{{Adams
#REDIRECT [[L-13-334, Physical Security Plan (Revision 16)]]
| number = ML13303A304
| issue date = 10/28/2013
| title = Beaver Valley Power Station Physical Security Plan (Revision 16)
| author name = Larson E A
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000334, 05000412
| license number = DPR-066, NPF-073
| contact person =
| case reference number = L-13-334
| document type = Letter, Security Plan
| page count = 3
}}
 
=Text=
{{#Wiki_filter:FENOCT SAFEGUARDS INFORMATION
--% When Separated From Enclosure, FirstEnergy Nuclear Operating Company Handle This Document As Decontrolled Beaver Valley Power Station P.O. Box 4 Shippingpott, PA 15077 Eric A. Larson Site Vice President 724-682-5234 Fax: 724-643-8069 October 28, 2013 L-13-334 10 CFR 50.54(p)(2)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Physical Security Plan (Revision 16)This letter forwards Revision 16 of the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) which was effective on September 11, 2013. Attachment A provides a summary of the Revision 16 changes. The changes were reviewed and determined not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, these revisions are being submitted in accordance with 10 CFR 50.54(p)(2).
The enclosed revision of the BVPS Physical Security Plan is Safeguards Information and must be withheld from public disclosure under the provisions of 10 CFR 73.21.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel L. Craine, Manager -Site Protection, at (724) 682-7812.Sincerely, Eric A. Larson Attachments:
A. Summary of BVPS Physical Security Plan, Revision 16 Changes SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station, Unit Nos. 1 and 2 L-13-334 Page 2
 
==Enclosures:==
 
BVPS Physical Security Plan, Revision 16 Changes cc: NRC Region I Administrator NRC Resident Inspector (w/o enclosure)
NRR Project Manager (w/o enclosure)
Director BRP/DEP (w/o enclosure)
Site BRP/DEP Representative (w/o enclosure)
SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled ATTACHMENT A L-1 3-334 Summary of BVPS Physical Security Plan, Revision 16 Changes Page 1 of 1 The following summarizes the BVPS Physical Security Plan (PSP), Revision 16 Changes: Revision 16 of the BVPS PSP revises Appendix C, BVPS Safeguards Contingency Plan to clarify the manning of the Central Alarm Station (CAS) and Secondary Alarm Station (SAS) to include the day to day normal manning of CAS and SAS. This change will clarify the Security Organizations Logistical Infrastructure manning with the template language located in Chapter 15 Section 15.4.The changes being made by Revision 16 of the BVPS PSP were reviewed using NEI 11-08, "Guidance on Submitting Security Plan Changes," and it was determined that NEI 11-08 was not conducive to this change. The 50.54(p)screening process determined that the Revision 16 changes do not decrease the effectiveness of the BVPS PSP.SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled}}

Latest revision as of 13:21, 11 April 2019