-177.Transformer) 29 5 4B04 4D 480V HVPDS No anchorage.
Add anchorage.
New load center installed per Load Center PCM 89-533 and new anchorage (Includes installed per PCM 91-177.Transformer) 30 15 3D03 Battery Rack 3A No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).31 15 3D03 Battery Rack 3A Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-182.and fall on batteries.
32 15 3D03 Battery Rack 3A Block walls not Verify block wall included in FPL FPL verified wall included in iE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls C30-1, C30-2, C30-4.33 15 3D24 Battery Rack 3B No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).34 15 3D24 Battery Rack 3B Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-182.1_ and fall on batteries.
38 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class ID 35 15 3D24 Battery Rack 3B Block walls not Verify block wall included in FPL FPL verified wall included in IE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls A42-2, C42-16, C42-17, C42-18.36 15 4D24 Battery Rack 4B No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).37 15 4D24 Battery Rack 4B Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-183.and fall on batteries.
38 15 4D24 Battery Rack 4B Block walls not Verify block wall included in FPL FPL verified wall included in IE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls C30-2, C30-3, C30-4.39 15 4D03 Battery Rack 4A No spacers on east end Add spacers on east end of Spacers added (ref. FPL letters of battery rack. battery rack. JPN-PTN-92-5261 and 5707).40 15 4D03 Battery Rack 4A Shade on lights may fail Add tie wire to lights. Tie wires added per PCM 91-182.and fall on batteries.
41 15 4D03 Battery Rack 4A Block walls not Verify block wall included in FPL FPL verified wall included in IE 80-evaluated by SRT. IE 80-11 program. 11 program as block walls A42-2, C42-15, C42-16, C42-18.42 14 3D01 3A Distribution One loose anchor bolt. Tighten loose bolt. Bolt disposition per PWO 93-Panels/Bus 010843.43 14 4D01 4B Distribution Three loose anchor Tighten loose bolt. Bolt disposition per PWO 93-Panels/Bus bolts. 010844.44 20 3C23B 3B Sequencer Additional top bracket as Add top bracket as found for Bracket added per PCM 91-180.found for sequencer 3A sequencer 3A.would provide added assurance and strength.This item had only one bracket.45 20 4C23A 4A Sequencer Additional top bracket as Add two top brackets as found for Bracket added per PCM 91-181.found for sequencer 3A sequencer 3A.would provide added assurance and strength.This item had only one bracket.39 Table 7-1: USI A-46 Outlier Resolution No. Equip Equip Name Outlier Issue SRT Recommended Resolution Status Class' ID 46 20 4C23B 4B Sequencer Additional top bracket as Add two top brackets as found for Bracket added per PCM 91-181.found for sequencer 3A sequencer 3A.would provide added assurance and strength.This item had only one bracket.47 21 3E207B 3B CCW Heat SRT could not verify Verify adequacy of pedestal FPL verified pedestal adequacy by Exchanger reinforcement steel design. calculations C-SJ51 1-01 and 02.design of pedestal.48 21 4E207B 4B CCW Heat SRT could not verify Verify adequacy of pedestal FPL verified pedestal adequacy by Exchanger reinforcement steel design. similarity with Item 53.design of pedestal.49 20 3C06 3B Vertical Panel Interaction metal egg Clip in metal egg crate sections of Currently light weight plastic egg crate ceiling may fall on ceiling, crate is installed.
operators.
50 20 4C06 4B Vertical Panel Interaction metal egg Clip in metal egg crate sections of Currently light weight plastic egg crate ceiling may fall on ceiling, crate is installed.
operators.
40 8 Peer Review The Peer Review Report is included as Appendix F. This includes the peer review of the SWEL selection, peer review of the seismic walkdown, and peer review of this final report.41 9 References
: 1. EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012.2. Turkey Point Updated Final Safety Analysis Report (UFSAR): Section 1, Section 2, and Section 5.3. Not used.4. AEC Publication TID 7024, "Nuclear Reactors and Earthquakes", August 1963.5. ACI 318-63, Building Code Requirements for Reinforced Concrete.6. AISC, "Specifications for the Design, Fabrication and Erection of Structural Steel for Buildings", adopted April 17, 1963.7. USNRC, "Verification Of Seismic Adequacy Of Mechanical And Electrical Equipment In Operating Reactors, Unresolved Safety Issue (USI) A-46", Generic Letter 87-02.8. USNRC, "Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities", Generic Letter 88-20, Supplement
 
===4.9. Stevenson===
 
& Associates report, "Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 & 4 to Resolve Unresolved Safety Issue (USI) A-46 and Generic Letter (GL) 87-02," dated April 30, 1993.10. USNRC, "Procedural and Submittal Guidance for the IPEEE for Severe Accident Vulnerabilities", NUREG-1407, June, 1991.11. FPL Letter L-92-222, "Individual Plant Examination of External Events (IPEEE)," letter to USNRC, August 31, 1992.12. NRC (E Leeds and M Johnson) Letter to All Power Reactor Licensees et al., "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding Recommendation 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," Enclosure 2.3, "Recommendation 2.3: Seismic," dated March 12, 2012 13. NRC Letter to FPL, "Generic Letter 88-20, Supplement 4, -Individual Plant Examination For External Events For Severe Accident Vulnerabilities-Turkey Point Nuclear Plant.Units 3 And 4", dated November 4, 1998.14. FPL Letter L-93-155, "Final Report of Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolved USI A-46 and GL 87-02".42 A Project Personnel Resumes and SWE Certificates A.1 INTRODUCTION Resumes for the following personnel that contributed to the seismic walkdown and/or peer review are included in this Appendix: " FPL: C. Figueroa, T. Satyan-Sharma, A. Restrepo, George Tullidge, T. Jones" Stevenson
& Associates:
J. O'Sullivan, S. Baker In addition, certificates from the EPRI Walkdown Training Course are included for each of the designated SWEs: C. Figueroa, T. Satyan-Sharma, J. O'Sullivan and S. Baker.A.2 RESUMES Carlos Andres Figueroa Mr. Figueroa is a Mechanical and Civil Design Engineer I in the Turkey Point Nuclear Station at Florida Power & Light. He has one year of Mechanical Systems Engineering experience at Entergy's River Bend Station in St. Francisville, LA. Mr. Figueroa also has three years of Operations experience and four years of Civil Design Engineering experience at FPL's Turkey Point Station in South Florida. He holds a BS in Mechanical Engineering from the University of Los Andes (Bogota, Colombia) and a MS in Mechanical Engineering, from the University of Florida. He completed Training on the Near Term task Force Recommendation 2.3 -Plant Seismic Walkdowns.
T. Satyan-Sharma, P.E.Mr. Satyan Sharma is a Consultant to Florida Power and Light for Turkey Point Station.He has managed and was the technical lead for the SQUG Project at a Nuclear Utility.He was a Peer Reviewer on the SQUG project at other Nuclear Plants and provided third party reviews. Mr. Satyan Sharma has 40 years of experience in Nuclear Industry in both Consulting (6 years) and Utility (34 years ) supporting plant operations.
Mr.Satyan Sharma has a Master of Science in Structural/Engineering Mechanics from New York University.
He was a member of the SQUG Team in the development of the Generic Implementation Procedures (GIP). He has received industry training as Seismic Capability Engineer (EPRI 5-Day Training), SQUG New and Replacement Equipment and Parts (NARE) Training, and SQUG Equipment Selection
& Relay Evaluation Training.A-1 Alexander Restrepo Mr. Restrepo is an Engineer I in the PRA Group at NextEra Energy, working primarily on Turkey Point Nuclear Station. He has three years of Operations experience at Turkey Point and two years of PRA experience.
He has completed the necessary requirements and qualifications for a PRA engineer.
Recently he completed Training on the Near Term task Force Recommendation 2.3 -Plant Seismic Walkdowns.
He holds a BS and MS in Nuclear Engineering, both from the University of Florida.George Tullidge Mr. Tullidge is a Staff Engineer in the PRA Group at NextEra Energy Juno Beach office.He has over 30 years of commercial nuclear power experience.
Mr. Tullidge has a degree in Physics from Pennsylvania State University.
His years of experience include Operations, Maintenance, and Engineering.
He also held an active Senior Reactor Operator license at St. Lucie and was a qualified Operations Shift Manager.Tim Jones Mr. Jones is an Operations Department Shift Manager at Turkey Point Nuclear. He has over 26 years of experience .in the Operations Department and was licensed in 1994 as Reactor Operator.
He received his SRO license in 1998. His years of experience include Operations, Maintenance, and Security.John J. O'Sullivan, P.E.Mr. O'Sullivan is a Senior Consultant in the S&A Boston office. He has managed and led seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments.
Mr. O'Sullivan has 24 years of seismic experience serving the nuclear industry.
Mr. O'Sullivan has participated in more than 10 USI A-46 and IPEEE projects in response to the requirements of Generic L.etters 87-02 and 88-20.Mr. O'Sullivan has a Master of Science in Structural Engineering from the Massachusetts Institute of Technology.
He has received industry training as Seismic Capability Engineer (EPRI 5-day SQUG training), EPRI IPEEI- Add-on, and Seismic Fragility training.Seth Baker Mr. Baker is a Senior Engineer in the S&A Boston office. He has performed structural engineering analysis & design, finite element analysis, structural mechanics evaluations, seismic qualification managed and seismic walkdowns.
Mr. Baker has a Master of A-2 Science in Civil/Structural Engineering from Stanford University.
He completed the EPRI training for NTTF 2.3 plant seismic walkdowns.
A-3 A.3 CERTIFICATES Certificate of Completion Carlos Figueroa Training on Near Term Task Force Recommendation 2.3-Plant Seismic Walkdowns July 27, 2012 FinK k.g.~.A-4 11 I Presents this Certificate of Achievement To Certify Piat I I Tirum&#xfd;ani Satyain-Sh I has Compfetedtthe SQVG Walkdown Screening andSeismic Evaluation Training Course HfeldJune 17-22, 1992 SQnG Mr10-U Presents this'Certifica te ofl clhievemen t'To Certify 'That i JIh 0Suiva has Compfetedthe SQ0 q 'Walkdown Screening andSeismic Evaluation Training Course ffHefdqugust 10-15, 1992 P..' ~SQUO CS1000 D"AU T-P&,MFRAo.o.
$QUO Tm C-*04.00 Rb P. K.-.... EPRM SQOPqg. M401.g A-5 A-6 B SWEL Selection Report Ma'~Florida Power & Light Selection of the Seismic Walkdown Equipment List (SWEL) for the Requirement
 
===2.3 Walkdown===
Turkey Point Nuclear Station Prepared by Reviewed by Reviewed by.Reviewed by Alexander Res Itrepo (PI Group)Ge &#xfd; l~idge (PRA Group)Tim Jon& *s" (perations)
Carlos Figueroa (Prigineering)
Date Date Date 1%/I/ IR-Date B-1 1 Introduction This document contains the information used to develop the Seismic Walkdown Equipment List (SWEL) at Turkey Point (PTN) in accordance with EPRI Report 1025286, "Seismic Walkdown Guidance," dated June 2012 [1].The selection process was completed by applying separate screening criteria to develop SWELs 1 and 2. The documentation is laid out by first providing the screening criteria requirements, and then providing the implementation of how PTN applied that screening criteria.2 Process The general process focused first on building a Master Component List, with attributes to support the sample selection process (Sections 3 and 4). This list was obtained by generating a NAMS query of the entire PTN Equipment Database for all components along with data such as system code, component type, location, etc. Then the screening criteria below were applied to arrive at a final SWEL 1 and SWEL 2 comprised of about 92 items and 8 items, respectively.
The process also included identifying a set of plant locations around which the walkdown was organized (Section 5). The plant locations were also used to support the "walk-by" process to assess cable trays and ventilation ducts and the potential for seismic spatial interactions (Section 6).Finally, Section 6 identifies several evaluations that supported the identification of targets for the walkdown and the specific attributes that needed to be examined.Because the SWEL needs to address a number of attributes, the selection was performed and reviewed by a team that includes representatives from PRA, Operations, and Engineering.
This was done systematically by performing table-top virtual walkdowns and pre-walkdowns of each location to identify candidates for the SWEL as well as other issues (e.g., seismic-flood) that needed to be inspected by the walk-by.3 SWEL 1 Screening Criteria The final SWEL 1 is contained in the Microsoft Excel workbook, "U3 (U4) PTN Fukushima SWEL" [2], in the "SWEL 1" spreadsheet on-file. Each iteration of the screening process described below is contained in the Microsoft Access database, "SWEL 1 "[3].These final SWEL (both SWEL 01 & SWEL 02), as well as the Master Component List, are available in Excel format on-file at Turkey Point.3.1 Screening Criteria I -Seismic Category 1 Requirement The scope of SSCs (Systems, Structures, and Components) in the plant are limited to those that are designed to Seismic Category (SC) I requirements.
This is done because only such items have a defined seismic licensing basis against which to evaluate the as-installed configuration.
B-2 Selecting these items is intended to comply with the request in the NRC 50.54(f) Letter, under the "Requested Actions" section, to "verify current plant configuration with the current license basis." Application Seismic Class 1 SSCs include over 20,000 items in the PTN equipment database.
A complete equipment list from the PTN equipment database was obtained via a NAMS query ran in June 2012. The Seismic Class 1 SSCs were queried from the report by choosing only those SSCs where the Seismic Class was designated with an I.3.2 Screening Criteria 2 -Equipment or Systems Requirement The scope of SSCs included selecting only those that do not regularly undergo inspections to confirm that their configuration continues to be consistent with the plant licensing basis.Cable/conduit raceways and HVAC ductwork were not included as "equipment" in the SWEL 1, and were instead left to be reviewed during area walk-bys of the spaces containing items on the SWEL 1. Also omitted were SC 1 structures, containment penetrations, and SC1 piping systems.Application The list of all SC1 SSCs was further reduced by including only "active" components, removing all items classified as "design" or "non-equip".
 
===3.3 Screening===
 
Criteria 3- Supports 5 Safety Functions Requirement The scope of SSCs to be included in SWEL 1, are those SSCs associated with maintaining the five safety functions.
These five safety functions include the four safe shutdown functions (reactor reactivity control, reactor coolant pressure control, reactor coolant inventory control, and decay heat removal, which includes the Ultimate Heat Sink), plus the containment functions.
Application Since the PRA risk model represents the five safety functions listed above, a list of all PRA component tags was compared to the remaining SSCs. Items not included in the PRA model were removed.3.4 Screening Criteria 4- Sample Considerations Requirement It was expected that SWEL 1, taken as a whole, would include representative items from some of the variations within each of the following five attributes:
A variety of types of systems B-3 Major new and replacement equipment A variety of types of equipment A variety of environments
* Equipment enhanced due to vulnerabilities identified during the IPEEE program Application The seismic aspects of the PTN IPEEE were resolved by the use of the FPL site-specific Seismic Program associated with Unresolved Safety Issue (USI) A-46 [4]. The equipment analyzed in this program was used as a base and compared to the screening criteria above.The remaining components in the Master Component List were reordered according to system code, component type, and then location in order to obtain a broad sample. Operations personnel were consulted with to identify new or replaced equipment that were on the truncated Master Component List.4 SWEL 2 Screening Criteria SWEL 2 began with the same Master Component List as SWEL 1. An initial screening was done retaining only SSCs related to the Spent Fuel Pool system. Screening criteria 1, 2, and 3 for SWEL 2 were performed identically to that of screening criteria 1,2, and 4 for SWEL 1, respectively.
The final SWEL 2 is contained in the Microsoft Excel workbook, "U3 (U4) PTN Fukushima SWEL" [2], in the "SWEL 2" spreadsheet on-file. Each iteration of the screening process is contained in the Access database, "SWEL 2" [5].These Microsoft Excel Workbooks, as well as the Master Component List are available in Excel format on-file at Turkey Point.4.1 Screening Criteria 4 -Cause Rapid Drain-Down Requirement The EPRI guidance requires assessment of the potential for Spent Fuel Pool (SFP) rapid draindown, specifically the identification of SFP penetrations below about 10 feet above the top of the fuel assemblies.
Application There are only two penetrations in the SFP below this level. One is a lower suction valve (*-797), the other is the fuel transfer tube, used to move fuel from containment to the SFP. During normal operation, this tube is isolated by a blind flange on the containment side and a manual valve on the Fuel Storage Building side. Other components were included in this screening based on their importance in maintaining spent fuel pool inventory and cooling.B-4 5 Walk-By Table Each location will also be subject to a walk-by, an examination (in less detail) of the other PRA components, as well as an inspection for other seismic issues:* Several other passive component types: cable trays & ventilation ducts.* Seismic-induced fire. This includes all flammable materials in each location such as hydrogen lines, gas bottles (acetylene, hydrogen), natural gas lines, and hazardous/flammable material stored in the location.,* Seismic-induced flood. This includes all flood/spray sources (tanks, piping) originating in each location, based on the Internal Flood PRA. Note, the flood sources of interest are only those originating in the location, not those coming from another location.
The potential for flood propagation will be addressed in the seismic/flood analysis.* Spatial interactions (2 / 1). This includes adverse physical interaction due to proximity, failing of other components or structures (e.g., cranes), and flexibility of attached lines and cables.The final Walk-By Table is contained in the Microsoft Excel workbook, "U3 PTN Fukushima SWEL" [2], in the "Walkby Table" spreadsheet as well as the Master Component List are available in Excel format at Turkey Point on-file.6 Evaluations The following evaluations were performed prior to and during the walkdown to assess specific issues that may add to the walkdown scope or the inspection criteria.6.1 IPEEE or USI A-46 Vulnerabilities The seismic assessment performed for PTN USI A-46 was reviewed for any seismic vulnerability identified.
These issues were included in the SWEL table.6.2 Configuration Verification The EPRI guidance identifies two types of inspection for the walkdown: (a) visual inspection and (b) configuration verification.
Visual inspection is typically what is performed in a walkdown, looking for obvious degraded conditions in equipment anchorage.
However, configuration verification is a more involved inspection consistent with the existing plant documentation of the design basis. This is required in at least 50% of the SWEL items with anchorage.
Since 28 SWEL components are MOVs (Class 8) or AOVs (or similar Class 7 components) which do not have anchorage, this leaves 50% of 72, or at least 36 components; to be included in the configuration verification.
For those components, the design basis was reviewed and the key attributes included in the walkdown forms to assist the inspection.
6.3 New Equipment B-5 The EPRI Guidance directs that the SWEL should include a "robust sampling of the major new or replacement equipment installed within the past 15 years (i.e., since the approximate completion of the seismic IPEEE evaluation)".
Based on discussion with Operations and Engineering, major new or replacement equipment was identified and noted as such in the SWEL spreadsheet.
 
===6.4 Modifications===
The walkdown team allowed for changes to be made to the SWEL mid-walkdown.
Many components were changed from 'B' train to 'A' train as the former was the protected train, precluding the thorough inspection of some components.
Various items were also replaced or removed because they were common components already on the other unit's SWEL or the component was no longer installed in the plant.7 References
: 1. "Final Report of Plant Specific Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolve Unresolved Safety issue (USI) A-46 and Generic Letter (GI) 87-02," Stevenson& Associates, April 1993.2. "PTN Fukushima SWEL," FPL, August 2012.3. "SWEL 1," FPL, August 2012.4. EPRI TR-1 025286, "Seismic Walkdown Guidance," June 2012.5. "SWEL 2," FPL, August 2012.B-6 C Seismic Walkdown Checklists (SWCs)Table C-1. Summary of Seismic Walkdown Checklists-Anchorage Co figuration Confirmation Performed Tag ID Component Description Area Equip. age Class Pg 4805 A-MCC (CABINET) 342 -4A MCC 1 C-5# 4B06 B-MCC (CABINET) 343 -4B MCC ROOM 1 C-7# 4807 C-MCC (CABINET) 215 -NORTH-SOUTH HALLWAY 1 C-9 4B08 D-MCC (CABINET) 234 -NEW ELECTRICAL EQUIPMENT 1 C-10 ROOM# 4B02 4802 480V HVPDS LOAD CENTER 4B 341 -480V LC ROOM 2 C-13 (CABINET)# 4B04 4D LC (Part of B train) (CABINET) 341 -480V LC ROOM 2 C-15 4850 4H LOAD CENTER (CABINET) 234 -NEW ELECTRICAL EQUIPMENT 2 C-17 ROOM## 4AB 4AB 4.16V SWITCHGEAR 4B (CABINET) 368 -4160V SWITCHGEAR ROOM 3 C-19 4AD 4.16KV SWITCHGEAR 4AD FOR BUS 4D 430 -SWITCHGEAR ROOM 4D 3 C-21# X05 4160/480V TRANSFORMER FOR 480V LC 341 -480V LC ROOM 4 C-23 4B## 4P201 B CHARGING PUMP B 201 -CHARGING PUMP ROOM 5 C-25## 4P203B BORIC ACID TRANSFER PUMP B 200 -BORIC ACID TANK ROOM 5 C-27# 4P21 1 B COMPONENT COOLING PUMP B 202 -COMPONENT COOLING PUMPRM 5 C-29# 4P212A SFP CLG WTR PMP A 223 -SPENT FUEL PIT PUMP/HEAT 5 C-31 EXCHANGER ROOM 4P214B CONTAINMENT SPRAY PUMP B 203 -CONTAINMENT SPRAY PUMP 5 C-33 ROOM 4P215B HI HEAD SAFETY INJECTION PUMP 4B 206 -HI-HEAD SIS PUMP ROOM 5 C-35## 4P241A EDG 4A OIL TRANSFER PUMP 431 -EMERGENCY DIESEL 4A DIESEL 5 C-37 OIL TRANSFER PUMP ROOM EMERG SFP EMERGENCY SPENT FUEL PIT COOLING 223 -SPENT FUEL PIT PUMP/HEAT 5 C-39 CLG PMP PUMP EXCHANGER ROOM## P2C AUXILIARY FEEDWATER PUMP C 306 -AUX FEED PUMP AREA 5 C-41 4P210B RHR PUMP B 211 -RHR PUMP ROOM 6 C-43#f 4P9B INTAKE COOLING WATER PUMP B 370 -INTAKE AREA 6 C-45 CV-4-1607 MAIN STEAM LINE A STM DUMP TO 300 -STEAM DECK 7 C-47 ATMOS CNTL VALVE CV-4-2818 TRAIN 1 S/G C FEED FLOW CONTROL 302 -FEEDWATER DECK 7 C-49 VALVE FCV-4-113A BORIC ACID TO BLENDER FLOW CNTL 201 -CHARGING PUMP ROOM 7 C-51 VLV FCV-4-488 STEAM GENERATOR B MAIN 302 -FEEDWATER DECK 7 C-53 FEEDWATER FLOW CONTROL VALVE HCV-4-121 CHG TO RCS CONTROL VALVE 209 -PIPE & VALVE ROOM 7 C-55 HCV-4-758 HAND CNTL VLV FOR RHR HX FLOW 210 -RHR HEAT EXCHANGER ROOM 7 C-57 CNTL PCV-4-4885 PRZR PORV N2 BACKUP SUPPLY 123 -CONTAINMENT 58 FOOT 7 Defer PRESSURE REGULATOR ELEVATION C-1 Tag ID Component Description Area Equip. Page Class POV-4-2605 MN STM ISO VLV FROM S/G B 300 -STEAM DECK 7 C-59 POV-4-4883 TPCW HEAT EXCHANGERS ISOLATION 334- TURBINE PLANT HEAT 7 C-61 VALVE EXCHANGER AREA SV-4-455C PRESSURIZER PORV SOLENOID VALVE 103 -PRESSURIZER CUBICLE 7 Defer TCV-4-143 NON REGEN HX OUTLET TO VCT OR 201 -CHARGING PUMP ROOM 7 C-63 DEMIN TEMP CNTL VLV MOV-4-1404 MTR OPERATED VALVE FROM STEAM 301 -BELOW STEAM DECK 8 C-65 GEN A TO AUX FW PP TURBINES MOV-4-350 EMERGENCY BORATION CONTROL 201 -CHARGING PUMP ROOM 8 C-67 VALVE MOV-4-535 PRESSURIZER PORV BLOCK VALVE 103 -PRESSURIZER CUBICLE 8 Defer MOV-4-744A RHR LO HEAD SI TO LOOP A MOTOR 121 -CONTAINMENT 14 FOOT 8 Defer OPERATED VLV ELEVATION OUTSIDE BIO-WALL MOV-4-751 NORMAL RHR INLET FROM RCS MOTOR 121 -CONTAINMENT 14 FOOT 8 Defer OPERATED VLV ELEVATION OUTSIDE BIO-WALL MOV-4-843B HHSI TO COLD LEG MOV 203 -CONTAINMENT SPRAY PUMP RM 8 C-69 MOV-4-860B RECIRC SUMP TO RHR PUMP SUCTION 210 -RHR HEAT EXCHANGER ROOM 8 C-71 MOTOR OPERATED VALVE MOV-4-861 B RECIRC SUMP TO RHR PUMP SUCTION 211 -RHR PUMP ROOM 8 C-73 MOTOR OPERATED VALVE MOV-4-862A RWST TO RHR PUMP SUCTION VALVE 211 -RHR PUMP ROOM 8 C-75 MOV-4-863B RHR PUMP RECIRC TO RWST 210 -RHR HEAT EXCHANGER ROOM 8 C-77 MOV-4-864B RWST MTR OP ISO VALVE TO SI .& RHR 217 -RWST AREA 8 C-79 PUMPS MOV-4-865A SI ACCUM A DISCH MOTOR OPERATED 121 -CONTAINMENT 14 FOOT 8 Defer VLV ELEVATION OUTSIDE BIO-WALL MOV-4-869 SI TO LOOP A&B HOT LEG MTR OP ISO 209 -PIPE & VALVE ROOM 8 C-81 VLV MOV-4-880B CTMT SPRAY PMP B DISCH ISO VLV 203 -CONTAINMENT SPRAY PUMP 8 C-83 ROOM SV-4-3434A EDG 4A OIL DAY TANK INLET CONTROL 407 -A DIESEL GENERATOR BUILDING ( 8 C-85 SOLENOID VALVE LOWER LEVEL)4V64A 4A EDG ROOM VENT EXHAUST FAN 424 -EMERGENCY DIESEL 4A CONTROL 9 C-87 ROOM 4V65B AXIAL FLOW VENTILATION FAN 430 -SWITCHGEAR ROOM 4D 9 C-89 N/A EDG FAN ASSEMBLIES (RADIATOR FAN) 309 -DIESEL GENERATOR BUILDING 9 C-91 (LOWER LEVEL)4E241 B LOAD CENTER ROOM 4A/B -AIR 341 -480V LOAD CENTER ROOM 10 C-93 HANDLING UNIT 4E242B LOAD CENTER ROOM 4C/D -AIR 341 -480V LOAD CENTER ROOM 10 C-95 HANDLING UNIT (TRAIN-B)4E243B SWITCHGEAR ROOM 4B -AIR HANDLING 368 -4160 V SWITCHGEAR ROOM 10 C-97 UNIT E16A CONTROL ROOM AIR HANDLING UNIT 310 -CABLE SPREADING ROOM 10 C-99 V77 AIR HANDLER UNIT FOR ELEC EQUIP 234 -NEW ELECTRICAL EQUIPMENT
.10 C-101 RM A/C CONDENSER E233 ROOM 4E239B LC & SWGR ROOMS A/C SYSTEM -315 -LP TURBINE NORTH AREA 11 C-103 CHILLER PACKAGE 1B (TRAIN-B)4CM226A EDG 4A AIR COMPRESSOR 425 -EMERGENCY DIESEL 4A AIR 12 C-105 START AREA.4D01 4D01 (DISTRIBUTION PANEL) 310 -CABLE SPREADING ROOM 14 C-107 4D23 4D23 (DISTRIBUTION PANEL) 347 -CONTROL ROOM INVERTER ROOM 14 C-109 4S77 100 AMP 2-POLE AUTOMATIC 234 -NEW ELECTRICAL EQUIPMENT 14 C-111 TRANSFER SWITCH ROOM 4D03 4B BATTERY RACK 346 -BATTERY ROOM 15 C-113 4D24 4A BATTERY RACK 347 -CONTROL ROOM INVERTER ROOM 15 C-115 4D02 4B1 BATTERY CHARGER 310 -CABLE SPREADING ROOM 16 C-117######C-2 Tag 11) Component Description Area Equip. Page Class## 4D02A 4B2 BATTERY CHARGER 234 -NEW ELECTRICAL EQUIPMENT 16 C-119 ROOM## 4D25 4A1 BATTERY CHARGER 347 -CONTROL ROOM INVERTER ROOM 16 C-121## 4Y05 STATIC INVERTER 4C 125 VDC/120 VAC 347- CONTROL ROOM INVERTER ROOM 16 C-123 7.5 KVA (CABINET)4Y07 STATIC INVERTER 4D 125 VDC/120 VAC 347 -CONTROL ROOM INVERTER ROOM 16 C-125 7.5 KVA (CABINET)# 4K4A 4A DIESEL GENERATOR 423 -EMERGENCY DIESEL 4A 17 C-127# 4QR35 CONTROL ROOM PROTECTION RACK 361 -CONTROL ROOM GENERAL 18 C-129 TIS-4-6413B SWGR RM 4D FAN 4V65B TEMP SWITCH 430 -SWITCHGEAR ROOM 4D 19 C-131 TW-4-412C DELTA T-TAVG CH I COLD LEG 1 104 -RCP A CUBICLE 19 Defer THERMOWELL 4C04 VERTICAL PANEL A 360 -CONTROL ROOM VERTICAL PANEL 20 C-133## 4C06/4C05 VERTICAL PANEL B 360 -CONTROL ROOM VERTICAL PANEL 20 C-135*# 4C13A 4A EDG CONTROL PANEL 427 -EMERGENCY DIESEL 4A CONTROL 20 C-137 ROOM## 4C23A SEQUENCER 4C23A -CABINET 368 -4160 V SWITCHGEAR ROOM 20 C-139 4C23B SEQUENCER 4C23B -CABINET 368 -4160 V SWITCHGEAR ROOM 20 C-141 4C264 4C264 -ALTERNATE SHUTDOWN PANEL 368 -4KV SWGR.ROOM B SIDE 20 C-143 CONSOLE CONTROL ROOM CONTROL CONSOLE 362 -CONTROL ROOM CONTROL 20 C-145 CONSOLE 4P214B HEAT SEAL WATER HEAT EXCHANGER FOR 203 -CONTAINMENT SPRAY PUMP 21 C-148 EXCHANGER CONTAINMENT SPRAY PUMP B ROOM## 4E206B RHR HEAT EXCHANGER B 210 -RHR HEAT EXCHANGER ROOM 21 C-150 4E207B COMPONENT COOLING HEAT 202 -COMPONENT COOLING PUMP 21 C-152 EXCHANGER B ROOM## 4E208A SPENT FUEL PIT HEAT EXCHANGER 223 -SPENT FUEL PIT PUMP/HEAT 21 C-154 EXCHANGER ROOM## 4T1 REFUELING WTR STORAGE TK 217 -RWST 21 C-156## 4T218 COMPONENT COOLING SURGE TANK 212 -SPENT FUEL PIT ROOM 21 Defer# 4T229B SI ACCUM B 114 -ACCUMULATOR B AREA 21 Defer 4T259A DIESEL OIL STORAGE TANK 4A 432 -EMERGENCY DIESEL 4A D)IESEL 21 C-158 OIL STORAGE TANK ROOM# 4T260A DIESEL OIL DAY TANK 4A FOR EDG 423 -EMERGENCY DIESEL 4A 21 C-160 4T270A EDG 4A STARTING AIR ACCUMULATOR 425 -EMERGENCY DIESEL 4A AIR 21 C-162 TANK START AREA.## 4T8 CONDENSATE STORAGE TANK 331 -CONDENSATE STORAGE TANK 21 C-164 4V30B EMERGENCY CONTAINMENT COOLER B 123 -CONTAINMENT 58 FOOT 21 Defer ELEVATION## T205C BORIC ACID STORAGE TANK C 200 -BORIC ACID TANK ROOM 21 C-166 4-12-031 TUBE GATE ISOLATION VALVE 212 -SPENT FUEL PIT ROOM 0 C-168 4-797 SFP COOLING WATER PUMP LOW 223 -SPENT FUEL PIT PUMP/HEAT 0 C-170 SUCTION VALVE EXCHANGER ROOM 4-910 SFP CLG PMP A SUCT ISO VLV 223 -SPENT FUEL PIT PUMP/HEIAT 0 C-172 EXCHANGER ROOM 4K200 BORIC ACID BLENDER 201 -CHARGING PUMP ROOM 0 C-174 BD-1 CREVS INTAKE BALANCING DAMPER 347 -CONTROL ROOM INVERTER ROOM 0 C-176 BS-4-1402 BASKET STRAINER TO INTAKE COOLING 202 -COMPONENT COOLING PUMP 0 C-178 WTR SUPPLY FOR CCW HX A ROOM LT-4-651 SPENT FUEL PIT LEVEL TRANSMITTER 212 -SPENT FUEL PIT ROOM 0 C-i80 Note: Detailed signed records of the checklists are available at the site.C-3 Per the EPRI guidance document, the top row of each checklist summarizes the status as follows: Status Meaning Y All relevant checks were answered Yes and no further action is required.N At least one check was answered No and follow-up is required.U At least one check could not be answered due to unavailable information and follow-up is required.Section 5.2.5 of this report identifies planned actions for items requiring follow-up.
C-4 Class (01) Motor Control Centers 4B05 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 4B05 Y N-u Equipment Class: (1) Motor Control Centers Equipment
 
==
Description:==
 
A-MCC (CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 342 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?MCC is within environmental enclosure.
See external anchorage of welded tabs in front and fillet welds in rear to embedded C6.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Concrete floor is cracked behind MCC, but the cracks are on other side of structural joint, so not an issue for MCC anchorage.
: 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
No Yes Yes Yes Not Applicable C-5 Status: Seismic Walkdown Checklist (SWC)Y FN--I U Equipment ID No.: Equipment Class: 4B05 (1) Motor Control Centers Equipment
 
==
Description:==
 
A-MCC (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
MCC is within an environmental enclosure.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?There may be spray sources for non-SC-I piping nearby, but MCC is protected by enclosure.
Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Opened enclosure doors and inspected front of MCC. Saw one missing cover panel screw at top of section labeled "40530".Comments Walkdown by Team B C-6 4B06 SWC Status: Seismic Walkdown Checklist (SWC)FY-]N U Equipment ID No.: Equipment Class: 4B06 (1) Motor Control Centers Equipment
 
==
Description:==
 
B-MCC (CABINET)*Project:
Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 343 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Checked wall and floor anchors.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See welded tabs at base, 12 places at < 36" o/c and three top supports.
Two 5/8 anchors per top support. Matches 5614-C-1790 Sheet 2.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-7 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4B06 (1) Motor Control Centers B-MCC (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and lower interior of cabinet (opened kick-panels at all anchors).
No loose or missing hardware.
MCC rear face is close to wall, but top support will limit seismic front/back displacement to a very low magnitude, so judged acceptable.
Comments Walkdown by Team B C-8 4B07 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 4B07 Equipment Class: (1) Motor Control Centers Equipment
 
==
Description:==
 
C-MCC (CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 215 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
No Saw two missing/broken bolts on back base clip in cubicle 40788 and 40702.3. Is the anchorage free of corrosion that is more than mild surface No oxidation?
Moderate corrosion at the lower back angles inside the MCC. Lots of large pieces of peeled paint inside.4. Is the anchorage free of visible cracks in the concrete near the No anchors?Hairline crack in floor in front of cubicle 40762 and travels into pad.5. Is the anchorage configuration consistent with plant documentation?
No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Upper wall supports are inconsistent with drawing 5614-C-1790 Sh. 3 Rev. 0 Internal base anchorage needs to be verified with plant drawing (see field sketch).6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
C-9 Status: Seismic Walkdown Checklist (SWC)Y FNu Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
41307 (1) Motor Control Centers C-MCC (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
All kick plates were opened to inspect the interior.
Deficiencies are noted in the anchorage section. Upper plates would require excessive dismantling to inspect interior.Comments Walkdown by Team A 4B08 SWC Status: Seismic Walkdown Checklist (SWC)ff] NUL C-10 Equipment ID No.: Equipment Class: 41308 (1) Motor Control Centers Equipment
 
==
Description:==
 
D-MCC (CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 215 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes C-11 Status: Seismic Walkdown Checklist (SWC)FYI NU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4B08 (1) Motor Control Centers D-MCC (CABINET)8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. -Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
MCC contains both Unit 3 and Unit 4 components.
Kick panels opened during Unit 3 walkdown and internals were inspected.
Comments Walkdown by Team A C-1 2 Class (02) Low Voltage Switchgear 4B02 SWC Status: Seismic Walkdown Checklist (SWC)[-]N U Equipment ID No.: Equipment Class: 4B02 (2) Low Voltage Switchgear Equipment
 
==
Description:==
 
4B02 480V HVPDS LOAD CENTER 4B (CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be. used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
41 Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See welds to embedments front and rear; matches 5614-C-1789.
No shims installed.
Yes Yes Yes Yes Yes C-13 Status: Seismic Walkdown Checklist (SWC)N U Equipment ID No.: Equipment Class: 4B02 (2) Low Voltaqe Switchqear Equipment
 
==
Description:==
 
4B02 480V HVPDS LOAD CENTER 4B (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet. Three loose thumb screws at back of rightmost section.Comments Walkdown by Team B C-14 4B04 SWC Status: Seismic Walkdown Checklist (SWC)FY]NU Equipment ID No.: Equipment Class: 4B04 (2) Low Voltage Switchgear Equipment
 
==
Description:==
 
4D LC (Part of B train) (CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis.
Additional space is provided at the end of this checklist for docurnentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See welds to embedments front and rear; matches 5614-C-1789.
Shims installed in some locations.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-15 Status: Seismic Walkdown Checklist (SWC)YNU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4B04 (2) Low Voltaqe Switchqear 4D LC (Part of B train) (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet, one loose thumbscrew at rear.Comments Walkdown by Team B C-16 4B50 SWC Status: Seismic Walkdown Checklist (SWC)YN]U Equipment ID No.: Equipment Class: 4B50 (2) Low Voltage Switchgear Equipment
 
==
Description:==
 
4H LOAD CENTER (CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinls.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet is welded to steel base frame and frame is anchored to concrete floor with 3/4 diameter CEA's. Inspected steel frame anchorage to concrete floor. Also opened front lower doors and saw stitch weld of cabinet base to base frame.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-17 Status: Seismic Walkdown Checklist (SWC)Y FN]U Equipment ID No.: Equipment Class: 4B50 (2) Low Voltaqe Switchqear Equipment
 
==
Description:==
 
4H LOAD CENTER (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
No Inspected exterior and lower interior of cabinet (opened all lower doors). One loose thumbscrew in rear door.Lift trolley on roof of cabinet is unrestrained side/side and may bang.This is a potential relay chatter issue.Comments Walkdown by Team B C-1 8 Class (03) Medium Voltage Switchgear 4AB SWC Status: Seismic Walkdown Checklist (SWC)YNU I Equipment ID No.: Equipment Class: 4AB (3) Medium Voltaqe Switchgear Equipment
 
==
Description:==
 
4AB 4.16V SWITCHGEAR 4B (CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes Unknown 2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet has internal anchorage.
No permission to open cabinet.Defer inspection.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Unknown Unknown Unknown C-1 9 Status: Seismic Walkdown Checklist (SWC)YNFU]Equipment ID No.: Equipment Class: 4AB (3) Medium Voltaqe Switchqear Equipment
 
==
Description:==
 
4AB 4.16V SWITCHGEAR 4B (CABINET)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
No Missing cover panel bolts (2 places) at rear of 4AB02 section.Other One missing relay cover panel nut (1 of 4) in empty relay slot (spare location).
Not considered an adverse condition.
Comments Walkdown by Team B C-20 4AD SWC Status: Seismic Walkdown Checklist (SWC)Y N F`Equipment ID No.: Equipment Class: 4AD (3) Medium Voltage Switchgear Equipment
 
==
Description:==
 
4.16KV SWITCHGEAR 4AD FOR BUS 4D Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 430 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet anchorage is internal; not permitted to open cabinet at this time. Defer inspection.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Unknown Unknown Unknown 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentiallv adverse seismic conditions?
Not Applicable Unknown C-21 Status: Seismic Walkdown Checklist (SWC)Y N [U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4AD (3) Medium Voltaqe Switchqear 4.16KV SWITCHGEAR 4AD FOR BUS 4D Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Two thumbscrews are loose in front.Comments Walkdown by Team B C-22 Class (04) Transformers X05 SWC Status: Seismic Walkdown Checklist (SWC)Y Lu Equipment ID No.: Equipment Class: X05 (4) Transformers Equipment
 
==
Description:==
 
4160/480V TRANSFORMER FOR 480V LC 4B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
4 of 6 welds are 4"long and 2 of 6 welds are about 1-1/2"long.
Does not match drawing 5610-E-9-35 (also see 5160-C-1 14 Sh. 2 Note 8).Yes Yes Yes No C-23 Status: Seismic Walkdown Checklist (SWC)Y E]U Equipment ID No.: Equipment Class: X05 (4) Transformers Equipment
 
==
Description:==
 
4160/480V TRANSFORMER FOR 480V LC 4B 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
There are two loose bolts on right side cover panel.Comments Walkdown by Team B C-24 Class (05) Horizontal Pumps 4P201B SWC Status: Seismic Walkdown Checklist (SWC)FY--] N U Equipment ID No.: Equipment Class: 4P201B (5) Horizontal Pumps Equipment
 
==
Description:==
 
CHARGING PUMP B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the. concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-277 and 5610-C-904 Yes Yes Yes Yes C-25 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: 4P201B (5) Horizontal Pumps Equipment
 
==
Description:==
 
CHARGING PUMP B 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-26 4P203B SWC Status: Seismic Walkdown Checklist (SWC)FV]N U Equipment ID No.: Equipment Class: 4P203B (5) Horizontal Pumps Equipment
 
==
Description:==
 
BORIC ACID TRANSFER PUMP B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 200 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs, Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-254 Sh. 1 Rev. 12 6. Based on the above anchorage evaluations, is the anchorage free of potentiallv adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-27 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4P203B (5) Horizontal Pumps BORIC ACID TRANSFER PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No Large cover plates for a nearby recessed area are stored next to the pump.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-28 4P211B SWC Status: Seismic Walkdown Checklist (SWC)WNU Equipment ID No.: Equipment Class: 4P21 1B (5) Horizontal Pumps Equipment
 
==
Description:==
 
COMPONENT COOLING PUMP B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 202 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-277 Rev. 13 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-29 Status: Seismic Walkdown Checklist (SWC)FY1N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4P211B (5) Horizontal Pumps COMPONENT COOLING PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found ro adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Walkdown by Team A C-30 4P212A SWC Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4P212A (5) Horizontal Pumps SFP CLG WTR PMP A Project: Location (Bldg, Elev, Room/Area):
Turkey Point 4 SWEL Unit 4. 18.00 ft. 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage
.1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Need to verify anchorage with plant documentation.
Noted 6 -1/2" diameter anchor bolts in the field.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Unknown Unknown C-31 Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4P212A (5) Horizontal Pumps SFP CLG WTR PMP A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-32 4P214B SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: 4P214B (5) Horizontal Pumps Equipment
 
==
Description:==
 
CONTAINMENT SPRAY PUMP B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinQs.
Additional space is provided at the end of this checklist for docurnentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of ootentiallv adverse seismic conditions?
Not Applicable Yes C-33 Status: Seismic Walkdown Checklist (SWC)FY1N U Equipment ID No.: Equipment Class: Eauioment Descriotion:
4P214B (5) Horizontal Pumps CONTAINMENT SPRAY PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Overhead CCW line has welded connections and is rigidly supported to wall.9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Walkdown by Team A C-34 4P215B SWC Status: Seismic Walkdown Checklist (SWC)W- N U Equipment ID No.: Equipment Class: 4P215B (5) Horizontal Pumps Equipment
 
==
Description:==
 
HI HEAD SAFETY INJECTION PUMP 4B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 206 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-35 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4P215B (5) Horizontal Pumps HI HEAD SAFETY INJECTION PUMP 4B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Walkdown by Team A C-36 4 P241A SWC Status: Seismic Walkdown Checklist (SWC)Y N I Equipment ID No.: Equipment Class: 4P241A (5) Horizontal Pumps Equipment
 
==
Description:==
 
EDG 4A OIL TRANSFER PUMP Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 431 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?One small area at edge of grout pad damage; not considered an adverse condition.
: 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (6) x 3/4 diameter CIP anchors (3 per side); need correct anchor drawing to verify (unknown).
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Unknown Unknown C-37 Status: Seismic Walkdown Checklist (SWC)Y N -1 Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4P241A (5) Horizontal Pumps EDG 4A OIL TRANSFER PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Overhead grating is tied down with clips.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Ventilation duct is well supported on the wall.Comments Walkdown by Team B C-38 EMERG SFP CLG PMP SWC Status: Seismic Walkdown Checklist (SWC)[y]NU Equipment ID No.: Equipment Class: EMERG SFP CLG PMP (5) Horizontal Pumps Equipment
 
==
Description:==
 
EMERGENCY SPENT FUEL PIT COOLING PUMP Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documnenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-39 Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
EMERG SFP CLG PMP (5) Horizontal Pumps EMERGENCY SPENT FUEL PIT COOLING PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Walkdown by Team A C-40 P2C SWC Status: Seismic Walkdown Checklist (SWC)W- N U Equipment ID No.: Equipment Class: P2C (5) Horizontal Pumps Equipment
 
==
Description:==
 
AUXILIARY FEEDWATER PUMP C Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 306 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?On two rear anchors, see top of stud is just below top of nut; nut engagement judged to be sufficient.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (6) x 3/4 diameter C/P bolts. Matches 5160-C-375 Sh. 1.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-41 Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
P2C (5) Horizontal Pumps AUXILIARY FEEDWATER PUMP C Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-42 Class (06) Vertical Pumps 4P210B SWC Status: Seismic Walkdown Checklist (SWC)F-- N U.Equipment ID No.: Equipment Class: 4P210B (6) Vertical Pumps Equipment
 
==
Description:==
 
RHR PUMP B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 4.00 ft, 211 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-43 Status: Seismic Walkdown Checklist (SWC)Y] N U Equipment ID No.: Equipment Class: 4P210B (6) Vertical Pumps Equipment
 
==
Description:==
 
RHR PUMP B 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations,is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-44 4P9B SWC Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 4P9B Equipment Class: (6) Vertical Pumps Equipment
 
==
Description:==
 
INTAKE COOLING WATER PUMP B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 370 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing. or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface No oxidation?
Bolts have rust and there is some flaking. Also top of anchor stud has rust beyond surface for some anchors.4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Visual cracks in pad and in slab. Anchorage is deeply embedded cast-in-place bolts and cracks are judged to be of minor significance.
: 5. Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (4) x 1" diameter bolts (appear to be cast-in-place).
Matches 5610-C-61 Shl.6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
C-45 Status: Seismic Walkdown Checklist (SWC)YN] U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4P913 (6) Vertical Pumps INTAKE COOLING WATER PUMP B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Scaffold OK, see AWC.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Outdoor area.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Walkdown by Team B C-46 Class (07) Fluid-Operated Valves CV-4-1607 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: CV-4-1 IT]N U 607 Equipment Class: (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
MAIN STEAM LINE A STM DUMP TO ATMOS CNTL VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 300 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable C-47 Status: Seismic Walkdown Checklist (SWC)rYN U Equipment ID No.: Equipment Class: CV-4-1607 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
MAIN STEAM LINE A STM DUMP TO ATMOS CNTL VALVE 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 1" clearance between valve and adjacent insulation.
Based on rigidity of valve and piping, there will be very little differential displacement, so OK. Conduit behind valve has low mass and is not considered a credible interaction hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-48 CV-4-2818 SWC Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: CV-4-2818 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
TRAIN 1 S/G C FEED FLOW CONTROL VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 302 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6.. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-49 Status: Seismic Walkdown Checklist (SWC)F-- N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
CV-4-2818 (7) Fluid-Operated Valves TRAIN 1 S/G C FEED FLOW CONTROL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Scaffold OK, see AWC.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoiddamage?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-50 FCV-4-113A SWC Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: FCV-4-113A (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
BORIC ACID TO BLENDER FLOW CNTL VLV Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3.' Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-51 Status: Seismic Walkdown Checklist (SWC)F NY U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
FCV-4-113A (7) Fluid-Ooerated Valves BORIC ACID TO BLENDER FLOW CNTL VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-52 FCV-4-488 SWC Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: FCV-4-488 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
STEAM GENERATOR B MAIN FEEDWATER FLOW CONTROL VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 302 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-53 Status: Seismic Walkdown Checklist (SWC)/.L-Y] N U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
FCV-4-488 (7) Fluid-Operated Valves STEAM GENERATOR B MAIN FEEDWATER FLOW CONTROL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Scaffold OK, see AWC.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Good flexibility of attached lines.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-54 HCV-4-121 SWC Status: Y F U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: HCV-4-121 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
CHG TO RCS CONTROL VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 209 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-55 Status: Seismic Walkdown Checklist (SWC)Yl Fu Equipment ID No.: Equipment Class: Eauiiment
 
==
Description:==
 
HCV-4-121 (7) Fluid-Operated Valves CHG TO RCS CONTROL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Limit switch electrical elbow is within 1/2" of an adjacent valve.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No Yes Yes No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-56 HCV-4-758 SWC Status: Y FN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: HCV-4-758 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
HAND CNTL VLV FOR RHR HX FLOW CNTL Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 10.00 ft, 210B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-57 Status: Seismic Walkdown Checklist (SWC)YWI u Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
HCV-4-758 (7) Fluid-Operated Valves HAND CNTL VLV FOR RHR HX FLOW CNTL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No Valve HC V-4-758 is in contact with the support for instrument air line at the floor level.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free No of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-58 POV-4-2605 SWC Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: POV-4-2605 (7) Fluid-Orerated Valves Equipment
 
==
Description:==
 
MN STM ISO VLV FROM S/G B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 300 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required;)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-59 Status: Seismic Walkdown Checklist (SWC)W N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
POV-4-2605 (7) Fluid-Operated Valves MN STM ISO VLV FROM S/G B Interaction Effects 7. Are soft targets free (from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-60 POV-4-4883 SWC Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: POV-4-4883 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
TPCW HEAT EXCHANGERS ISOLATION VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 334 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-61 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
POV-4-4883 (7) Fluid-Operated Valves TPCW HEAT EXCHANGERS ISOLATION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-62 TCV-4-143 SWC Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: TCV-4-143 (7) Fluid-Operated Valves Equipment
 
==
Description:==
 
NON REGEN HX OUTLET TO VCT OR DEMIN TEMP CNTL VLV Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, 'is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-63 Status: Seismic Walkdown Checklist (SWC)[NU Equipment ID No.: Equipment Class: Eauinment Descrintion:
TCV-4-1 43 (7) Fluid-Operated Valves NON REGEN HX OUTLET TO VCT OR DEMIN TEMP CNTL VLV Equipment DescriDtion:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Gap between valve and adjacent conduit is adequate, approximately 2" 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Dry boric acid corrosion is tagged and tracked within PTN's boric acid program.Yes Comments Walkdown by Team A C-64 Class (08) Motor-Operated and Solenoid-Operated Valves MOV-4-1404 SWC Status: Seismic Walkdown Checklist (SWC)I- N U Equipment ID No.: Equipment Class: MOV-4-1404 (8) Motor-Operated and Solenoid-Operated Valves MTR OPERATED VALVE FROM STEAM GENERATOR A TO AUX FW PP Equipment
 
==
Description:==
 
TURBINES Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 301 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable C-65 Status: Seismic Walkdown Checklist (SWC)FYN U Equipment ID No.: MOV-4-1404 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MTR OPERATED VALVE FROM STEAM GENERATOR A TO AUX FW PP Equipment
 
==
Description:==
 
TURBINES 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Small area enclosed by missile shielding.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-66 MOV-4-350 SWC Status: [-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-350 (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
EMERGENCY BORATION CONTROL VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-67 Status: Seismic Walkdown Checklist (SWC)WT1N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-4-350 (8) Motor-Operated and Solenoid-Operated Valves EMERGENCY BORATION CONTROL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No Gearbox is approximately 3/4" from an adjacent electrical conduit.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-68 MOV-4-843B SWC Status: ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-843B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
HHSI TO COLD LEG MOV Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinci other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-69 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
MOV-4-843B (8) Motor-Operated and Solenoid-Operated Valves HHSI TO COLD LEG MOV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Adequate clearance between handwheel and TB4150.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-70 MOV-4-860B SWC Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-860B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 10.00 ft, 210B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-71 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
MOV-4-860B (8) Motor-Operated and Solenoid-Operated Valves RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-72 MOV-4-861 B SWC Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-861 B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 4.00 ft, 211 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-73 Status: Seismic Walkdown Checklist (SWC)FY_]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-4-861 B (8) Motor-Operated and Solenoid-Operated Valves RECIRC SUMP TO RHR PUMP SUCTION MOTOR OPERATED VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-74 MOV-4-862A SWC Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-862A (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RWST TO RHR PUMP SUCTION VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 4.00 ft, 211 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-75 Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-4-862A (8) Motor-Operated and Solenoid-Operated Valves RWST TO RHR PUMP SUCTION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-76 MOV-4-863B SWC Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-863B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RHR PUMP RECIRC TO RWST Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 10.00 ft, 210A Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-77 Status: Seismic Walkdown Checklist (SWC)FY_]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-4-863B (8) Motor-Operated and Solenoid-Operated Valves RHR PUMP RECIRC TO RWST Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations,-
is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-78 MOV-4-864B SWC Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-864B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
RWST MTR OP ISO VALVE TO Sl & RHR PUMPS Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 217 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-79 Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-4-864B (8) Motor-Operated and Solenoid-Operated Valves RWST MTR OP ISO VALVE TO SI & RHR PUMPS Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-80 MOV-4-869 SWC Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-869 (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
SI TO LOOP A&B HOT LEG MTR OP ISO VLV Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 209 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentiallv adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-81 Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
MOV-4-869 (8) Motor-Operated and Solenoid-Operated Valves SI TO LOOP A&B HOT LEG MTR OP ISO VLV Interaction Effects 7. Are soft targets freefrom impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes.could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-82 MOV-4-880B SWC Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: MOV-4-880B (8) Motor-Operated and Solenoid-Operated Valves Equipment
 
==
Description:==
 
CTMT SPRAY PMP B DISCH ISO VLV Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of uotentiallv adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-83 Status: Seismic Walkdown Checklist (SWC)WjN U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
MOV-4-880B (8) Motor-Operated and Solenoid-Operated Valves CTMT SPRAY PMP B DISCH ISO VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Nearby containment spray test line has welded connections and is rigidly supported.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-84 SV-4-3434A SWC Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
SV-4-3434A (8) Motor-Operated and Solenoid-Operated Valves EDG 4A OIL DAY TANK INLET CONTROL SOLENOID VALVE Project: Location (Bldg, Elev, Room/Area):
Turkey Point 4 SWEL Unit 4. 18.00 ft. 423 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i~e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-85 Status: Seismic Walkdown Checklist (SWC)YNU Equipment ID No,: Equipment Class: Equipment
 
==
Description:==
 
SV-4-3434A (8) Motor-Operated and Solenoid-Operated Valves EDG 4A OIL DAY TANK INLET CONTROL SOLENOID VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
No lights above.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-86 Class (09) Fans 4V64A SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 4V64A Equipment Class: (9) Fan F IN U S Equipment
 
==
Description:==
 
4A EDG ROOM VENT EXHAUST FAN Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 424 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (8) x 5/8 diameter thru bolts to steel frame. Frame is hung from above.Not Applicable C-87 Status: Seismic Walkdown Checklist (SWC)FY-]N U Equipment ID No.: Equipment Class: 4V64A (9) Fans Equipment
 
==
Description:==
 
4A EDG ROOM VENT EXHAUST FAN 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-88 4V65B SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 4V65B Equipment Class: (9) Fan ITY U U S Equipment
 
==
Description:==
 
AXIAL FLOW VENTILATION FAN Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 430 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?See (4) thru bolts to steel frame (estimate as 1/2 diameter).
Frame is hung from above 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?On steel frame.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Yes Yes Yes Not Applicable Yes C-89 Status: Seismic Walkdown Checklist (SWC)FYIN U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4V65B (9) Fans AXIAL FLOW VENTILATION FAN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Very little overhead.9. Do attached lines have adequate flexibility to avoid damage?Lines have good flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-90 EDG FAN ASSEMBLIES SWC Status: Y N -U-]Seismic Walkdown Checklist (SWC)Equipment ID No.: EDG FAN ASSEMBLIES Equipment Class: (9) Fans Equipment
 
==
Description:==
 
EDG FAN ASSEMBLIES (RADIATOR FAN)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 309 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Unknown Yes for visible welds on inside edge of equipment base.Unknown for expected welds on outer edge of base. Not visible from inside or from outside.3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?Same as above.5. Is the anchorage configuration consistent with plant documentation?
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Along inside long edge of base, see (6) welds to embedments, see field sketch. Visible anchorage is consistent with drawing 5614-C-1589 Sh. 1. Unknown for expected welds along outer edge, not visible.6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
C-91 Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
EDG FAN ASSEMBLIES (9) Fans EDG FAN ASSEMBLIES (RADIATOR FAN)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-92 Class (10) Air Handlers 4E241 B SWC Status: Seismic Walkdown Checklist (SWC)FI N U Equipment ID No.: Equipment Class: 4E241B (10) Air Handlers Equipment
 
==
Description:==
 
LOAD CENTER ROOM 4A/B -AIR HANDLING UNIT Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Mild rust on unit base to C3 bolts.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.), See (6) x 1/2 diameter anchors thru weldment baseplate and grout pad into floor. Anchorage matches 5614-C-1738 Sh. 3.Yes Yes Yes Yes Yes C-93 Status: Seismic Walkdown Checklist (SWC)F-]N U Equipment ID No.: Equipment Class: 4E241B (10) Air Handlers Equipment
 
==
Description:==
 
LOAD CENTER ROOM 4A/B -AIR HANDLING UNIT 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-94 4E242B SWC Status: Seismic Walkdown Checklist (SWC)Y LU Equipment ID No.: Equipment Class: 4E242B (10) Air Handlers Equipment
 
==
Description:==
 
LOAD CENTER ROOM 4C/D -.AIR HANDLING UNIT (TRAIN-B)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 341 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is similar to 4E2 41B.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-95 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauiiment
 
==
Description:==
 
4E242B (10) Air Handlers LOAD CENTER ROOM 4C/D -AIR HANDLING UNIT (TRAIN-B)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Rusting of base weldment near front edge requires maintenance.
Comments Walkdown by Team B C-96 4E243B SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: 4E243B (10) Air Handlers Equipment
 
==
Description:==
 
SWITCHGEAR ROOM 4B -AIR HANDLING UNIT Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Some minor rust on unit base.4. Is the anchorage free of visible cracks in the concrete near the anchors?Small crack in grout pad at front right. Crackjudged to be of minor significance.
: 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage found is (6) x 1/2" diameter concrete expansion anchor (CEA) thru steel plate embedded in grout pad. Anchorage is similar to that shown for U4 air handlers on 5614-C-1738 Sh. 3.6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
No Yes Yes Yes Not Applicable Yes C-97 Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
4E243B (10) Air Handlers SWITCHGEAR ROOM 4B -AIR HANDLING UNIT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-98 E16A SWC Status: Seismic Walkdown Checklist (SWC)Y [7u Equipment ID No.: Equipment Class: E16A (10) Air Handlers Equipment
 
==
Description:==
 
CONTROL ROOM AIR HANDLING UNIT Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic-conditions?
Not Applicable Not Applicable Not Applicable Not Applicable No C-99 Status: Seismic Walkdown Checklist (SWC)Y FNL U Equipment ID No.: Equipment Class: E16A (10) Air Handlers Equipment
 
==
Description:==
 
CONTROL ROOM AIR HANDLING UNIT Unit appears to be unanchored.
Feet of unit appear to sit on vibration isolation pads (4 places).Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are a masonry walls in the area. See AWC for comments.Air duct is supported by floor framing, OK.9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
There is non-rugged rod hung copper tubing in the area and tubing is attached to E16A. Unknown if this piping is seismically designed.Comments Walkdown by Team B C-100 V77 SWC Status: Seismic Walkdown Checklist (SWC)Y N FU-Equipment ID No.: Equipment Class: V77 (10) Air Handlers Equipment
 
==
Description:==
 
AIR HANDLER UNIT FOR ELEC EQUIP RM A/C CONDENSER E233 Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?See below.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Unknown Unknown Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Unknown C-101 Status: Seismic Walkdown Checklist (SWC)Y N FU_Equipment ID No.: Equipment Class: V77 (10) Air Handlers Equipment
 
==
Description:==
 
AIR HANDLER UNIT FOR ELEC EQUIP RM A/C CONDENSER E233 Only able to confirm anchorage on one side of cabinet base. Per drawing 5610-C-1701 Sh. 5, expect that remaining anchorage is hidden from view (weld to inside of base frame, not visible unless housing is disassembled.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems,.
ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. -Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-102 Class (11) Chillers 4E239B SWC Status: Seismic Walkdown Checklist (SWC)Y N FU Equipment ID No.: Equipment Class: 4E239B (11) Chillers Equipment
 
==
Description:==
 
LC & SWGR ROOMS A/C SYSTEM -CHILLER PACKAGE 1B (TRAIN-B)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 315 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (10) x 5/8 diameter thru bolts to steel platform.
See field sketch. Need correct anchor drawing to verify (unknown).
Yes Yes Yes Yes Unknown C-103 Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: 4E239B (11) Chillers Equipment
 
==
Description:==
 
LC & SWGR ROOMS A/C SYSTEM -CHILLER PACKAGE 1 B (TRAIN-B)6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Outdoor area open above. Temporary light nearby OK, see A WC.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-104 Class (12) Air Compressors 4CM226A SWC Status: Seismic Walkdown Checklist (SWC)FY] N U Equipment ID No.: Equipment Class: 4CM226A (12) Air Compressors Equipment
 
==
Description:==
 
EDG 4A AIR COMPRESSOR Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 425 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the-concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-105 Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: 4CM226A (12) Air Compressors Equipment
 
==
Description:==
 
EDG 4A AIR COMPRESSOR
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
See (6) thru bolts to steel skid, 5/8 diameter.Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Very good flexibility for air line.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-106 Class (14) Distribution Panels 4D01 SWC Status: Seismic Walkdown Checklist (SWC)Y N FU-Equipment ID No.: Equipment Class: 4D01 (14) Distribution Panels Equipment
 
==
Description:==
 
4D01 (DISTRIBUTION PANEL)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?See loose anchor bolts; see field sketch. Unknown if this is OK per design basis.Also some anchor locations cannot be seen (unknown).
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
OK for visible anchors, some anchor locations cannot be seen (unknown).
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is shown on field sketch, see (22) x 3/8 diameter (estimated size) anchors plus two more probably blocked from view.Need correct anchor drawing to verify (unknown).
Also two anchor locations cannot be seen (unknown).
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Unknown Unknown Yes Unknown Unknown C-107 Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4D01 (14) Distribution Panels 4D01 (DISTRIBUTION PANEL)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
About 1" gap to wall behind cabinet; judged to be sufficient shake space.Comments Walkdown by Team B C-108 4D23 SWC Status: Y N Fi Seismic Walkdown Checklist (SWC)Equipment ID No.: 4D23 Equipment Class: (14) Distribution Panels Equipment
 
==
Description:==
 
4D23 (DISTRIBUTION PANEL)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 347 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Unknown Cabinet anchorage is internal.
No permission to open cabinet. Defer anchorage inspection.
: 3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the. Unknown anchors?See crack in floor at front of cabinet that has potential to moderately affect concrete expansion anchor strength.
Unknown if it passes through such an anchor.5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
C-109 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4D23 (14) Distribution Panels 4D23 (DISTRIBUTION PANEL)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
About 1-1/2" clearance to wall plate behind cabinet. Judged to be acceptable for shake space.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet. No loose or missing hardware.Yes Comments Walkdown by Team C C-110 4S77 SWC Status: Seismic Walkdown Checklist (SWC)I-] N U Equipment ID No.: Equipment Class: 4S77 (14) Distribution Panels Equipment
 
==
Description:==
 
100 AMP 2-POLE AUTOMATIC TRANSFER SWITCH Project: Turkey Point 4 SWEL Location (BIdg, Elev, Room/Area):
Unit 4, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Small grout patch at upper left not considered a crack issue.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (12) x 1/2 CEA to wall.6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
No Yes Yes Yes Not Applicable Yes C-111 Status: Seismic Walkdown Checklist (SWC)FY ]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4S77 (14) Distribution Panels 100 AMP 2-POLE AUTOMATIC TRANSFER SWITCH Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapseonto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions Yes Yes Yes Yes 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened front door). No loose or missing hardware.Yes Comments Walkdown by Team B C-112 Class (15) Batteries on Racks 4D03 SWC Status: Seismic Walkdown Checklist (SWC)YF U Equipment ID No.: Equipment Class: 4D03 (15) Batteries on Racks Equipment
 
==
Description:==
 
4B BATTERY RACK Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 346 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Additional space is 1provided at the end of this checklist for documentinQ other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Some mild rust seen in some cases.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage seen to be a mix of 5/8 and 3/8 diameter CEA's each rack.See field sketch. Anchorage does not match 5610-C-1369.
Yes Yes Yes Yes No C-113 Status: Seismic Walkdown Checklist (SWC)Y L-N]u Equipment ID No.: Equipment Class: 4D03 (15) Batteries on Racks Equipment
 
==
Description:==
 
4B BATTERY RACK 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Typically there is a 3/8 to 1/2" (approx.)
gap between front of batteries and horizontal rail. Issue is common for all inspected racks. Unknown if this is acceptable (batteries can slide forward to rail).Comments Walkdown by Team B C-1 14 4D24 SWC Status: Seismic Walkdown Checklist (SWC)YL ]u Equipment ID No.: Equipment Class: 4D24 (15) Batteries on Racks Equipment
 
==
Description:==
 
4A BATTERY RACK Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 347 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage seen to be a mix of 5/8 and 1/2 diameter CEA's. See field sketch. Anchorage does not match 5610-C-1369.
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
Yes Yes Yes Yes No No C-115 Status: Seismic Walkdown Checklist (SWC)YF U Equipment ID No.: Equipment Class: EauiDment
 
==
Description:==
 
4D24 (15) Batteries on Racks 4A BATTERY RACK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.Vertical sanitary line in corner of room judged not to be a collapse hazard.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
Typically there is a 3/8" (approx.)
gap between front of batteries and horizontal rail. Issue is common for all inspected racks. Unknown if this is acceptable (batteries can slide forward to rail).Comments Walkdown by Team C C-116 Class (16) Inverters 4D02 SWC Status: Seismic Walkdown Checklist (SWC)Y NFU Equipment ID No.: Equipment Class: 4D02 (16) Inverters Equipment
 
==
Description:==
 
4B1 BATTERY CHARGER Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (8) x 5/8 diameter thru bolts to steel frame; frame is anchored with 5/8 CEA to floor. See field sketch. Need correct anchor drawing to verify (unknown).
Yes Yes Yes Unknown C-1 17 Status: Seismic Walkdown Checklist (SWC)Y N FJ-Equipment ID No.: Equipment Class: 4D02 (16) Inverters Equipment
 
==
Description:==
 
4B1 BATTERY CHARGER 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8., Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet. No loose or missing hardware.Comments Walkdown by Team B C-118 4D02A SWC Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 4D02A Equipment Class: (16) Inverters Equipment
 
==
Description:==
 
4B2 BATTERY CHARGER'Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 234 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Anchorage is thru bolts to steel frame.5. Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (8) x 5/8 diameter thru bolts to C8 sleepers; C8's are welded to floor plate. Floor plate is anchored with (8) x 5/8 CEA.Anchorage matches 5610-C-1701 Sh. I (refer to drawing grid F5).6. Based on the above anchorage evaluations, is the anchorage free of Yes potentiallv adverse seismic conditions?
C-119 Status: Seismic Walkdown Checklist (SWC)[K]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4D02A (16) Inverters 4B2 BATTERY CHARGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There is a masonry wall near the cabinet. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior.
Opened lower lowers, no loose/missing hardware.Comments Walkdown by Team B C-120 4D25 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 41D25 (16) Inverters Equipment
 
==
Description:==
 
4A1 BATTERY CHARGER Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 347 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Floor crack seen in front area, may continue near CEA at front. No cracks seen in rear area.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (8) x 5/8 thru bolts to C8 and (8) x 5/8 CEA to floor thru base plate. Similar to "4B 1 Battery Charger".
See field sketch for the "4B 1 Battery Charger".
Need correct anchor drawing to verify (unknown).
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes No Unknown No C-1 21 Status: Seismic Walkdown Checklist (SWC)Yl u Equipment ID No.: Equipment.
Class: Equipment
 
==
Description:==
 
4D25 (16) Inverters 4A1 BATTERY CHARGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Scaffold around cabinet is braced and anchored, OK.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened lower front doors).No loose or missing hardware.Comments Walkdown by Team A C-122 4Y05 SWC Status: Seismic Walkdown Checklist (SWC)Y-]N U Equipment ID No.: Equipment Class: 4Y05 (16) Inverters STATIC INVERTER 4C 125 VDC/120 VAC 7.5 KVA Equipment
 
==
Description:==
(CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 347 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Visual hairlines cracks in grout pad are present but judged to be of minor significance.
: 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (5) x 5/8 diameter CEA's. See field sketch. Anchorage does not match 5610-C-652 Sh. 2.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes No No C-123 Status: Seismic Walkdown Checklist (SWC)FYIN U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
4Y05 (16) Inverters STATIC INVERTER 4C 125 VDC/120 VAC 7.5 KVA (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes There is a 1-1/2" gap between cabinet and handrail.
Judged to be acceptable for shake space.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet. No loose or missing hardware.Comments Walkdown by Team C C-124 4Y07 SWC Status: Seismic Walkdown Checklist (SWC)YN- u Equipment ID No.: Equipment Class: 4Y07 (16) Inverters STATIC INVERTER 4D 125 VDC/120 VAC 7.5 KVA Equipment
 
==
Description:==
(CABINET)Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 347 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchora-qe
: 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Visual crack is present at front but judged to be of minor significance.
: 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Not Applicable Yes C-125 Status: Seismic Walkdown Checklist (SWC)Y -]u Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4Y07 (16) Inverters STATIC INVERTER 4D 125 VDC/120 VAC 7.5 KVA (CABINET)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes About 2-3/4" gap to wall. Judged to be acceptable for shake space.See A WC for scaffold comments.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior of cabinet. No loose or missing hardware.Comments Walkdown by Team C C-126 Class (17) Engine-Generators 4K4A SWC Status: Y N- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 4K4A Equipment Class: (17) Engine-Generators Equipment
 
==
Description:==
 
4A DIESEL GENERATOR Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 423 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?See hairline cracks (may be paint cracks only) at west end of skid, two anchor locations.
Cracks are judged to be of minor significance.
: 5. Is the anchorage configuration consistent with plant documentation?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (12) x 1-1/4" CIP bolt along each long side plus (2) more each short side; (28) total anchor bolts. Matches drawing 5614-C-1589 Sh.1.C-127 Status: Seismic Walkdown Checklist (SWC)YW] U Equipment ID No.: Equipment Class: 4 K4A (17) Enqine-Generators Equipment
 
==
Description:==
 
4A DIESEL GENERATOR 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No Two pendulum lights above on.-skid panel at southwest may be a hazard. Lights will bang against hard surfaces and light shade may fall and hit soft targets on skid.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Overhead crane is restrained.
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Attached lines have good flexibility.
See photos.10. Based on the above seismic interaction evaluations, is equipment free No of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-128 Class (18) Instruments on Racks 4QR35 SWC Status: Y N Seismic Walkdown Checklist (SWC)Equipment ID No.: 4QR35 Equipment Class: (18) Instruments on Racks Equipment
 
==
Description:==
 
CONTROL ROOM PROTECTION RACK Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 310 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?See floor cracks on right side but not near anchors.5. Is the anchorage configuration consistent with plant documentation?
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is shown on field sketch, see (8) x 3/8 diameter (estimated size). anchors. Need correct anchor drawing to verify (unknown).
Also anchor locations at right end have gap between cabinet base and floor (see stack of washers).C-129 Status: Seismic Walkdown Checklist (SWC)Y NI- I Equipment ID No.: Equipment Class: 4QR35 (18) Instruments on Racks Equipment
 
==
Description:==
 
CONTROL ROOM PROTECTION RACK 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution, systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened all doors of line-up).No loose or missing hardware.Comments Walkdown by Team B C-130 Class (19) Temperature Sensors TIS-4-6413B SWC Status: Seismic Walkdown Checklist (SWC)Y NF--Equipment ID No.: Equipment Class: TIS-4-6413B (19) Temperature Sensors Equipment
 
==
Description:==
 
SWGR RM 4D FAN 4V65B TEMP SWITCH Project: Turkey Point 4 SWEL Location (BIdg, Elev, Room/Area):
Unit 4, 42.00 ft, 430 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Wall mounted unit; cannot see wall anchorage fully unless switch is disassembled.
After removal of cover, can only see studs to mounting plate.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks in wall.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
No Unknown Unknown Yes Not Applicable C-131 Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: TIS-4-6413B (19) Temperature Sensors Equipment
 
==
Description:==
 
SWGR RM 4D FAN 4V65B TEMP SWITCH.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Note: Very light item; anchorage failure not credible.Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adlequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-132 Class (20) Instrumentation and Control Panels and Cabinets 4C04 SWC Status: Seismic Walkdown Checklist (SWC)Y N F_Equipment ID No.: Equipment Class: 4C04 (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
VERTICAL PANEL A Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 360 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes for visible anchors.Unknown for anchors that are not visible (blocked by cables, wires, etc.). See the field sketch, expect that (1) in rear and (5) front anchors are present but not visible.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the anchors?Per PTN-O-J-C-90-0003, expect that anchors are embedded in concrete curb. Cannot see curb, therefore crack inspection results are unknown.No Unknown Unknown Unknown 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Unknown C-133 Status: Seismic Walkdown Checklist (SWC)Y N F-Equipment ID No.: Equipment Class: 4C04 (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
VERTICAL PANEL A Per PTN-O-J-C-90-0003 Sh. 44, expect 1/2" anchors <= 24" o/c.Visible anchors are consistant with this design. See field sketch.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Egg crate ceiling tiles above are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was resolved by analysis.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Ceiling tiles are a concern; see above.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No No Yes No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet. Back of cabinet is open (no doors). Some hanging loops of cable seen, but not a concern. Also see Dell PC on a shelf. The PC is clamped down and shelf is strong;OK (see photo). Also no loose or missing hardware.Comments Walkdown by Team B C-134 4C06_4C05 SWC Status: Y N Seismic Walkdown Checklist (SWC)Equipment ID No.: 4C06 4C05 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
VERTICAL PANEL B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 360 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings., Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Unknown Yes for visible anchors.Unknown for anchors that are not visible (blocked by cables, wires, etc.). See the field sketch. Expect that (6 or 7) front anchors are present but not visible.3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?Per PTN-O-J-C-90-0003, expect that anchors are embedded in concrete curb. Cannot see curb, therefore crack inspection results are unknown.5. Is the anchorage configuration consistent with plant documentation?
Unknown (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Per PTN-O-J-C-90-0003 Sh. 44, expect 1/2" anchors <= 24" o/c.Visible anchors are consistent with this design. Cannot see all anchors so verification status is unknown. See field sketch.6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
C-135 Status: Seismic Walkdown Checklist (SWC)Y NF-Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4C06 4C05 (20) Instrumentation and Control Panels and Cabinets VERTICAL PANEL B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Egg crate ceiling tiles above are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was resolved by analysis.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Ceiling tiles are a concern; see above.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No No Yes No Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet. Back of cabinet is open (no doors). Some hanging loops of cable seen, but not a concern. No loose or missing hardware.Yes Comments Walkdown by Team B C-136 4C13A SWO Status: Seismic Walkdown Checklist (SWC)Y NF--Equipment ID No.: Equipment Class: 4C13A (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
4A EDG CONTROL PANEL Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 427 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Visual cracks are present but judged to be of minor significance.
Appear to be surface cracks only.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See welds to floor embedments, see field sketch. Need correct anchor drawing to verify (unknown).
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Unknown Unknown C-137 Status: Seismic Walkdown Checklist (SWC)Y NFU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4C13A (20) Instrumentation and Control Panels and Cabinets 4A EDG CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Overhead light may bang against adjacent overhead items. Light is judged rugged, so OK. Blub may break but not considered a hazard.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened rear door). No loose or missing hardware.Comments Walkdown by Team B C-138 4C23A SWC Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: 4C23A (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
SEQUENCER 4C23A -CABINET Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Inspected floor and wall anchors.Unknown: One floor anchor expected to be present is not visible (block by wires).3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the anchors?No floor or wall cracks visible.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which* an anchorage configuration verification is required.)
See (2) floor anchors in right section and (1) in left section. One floor anchor in left section probably covered by wires. See field sketch. Also see two wall anchors (one per side).Configuration is consistent with PTN-BFJC-92-039 Attach. 1 Sheet 9 except unknown for one floor anchor not visible. Top anchorage matches 5614-C-1792.
Yes Unknown Unknown Yes Unknown C-139 Status: Seismic Walkdown Checklist (SWC)Y N F Equipment ID No.: Equipment Class: 4C23A (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
SEQUENCER 4C23A -CABINET 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened all doors). No loose or missing hardware.Comments Walkdown by Team B C-140 4C23B SWC Status: Seismic Walkdown Checklist (SWC)FY]N -U Equipment ID No.: Equipment Class: 4C23B (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
SEQUENCER 4C23B -CABINET Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Visual cracks are present but judged to be of minor significance.
Appear to be surface cracks only.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See two floor anchors per cabinet (4 total) and two wall anchors.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Yes Yes Yes Not Applicable Yes C-141 Status: Seismic Walkdown Checklist (SWC)I-W]IN U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
4C23B (20) Instrumentation and Control Panels and Cabinets SEQUENCER 4C23B -CABINET I I I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There is a masonry wall behind the cabinet. Per drawing 5160-C-1730, the wall is safety related and acceptable for design basis (wall T-18-6A).9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Inspected exterior and interior of cabinet (opened all doors). No loose or missing hardware.Comments Walkdown by Team B C-142 4C264 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 4C264 (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
4C264 -ALTERNATE SHUTDOWN PANEL Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 368 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage is combination of CEA's and weld to embedments.
: 3. Is the anchorage free of corrosion that is more than mild. surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?One cracks visible but not near an anchor.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Yes Yes Yes Yes C-1 43 Status: Seismic Walkdown Checklist (SWC)Y FNu Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4C264 (20) Instrumentation and Control Panels and Cabinets 4C264 -ALTERNATE SHUTDOWN PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
There are masonry walls in the area. See AWC for comments.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that No could adversely affect the safety functions of the equipment?
No Lower left latch of transparent front panel (guard panel) is not engaged: Other Inspected exterior and interior of cabinet (opened all doors). No loose or missing hardware.Comments Walkdown by Team B C-144 CONSOLE SWC Status: Y N ---Seismic Walkdown Checklist (SWC)Equipment ID No.: CONSOLE Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
CONTROL ROOM CONTROL CONSOLE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 362 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Unknown Based on inspection, nominal anchorage is 1/2 diameter anchor, 24" o/c along edges.See field sketch. Viewed all front anchors except one location was covered by wires.Expect that all rear anchors were seen. Two locations in rear seen to be missing an anchor (see empty holes).No side anchors seen.No issues with visible anchors.Unknown: Two rear anchor locations known to be missing an anchor bolt;unknown if this is OK per design basis. Can't inspect some anchors, covered by wires.3. Is the anchorage free of corrosion that is more than mild surface Unknown oxidation?
Same as above.4. Is the anchorage free of visible cracks in the concrete near the Unknown anchors?C-145 Status: Seismic Walkdown Checklist (SWC)Y NFUj Equipment ID No.: Equipment Class: CONSOLE (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
CONTROL ROOM CONTROL CONSOLE Expect cabinet sits on concrete curb. Cannot see curb & not able to inspect.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Unknown Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No Egg crate ceiling tiles above are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was resolved by analysis.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, No and masonry block walls not likely to collapse onto the equipment?
Ceiling tiles are a concern; see above.9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free No of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
C-146 L-Status: Y NL1 Seismic Walkdown Checklist (SWC)Equipment ID No.: CONSOLE Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
 
==
Description:==
 
CONTROL ROOM CONTROL CONSOLE Inspected exterior and interior of cabinet (opened all doors). One small electrical box seen lying on floor of cabinet nestled in wires.Discussed with operators and found to be non-safety device and not a concern (see photo). No other issues.Comments Walkdown by Team B C-147 Class (21) Tanks and Heat Exchangers 4P214B HEAT EXCHANGER SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: 4P214B HEAT EXCHANGER (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
SEAL WATER HEAT EXCHANGER FOR CONTAINMENT SPRAY PUMP B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 203 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-148 Status: Seismic Walkdown Checklist (SWC)F7N U Equipment ID No.: Equipment Class: 4P214B HEAT EXCHANGER (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
SEAL WATER HEAT EXCHANGER FOR CONTAINMENT SPRAY PUMP B 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-149 4E206B SWC Status: Seismic Walkdown Checklist (SWC)Y-]N U Equipment ID No.: Equipment Class: 4E206B (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
RHR HEAT EXCHANGER B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 4.00 ft, 210A Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with 5610-C-271 Sh. 1 Rev. 9 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-1 50 Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4E206B (21) Tanks and Heat Exchangers RHR HEAT EXCHANGER B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-151 4E207B SWC Status: Seismic Walkdown Checklist (SWC)FY]N U Equipment ID No.: Equipment Class: 4E207B (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
COMPONENT COOLING HEAT EXCHANGER B Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 202 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
Not Applicable Yes C-152 Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
4E207B (21) Tanks and Heat Exchanqers COMPONENT COOLING HEAT EXCHANGER B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-153 4E208A SWC Status: Seismic Walkdown Checklist (SWC)Y N&#xb6;-U Equipment ID No.: Equipment Class: 4E208A (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
SPENT FUEL PIT HEAT EXCHANGER Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Need to verify anchorage with plant documentation.
Noted 4 -3/4" diameter anchor bolts per pedestal (8 total) in the field.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Unknown Unknown C-154 Status: Seismic Walkdown Checklist (SWC)YN FU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4E208A (21) Tanks and Heat Exchangers SPENT FUEL PIT HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Heat exchanger is approximately 1/2" from a vertical pipe support.Based on the transverse stiffness of the heat exchanger it is not possible for seismic interaction.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Adequate spacing exists between scaffolding and the heat exchanger.
Overhead chain hoists are properly clamped to beams and chains are stored in a safe position.Yes Comments Walkdown by Team A C-155 4T1 SWC Status: Seismic Walkdown Checklist (SWC)Y Nu Equipment ID No.: Equipment Class: Eauipment
 
==
Description:==
 
4T1 (21) Tanks and Heat Exchangers REFUELING WTR STORAGE TK I I Project: Location (Bldg, Elev, Room/Area):
Turkey Point 4 SWEL Unit 4, 18.00 ft, 217 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Moderate corrosion on anchor bolts at several locations.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with drawing 5610-C-375 Sh. 1 Rev. 8 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes No Yes Yes No C-156 r Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4T1 (21) Tanks and Heat Exchanqers REFUELING WTR STORAGE TK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Scaffolding deficiencies discussed under area walkby checklist for Area 217- RWST.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-157 4T259A SWC Status: Seismic Walkdown Checklist (SWC)Y].N U Equipment ID No.: Equipment Class: 4T259A (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
DIESEL OIL STORAGE TANK 4A Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 432 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Tank is integral with building (lined concrete vault). No anchorage required.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks seen at base of tank in transfer pump area.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
No Yes Yes Yes Not Applicable Yes C-158 Status: Seismic Walkdown Checklist (SWC)IWIN U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4T259A (21) Tanks and Heat Exchangers DIESEL OIL STORAGE TANK 4A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Inspected penetrations in transfer pump area.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-159 4T260A SWC Status: Seismic Walkdown Checklist (SWC)FY]NU Equipment ID No.: Equipment Class: 4T260A (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
DIESEL OIL DAY TANK 4A FOR EDG Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 423 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is (8) x 3/4 CIP bolts (4 per saddle). Matches drawing 5614-C-1589 Sh. 1.6. Based on the above anchorage evaluations, is the anchorage free of Dotentiallv adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-1 60 Status: Seismic Walkdown Checklist (SWC)FY1N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4T260A (21) Tanks and Heat Exchanqers DIESEL OIL DAY TANK 4A FOR EDG Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
Overhead duct is well supported.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Walkdown by Team B C-161 4T270A SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 4T270A (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
EDG 4A STARTING AIR ACCUMULATOR TANK Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 425 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See (6) x 3/4 diameter thru bolts to steel skid around base.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-162 Status: Seismic Walkdown Checklist (SWC)[NU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4T270A (21) Tanks and Heat Exchangers EDG 4A STARTING AIR ACCUMULATOR TANK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-163 4T8 SWC Status: Seismic Walkdown Checklist (SWC)Y F]U Equipment ID No.: Equipment Class: 4T8 (21) Tanks and Heat Exchanqers Equipment
 
==
Description:==
 
CONDENSATE STORAGE TANK Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 331 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to recordthe results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Due to past corrosion, a group of 1-3/8 anchors at the south and southwest have reduced bolt cross-sectional areas where bolts enter the top of the pad. The reduced strength of the bolts needs to be verified as acceptable.
The bolts have been painted so ongoing corrosion does not appear to be an issue.4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes No Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
C-164 Status: Seismic Walkdown Checklist (SWC)YL-LU Equipment ID No.: Equipment Class: 4T8 (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
CONDENSATE STORAGE TANK 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Missile shield above, OK.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team B C-165 T205C SWC Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: T205C (21) Tanks and Heat Exchangers Equipment
 
==
Description:==
 
BORIC ACID STORAGE TANK C Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 27.00 ft, 200 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage consistent with PCM 90-440 6. Based on the above anchorage evaluations, is the anchorage free of 1otentiallv adverse seismic conditions?
Yes Yes Yes Yes Yes Yes C-166 Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
T205C (21) Tanks and Heat Exchangers BORIC ACID STORAGE TANK C Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
East side of tank is within 1/2" of hanger support for CCW. Based on the location of wall penetrations and other supports for the CCW, as well as the insulation around the tank, there is adequate stiffness and clearance to preclude potential seismic interaction.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-167 Class (00) Other 4-12-031 SWC Status: Seismic Walkdown Checklist (SWC)Y lN U Equipment ID No.: Equipment Class: 4-12-031 (0) Other Equipment
 
==
Description:==
 
TUBE GATE ISOLATION VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 212A Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable C-168 Status: Seismic Walkdown Checklist (SWC)IW1N U Equipment ID No.: Equipment Class: 4-1 2-03 1 (0) Other Equipment
 
==
Description:==
 
TUBE GATE ISOLATION VALVE 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-169 4-797 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No,: 4-797 Equipment Class: (0) 0th IY]N U er Equipment
 
==
Description:==
 
SFP COOLING WATER PUMP LOW SUCTION VALVE Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 30.00 ft, 223B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-170 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 4-797 Equipment Class: (0) Oth W-N N U er Equipment
 
==
Description:==
 
SFP COOLING WATER PUMP LOW SUCTION VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Walkdown by Team A C-171 4-910 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 4-910 Equipment Class: (0) Oth U er Equipment
 
==
Description:==
 
SFP CLG PMP A SUCT ISO VLV Project: " Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 223 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with. plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-172 Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4-910 (0) Other SFP CLG PMP A SUCT ISO VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Adequate gap between valve and adjacent line.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-173 4K200 SWC Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: 4K200 Equipment Class: (0) 0th Y]N U er Equipment
 
==
Description:==
 
BORIC ACID BLENDER Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable Not Applicable Yes C-174 Status: Seismic Walkdown Checklist (SWC)FYINU Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
4K200 (0) Other BORIC ACID BLENDER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-175 BD-1 SWC Status: Seismic Walkdown Checklist (SWC)Y]N U Equipment ID No.: Equipment Class: BD-1 (0) Other Equipment
 
==
Description:==
 
CREVS INTAKE BALANCING DAMPER Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 347 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Welded supports to floor mounted frame.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Checked floor area around frame posts.No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-1 76 Status: Seismic Walkdown Checklist (SWC)Equipment ID No.: BD-1 Equipment Class: (0) Oth W-]N U er Equipment
 
==
Description:==
 
CREVS INTAKE BALANCING DAMPER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
There are a masonry walls in the area. Per drawing 5160-C-1 728, the walls are safety related and acceptable for design basis (A-42-1, -3, -4).9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free Yes of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team C C-177 BS-4-1402 SWC Status: Seismic Walkdown Checklist (SWC)L-Y- N U Equipment ID No.: Equipment Class: BS-4-1402 (0) Other BASKET STRAINER TO INTAKE COOLING WTR SUPPLY FOR CCW HX Equipment
 
==
Description:==
 
A Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 18.00 ft, 202 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-178 Status: Seismic Walkdown Checklist (SWC)FY N U Equipment ID No.: Equipment Class: BS-4-1402 (0) Other BASKET STRAINER TO INTAKE COOLING WTR SUPPLY FOR CCW HX A EauiDment DescriDtion:
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-179 LT-4-651 SWC Status: Seismic Walkdown Checklist (SWC)U Equipment ID No.: Equipment Class: LT-.4-651 (0) Other Equipment
 
==
Description:==
 
SPENT FUEL PIT LEVEL TRANSMITTER Project: Turkey Point 4 SWEL Location (Bldg, Elev, Room/Area):
Unit 4, 42.00 ft, 212B Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes C-180 Status: Seismic Walkdown Checklist (SWC)rY]N U Equipment ID No.: Equipment Class: Equipment
 
==
Description:==
 
LT-4-65 1 (0) Other SPENT FUEL PIT LEVEL TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes Adjacent tent scaffold is adequately braced to nearby wall and railing.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yes and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Comments Walkdown by Team A C-181 D Area Walk-By Checklists (AWCs)Table D-1. Summary of Area Walkdown Checklists Area Walk-by Description ID Page Area 200 Area 200 -BORIC ACID TANK ROOM 4P203B D-4 T205C Area 201 Area 201 -CHARGING PUMP ROOM 4K200 D-6 4P201B FCV-4-113A TCV-4-143 MOV-4-350 Area 202 Area 202 -COMPONENT COOLING PUMP BS-4-1402 D-8 ROOM 4P211B 4E207B Area 203 Area 203 -CONTAINMENT SPRAY PUMP 4P214B D-10 ROOM MOV-4-880B MOV-4-843B 4P214B HEAT EXCHANGER Area 206 Area 206 -HI-HEAD SIS PUMP ROOM 4P215B D-12 Area 209 Area 209 -PIPE & VALVE ROOM HCV-4-121 D-14 MOV-4-869 Area 210A Area 210 -RHR HEAT EXCHANGER ROOM MOV-4-863B D-16 LOWER 4E206B Area 210B Area 210B -RHR HEAT EXCHANGER ROOM HCV-4-758 D-18 UPPER MOV-4-860B Area 211 Area 211 -RHR PUMP ROOM 4P210B D-20 MOV-4-861 B MOV-4-862A Area 212A Area 212A -SPENT FUEL PIT ROOM NORTH 4-12-031 D-22 SIDE 4T218 Area 212B Area 212B -SPENT FUEL PIT ROOM SOUTH LT-4-651 D-24 SIDE Area 215 Area 215 -NORTH-SOUTH HALLWAY 4808 D-26 4B07 Area 217 Area 217 -RWST MOV-4-864B D-28 4T1 Area 223 Area 223 -SPENT FUEL PIT PUMP/HEAT 4-910 D-30 EXCHANGER ROOM 4P212A EMERG SFP CLG PMP 4E208A Area 223B Area 223B -CASK WASH AREA 4-797 D-32 Area 234A Area 234A -NEW ELECTRICAL EQUIPMENT 4850 D-34 ROOM, 18' ELEVATION V77 4S77 4D02A Area 300 Area 300 -STEAM DECK CV-4-1607 D-36 POV-4-2605 Area 301 Area 301 -BELOW.STEAM DECK MOV-4-1404 D-38 Area 302 Area 302 -FEEDWATER DECK FCV-4-488 D-40 CV-4-2818 Area 306 Area 306 -AUX FEED PUMP AREA P2C D-42 Area 309 Area 309 -DIESEL GENERATOR BUILDING EDG FAN ASSEMBLIES D-44 (LOWER LEVEL)D-1 Area Walk-by Description ID Page Area 310B Area 310B -CABLE SPREADING ROOM, 4D01 D-46 AREA NEAR MG SET 4D02 Area 310C Area 310C -CABLE SPREADING ROOM, E16A D-48 MECH. EQ. ROOM (E16 AIR HANDLERS)Area 310D Area 310D -CABLE SPREADING ROOM, 4QR35 D-50 AREA NEAR 4QR35 Area 315 Area 315 -LP TURBINE NORTH AREA 4E239B D-52 Area 331 Area 331 -CONDENSATE STORAGE TANK 4T8 D-54 Area 334 Area 334 -TURBINE PLANT HEAT POV-4-4883 D-56 EXCHANGER AREA Area 341 Area 341 -480V LC ROOM 4804 D-58 4B02 X05 4E241 B 4E242B Area 342 Area 342 -3A MCC 4805 D-60 Area 343 Area 343 -3B MCC ROOM 4806 D-62 Area 346 Area 346 -4B BATTERY ROOM 4D03 D-64 Area 347A Area 347 -CONTROL ROOM INVERTER 4D23 D-66 ROOM -U4 DC EQUIP ROOM 4D25 4Y07 Area 347B Area 347 -CONTROL ROOM INVERTER 4Y05 D-68 ROOM -U3 DC EQUIP ROOM Area 347C Area 347 -CONTROL ROOM INVERTER 4D24 D-70 ROOM -4A BATTERY ROOM Area 347D Area 347 -CONTROL ROOM INVERTER BD-1 D-72 ROOM -CREVS ROOM Area 360 Area 360 -CONTROL ROOM 4C06 4C05 D-74 4C04 Area 362 Area 362 -CONTROL ROOM CONTROL CONSOLE D-76 CONSOLEAWC Area 368A Area 368 -4160 V SWITCHGEAR ROOM A 4C23A D-78 Area 368B Area 368 -4160 V SWITCHGEAR ROOM B 4AB D-80 4E243B 4C23B 4C264 Area 370 Area 370 -INTAKE AREA 4P9B D-82 Area 423 4A DIESEL GENERATOR SV-4-3434A D-84 4K4A 4T260A Area 424 Area 424 -EMERGENCY DIESEL 4A 4V64A D-86 Area 425 Area 425 -EMERGENCY DIESEL 4A AIR 4CM226A D-88 START AREA. 4T270A Area 427 Area 427 -EMERGENCY DIESEL 4A 4C13A D-90 CONTROL ROOM Area 430 Area 430 -SWITCHGEAR ROOM 4D 4V65B D-92 TIS-4-6413B 4AD Area 431 Area 431 -EMERGENCY DIESEL 4A DIESEL 4P241A D-94 OIL TRANSFER PUMP ROOM Area 432 EMERGENCY DIESEL 4A DIESEL OIL 4___ 1 STORAGE TANK ROOM Note: Detailed signed records of the checklists are available at the site.T259A D-96 D-2 Per the EPRI guidance document, the top row of each checklist summarizes the status as follows: Status Meaning Y All relevant checks were answered Yes and no further action is required.N At least one check was answered No and follow-up is required.U At least one check could not be answered due to unavailable information and follow-up is required.Section 5.3 of this report identifies planned actions for items requiring follow-up.
D-3 Area 200 Status: [- N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 200 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditionsof cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-4 Status: L-j N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 200 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown bv Team A D-5 Area 201 Status: Y L U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 201 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of No potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Nut and washer missing at base plate of support for PS-4-201B 2. Does anchorage of equipment in the area appear to be free of No significant degraded conditions?
Bent hanger rod supporting overhead nitrogen line.3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-6 Status: Y [7N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 201 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-7 Area 202 Status: LIN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 202 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Overhead grating is secured.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area well supported (welded and threaded lines). Spray nozzles have good clearance.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-8 Status: Z] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 202 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold near heat exchangers and north wall found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-9 Area 203 Status: Y ILN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 203 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit No raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Two bent hanger rods above MOV-4-843B.
: 4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-10 Status: Y L] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 203 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-11 Area 206 Status: LY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 206 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
The motor cable box on the 4A pump is flush against wall. Due to the flexibility of the box and the fact that only a few cables are passing through the relatively large box-to-motor interface, any seismic interaction between the wall and the box would not affect the operation of the pump.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Overhead seal water lines are well supported and have welded connections.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-1 2 Status: Area Walk-By Checklist (AWC)Location (Blda. Elev. Room/Area):
FY_]N U Area 206 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Yes Yes Comments Walkdown by Team A D-13 Area 209 Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 209 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-14 Status: I N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 209 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anichored.
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-1 5 Area 210A Status: F] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to. record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-1 6 Status: [Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-17 Area 210B Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-18 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 210B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-19 Area 211 Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 211 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-20 Status: Li N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 211 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding:
lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-21 Area 212A Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 212A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visiblewithout necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-22 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 212A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown bv Team A D-23 Area 212B Status: FY] N U Area Walk-By Checklist(AWC)
Location (Bldg, Elev, Room/Area):
Area 212B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible Without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-24 Status: E N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 212B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-25 Area 215 Status: Area Walk-By Checklist (AWC)FNU Location (Bldg, Elev, Room/Area):
Area 215 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable D-26 Status: Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 215 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead.shielding)?
: 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Not Applicable Yes Comments Area 215 was inspected during Unit 3 walkdowns and is documented under "Area 220 -Auxiliary Building".
Walkdown by Team A D-27 Area 217 Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 217 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-28 Status: [ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 217 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffolding on west side of RWST is unbraced with the only one lateral support at the top. The scaffolding is in the process of being disassembled and the current configuration is therefore deemed acceptable.
PTN was notified of the condition.
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-29 Area 223 Status: Y FN] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
A hanger rod support for 12" diameter pipe above the heat exchanger appears to have shifted, as indicated by an unpainted portion of the pipe being exposed. There is a tag on the support, possibly indicating that the issue had been previously identified.
The hanger rod is still able to support the pipe and is not considered to be an adverse seismic condition, therefore no hazard exists. PTN was notified of the condition.
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic No interactions that could cause flooding or spray in the area?Handwheel for valve 4-913 is within 1/8" of an adjacent line.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-30 Status: Y L U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No: Temporary light is hooked to an instrument air line on the east side of the heat exchanger.
No: Scaffolding above 4-816B is not adequately braced in the east-west direction.
Other:.Hoist chains are stored in a safe position, away from equipment.
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-31 Area 223B Status: Y iii U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-32 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 223B 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Door on DP422 is unlatched and open.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team A D-33 Area 234A Status: 7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 234A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Both V76 and V77 air handlers appear to be anchored on one side only but per drawing part of anchorage is hidden from view so OK; see SWC for V77.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area sufficiently supported.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-34 Status: 7Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 234A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Large heavy cart, "Continuous Load Unit" on wheels 33" from cabinet (see also AWC). Not considered a credible hazard to nearby equipment because of large gap. It is noted that restaint is with plastic strap and this seems weak as a restaint.Loose equipment box in corner >20" from 3B50. Not considered a credible interaction hazard because impact load potential is very low.Chair behind not a credible hazard (won't hit 3B50).8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. The walls are shown on drawing 5160-C-1701 Sh. I and 2 and designs are designated as"Seismic Category I" (Sh. 1) and "Seismically Designed" (Sh. 2).Comments Walkdown by Team B D-35 Area 300 Status: 7Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 300 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Outside area enclosed by missile shield.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-36 Status: Ei N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 300 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-37 Area 301 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 301 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-38 Status: YJ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 301 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-39 Area 302 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 302 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-40 Status: [YJ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 302 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
There is a lot of scaffold in the area. Scaffold found to be well braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Checked temporary platform above; no issues.Comments Walkdown by Team B D-41 Area 306 Status: r-Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 306 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-42 Status: N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 306 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Area was also inspected for Unit 3.Comments Walkdown by Team B D-43 Area 309 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 309 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Area is overlapped by Area 424. See comments for Area 424.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-44 Status: E N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 309 7. Does it appear that the area is free of potentially adverse seismic. Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-45 Area 310B Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Lights are stiff, won't hit cabinets.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-46 Status: [YJ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310B 7. Does it appear that the area is free of potentiallyadverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-I1727, the walls are safety related and acceptable for design basis (wall C-30-3).Comments Walkdown by Team B D-47 Area 310C Status: Y NI U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310C Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of No potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Air handlers appear unanchored, see El6A SWC.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions(e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area, is free of potentially adverse seismic No interactions that could cause flooding or spray in the area?Rod hung copper tubing ("Service Water" tag seen) appears to be non-seismic.
Connects to air handlers.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-48 Status: Y FN] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310C 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Loose steel cover panels leaning against wall in front of air handlers.Potential to fall.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-49 Area 310D Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310D Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Floor supported cable tray, OK.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?See red piping in area, well supported.
Per plant engineers, piping is a gas system (expect halon).6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-50 Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 310D 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-51 Area 315 Status: EY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 315 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Outdoor location open above.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Light pole near 4E239B welded to platform, OK.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Location ensures equipment is resistant to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-52 Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 315 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary light on Turbine deck judged OK. Won't topple (heavy base) and can't slide into equipment.
Adjacent scaffold well braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Shed to west of platform judged OK; location ensures good lateral strenght (resists high wind loads). Shed is light so seismic load is low.Comments Walkdown by Team B D-53 Area 331 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 331 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions.
may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Outdoor location ensures equipment is not vulnerable to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-54 Status: -Y- N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 331 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-55 Area 334 Status: Y] N U Area Walk-By Checklist (AWC)Location (BIdg, Elev, Room/Area):
Area 334 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
One anchor on nearby Basket Strainer has been corroded then painted over; overall anchorage of strainer is still good so judged acceptable.
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Outdoor area open above.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Outdoor location ensures equipment is not vulnerable to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-56 Status: FY_ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 334 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-57 Area 341 Status: 7Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 341 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-58 Status: I N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 341 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No issues.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-1729, the walls are safety related and acceptable for design basis (walls T-31-1B,-2B, -3B).Comments Walkdown by Team B D-59 Area 342 Status: L7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 342 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist-for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?MCC is in an enclosure, so not vulnerable to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?Hydrogen lines > 35' away.D-60 Status: [YJ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 342 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Checked scaffold in the area, judged to be sufficiently braced and anchored.
Saw a loose cart on two wheels, wheels locked in up position off ground. Cart was far from equipment and not a hazard.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-61 Area 343 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 343 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-62 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 343 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No issues.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-63 Area 346 Status: [Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 346 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-64 Status: IYi N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 346 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-1727, the walls are safety related and acceptable for design basis (walls C-30-2, -3,-4).Comments Walkdown by Team B D-65 Area 347A Status: [] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-66 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area found to be adequately braced and anchored.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are masonry walls in the area. Per drawing 5160-C-1 728, the walls are safety related and acceptable for design basis (walls A-42-1,-2,-3,-4; C-42-15,-16,-17,-18).
Comments Walkdown bv Team C D-67 Area 347B Status: [ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Domestic water supply to wall sink reviewed.
Sink is supported by drain line. Judged not to be a spray hazard.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-68 Status: lE N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are masonry walls in the area. Per drawing 5160-C-I 728, the walls are safety related and acceptable for design basis (walls A-42-1,-2,-3,-4; C-42-15,-16,-17,-18).
Comments Walkdown by Team C D-69 Area 347C Status: -YN U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347C Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
1 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Light shades safety wired to supports.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-70 Status: YI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347C 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are masonry walls in the area. Per drawing 5160-C-1728, the walls are safety related and acceptable for design basis (walls A-42-1,-2,-3,-4; C-42-15,-16,-17,-18).
Comments Walkdown by Team C D-71 Area 347D Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347D Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tile~s and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-72 Status: Y]- N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 347D 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Area also covered by Unit 3 walkdown; see Unit 3 AWC for comments.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are masonry walls in the area. Per drawing 5160-C-i1728, the walls are safety related and acceptable for design basis (walls A-42-1,-2,-3,-4; C-42-15,-16,-17,-18).
Comments Walkdown by Team C D-73 Area 360 Status: Y -NU Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 360 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic No spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Egg crate ceiling tiles above main area of Control Room are not tied to framing and can fall on operators and soft targets. This issue was cited in A-46 inspection.
Unknown if this was. resolved by analysis.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-74 Status: Y N] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 360 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Unrestrained "Man-Machine Interface" cart on wheels (see photo) is close to Rack No 14, "Protection Ch. Set Ill". Cart may impact against cabinet.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There is a masonry wall in the area. Per drawing 5160-C-1728, the wall is safety related and acceptable for design basis (walls A-42-2).Comments Walkdown by Team B D-75 Area 362 Status: [] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 362 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic No spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Egg crate ceiling tiles may fall; see Area 360 AWC comments.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-76 Status: lY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 362 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-77 Area 368A Status: Fj] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368A Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-78 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368A 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
No issues.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-I1730, the walls are safety related and acceptable for design basis (walls T-18-5A,-6A, -7A).Comments Walkdown by Team B D-79 Area 368B Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368B Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from-the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-80 Status: EY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 368B 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold overhead seen to be well braced and anchored.Loose breaker >31" from 4AB; based on large gap to equipment not a credible hazard.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?There are a masonry walls in the area. Per drawing 5160-C-1730, the walls are safety related and acceptable for design basis (walls T-18-5A,-6A, -7A).Comments Walkdown by Team B D-81 Area 370 Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 370 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Cable tray on crane support framing, well supported.
: 4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Outdoorlocation ensures equipment is not vulnerable to spray.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-82 Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 370 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Scaffold in area is well braced and anchored to hard points.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-83 Area 423 Status: Y U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 423 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Phone stand is well anchored.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Support conditions are very good.4. Does it appear that the area is free of potentially adverse seismic No spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Two pendulum lights may be a hazard; see 4K4A SWC.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area well supported.
Spray nozzles have good clearance.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-84 Status: Y [j U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 423 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Overhead crane is restrained.
Comments Walkdown by Team B D-85 Area 424 Status: Y N] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 424 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
The 4V64A fan is assigned to this area. Area 424 is the overhead of Area 423. See comments for Area 423.2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-86 Status: Y [N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 424 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-87 Area 425 Status: Y 7 U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 425 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes.spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area well supported.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-88 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 425 7. Does it appear that the area is free of potentially adverse seismic No interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
12' ladder on wall behind air tanks is stowed but can slide on brackets and also swing. Ladder can hit tubing line near RV-4-1456A, see photos. This is judged to be a potentially adverse condition.
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-89 Area 427 Status: Y FN] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 427 Instructions for Completing Checklist' This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1 .Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Exhaust fan overhead is well secured. See 4C13A SWC for comments on light.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping in the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-90 Status: Y F-] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 427 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of-portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Saw loose plastic step stool, not a concern.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-91 Area 430 Status: Ii N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 430 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Very little overhead.4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Lights that are hunf are well above equipment and not an impact hazard.5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?No fire piping is the area.6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-92 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 430 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Loose breaker in corner, 42" from 4AD. Large gap to equipment so not a credible hazard.8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Walkdown by Team B D-93 Area 431 Status: Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 431 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?Fire piping in area well supported.
Spray nozzles have good clearance.
: 6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-94 Status: ] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 431 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated With housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Overhead grating is tied down with clips.Comments Walkdown by Team B D-95 Area 432 Status: `] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 432 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items.The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to. be free of Yes potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of Yes significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit Yes raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic Yes spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic Yes interactions that could cause a fire in the area?D-96 Status: Y] NU Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):
Area 432 7. Does it appear that the area is free of potentially adverse seismic Yes interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Inspected internal area near transfer pump and external area (two outside walls).Comments Walkdown by Team B D-97 E Plan for Future Seismic Walkdown of Inaccessible Equipment This appendix identifies equipment that was partly or completely inaccessible for inspection during the walkdown.
The tables below address three categories of equipment:
Table E-1 Item was completely inaccessible due to radiological, safety or other issues. Area corresponding to the item was also inaccessible.
Table E-2 Anchorage of item was internal and team was denied permission to open due to personnel hazard or hazard to plant operation.
Table E-3 Status of inspections of electrical cabinet for "Other Adverse Conditions" under SWC Check 11. For some cabinets, inspection did not include all compartments/sections because of safety concerns or hazard to plant operation.
The inspections for Turkey Point Unit 4 deferred components and inaccessible components will be performed prior to the end of the first quarter in 2013 which falls within the window of the next refueling outage. An action request (AR) has been issued to plan for and implement additional cabinet internal inspections.
E-1 Table E-1. Completely Inaccessible Equipment Component ID Description Reason for Inaccessibility 4T229B Sl ACCUM B Item is within Containment and plant was operating at the time of inspection.
4V30B EMERGENCY CONTAINMENT Same as above COOLER B MOV-4-535 PRESSURIZER PORV BLOCK Same as above VALVE MOV-4-744A RHR LO HEAD Sl TO LOOP A Same as above MOTOR OPERATED VLV MOV-4-751 NORMAL RHR INLET FROM RCS Same as above MOTOR OPERATED VLV MOV-4-865A Sl ACCUM A DISCH MOTOR Same as above OPERATED VLV PCV-4-4885 PRZR PORV N2 BACKUP Same as above SUPPLY PRESSURE REGULATOR SV-4-455C PRESSURIZER PORV SOLENOID Same as above VALVE TW-4-412C DELTA T-TAVG CH I COLD LEG 1 Same as above THERMOWELL 4T218 COMPONENT COOLING SURGE Surge tank area not accessible during TANK walkdown, plant security issues.Table E-2.lnternal anchorage of equipment not accessible for inspection Component ID Description Reason for Inaccessibility 4AB 4AB 4.16V SWITCHGEAR 4A Electrical hazard (CABINET)4AD 4.16KV SWITCHGEAR 4AD FOR Electrical hazard BUS 4D 4D23 4D23 (DISTRIBUTION PANEL) Electrical hazard E-2 Table E-3.Status of internal inspection of electrical cabinets Component ID Description Class Status 4B05 A-MCC (CABINET) 01 MCC is within an environment enclosure.
Opened enclosure doors and inspected front of MCC.4806 B-MCC (CABINET) 01 MCC kick plates (lower plates) were opened and the interior was inspected.
4B07 C-MCC (CABINET) 01 Same as above.4B08 D-MCC (CABINET) 01 Same as above.4B02 4B02 480V HVPDS LOAD CENTER 4B 02 Not accessible due to plant operation/safety hazard.(CABINET)4B04 4D LC (Part of B train) 02 Same as above.4B50 4H LOAD CENTER (CABINET) 02 Permission to open spare compartments.
Opened 3 of 3 lower doors.4AB 4AB 4.16V SWITCHGEAR 4A (CABINET) 03 See Table E.2 4AD 4.16KV SWITCHGEAR 4AD FOR BUS 03 See Table E.2 4D 4D01 4D01 (DISTRIBUTION PANEL) 14 Kick plates (lower plates) were opened and the interior was inspected.
4D23 4D24 (DISTRIBUTION PANEL) 14 See Table E.2 4D02A 4B2 BATTERY CHARGER 16 Permission to open lower compartments.
Opened 2 of 2 lower doors.4Y05 STATIC INVERTER 4C 125 VDC/120 16 Not accessible due to plant operation/safety hazard.VAC 7.5 KVA (CABINET)4Y07 STATIC INVERTER 4D 125 VDC/120 16 Same as above.VAC 7.5 KVA (CABINET)4D02 4B1 BATTERY CHARGER 16 Same as above.4D25 4A1 BATTERY CHARGER 16 Permission to open lower compartments.
Opened 2 of 2 lower doors.E-3 F Peer Review Report Peer Review Report for the Seismic Walkdown Inspection of Turkey Point Nuclear Station (NRC Near Term Task Force Recommendation 2.3)Turkey Point Nuclear Station October 2012 Prepared by Reviewed by Reviewed by Reviewed by L.ead)Date/
f Date Date F-1
: 1. INTRODUCTION This report documents the peer review of the seismic walkdowns performed for Turkey Point Nuclear Station in September 2012, in support of the NRC Near Term Task Force (NTTF)Recommendation 2.3. This document describes the peer review team and process (Section 3), the peer review of the SWEL selection (Section 4), and the peer review of the seismic walkdown (Section 5).The peer review was performed consistent with Section 6 of the EPRI-TR-1 025286 (REF 1)guidance document and addresses the following specific activities: " Review of the selection of components for the Seismic Walkdown Equipment List (Section 4)" Review of a sample of the checklists prepared for the Seismic Walkdowns
& Walk-Bys (Section 5.1)" Review of any licensing basis evaluations (Section 5.2)" Review of the decisions for entering the potentially adverse conditions in to the plant's Corrective Action Program (Section 5.2)* Review of the final submittal report (Section 6).2. BACKGROUND This peer review covers three portions of the seismic walkdown: (a) the preparation of the SWEL, (b) the actual walkdown, and (c) the final submittal report.The Seismic Walkdown Equipment List (SWEL) was prepared in July and August and finalized in September, based on revisions that occurred during the walkdowns.
Section 3 describes the process of peer reviewing the SWEL.The vast majority of the seismic walkdowns occurred September 11 through September
: 20. The peer review of the walkdowns occurred in the afternoons of those same dates. This portion of the peer review is documented in Section 4.Two entire areas -the. containments
-were deferred for each unit for completion during each following respective outage. This allowed the walkdown to occur with less radiation exposure to the walkdown team.Four components could not be examined entirely with the bus powered: Essential 4KV switchgear Buses 3AB and 4AB, and the protected sequencers during walkdowns which were 3C23B and 4C23B. Consequently, the walkdowns for these components were postponed until the next scheduled outage when they can be scheduled to be removed from service for maintenance.
These inspection deferrals are being tracked under the Corrective Action Program (CAP) by two separate Actions Requests, one for each unit.F-2
: 3. PEER REVIEW TEAM & PROCESS The Turkey Point (PTN) Peer Review Team consisted of individuals from PTN operations, civil engineering, licensing, and PRA as well as structural/seismic engineers from Stevenson
&Associates.
These individuals participated in phases of preparation, performance, and peer review of the seismic walkdowns.
This section documents the peer review process and how the Peer Review Team interacted with the Seismic Walkdown Engineering Teams.3.1 Peer Review Team The affiliation, role, and qualifications for each Peer Review Team member are summarized in the following table.Name Group Role
* Qualifications
**Tim Jones PTN Operations PR -SWEL (e), (f)Tirumani Satyan PTN Licensing SWE Team #1 (a), (b), (c), (d)Sharma PR -SWE Team A Carlos Figueroa PTN Civil Engineering SWE Team #2 (a), (b), (c), (e)PR -SWE Team B John O'Sullivan Stevenson
&Assoc. SWE Team #1 (a), (b), (c)(consultant eng.) PR -SWE Team A Seth Baker Stevenson
&Assoc. SWE Team #2 (a), (b), (c)(consultant eng.) PR -SWE Team B Alexander Restrepo PTN PRA Group PR Team Lead (a), (e)PTN -SWEL George Tullidge PSL PRA Group SWEL Review (e)Notes:* Role: PR (peer review), SWEL (seismic walkdown equipment list), SWE (seismic walkdown engineer)** Qualifications: (a) Completed EPRI NTTF 2.3 Seismic Walkdown Training (b) Seismic engineering experience (c) Degree in mechanical engineering or civil/structural engineering (d) Seismic PRA / IPEEE experience (e) Knowledge of plant operations, documentation (f) Plant Operations member 3.2 Peer Review Process PR Team Lead A. Restrepo served as the Peer Review Team Lead. In that role, he was responsible for coordinating the peer review and assembling this report. As described below, he also performed some additional roles as part of the walkdown team PR. He also had the lead in the SWEL preparation, so he was not part of that PR process. As such, the SWEL was independently reviewed by a PRA Engineer from PSL, a Senior License Operator from PTN and one of the Peer Reviewers from PTN. Finally, he did not participate as an active team member during the seismic walkdown process and did not perform any other work besides the one described above. Therefore, his roll as the lead pear reviewer is considered acceptable F-3 SWEL Preparation The SWEL was prepared by A. Restrepo, who is a PTN PRA engineer, with PTN Operations experience and familiarity with the PTN IPEEE Report and the PTN PRA model.The SWEL was reviewed by a team that included a PRA engineer (G. Tullidge), a licensing engineer (T. Satyan Sharma), a civil engineer (A. Figueroa), and an Operations representative (T. Jones). All of these individuals are familiar with the design and layout of the plant and plant documentation.
Seismic Walkdown The primary seismic walkdown was conducted with two teams, each with two qualified structural/seismic engineers.
The Peer Review of the walkdowns consisted of a Peer Review Team Lead with Operations and PRA knowledge, and structural/seismic engineers.
The structural/seismic engineers made up the SWE teams, but also served to peer review each other's work. The Peer Review Team Lead also participated in many of the walkdowns for logistical support as well as peer review. The ultimate judgments regarding licensing basis were made by qualified PTN structural engineers." Seismic Walkdown Engineers (SWE):-SWE Team #1 -J. O'Sullivan (team lead), T. Satyan Sharma-SWE Team #2 -S. Baker (team lead), C. Figueroa* PR Team Lead -A. Restrepo" PR SWE Team A -S. Baker (team lead), C. Figueroa o PR SWE Team B -J. O'Sullivan (team lead), T. Satyan Sharma" Licensing Basis Reviewers
-T. Satyan Sharma, C. Figueroa" IPEEE Reviewers-A. Restrepo Final Report The final seismic walkdown report was prepared by the Stevenson
& Assoc. consultants, with review by Turkey Point representatives from Operations, design structural engineering, and PRA." Preparers-J.
O'Sullivan, S. Baker" Reviewers
-T. Satyan Sharma, C. Figueroa F-4
: 4. PEER REVIEW -SELECTION OF COMPONENTS FOR SWEL The purpose of this section is to describe the process to perform the peer review of the selected components that were included in the Seismic Walkdown Equipment List (SWEL). This peer review was based on review of the SWEL Selection Report (REF 2)The guidance in Section 3: Selection of SSCs of the EPRI Technical Report (REF'I) was used as the basis for this review. Specifically, this peer review utilized the checklist in Appendix F: Checklist for Peer Review of SSC Selection of the EPRI Technical Report in Reference 1.Attachment 1 of this peer review report documents the completed checklist.
This peer review determined that the SSCs selected for the SWEL 1 seismic walkdowns represent a diverse sample of equipment required to perform the five safety functions and to meet the sample selection attributes, including: " Various types of systems" Major new and replacement equipment" Various types of equipment" Various environments" Equipment enhanced based on the findings of the IPEEE* Risk insight consideration For SWEL 2 development, the peer review determined that spent fuel related items were adequately considered and were appropriately included or excluded.This peer review resulted in no additional findings.
All peer review comments requiring resolution were incorporated prior to completion of the SWEL Selection Report.This peer review concludes that the process for selecting SSCs to be included on the Seismic Walkdown Equipment List appropriately followed the process outlined in Reference
: 1. It is further concluded that the SWEL sufficiently represents a broad population of plant Seismic Category 1 equipment and systems to meet the objectives of the NRC 50.54(f) Letter.F-5
: 5. PEER REVIEW -SEISMIC WALKDOWN The peer review of the seismic walkdown was performed by the PR Teams on September 11-20, following the walkdowns for those days. Additional peer reviews occurred following the walkdowns as documented in this report.5.1 Review of Sample Checklists
& Area Walk-bys The peer review meetings consisted of each SWE Team (#1 and #2) presenting samples from their Seismic Walkdown Checklist (SWC) and Area Walk-by Checklist (AWC) that they had completed earlier that day. This peer review meeting following the day's walkdown activities allowed for immediate feedback between each walkdown team as well as common agreement on how some issues would be addressed.
Table 5-1 lists the sample of 14 components from each unit from the Seismic Walkdown Checklist (SWC) that were discussed in the peer review meetings.
These samples represent about 14% of each unit's SWEL population of 100 components.
The sample includes a variety of types of components (heat exchanger, valve, pump, tank, instrument rack, unit sub, transformer, fan, MCC, compressor, power panel, and control panel) and component locations (RHR pits, intake, RCA, DG Bldg, and Essential Switchgear room).Table 5-1 also lists the sample of 6 areas per unit from the Area Walk-by Checklist (AWC) that were discussed in the peer review. These samples represent about 20% of the total AWC population of 30 areas.When reviewing the components and areas during the afternoon peer review sessions, the following topics were addressed: " Concrete cracks -For each team, concrete cracks were observed in the concrete floors where components were anchored.
Since the guidance does not give discretion for the significance of the crack, the peer review team agreed that the concrete cracks near anchorage should be recorded as "U" (unresolved).
Then, following further review, these findings could be changed to "YES" for minor surface cracks or "NO" for concrete crack near anchorage that may need further review." Physical interaction
-Several of the samples were examples of close spacing between the SWEL component and a hard object (such as a hand rail), with the potential for interaction.
In each case, the spacing was judged adequate, but this did -reinforce the importance of careful field examination of each component." Seismic housekeeping
-Seismic housekeeping was assessed in each area and found to be acceptable.
Storage boxes were tied off or separated from equipment in designated areas.The presence of stanchions to rope off -the protected train equipment was noted. It was agreed that these do not represent significant seismic risk due to the weight distribution (heavy base) and the light-weight nature of these stanchions.
F-6
" Seismic scaffolding
-A number of areas had scaffolding.
In each case, the scaffolding was carefully braced to provide seismic strength and documented on the scaffolding.
This was observed by both walkdown teams." Non-safety piping in SR buildings
-NS piping in all walk-by areas was observed to be well supported.
 
===5.2 Review===
of Licensing Basis Evaluations&
Corrective Action Process The final report provides a list of the anomalies encountered during the Turkey Point seismic walkdown inspections and how they were addressed.
The review of those anomalies demonstrates a thorough and reasonable process for the review of open issues. There were no added comments offered by the peer review team.6. REVIEW FINAL SUBMITTAL REPORT & SIGN-OFF The final submittal report has been reviewed by Turkey Point representatives from structural engineering, Operations, and the PRA Group, and found to meet the requirements of the EPRI 1025286 -Seismic Walkdown Guidance (REF. 1)7. REFERENCES
: 1. EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, June 2012.2. Turkey Point Report, Selection of the Turkey Point Nuclear Station Seismic Walkdown Equipment List (SWEL) for the Requirement 2.3 Walkd6wn, Rev 01, September 2012.F-7 Table 5-1: Table of Sample Components from Seismic Walkdown Checklist (SWC)Walkdown Team (PR Team) Equipment Identification Walkby Area Identification Unit 3 -SWE Team #1 LT-3-651 (PR Team A) HCV-3-121 209 3B08. 220 3P212A EMERG SPF CLG PMP 3-797 3E207B 202 Unit 3 -SWE Team #2 3P9B 370 (PR Team B) 3T36 3C23A 3B05 3K4B 409 3D03 3S77 234 Unit 4 -SWE Team #1 4B07 (PR Team A) T205C 4E208A 4P212A 223 4E206B 210 4T1 217 4P214B Unit 4 -SWE Team #2 4C23A 368 (PR Team B) 4k4A 4T8 4T259A 432 4X05 4C12A 4QR35 310 F-8 ATTACHMENT 1: PEER REVIEW CHECKLIST Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer-review process and how the SWEL may have changed to address those findings.
Additional space is provided at the end of this checklist for documenting other comments.1. Were the five safety functions adequately represented in the SWEL 1 selection?
YN NEIl&#xfd;Requirement met.I 2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
*a. Various types of systems? YlN NnI Eequirement met.!b. Major new and replacement equipment?
YO NEI-Requirement met.]c. Various types of equipment?
YM N[-]Requirement met.l d. Various environments?
YI Nil'Reqguirement met.J e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YM NEIl Requirement met.J F-9 Peer Review Checklist for SWEL f. Were risk insights considered in the development of SWEL 1? YM NEL 3. For SWEL 2: a. Were spent fuel pool related items considered, and if applicable included in SWEL 2? Y[A NEI b. Was an appropriate justification documented for spent fuel pool related items YN NE-]not included in SWEL 2?4. Provide any other comments related to the peer review of the SWELs.S. Have all peer review comments been adequately addressed in the final SWEL? 7CD NEI Peer Reviewer ~#1: __ _ _ _ Date: k1 I -Carlos Figueroa Peer Reviewer#2: / CDate: ''T-Sa~tya arnna F-I 0}}

Latest revision as of 01:14, 12 April 2019