L-77-197: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
#REDIRECT [[L-77-197, St. Lucie Unit 1 - Proposed Amendment to Facility Operating License DPR-67. Page 3/4 1-26 and Page B 3/4 1-4 Maximum Allowable CEA Drop Time in Specification 3.1.3.4 Is Changed from 3.3 Seconds to 3.0 Seconds]]
#REDIRECT [[L-77-197, Proposed Amendment to Facility Operating License DPR-67. Page 3/4 1-26 and Page B 3/4 1-4 Maximum Allowable CEA Drop Time in Specification 3.1.3.4 Is Changed from 3.3 Seconds to 3.0 Seconds]]

Latest revision as of 12:37, 5 April 2019