ENS 45029: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/28/2009 21:59 EDT | | event date = 04/28/2009 21:59 EDT | ||
| last update date = 04/29/2009 | | last update date = 04/29/2009 | ||
| title = Manual Reactor Trip Initiated | | title = Manual Reactor Trip Initiated as a Result of a Loss of Condensate Flow | ||
| event text = At 2159 Sequoyah Unit 1 was manually tripped from 18% reactor power. The manual trip was in response to automatic isolation of all intermediate pressure feedwater heater strings resulting in a loss of all condensate flow. The feedwater heater strings isolated following a manual trip of the main turbine. The main turbine was manually tripped in response to a failed open moisture separator reheater relief valve. At the time of the event Sequoyah Unit 1 was raising power following a refueling outage. | | event text = At 2159 Sequoyah Unit 1 was manually tripped from 18% reactor power. The manual trip was in response to automatic isolation of all intermediate pressure feedwater heater strings resulting in a loss of all condensate flow. The feedwater heater strings isolated following a manual trip of the main turbine. The main turbine was manually tripped in response to a failed open moisture separator reheater relief valve. At the time of the event Sequoyah Unit 1 was raising power following a refueling outage. | ||
Following the reactor trip, all safety-related equipment operated as designed. Auxiliary feedwater automatically actuated as expected on loss of the operating main feedwater pump. | Following the reactor trip, all safety-related equipment operated as designed. Auxiliary feedwater automatically actuated as expected on loss of the operating main feedwater pump. |
Latest revision as of 22:12, 1 March 2018
Where | |
---|---|
Sequoyah Tennessee (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-2.15 h-0.0896 days <br />-0.0128 weeks <br />-0.00295 months <br />) | |
Opened: | James W. Fuller 23:50 Apr 28, 2009 |
NRC Officer: | Joe O'Hara |
Last Updated: | Apr 29, 2009 |
45029 - NRC Website
| |