NRC 2016-0006, Point Beach, Units 1 and 2 - License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.1: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NRC 2016-0006, License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.1]]
| number = ML16040A175
| issue date = 02/09/2016
| title = Point Beach, Units 1 and 2 - License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.1
| author name = Woyak B
| author affiliation = NextEra Energy Point Beach, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| contact person =
| case reference number = NRC 2016-0006
| document type = Letter type:NRC, Response to Request for Additional Information (RAI)
| page count = 5
}}
 
=Text=
{{#Wiki_filter:February 9, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 NRC 2016-0006 10 CFR 50.90 License Amendment Request 277. Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information
#5 -Correction to Table 5.1 Reference 1 : NextEra Energy Point Beach, LLC letter to NRC, dated January 26, 2016, License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information  
#5 In Reference 1, NextEra Energy Point Beach, LLC (NextEra) submitted a supplemental response to request for additional information (RAI) #5 for License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan. The Shift Technical Advisor (STA) was inadvertently omitted from Table 5.1, "Minimum Staffing For Emergencies," of Enclosure 2, Attachments 1 and 2 of Reference (1). Enclosure 1, Attachments 1 and 2 of this letter replaces Table 5.1. This letter contains no new regulatory commitments and no revisions to existing commitments.
Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 ENCLOSURE1,ATTACHMENT1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO MARKED-UP COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows POINT BEACH NUCLEAR PLANT EMERGENCY PLAN MANUAL ORGANIZATIONAL CONTROL OF EMERGENCIES
 
===8.0 BASES===
EP 5.0 NNSR Revision 6-l-62 DRAFT July 22, 2015 TBD B-1 PBNP Staffing Analysis perfmmed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.
M'. m1mum TABLE5.1 St ffi F E a mg or mergenc1es ON SIITFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE AREA Shift Manager (SM) Plant Operations and Operating Supervisor (OS) Assessment of Operational Control Operators (CO) Aspects Auxiliary Operators (AO) (I FBL + 2 FBM) (Note I) Shift Technical Advisor (STA) Notification/
Communicator Communications Security 8hlft Supervisor (S&S} --(State and Local Notifications)
Support Staff Radiochemistry Technician Dose Assessment Radiation Protection Technologist Fire Brigade Additional FBMs and/or AOs (Note I) TOTALS FBL-Fire Brigade Leader FBM-Fire Brigade Member (B-I) Staffing I 2 4 5 I Note2 I I I +2 2 !820 Note I: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs. Note 2: This position may be filled by the OS, AO, or STA. AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 31!60 61!90 AREA MINUTES MINUTES Emergency Director tEGFJ (TSC) I + Emergency Direction and TSC Manager I Control EOFManager I Assistant EOF Manager l EALMonitor l Operations Coordinator I + En.,ineerina Coordinator
+ + Reactor Enaineer I Mechanical Engineer l Electrical Engineer I OSC Coordinator I + Rad/Chem Coordinator I Operations Leader (OSC) I + Radiation Protection Leader (OSC) 1 + Plant System Engineering I Radiation Protection Technician (OSC) 4 Repair and Corrective Actions I&C Leader (OSC) + I Protective Actions I&C Technician (OSC) I Mechanical or Eleetrieal Leader (OSC) + I Mechanical (OSC) 1 Electrical Leader (OSC) l Electrician (OSC) 1 Chemistrv Leader l Radiochemistry Technician (OSC) I Resource Coordinator (EOF) I Dose/PAR Coordinator (EOF) + l OSRPF Coordinator l + Field Team Leader l + Field Monitoring Team #I 2 + Field Monitoring Team #2 2 + Communications ERF Communicator (TSC) I + ERF Communicator (EOF) I ENS Communicator (TSC) I + State/County Communicator (EOF) I TOTALS 627 MIO Page 18 of25 ENCLOSURE1,ATTACHMENT2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO CLEAN COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows POINT BEACH NUCLEAR PLANT EMERGENCY PLAN MANUAL ORGANIZATIONAL CONTROL OF EMERGENCIES
 
===8.0 BASES===
EP 5.0 NNSR Revision 62 TBD B-1 PBNP Staffing Analysis performed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.
M'. mimum TABLE 5.1 St ffi F E a mg or mergenc1es ON SHIFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE AREA Shift Manager (SM) Plant Operations and Operating Supervisor (OS) Assessment of Operational Control Operators (CO) Aspects Auxiliary Operators (AO) (l FBL + 2 FBM) (Note 1) Shift Technical Advisor (STA) Notification/
Communicator Communications Security Supervisor
* (State and Local Notifications)
Support Staff Radiochemistry Technician Dose Assessment Radiation Protection Technologist Fire Brigade Additional FBMs and/or AOs (Note 1) TOTALS FBL-Fire Brigade Leader FBM -Fire Brigade Member (B-1) Staffing 1 2 4 5 1 Note2 1 1 l 2 2 20 Note 1: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs. Note 2: This position may be filled by the OS, AO, or STA. AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 60 90 AREA MINUTES MINUTES Emergency Director (TSC) I Emergency Direction and TSCManager 1 Control EOFManager 1 Assistant EOF Manaaer I EAL Monitor I Operations Coordinator I Reactor Engineer I Mechanical Engineer I Electrical Engineer I OSC Coordinator 1 Rad/Chem Coordinator 1 Operations Leader (OSC) I Radiation Protection Leader (OSC) I Radiation Protection Technician (OSC) 4 Plant System Engineering I I&C Leader (OSC) I Repair and Corrective Actions !&C Technician (OSC) 1 Protective Actions Mechanical Leader (OSC) I Mechanical (OSC) 1 Electrical Leader (OSC) I Electrician (OSC) I Chemistry Leader I Radiochemistry Technician (OSC) 1 Resource Coordinator (EOF) 1 Dose/PAR Coordinator (EOF) I OSRPF Coordinator I Field Team Leader 1 Field Monitoring Team# 1 2 Field Monitoring Team #2 2 Communications ERF Communicator (TSC) I ERF Communicator (EOF) 1 ENS Communicator (TSC) I State/County Communicator (EOF) I TOTALS 27 10 Page 18 of25 February 9, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 NRC 2016-0006 10 CFR 50.90 License Amendment Request 277. Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information
#5 -Correction to Table 5.1 Reference 1 : NextEra Energy Point Beach, LLC letter to NRC, dated January 26, 2016, License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan Supplemental Response to Request for Additional Information
#5 In Reference 1, NextEra Energy Point Beach, LLC (NextEra) submitted a supplemental response to request for additional information (RAI) #5 for License Amendment Request 277, Revision to Staff Augmentation Times in the Point Beach Nuclear Plant Emergency Plan. The Shift Technical Advisor (STA) was inadvertently omitted from Table 5.1, "Minimum Staffing For Emergencies," of Enclosure 2, Attachments 1 and 2 of Reference (1). Enclosure 1, Attachments 1 and 2 of this letter replaces Table 5.1. This letter contains no new regulatory commitments and no revisions to existing commitments.
Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 ENCLOSURE1,ATTACHMENT1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO MARKED-UP COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows POINT BEACH NUCLEAR PLANT EMERGENCY PLAN MANUAL ORGANIZATIONAL CONTROL OF EMERGENCIES
 
===8.0 BASES===
EP 5.0 NNSR Revision 6-l-62 DRAFT July 22, 2015 TBD B-1 PBNP Staffing Analysis perfmmed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.
M'. m1mum TABLE5.1 St ffi F E a mg or mergenc1es ON SIITFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE AREA Shift Manager (SM) Plant Operations and Operating Supervisor (OS) Assessment of Operational Control Operators (CO) Aspects Auxiliary Operators (AO) (I FBL + 2 FBM) (Note I) Shift Technical Advisor (STA) Notification/
Communicator Communications Security 8hlft Supervisor (S&S} --(State and Local Notifications)
Support Staff Radiochemistry Technician Dose Assessment Radiation Protection Technologist Fire Brigade Additional FBMs and/or AOs (Note I) TOTALS FBL-Fire Brigade Leader FBM-Fire Brigade Member (B-I) Staffing I 2 4 5 I Note2 I I I +2 2 !820 Note I: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs. Note 2: This position may be filled by the OS, AO, or STA. AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 31!60 61!90 AREA MINUTES MINUTES Emergency Director tEGFJ (TSC) I + Emergency Direction and TSC Manager I Control EOFManager I Assistant EOF Manager l EALMonitor l Operations Coordinator I + En.,ineerina Coordinator
+ + Reactor Enaineer I Mechanical Engineer l Electrical Engineer I OSC Coordinator I + Rad/Chem Coordinator I Operations Leader (OSC) I + Radiation Protection Leader (OSC) 1 + Plant System Engineering I Radiation Protection Technician (OSC) 4 Repair and Corrective Actions I&C Leader (OSC) + I Protective Actions I&C Technician (OSC) I Mechanical or Eleetrieal Leader (OSC) + I Mechanical (OSC) 1 Electrical Leader (OSC) l Electrician (OSC) 1 Chemistrv Leader l Radiochemistry Technician (OSC) I Resource Coordinator (EOF) I Dose/PAR Coordinator (EOF) + l OSRPF Coordinator l + Field Team Leader l + Field Monitoring Team #I 2 + Field Monitoring Team #2 2 + Communications ERF Communicator (TSC) I + ERF Communicator (EOF) I ENS Communicator (TSC) I + State/County Communicator (EOF) I TOTALS 627 MIO Page 18 of25 ENCLOSURE1,ATTACHMENT2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 277 REVISION TO STAFF AUGMENTATION TIMES IN THE PBNPEMERGENCYPLAN REVISION TO CLEAN COPY OF TABLE 5.1 OF EMERGENCY PLAN 5.0 1 Page follows POINT BEACH NUCLEAR PLANT EMERGENCY PLAN MANUAL ORGANIZATIONAL CONTROL OF EMERGENCIES
 
===8.0 BASES===
EP 5.0 NNSR Revision 62 TBD B-1 PBNP Staffing Analysis performed and approved on 11/06/2013 (Rev 2) in accordance with NEI 10-05 (Rev 0), Assessment of On-Shift Emergency Response Organization Staffing Capabilities.
M'. mimum TABLE 5.1 St ffi F E a mg or mergenc1es ON SHIFT STAFFING MAJOR FUNCTIONAL POSITION/FUNCTION TITLE AREA Shift Manager (SM) Plant Operations and Operating Supervisor (OS) Assessment of Operational Control Operators (CO) Aspects Auxiliary Operators (AO) (l FBL + 2 FBM) (Note 1) Shift Technical Advisor (STA) Notification/
Communicator Communications Security Supervisor
* (State and Local Notifications)
Support Staff Radiochemistry Technician Dose Assessment Radiation Protection Technologist Fire Brigade Additional FBMs and/or AOs (Note 1) TOTALS FBL-Fire Brigade Leader FBM -Fire Brigade Member (B-1) Staffing 1 2 4 5 1 Note2 1 1 l 2 2 20 Note 1: Total staffing for AOs/FBMs is 7. This includes a minimum of 5 AOs plus 2 additional FBMs which may be AOs. Note 2: This position may be filled by the OS, AO, or STA. AUGMENTATION STAFFING MAJOR FUNCTIONAL POSITION TITLE 60 90 AREA MINUTES MINUTES Emergency Director (TSC) I Emergency Direction and TSCManager 1 Control EOFManager 1 Assistant EOF Manaaer I EAL Monitor I Operations Coordinator I Reactor Engineer I Mechanical Engineer I Electrical Engineer I OSC Coordinator 1 Rad/Chem Coordinator 1 Operations Leader (OSC) I Radiation Protection Leader (OSC) I Radiation Protection Technician (OSC) 4 Plant System Engineering I I&C Leader (OSC) I Repair and Corrective Actions !&C Technician (OSC) 1 Protective Actions Mechanical Leader (OSC) I Mechanical (OSC) 1 Electrical Leader (OSC) I Electrician (OSC) I Chemistry Leader I Radiochemistry Technician (OSC) 1 Resource Coordinator (EOF) 1 Dose/PAR Coordinator (EOF) I OSRPF Coordinator I Field Team Leader 1 Field Monitoring Team# 1 2 Field Monitoring Team #2 2 Communications ERF Communicator (TSC) I ERF Communicator (EOF) 1 ENS Communicator (TSC) I State/County Communicator (EOF) I TOTALS 27 10 Page 18 of25}}

Latest revision as of 10:26, 2 February 2019