ENS 41479: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/10/2005 11:00 EST
| event date = 03/10/2005 11:00 EST
| last update date = 03/10/2005
| last update date = 03/10/2005
| title = Contractor Supervisor Found Positive For Illegal Drugs During A Pre-Access Drug Test
| title = Contractor Supervisor Found Positive for Illegal Drugs During a Pre-Access Drug Test
| event text = A contractor supervisor was determined to have been under the influence of an illegal drug during a pre-access drug test.  The employee's access to the plant has been terminated.  Contact the Headquarters Operations Officer for additional details.  
| event text = A contractor supervisor was determined to have been under the influence of an illegal drug during a pre-access drug test.  The employee's access to the plant has been terminated.  Contact the Headquarters Operations Officer for additional details.  
The NRC Resident Inspector was notified of this event by the licensee.
The NRC Resident Inspector was notified of this event by the licensee.

Latest revision as of 22:21, 1 March 2018

ENS 41479 +/-
Where
Cook American Electric Power icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 26.73
Time - Person (Reporting Time:+0.15 h0.00625 days <br />8.928571e-4 weeks <br />2.0547e-4 months <br />)
Opened: Richard Hackman
16:09 Mar 10, 2005
NRC Officer: John Mackinnon
Last Updated: Mar 10, 2005
41479 - NRC Website
Loading map...