ML080770227: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[NL-08-0179, Joseph M. Farley, Units 1 and 2, Actions for Confirmatory Action Letter No. NRR-07-018]]
| number = ML080770227
| issue date = 03/17/2008
| title = Joseph M. Farley, Units 1 and 2, Actions for Confirmatory Action Letter No. NRR-07-018
| author name = Jones D H
| author affiliation = Southern Nuclear Operating Co, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000348, 05000364
| license number =
| contact person =
| case reference number = NL-08-0179, TAC MD4151, NRR-07-018
| document type = Letter, Confirmatory Action Letter (CAL)
| page count = 2
| project = TAC:MD4151
| stage = Other
}}
 
=Text=
{{#Wiki_filter:David H. Jones Southern Nuclear Vice President Operating Company. Inc. Engineering 40 Inverness Center Parkway Birmingham.
Alabama 35242 Tel Fax SOUTHE-A March 1 7, COMPANY Energy to Serve lOur WorM'" Docket 50-348 NL-08-0179 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant -Units 1 and Reply to Acknowledgement Actions for Confirmatory Action Letter No.
Ladies and Gentlemen:
On January 30, 2008 the NRC staff issued the letter "Joseph M. Farley Nuclear Plant, Units 1 and 2 -Acknowledgement of Actions for Confirmatory Action Letter No. NRR-07-018 (TAC Nos. MD4151 and MD4152)." The NRC letter indicated that several commitments remained open, and that, for Unit 2, Farley Nuclear Plant (FNP) has yet to " perform reexaminations on two pressurizer Alloy 82/182 butt welds prior to October 2009 " This item appears to be based on commitments listed in Enclosure 3 of the Southern Nuclear Operating Company (SNC) letter NL-07-0483, dated March 6,2007 (ML070650572) to the NRC. This letter is to clarify that the commitment to "perform reexaminations on two pressurizer Alloy 82/182 butt welds prior to October 2009" has been satisfied.
The reexamination was completed as part of the inspection of all six welds during 2R18, as reported in SNC letter NL-07-1317 dated July 18,2007 which stated: "During the Spring 2007 Unit 2 outage 2R 18, all six pressurizer dissimilar metal butt welds containing Alloy 82/182 material were examined to meet MRP-139 volumetric examination requirements." The outstanding commitments for Farley Unit 2, from the SNC letter NL-07-0483 dated March 6, 2007 for Unit 2 are:
* Perform MRP-139 mitigation and post-mitigation examination activities on pressurizer nozzles by the end of the 2R20 outage (Spring U.S. Nuclear Regulatory Commission NL-08-0179 Page 2
* If a shut down occurs due to excessive primary system unidentified leakage, and if the leakage cannot be confirmed to originate from a source other than the pressurizer nozzles, a bare metal visual examination of Alloy 82/182 weld locations on the pressurizer will be performed to determine whether the leakage originated at those locations. (This commitment is ongoing until mitigation of pressurizer Alloy 82/182 welds.)
* Examinations of pressurizer weld overlays will be performed in accordance with 139 and/or NRC approved alternatives. (This commitment is a continuing compliance commitment.)
In conclusion, the commitment regarding reexaminations for the two pressurizer Alloy 82/182 butt welds, noted as open in the NRC letter dated January 30, 2008 has been completed, as documented in SNC letter NL-07-1317 dated July 18, 2007. Please also note that ADAMS contains a version of the Confirmatory Action Letter No. 07-018 (ML070670264) that indicates a letter date of March 15,2007. The actual date, on the signed letter received by SNC, is March 12,2007. This letter contains no NRC commitments.
If you have any questions, please advise. DHJ/JLS/phr Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President
-Plant Farley Mr. D. H. Jones, Vice President
-Engineering RType: CFA04.054; LC# 14725 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Acting Regional Administrator Ms. K. R. Cotton, NRR Project Manager -Farley Mr. E. L. Crowe, Senior Resident Inspector
-Farley}}