NRC 2016-0037, Point Beach Nuclear Plant, Units 1 and 2 - Submittal of Technical Requirements Manual Change Summary for 2015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NRC 2016-0037, Submittal of Technical Requirements Manual Change Summary for 2015]]
| number = ML16230A369
| issue date = 08/17/2016
| title = Point Beach Nuclear Plant, Units 1 and 2 - Submittal of Technical Requirements Manual Change Summary for 2015
| author name = Woyak B
| author affiliation = NextEra Energy Point Beach, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| contact person =
| case reference number = NRC 2016-0037
| document type = Letter type:NRC
| page count = 2
}}
 
=Text=
{{#Wiki_filter:August 17, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary NEXT era POINT BEACH NRC 2016-0037 10 CFR 50.71(e) In accordance with 10 CFR 50. 71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 2015, through December 31, 2015. NextEra previously submitted the TRM change summary for January 1, 2014, through December31, 2014, on August 11, 2015 (ML15223B293).
This letter contains no new commitments and no revisions to existing commitments.
If you have any questions or require additional information, please contact me at (920) 755-7599.
Sincerely, NextEra Energy Point Beach, LLC Licensing Manager . ***--Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Affected Section 2.1 (U1) 2.1 (U2) 2.2 3.3.2 3.7.7 3.7.7 4.18 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE
 
==SUMMARY==
FOR 2015 Date of Affected Change Page(s) Summary 10/26/15 All New Core Operating Limits for Unit 1 Cycle 36. 10/15/15 All New Core Operating Limits for Unit 2 Cycle 35. 9/24/15 All References were updated in the Reactor Coolant System Pressure and Temperature Limits Report. 3/16/15 3.3.2-1 Leading Edge Flow Meter (LEFM). Changed "LEFM inoperable" to "LEFM non-functional" to reflect use of functionality vs. operability.
5/14/15 3.7.7-1, Removed reference to 1 P-29, turbine driven auxiliary 3.7.7-7, feedwater pump. This pump is no longer impacted by 3.7.7-9, Service Water limitations due to a station modification 3.7.7-13 that resulted in no longer using Service Water for pump bearing cooling. 11/20/15 3.7.7-13 Added "Amendments 199 and 204, Service Water," as a new reference.
9/24/15 4.18-4 Added NUREG-1022, 10 CFR 50.72, 10 CFR 50.73, and NextEra procedure Ll-AA-102-1001 as references for reporting requirements.}}