ML14177A471: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-14-189, Physical Security Plan (Revision 18)]]
| number = ML14177A471
| issue date = 06/24/2014
| title = Beaver Valley Power Station Physical Security Plan (Revision 18)
| author name = Larson E A
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000334, 05000412
| license number = DPR-066, NPF-073
| contact person =
| case reference number = L-14-189
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:" RrstEnergy Nuclear Operating Company Eric A. Larson Site Vice President SAFEGUARDS INFORMATION When Separated From Enclosure, Handle J"his Document As Decontrolled Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 June 24, 2014 L-14-189 10 CFR 50.54(p)(2)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Physical Security Plan (Revision  
: 18) This letter forwards Revision 18 of the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) which was effective on June 3, 2014. Attachment A provides a summary of the Revision 18 changes. The changes were reviewed and determined not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, these revisions are being submitted in accordance with 10 CFR 50. 54(p )(2). The enclosed revision of the BVPS Physical Security Plan is Safeguards Information and must be withheld from public disclosure under the provisions of 10 CFR 73.21. ' There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel L. Craine, Site Protection, at (724) 682-7812.
Sincerely, Eric A. Larson Attachments:
A. Summary of BVPS Physical Security Plan, Revision 18 Changes
 
==Enclosure:==
 
BVPS Physical Security Plan, Revision 18 Changes SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled SAFEGUARDS INFORMATION When Separated From Enclosi,Jre, Handle This Document As Decontrolled Beaver Valley Power Station, Unit Nos. 1 and 2 L-14-189 Page 2 cc: NRC Region I Administrator NRC Senior Resident Inspector (w/o enclosure)
NRR Project Manager (w/o enclosure)
Director BRP/DEP (w/o enclosure)
Site BRP/DEP Representative (w/o enclosure)
SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled}}

Latest revision as of 06:40, 11 April 2019