ML15041A529: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:BARSARA Ak. NICKPresident and CEODAIRYLAND POWERCOOPERATIVE SAFEGUARDS INFORMATION "When separated from enclosures, handle thisdocument as decontrolled."
{{#Wiki_filter:BARSARA Ak. NICK President and CEO DAIRYLAND POWER COOPERATIVE SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." January 2, 2015 10 CFR 50.5.4 (p)In reply, please refer to LAC-14324 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555  
January 2, 201510 CFR 50.5.4 (p)In reply, please refer to LAC-14324 DOCKET NO. 50-409 and 72-046ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555


==Dear Sir or Madam:==
==Dear Sir or Madam:==


==SUBJECT:==
==SUBJECT:==
 
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No. DPR-45 Changes to Physical Security Plan, Security Force Training & Qualification Plan and Safety Contingency Plan A complete review of the ISFSI Physical Security Plan has been performed, and a number of changes were found necessary to keep the Plan current. These changes are being submitted in accordance with 10 CFR 50.54 (p). This revision has been approved by the LACBWR Operations Review Committee and the Safety Review Committee.
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No. DPR-45Changes to Physical Security Plan, Security Force Training  
Included are revisions to the ISFSI Physical Security Plan, the Security Force Training and Qualification Plan and the Safeguards Contingency Plan. The location of the changes are indicated by a bold bar in the right-hand margin of each affected page.We are enclosing, as 'a separate item, an explanation of the changes to our subject plans. My staff has reviewed these changes and have determined they do not result in a decrease in the commitment to security of the plans.These enclosures are being sent as Safeguards Information.
& Qualification Planand Safety Contingency PlanA complete review of the ISFSI Physical Security Plan has been performed, and a number ofchanges were found necessary to keep the Plan current.
Please update your copy of the ISFSI Security Plan with the enclosed revised pages, and acknowledge these actions by signing and returning the enclosed receipt.Please contact Don Egge, 608-689-2331 or Lane Peters, 608-689-4316, if you have any questions or comments.SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." A Touchstone Energy Cooperative
These changes are being submitted inaccordance with 10 CFR 50.54 (p). This revision has been approved by the LACBWROperations Review Committee and the Safety Review Committee.
Included are revisions to the ISFSI Physical Security Plan, the Security Force Training andQualification Plan and the Safeguards Contingency Plan. The location of the changes areindicated by a bold bar in the right-hand margin of each affected page.We are enclosing, as 'a separate item, an explanation of the changes to our subject plans. My staffhas reviewed these changes and have determined they do not result in a decrease in thecommitment to security of the plans.These enclosures are being sent as Safeguards Information.
Please update your copy of the ISFSISecurity Plan with the enclosed revised pages, and acknowledge these actions by signing andreturning the enclosed receipt.Please contact Don Egge, 608-689-2331 or Lane Peters, 608-689-4316, if you have anyquestions or comments.
SAFEGUARDS INFORMATION "When separated from enclosures, handle thisdocument as decontrolled."
A Touchstone Energy Cooperative
_0_>3200 East Ave. S. o PO Box 817 e La Crosse, WI 54602-0817 o 608-787-1258 o 608-787-1469 fax o www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.
_0_>3200 East Ave. S. o PO Box 817 e La Crosse, WI 54602-0817 o 608-787-1258 o 608-787-1469 fax o www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.
LJC-14324 Page 2January 2, 2015DAIRYMAND POWERCOOPERATIVE SAFEGUARDS INFORMATION "When separated from enclosures, handle thisdocument as decontrolled."
LJC-14324 Page 2 January 2, 2015 DAIRYMAND POWER COOPERATIVE SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." 10 CFR 50.54 (p)Sincerely, DAIRYLAND POWER COOPERATIVE Barbara A. Nick President and CEO DGE:tco Enclosures cc: Cynthia D. Pederson, Regional Administrator U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 cc (w/o enclosures):
10 CFR 50.54 (p)Sincerely, DAIRYLAND POWER COOPERATIVE Barbara A. NickPresident and CEODGE:tcoEnclosures cc: Cynthia D. Pederson, Regional Administrator U. S. Nuclear Regulatory Commission Region III2443 Warrenville Road, Suite 210Lisle, IL 60532-4352 cc (w/o enclosures):
Gene Bonano, Physical Security Inspector U. S. NRC, Region III 801 Warrenville Rd Lisle, IL 60532-4351 Marlayna Vaaler, Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8F5 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." A Touchstone Energy' Cooperative
Gene Bonano, Physical Security Inspector U. S. NRC, Region III801 Warrenville RdLisle, IL 60532-4351 Marlayna Vaaler, Project ManagerU. S. Nuclear Regulatory Commission Mail Stop T-8F5Two White Flint North11545 Rockville PikeRockville, MD 20852-2738 SAFEGUARDS INFORMATION "When separated from enclosures, handle thisdocument as decontrolled."
A Touchstone Energy' Cooperative
____3200 East Ave. S.
____3200 East Ave. S.
* PO Box 817 L La Crosse, WI 54602-0817
* PO Box 817 L La Crosse, WI 54602-0817

Revision as of 08:13, 9 July 2018

La Crosse Boiling Water Reactor, Changes to Physical Security Plan, Security Force Training & Qualification Plan and Safety Contingency Plan
ML15041A529
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 02/02/2015
From: Nick B A
Dairyland Power Cooperative
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LAC-14324
Download: ML15041A529 (2)


Text

BARSARA Ak. NICK President and CEO DAIRYLAND POWER COOPERATIVE SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." January 2, 2015 10 CFR 50.5.4 (p)In reply, please refer to LAC-14324 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir or Madam:

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No. DPR-45 Changes to Physical Security Plan, Security Force Training & Qualification Plan and Safety Contingency Plan A complete review of the ISFSI Physical Security Plan has been performed, and a number of changes were found necessary to keep the Plan current. These changes are being submitted in accordance with 10 CFR 50.54 (p). This revision has been approved by the LACBWR Operations Review Committee and the Safety Review Committee.

Included are revisions to the ISFSI Physical Security Plan, the Security Force Training and Qualification Plan and the Safeguards Contingency Plan. The location of the changes are indicated by a bold bar in the right-hand margin of each affected page.We are enclosing, as 'a separate item, an explanation of the changes to our subject plans. My staff has reviewed these changes and have determined they do not result in a decrease in the commitment to security of the plans.These enclosures are being sent as Safeguards Information.

Please update your copy of the ISFSI Security Plan with the enclosed revised pages, and acknowledge these actions by signing and returning the enclosed receipt.Please contact Don Egge, 608-689-2331 or Lane Peters, 608-689-4316, if you have any questions or comments.SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." A Touchstone Energy Cooperative

_0_>3200 East Ave. S. o PO Box 817 e La Crosse, WI 54602-0817 o 608-787-1258 o 608-787-1469 fax o www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.

LJC-14324 Page 2 January 2, 2015 DAIRYMAND POWER COOPERATIVE SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." 10 CFR 50.54 (p)Sincerely, DAIRYLAND POWER COOPERATIVE Barbara A. Nick President and CEO DGE:tco Enclosures cc: Cynthia D. Pederson, Regional Administrator U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 cc (w/o enclosures):

Gene Bonano, Physical Security Inspector U. S. NRC, Region III 801 Warrenville Rd Lisle, IL 60532-4351 Marlayna Vaaler, Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8F5 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 SAFEGUARDS INFORMATION"When separated from enclosures, handle this document as decontrolled." A Touchstone Energy' Cooperative

____3200 East Ave. S.

  • PO Box 817 L La Crosse, WI 54602-0817
  • 608-788-4000
  • 608-787-1420 fax
  • www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.