ML15280A429: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[DCL-15-115, Withdrawal of License Amendment Request 15-04, Exigent Revision to Technical Specification 3.8.9. Distribution Systems- Operating.]]
| number = ML15280A429
| issue date = 10/07/2015
| title = Withdrawal of License Amendment Request 15-04, Exigent Revision to Technical Specification 3.8.9. Distribution Systems- Operating.
| author name = Allen B S
| author affiliation = Pacific Gas & Electric Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| case reference number = DCL-15-115
| document type = Letter
| page count = 2
| project =
| stage = Withdrawal
}}
 
=Text=
{{#Wiki_filter:Pacific Gas and Electric Company B arry S. Allen Diablo Canyon Power Plant Vice President, Nuclear Services Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 October 7, 2015 ao5.545.4888 PG&E Letter DCL-15-115 Internal:
691.4888 Fax: 805.545.6445 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 10 CFR 50.90 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Withdrawal of License Amendment Request 15-04 Exigent Revision to Technical Specification 3.8.9. "Distribution Systems-Operating" Reference 1 : PG&E Letter DCL-15-091, "License Amendment Request 15-04, Exigent Revision to Technical Specification 3.8.9, 'Distribution Systems-Operating,"'
dated August 12, 2015 Dear Commissioners and Staff: On August 12, 2015, Pacific Gas and Electric Company (PG&E) requested approval (Reference
: 1) of a proposed license amendment request (LAR) to revise Technical Specification (TS) 3.8.9, "Distribution Systems-Operating." The proposed change requested revision of TS 3.8.9, Condition 8, Required Action 8.1 Completion Time from 2 hours to 24 hours to support replacing electronic style inverter output breakers online. The LAR requested exigent review by the NRC. Subsequent discussions with the NRC Project Manager for Diablo Canyon Power Plant identified that the justification for an exigent review was not supported, but the review could continue on a routine basis. Because PG&E plans to replace the subject Unit 1 breakers during the upcoming Unit 1 Refueling Outage Nineteen scheduled for October 2015, and the next Unit 2 outage is scheduled sooner than the anticipated review schedule (May 2016), PG&E hereby withdraws License Amendment Request 15-04 submitted in Reference
: 1. PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter. This letter includes no revisions to existing regulatory commitments.
* If you have any questions or require additional information, please contact Mr. Hossein Hamzehee at 805-545-4720. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek Document Control Desk October 7, 2015 Page 2 PG&E Letter DCL-15-115 I state under penalty of perjury that the foregoing is true and correct. Executed on October 7, 2015. Sincerely, Barry S. Allen Vice President-Nuclear Services mjrm/4557/50709593 cc: Marc L. Dapas, NRC Region IV Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager Gonzalo L. Perez, Branch Chief, California Dept of Public Health Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek Pacific Gas and Electric Company B arry S. Allen Diablo Canyon Power Plant Vice President, Nuclear Services Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 October 7, 2015 ao5.545.4888 PG&E Letter DCL-15-115 Internal:
691.4888 Fax: 805.545.6445 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 10 CFR 50.90 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Withdrawal of License Amendment Request 15-04 Exigent Revision to Technical Specification 3.8.9. "Distribution Systems-Operating" Reference 1 : PG&E Letter DCL-15-091, "License Amendment Request 15-04, Exigent Revision to Technical Specification 3.8.9, 'Distribution Systems-Operating,"'
dated August 12, 2015 Dear Commissioners and Staff: On August 12, 2015, Pacific Gas and Electric Company (PG&E) requested approval (Reference
: 1) of a proposed license amendment request (LAR) to revise Technical Specification (TS) 3.8.9, "Distribution Systems-Operating." The proposed change requested revision of TS 3.8.9, Condition 8, Required Action 8.1 Completion Time from 2 hours to 24 hours to support replacing electronic style inverter output breakers online. The LAR requested exigent review by the NRC. Subsequent discussions with the NRC Project Manager for Diablo Canyon Power Plant identified that the justification for an exigent review was not supported, but the review could continue on a routine basis. Because PG&E plans to replace the subject Unit 1 breakers during the upcoming Unit 1 Refueling Outage Nineteen scheduled for October 2015, and the next Unit 2 outage is scheduled sooner than the anticipated review schedule (May 2016), PG&E hereby withdraws License Amendment Request 15-04 submitted in Reference
: 1. PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter. This letter includes no revisions to existing regulatory commitments.
* If you have any questions or require additional information, please contact Mr. Hossein Hamzehee at 805-545-4720. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek Document Control Desk October 7, 2015 Page 2 PG&E Letter DCL-15-115 I state under penalty of perjury that the foregoing is true and correct. Executed on October 7, 2015. Sincerely, Barry S. Allen Vice President-Nuclear Services mjrm/4557/50709593 cc: Marc L. Dapas, NRC Region IV Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager Gonzalo L. Perez, Branch Chief, California Dept of Public Health Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek}}

Latest revision as of 08:18, 7 April 2019