L-14-107, Davis-Besse Nuclear Power Station - Core Operating Limits Report, Cycle 19: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-14-107, Core Operating Limits Report, Cycle 19]]
| number = ML14108A311
| issue date = 04/18/2014
| title = Davis-Besse Nuclear Power Station - Core Operating Limits Report, Cycle 19
| author name = Lieb R A
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000346
| license number = NPF-003
| contact person =
| case reference number = L-14-107
| document type = Fuel Cycle Reload Report, Letter type:L
| page count = 25
}}
 
=Text=
{{#Wiki_filter:FENOC-FirstEnergy Nuctearlirating Company55Al North State Route 2Oak Harbor, Ohio 43449 419-321-7676nqnd A Lbb , Fax: 41gn1-7ffi2 Vi co Prcsi dent, ^lrclear April 18, 2014 L-14-107 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Core Operatinq Limits Report, Cvcle 19 Pursuant to the requirements of Davis-Besse Nuclear Power Station (DBNPS)Technical Specification 5.6,3,'CORE OPERATING LIMITS REPORT (COLR)," FirstEnergy Nuclear Operating Company hereby submits the DBNPS Cycle 19 COLR,Revision 0.
There are no regulatory commitments contained in this submittal. lf there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at (330) 315-6810.Sincerely, Ua#/Raymbnd A. Lieb
 
==Enclosure:==
 
FirstEnergy Nuclear Operating Company, Davis-Besse Unit 1, Cycle 19, Core Operating Limits Report, Revision 0cc: NRC Region lllAdministrator NRC Resident InspectorNRC Project Manager Utility Radiological Safety Board}}

Latest revision as of 08:55, 11 April 2019