ML070890363: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[NG-07-0270, Duane Arnold Energy Center - Withdrawal of Relief Request to Allow Use of the Provisions of IWA-4132 for the Remainder of the Third 10-Year Inservice Inspection Interval and the Fourth Ten-Year Inservice Inspection Interval]]
| number = ML070890363
| issue date = 03/20/2007
| title = Duane Arnold Energy Center - Withdrawal of Relief Request to Allow Use of the Provisions of IWA-4132 for the Remainder of the Third 10-Year Inservice Inspection Interval and the Fourth Ten-Year Inservice Inspection Interval
| author name = VanMiddlesworth G D
| author affiliation = FPL Energy Duane Arnold, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR/ADRO
| docket = 05000331
| license number = DPR-049
| contact person =
| case reference number = IWA-4132, NG-07-0270
| document type = Letter
| page count = 2
| project =
| stage = Withdrawal
}}
 
=Text=
{{#Wiki_filter:FPL Enry Duaneo AoT~dl Energy Cete FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 March 20, 2007 NG-07-0270 10 CFR 50.55a(a)(3)(i)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket: 50-331 Op. License No: DPR-49 Withdrawal of Relief Request To Allow Use Of The Provisions Of IWA-4132 For The Remainder Of The Third 10-Year Inservice Inspection Interval And The Fourth Ten-Year Inservice Inspection Interval
 
==Reference:==
 
1)Letter, G. Van Middlesworth (FPL Energy) to USNRC,"Request To Allow Use Of The Provisions Of IWA-4132 For The Remainder Of The Third 10-Year Inservice Inspection Interval And The Fourth Ten-Year Inservice Inspection Interval," NG-06-0622, dated September 29, 2006 (ML062780201)
In Reference 1, FPL Energy Duane Arnold requested relief from the American Society of Mechanical Engineers (ASME) Code to allow application of the provisions of IWA-4132 to the stock rotation of Recirculation Pump Seal Flange Assemblies at the Duane Arnold Energy Center (DAEC). FPL Energy Duane Arnold has determined that the relief requested in Reference 1 is no longer required and hereby withdraws that application.
This letter contains no new commitments and no revisions to existing commitments.
7 4D+7 NG-07-0270 March 20, 2007 Page 2 of 2 Questions regarding this matter should be directed to Steve Catron, Licensing Manager, at (319) 851-7234.Gary Van Middlesworth Site Vice President, Duane Arnold Energy Center FPL Energy Duane Arnold cc: Administrator, Region III, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC}}

Revision as of 01:37, 11 November 2018