{{Adams
#REDIRECT [[L-15-331, Commitment to Maintain Severe Accident Management Guidelines]]
| number = ML15329A209
| issue date = 11/25/2015
| title = Commitment to Maintain Severe Accident Management Guidelines
| author name = Boles B D
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000346
| license number = NPF-003
| contact person =
| case reference number = L-15-331
| document type = Letter
| page count = 3
}}
 
=Text=
{{#Wiki_filter:FE NOCŽ FirstEnergy Nuclear Operating Company Brian D. Boles Vice President, Nuclear November 25, 2015 L-15-331 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Commitment to Maintain Severe Accident Management Guidelines 5501 North State Route 2 Oak Harbor, Ohio 43449 419-321-7676 Fax: 419-321-7582 The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes FirstEnergy Nuclear Operating Company (FENOC) commitments related to SAMGs for Davis-Besse Nuclear Power Station. These guidelines would be used by emergency response personnel during conditions in which significant damage to fuel in the reactor vessel or spent fuel pool is occurring or is imminent.
SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.
The new SAMG commitments are listed in the Attachment.
It is expected that NRC staff personnel will conduct periodic inspection of our Severe Accident Management Guidelines and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. Inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAM Gs. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-315-6810.
I>. t. S11lr--r Brian D. Boles
 
==Attachment:==
 
Regulatory Commitment List Davis-Besse Nuclear Power Station, Unit No. 1 L-15-331 Page 2 cc: NRC Region Ill Administrator NRC Project Manager NRC Resident Inspector Director, Office of Nuclear Reactor Regulation (NRR) Utility Radiological Safety Board Attachment L-15-331 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for Davis-Besse Nuclear Power Station (DBNPS) in this document.
Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only as information and are not Regulatory Commitments.
Please notify Mr. Thomas A Lentz, Manager -Fleet Licensing, at 330-315-681 O of any questions regarding this document or associated Regulatory Commitments.
TYPE (Check One) SCHEDULED COMPLETION COMMITMENT ONE-CONTINUING DATE TIME COMPLIANCE ACTION 1. FENOC will consider the x October 31, 2016 DBNPS site SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. 2. FENOC will update the x Within 2 refueling DBNPS site SAMGs to future outages or 3 years of revisions of the PWROG the publication date of generic severe accident the guidelines, technical guidelines, and the whichever is greater SAMGs will be integrated with other emergency response guideline sets and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.
FE NOCŽ FirstEnergy Nuclear Operating Company Brian D. Boles Vice President, Nuclear November 25, 2015 L-15-331 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Commitment to Maintain Severe Accident Management Guidelines 5501 North State Route 2 Oak Harbor, Ohio 43449 419-321-7676 Fax: 419-321-7582 The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes FirstEnergy Nuclear Operating Company (FENOC) commitments related to SAMGs for Davis-Besse Nuclear Power Station. These guidelines would be used by emergency response personnel during conditions in which significant damage to fuel in the reactor vessel or spent fuel pool is occurring or is imminent.
SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.
The new SAMG commitments are listed in the Attachment.
It is expected that NRC staff personnel will conduct periodic inspection of our Severe Accident Management Guidelines and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. Inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAM Gs. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-315-6810.
I>. t. S11lr--r Brian D. Boles
 
==Attachment:==
 
Regulatory Commitment List Davis-Besse Nuclear Power Station, Unit No. 1 L-15-331 Page 2 cc: NRC Region Ill Administrator NRC Project Manager NRC Resident Inspector Director, Office of Nuclear Reactor Regulation (NRR) Utility Radiological Safety Board Attachment L-15-331 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for Davis-Besse Nuclear Power Station (DBNPS) in this document.
Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only as information and are not Regulatory Commitments.
Please notify Mr. Thomas A Lentz, Manager -Fleet Licensing, at 330-315-681 O of any questions regarding this document or associated Regulatory Commitments.
TYPE (Check One) SCHEDULED COMPLETION COMMITMENT ONE-CONTINUING DATE TIME COMPLIANCE ACTION 1. FENOC will consider the x October 31, 2016 DBNPS site SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. 2. FENOC will update the x Within 2 refueling DBNPS site SAMGs to future outages or 3 years of revisions of the PWROG the publication date of generic severe accident the guidelines, technical guidelines, and the whichever is greater SAMGs will be integrated with other emergency response guideline sets and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.}}