NL-16-128, Sequoyah Nuclear Plant, Units 1 and 2, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[CNL-16-128, Sequoyah Nuclear Plant, Units 1 and 2, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14]]
| number = ML16222A355
| issue date = 08/03/2016
| title = Sequoyah Nuclear Plant, Units 1 and 2, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14
| author name = Shea J W
| author affiliation = Tennessee Valley Authority
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000327, 05000328
| license number = DPR-077, DPR-079
| contact person =
| case reference number = CNL-16-128
| document type = Letter
| page count = 3
}}
 
=Text=
{{#Wiki_filter:SAFEGUARDS INF,ORMATION Tennessee Valley Authority, 1101 Market Stree*t, Chattanooga, Tennessee 37402 CNL-16-128 August 3, 2016 10 CFR 50.4(b)(4) 10 CFR 50.54(p) ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
 
==Subject:==
Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage lnstallat_ion Security Program, Revision 14 In accordance with Title 10 of the Code of Federal Regulations (1 O CFR) 50.54(p), this letter provides Revision 14 of the Sequoyah Nuclear Plant (SQN) Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program. The Revision Log of the SQN Physica'1 Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, provided in the enclosure, describes the recent change. The revised plan became effective as of June 6, 2016.
* Tennessee Valley Authority (TVA) has evaluated the changes contained in this revision and does not consider the revision to decrease the safeguards effectiveness of the subject plan. SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission CNL-16-.128 Page 2 August 3, 2016 The enclosure to this letter contains Safeguards Information and should be protected in accordance with 10 CFR 73.21 and 10 CFR 73.22. The enclosed plan revision is being sent by certified mail and the signed receipt will signify that the NRC has received this information.
There are no new regulatory commitments associated with this submittal.
If you have any questions regarding this information, please contact Al Little, SQN Senior Manager, Nuclear Site Security at (423) 843-6942.
Respectfully, J. W. Shea Vice President, Nuclear Licensing
 
==Enclosure:==
 
cc (Enclosure):
Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and the Independent Spent Fuel Storage Installation Security Program, Revision 14 NRC Regional Administrator
-Region ii SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.
SAFEGUARDS
!NFORMATION Enclosure i Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and the Independent Spent Fuel Stqrage Security Program, Revision 14 SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.}}

Latest revision as of 06:24, 21 January 2019