Line 16: Line 16:
| event date = 08/25/2007 10:58 EDT
| event date = 08/25/2007 10:58 EDT
| last update date = 08/25/2007
| last update date = 08/25/2007
| title = Autostart Of All Emergency Diesel Generators Due To A Grid Disturbance
| title = Autostart of All Emergency Diesel Generators Due to a Grid Disturbance
| event text = A switchyard grid disturbance caused undervoltage relays to start both unit's Emergency Diesel Generators (EDGs).  1A, 1B, 2A, and 2B [EDGs] started which met ESF actuation [conditions].  The [EDGs] did not supply the emergency [buses] due to voltage returning to normal immediately.  The grid fault was isolated and the [EDGs] were secured.
| event text = A switchyard grid disturbance caused undervoltage relays to start both unit's Emergency Diesel Generators (EDGs).  1A, 1B, 2A, and 2B [EDGs] started which met ESF actuation [conditions].  The [EDGs] did not supply the emergency [buses] due to voltage returning to normal immediately.  The grid fault was isolated and the [EDGs] were secured.
The EDGs are now available to respond if needed.
The EDGs are now available to respond if needed.

Latest revision as of 21:16, 1 March 2018

ENS 43597 +/-
Where
Catawba 
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+0.27 h0.0113 days <br />0.00161 weeks <br />3.69846e-4 months <br />)
Opened: John Gates
15:14 Aug 25, 2007
NRC Officer: Pete Snyder
Last Updated: Aug 25, 2007
43597 - NRC Website