ENS 41794: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/26/2005 EDT
| event date = 04/26/2005 EDT
| last update date = 06/24/2005
| last update date = 06/24/2005
| title = Part 21 Notification - Critical Power Determination For Ge14 And Ge12 Fuel With Zircaloy Spacers
| title = Part 21 Notification - Critical Power Determination for Ge14 and Ge12 Fuel with Zircaloy Spacers
| event text = The following is a portion of a facsimile received on June 24, 2005 from GE Energy, reference - MFN 05-058 Rev 1:
| event text = The following is a portion of a facsimile received on June 24, 2005 from GE Energy, reference - MFN 05-058 Rev 1:
ATTACHMENT 2 - 60-Day interim Report Notification per �21.21(a)(2), and Transfer of Information per �21.21(b)
ATTACHMENT 2 - 60-Day interim Report Notification per �21.21(a)(2), and Transfer of Information per �21.21(b)

Latest revision as of 22:20, 1 March 2018

ENS 41794 +/-
Where
Ge Energy
Wilmington, North Carolina (NRC Region 1)
Organization: Ge Energy
Reporting
10 CFR 21.21
Time - Person (Reporting Time:+1425.58 h59.399 days <br />8.486 weeks <br />1.953 months <br />)
Opened: Jason S. Post
13:35 Jun 24, 2005
NRC Officer: Steve Sandin
Last Updated: Jun 24, 2005
41794 - NRC Website