ML100920294: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[NRC 2009-0022, 2009 Point Beach Initial License Examination ES-301-6 Forms]]
| number = ML100920294
| issue date = 05/11/2009
| title = 2009 Point Beach Initial License Examination ES-301-6 Forms
| author name = Bielby M E
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =
| addressee affiliation = Florida Power & Light Energy Point Beach, LLC
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| contact person =
| case reference number = NRC 2009-0022
| document type = License-Operator, Part 55 Examination Related Material
| page count = 2
}}
 
=Text=
{{#Wiki_filter:E S-301 Competencies Checklist Form ES-301-6 Facility: PBNP    Date of Examination: Week of May 11 th 2009 Operating Test No.:2009-01 Crew A APPLICANTS RO      SRO-I      SRO-U RO      SRO-I      SRO-U RO    SRO-I    SRO-U  RO SRO-I SRO-U  SCENARIO SCENARIO SCENARIO SCENARIO    Competencies 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Interpret/Diagnose Events and Conditions 1,2 1,3 3 6 3 3 2,6 4 4,5,6    Comply With and
 
Use Procedures (1) all 4,5 3,4 5 1,4, 5 1,3, 4 2,6 4,5 2,5,6    Operate Control
 
Boards (2) 1,4, 5  4,5  1,3, 4 2,5, 6 5,6, 7 1,5,6    Communicate
 
and Interact all 1,3, 4 all 2,4, 5 all 3,4 2,4, 5 4,5 1,4    Demonstrate Supervisory Ability (3) 1,4, 5  3,4  1,3, 4        Comply With and
 
Use Tech. Specs. (3) 1,3  2,3  2,3        Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
Instructions:
 
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
 
E S-301 Competencies Checklist Form ES-301-6 Facility: PBNP      Date of Examination: Week of May 11 th 2009 Operating Test No.:2009-01 Crew B APPLICANTS RO      SRO-I SRO-U        RO        SRO-I      SRO-U RO  SRO-I  SRO-U  RO SRO-I SRO-U  SCENARIO SCENARIO SCENARIO SCENARIO    Competencies 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Interpret/Diagnose Events and Conditions 2,6 3  1,2 1,3          Comply With and
 
Use Procedures (1) 2,6 1,4, 5  all 4,5          Operate Control
 
Boards (2) 2,5, 6    1,4, 5          Communicate
 
and Interact 2,4, 5 all  all 1,3, 4          Demonstrate Supervisory Ability (3) 1,3, 4  1,4, 5            Comply With and
 
Use Tech. Specs. (3) 2,3  1,3            Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
Instructions:
 
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.}}

Revision as of 14:47, 19 September 2018