ENS 53844: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 28: | Line 28: | ||
Once the source was secured, and permit posted, the RSO did a full investigation. | Once the source was secured, and permit posted, the RSO did a full investigation. | ||
Basic cause - The maintenance employee that unbolted the source entered the area from a direction that could only be accessed during a maintenance down. There was a radiation label on the scale itself, but no sign from his access point." | Basic cause - The maintenance employee that unbolted the source entered the area from a direction that could only be accessed during a maintenance down. There was a radiation label on the scale itself, but no sign from his access point." | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190204en.html#en53844 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Revision as of 07:30, 4 February 2019
Where | |
---|---|
Tilden Mining Company L.C. Ishpeming, Michigan (NRC Region 3) | |
License number: | 21-26748-01 |
Organization: | Tilden Mining Company L.C. |
Reporting | |
10 CFR 30.50(b)(2), Licensed Material Protection Equipment Failure | |
Time - Person (Reporting Time:+6.23 h0.26 days <br />0.0371 weeks <br />0.00853 months <br />) | |
Opened: | Lawrence Gray 11:14 Jan 24, 2019 |
NRC Officer: | Donald Norwood |
Last Updated: | Jan 24, 2019 |
53844 - NRC Website | |