ENS 48556: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/04/2012 12:00 EST
| event date = 12/04/2012 12:00 EST
| last update date = 04/24/2013
| last update date = 04/24/2013
| title = Temporary Emergency Operating Facility Established For Planned Outage
| title = Temporary Emergency Operating Facility Established for Planned Outage
| event text = In support of the planned upgrades to Crystal River Unit 3's Emergency Operations Facility's (EOF) heating, ventilation and air conditioning (HVAC) system, on Dec. 4, 2012, at 1200 hours Eastern Standard Time a temporary EOF has been established and declared operational. The temporary EOF is located adjacent to the primary EOF and remains outside the 10-mile Emergency Planning Zone. The temporary EOF meets the functional requirements of the primary EOF. During the establishment of the temporary EOF, there was no loss in the functionality of the EOF. If an emergency requiring EOF activation occurs, the temporary EOF will be staffed and activated using emergency planning procedures. The Emergency Response Organization has been briefed on the use of the temporary EOF. Readiness of the temporary EOF has been confirmed by a facility walkdown using existing procedures. This condition has no adverse affect on the public's or employees' health and safety. The EOF HVAC system is scheduled to be out of service for approximately four months.
| event text = In support of the planned upgrades to Crystal River Unit 3's Emergency Operations Facility's (EOF) heating, ventilation and air conditioning (HVAC) system, on Dec. 4, 2012, at 1200 hours Eastern Standard Time a temporary EOF has been established and declared operational. The temporary EOF is located adjacent to the primary EOF and remains outside the 10-mile Emergency Planning Zone. The temporary EOF meets the functional requirements of the primary EOF. During the establishment of the temporary EOF, there was no loss in the functionality of the EOF. If an emergency requiring EOF activation occurs, the temporary EOF will be staffed and activated using emergency planning procedures. The Emergency Response Organization has been briefed on the use of the temporary EOF. Readiness of the temporary EOF has been confirmed by a facility walkdown using existing procedures. This condition has no adverse affect on the public's or employees' health and safety. The EOF HVAC system is scheduled to be out of service for approximately four months.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.

Latest revision as of 22:01, 1 March 2018

ENS 48556 +/-
Where
Crystal River Duke Energy icon.png
Florida (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-1.2 h-0.05 days <br />-0.00714 weeks <br />-0.00164 months <br />)
Opened: Mark Broussard
15:48 Dec 4, 2012
NRC Officer: Steve Sandin
Last Updated: Apr 24, 2013
48556 - NRC Website
Loading map...