Line 1: Line 1:
{{Adams
#REDIRECT [[L-2016-067, St. Lucie, Units 1 and 2 - Schedule Commitment Change to NRC Bulletin 2012-01, Design Vulnerability in Electric Power Systems]]
| number = ML16097A600
| issue date = 03/29/2016
| title = St. Lucie, Units 1 and 2 - Schedule Commitment Change to NRC Bulletin 2012-01, Design Vulnerability in Electric Power Systems
| author name = Costanzo C R
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000335, 05000389
| license number =
| contact person =
| case reference number = BL-12-001, L-2016-067
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:., MAR 2 9* 2016 L-2016-067 F.PL@ ... : * :.* '"
* 10 CFR 50.4 . ' ..:. " . . , ' I ' ' '' J(, .. :
;i.:i r:; r* **. *;.1: ;:*:*,.,
f-::
*.1 .t '*; " * ; 10 CFR 50.54(f)
: ., '* 1i ,, c
:'* '£.::: : *:! . : ;:::;j::.*;
,,: .. :*''.: ,_.,,.
_ ..
*-t,,,*
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 2'0555
* i :"***, * *, ";: r .:. {<}.: . : : ; . ' -. I ..*. ;t .. \'' .. *} : . ...... '*'l *-. : ''I' '' * ' : i : *, . . ' Re: St. Lucie Units 1 and 2 Dc>cket and 50:.3gg ... ;
,' *; Schedule Coinmitment Change'frf.NGR Bulletin 2012.:01*-_:
* * ' * "' i. * '* * , .* " "* * .. Design Vulnerability in Electric Power Systems *' ..... : ! ' '
* i , .. i, :; * ' i. : ; * : '. ,*I.,: ' * .:. } : .: : ' ' ; I ' ! * *.1j:
* j I.I ; i ,..., i ; ..: *, ';, .'} * , ** ,, * ,* * ** 1 ,.., .; . : . . *. ; .. '. ; ... ; .. . --*.*: '
 
==References:==
: 1. NRC Vulnerability Systems;*:,
dated July 27, 2012. (ML1'2074Al
: 15) 2. FPL letter L-2012-391 dated October 25, 2012, "St. Lucie Units 1 and 2 FPL Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System."
(ML12300A422)
: 3. Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013. (ML13333Al47)
: 4. NRC letter:dated December 20, 2013, "Request for Additional Information Regarding Response to Bulletin.
2012-:0 I;* 'Desig1Y Vulnerability' in Electric Power System."'
. . : .. * ' * (ML13351A314)
: '* . '.:. ; ! ' ;.:,
* 5. FPL letter L-2014-032 dated February 3, 2014, "FPL RAI Response to NRC Bulletin 2012-01 Design Electric Power (ML14051A608)
I.;*: ': * (!,J *: :,,t. ! *!:_.
' _.,*/
'T!,'
* 6. Nudear Energy Institute letter to"the NRC, Industry Initiative on Open Phase Condition, Revision I, dated,March ' I * *;, On July 27, 2012, via Reference 1, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2012-01, "Design Vulnerability in Electrical Power Systems,"
requesting the addressees to provide information about the facilities' electric power system designs and to verify their eompliance
'with vari0us design criteria.
' . ..,! Florida Power & Light (FPL) provided the St. Lucie plant response to the bulletin in Reference
: 2. Via Reference 3, the Nuclear Energy Institute (NEI) outlined the industry
: strategy, goal, criteria and timeline for nuclear stations to detect and protect from an adverse opefi phase , : .. condition and develop an Open Phase Condition Initiative document.
In Reference NRO . 1 l_p . . .. ; . G j:,
6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2016-067 Page2 docketed a request for additional information (RAI) regarding the St. Lucie response to the bulletin.
Reference 5 provided the FPL response for this RAI, and the response included a commitment to follow the implementation schedule contained within the generic sphedule provided in the Industry NEI OPC Initiative, dated October 9, 2013. NEI subsequently revised the OPC Initiative in Reference
: 6. This revision included changes to the generic schedule
. . FPL is revising this commitment made in Reference 5 as follows:
"St. Lucie Units 1 and 2 commit to meeting the generic schedule provided in the current revision of the NEI Industry OPC Initiative
--Revision 1, dated March 2015 --or any subsequent revisions issued by NEL St. Lucie intends to meet the milestones of this schedule;
: however, deviations may be required to accommodate outage schedules, software and hardware availability, manufacturer's delivery capabilities, licensing delays, etc.
* Any deviations from the NEI Industry OPC Initiative schedule will be documented through the deviation/exemption process in NEI OPC Guidance Doc;ument APC 14-25 or subsequent revision."
Please contact Ken Frehafer at (772) 467-7748 ifthere are any questions on this submittal.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on
?fd,6 Respectfully submitted, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/KWF cc: NRC Region II Administrator St. Lucie Plant Senior Resident Inspector 
., MAR 2 9* 2016 L-2016-067 F.PL@ ... : * :.* '"
* 10 CFR 50.4 . ' ..:. " . . , ' I ' ' '' J(, .. :
;i.:i r:; r* **. *;.1: ;:*:*,.,
f-::
*.1 .t '*; " * ; 10 CFR 50.54(f)
: ., '* 1i ,, c
:'* '&#xa3;.::: : *:! . : ;:::;j::.*;
,,: .. :*''.: ,_.,,.
_ ..
*-t,,,*
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 2'0555
* i :"***, * *, ";: r .:. {<}.: . : : ; . ' -. I ..*. ;t .. \'' .. *} : . ...... '*'l *-. : ''I' '' * ' : i : *, . . ' Re: St. Lucie Units 1 and 2 Dc>cket and 50:.3gg ... ;
,' *; Schedule Coinmitment Change'frf.NGR Bulletin 2012.:01*-_:
* * ' * "' i. * '* * , .* " "* * .. Design Vulnerability in Electric Power Systems *' ..... : ! ' '
* i , .. i, :; * ' i. : ; * : '. ,*I.,: ' * .:. } : .: : ' ' ; I ' ! * *.1j:
* j I.I ; i ,..., i ; ..: *, ';, .'} * , ** ,, * ,* * ** 1 ,.., .; . : . . *. ; .. '. ; ... ; .. . --*.*: '
 
==References:==
: 1. NRC Vulnerability Systems;*:,
dated July 27, 2012. (ML1'2074Al
: 15) 2. FPL letter L-2012-391 dated October 25, 2012, "St. Lucie Units 1 and 2 FPL Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System."
(ML12300A422)
: 3. Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013. (ML13333Al47)
: 4. NRC letter:dated December 20, 2013, "Request for Additional Information Regarding Response to Bulletin.
2012-:0 I;* 'Desig1Y Vulnerability' in Electric Power System."'
. . : .. * ' * (ML13351A314)
: '* . '.:. ; ! ' ;.:,
* 5. FPL letter L-2014-032 dated February 3, 2014, "FPL RAI Response to NRC Bulletin 2012-01 Design Electric Power (ML14051A608)
I.;*: ': * (!,J *: :,,t. ! *!:_.
' _.,*/
'T!,'
* 6. Nudear Energy Institute letter to"the NRC, Industry Initiative on Open Phase Condition, Revision I, dated,March ' I * *;, On July 27, 2012, via Reference 1, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2012-01, "Design Vulnerability in Electrical Power Systems,"
requesting the addressees to provide information about the facilities' electric power system designs and to verify their eompliance
'with vari0us design criteria.
' . ..,! Florida Power & Light (FPL) provided the St. Lucie plant response to the bulletin in Reference
: 2. Via Reference 3, the Nuclear Energy Institute (NEI) outlined the industry
: strategy, goal, criteria and timeline for nuclear stations to detect and protect from an adverse opefi phase , : .. condition and develop an Open Phase Condition Initiative document.
In Reference NRO . 1 l_p . . .. ; . G j:,
6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2016-067 Page2 docketed a request for additional information (RAI) regarding the St. Lucie response to the bulletin.
Reference 5 provided the FPL response for this RAI, and the response included a commitment to follow the implementation schedule contained within the generic sphedule provided in the Industry NEI OPC Initiative, dated October 9, 2013. NEI subsequently revised the OPC Initiative in Reference
: 6. This revision included changes to the generic schedule
. . FPL is revising this commitment made in Reference 5 as follows:
"St. Lucie Units 1 and 2 commit to meeting the generic schedule provided in the current revision of the NEI Industry OPC Initiative
--Revision 1, dated March 2015 --or any subsequent revisions issued by NEL St. Lucie intends to meet the milestones of this schedule;
: however, deviations may be required to accommodate outage schedules, software and hardware availability, manufacturer's delivery capabilities, licensing delays, etc.
* Any deviations from the NEI Industry OPC Initiative schedule will be documented through the deviation/exemption process in NEI OPC Guidance Doc;ument APC 14-25 or subsequent revision."
Please contact Ken Frehafer at (772) 467-7748 ifthere are any questions on this submittal.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on
?fd,6 Respectfully submitted, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/KWF cc: NRC Region II Administrator St. Lucie Plant Senior Resident Inspector}}