{{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT  
{{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT  


La CrossLicense TRevision8.Sup8.1.8.1.8.1.8.2.8.2.8.3.8.4.8.5.8.5.8 8
La Cros s License T Revisio n 8.Sup 8.1.8.1.8.1.8.2.8.2.8.3.8.4.8.5.8.5.8 8
88.5.
8 8.5.
8.5.8 8
8.5.8 8
88.5.48.6.8.6.
8 8.5.4 8.6.8.6.
8.6.8 8
8.6.8 8
8 8
8 8
88.6.8 8
8 8.6.8 8
8 8
8 8
8 8
8 8
Line 30: Line 30:
8 8
8 8
8 8
8 8
8se Boiling WTermination n 0 plement to tIntroductio n1.Purpos2.BackgrSite Locati o1.Site DeRemaining Impacts to tLa Crosse B1.Geogra.5.1.1.Site.5.1.2.Pop.5.1.3.Site2.Climate3.Topogr.5.3.1.Top.5.3.2.Geo.5.3.3.Sei4.HydrolEnvironme n1.Summa2.Radiolo.6.2.1.Occ.6.2.2.Off.6.2.3.Env.6.2.4.Sto.6.2.5.Rad3.Non-ra.6.3.1.Ons.6.3.2.Off.6.3.3.Wa.6.3.4.Wa.6.3.5.Air.6.3.6.Aqu.6.3.7.Ter.6.3.8.Thr.6.3.9.Occ.6.3.10.Co.6.3.11.So.6.3.12.En.6.3.13.Cu.6.3.14.Ae.6.3.15.NoWater Reacto rPlan the Environ mn .................
8 s e Boiling W Termination n 0 plement to t Introductio n 1.Purpos 2.Backg rSite Locati o 1.Site D eRemaining Impacts to t La Crosse B 1.Geogr a.5.1.1.Sit e.5.1.2.Po p.5.1.3.Sit e 2.Climat e 3.Topog r.5.3.1.To p.5.3.2.Ge o.5.3.3.Sei 4.Hydro lEnvironme n 1.Summ a 2.Radiol o.6.2.1.Oc c.6.2.2.Of f.6.2.3.En v.6.2.4.St o.6.2.5.Ra d 3.Non-r a.6.3.1.On s.6.3.2.Of f.6.3.3.W a.6.3.4.W a.6.3.5.Ai r.6.3.6.Aq u.6.3.7.Te r.6.3.8.Th r.6.3.9.Oc c.6.3.10.C o.6.3.11.S o.6.3.12.E n.6.3.13.C u.6.3.14.A e.6.3.15.N o W ater Reacto r Plan t he Environ m n .................
e .................
e .................
round ..........
r oun d ..........
on and Desc rescription A fDismantle mthe Post-Sh uBoiling Wat eaphy and De me Location a npulation ......
o n and Desc r e scription A fDismantle m t he Post-Sh u Boiling Wat e a phy and De m e Location a n p ulation ......
e Access, L ae .................
e Access, L a e .................
raphy, Geol opography ....
r aphy, Geol o p ography ....
ology ..........smology .....
o logy ..........smology .....
logy and Hy dntal Effects oary ..............
l ogy and Hy d ntal Effects o ary ..............
ogical Effec tcupational Rfsite Radiati ovironmental rage and Di sdiological C radiological Esite Land U sfsite Land U ater Use .......
ogical Effec t c upational R f site Radiati o vironmental rage and Di s diological C r a diological E site Land U s fsite Land U ater Use .......
ater Quality .
ater Quality .
r Quality .....
r Quality .....
uatic Ecolo grrestrial Eco lreatened or Ecupational I sost...............
uatic Ecolo g rrestrial Eco l reatened or E c upational I s o st...............
ocioeconom invironment aultural, Hist oesthetics .....
ocioeconom i nvironment a ultural, Hist o e sthetics .....
oise.............
o ise.............
r  TABLE Omental Repo r...................
r  TABLE O mental Repo r...................
....................
....................
....................
....................
.ription ........
.r iption ........
.fter Unrestri ment and De cutdown Dec oer Reactor E mography ..
.f ter Unrestri m ent and De c u tdown Dec o e r Reactor E m ography ..
.nd Descript i...................
.n d Descript i...................
.and and Wat
.a nd and Wat
...................
...................
.ogy and Sei s...................
.o gy and Sei s...................
....................
....................
....................
....................
.drogeology
.d rogeology
.of Decommi...................
.o f Decomm i...................
.ts of Deco mRadiation Ex pon Exposur eEffects of Asposal of L oriteria for L iEffects of D ese ................
.t s of Deco m R adiation Ex p o n Exposur eEffects of A s posal of L o riteria for L i Effects of D e s e ................
.se (in the V i...................
.se (in the V i...................
....................
....................
....................
....................
.gy................
.g y................
.logy ............
.l ogy ............
.Endangered ssues/Safet y...................
.E ndangered ssues/Safet y...................
.ic Impacts ...
.ic Impacts ...
.al Justice .....
.al Justice .....
.oric, and Ar c...................
.o ric, and Ar c...................
....................
....................
.8-i OF CONTErt ................
.8-i OF CONT E r t ................
....................
....................
....................
....................
....................
....................
....................
....................
.cted Releas ecommission iommissioni nnvironment  
.cted Releas e commission i o mmissioni nnvironment  
...................
...................
.ion ..............
.i on ..............
....................
....................
.er Use ........
.er Use ........
Line 87: Line 87:
....................
....................
.mmissioning  
.mmissioning  
.posure ........
.p osure ........
.e and Monit oAccidents an dow-Level R aicense Term ecommissio n...................
.e and Monit o A ccidents an d o w-Level R a i cense Term e commissio n...................
.icinity) .......
.i cinity) .......
....................
....................
....................
....................
Line 100: Line 100:
....................
....................
....................
....................
.cheological R...................
.c heological R...................
....................
....................
.ENTS ...................
.E NTS ...................
....................
....................
....................
....................
Line 108: Line 108:
....................
....................
.e .................
.e .................
.ing Activiti eng Activities Descriptio n...................
.i ng Activiti e n g Activities Descriptio n...................
....................
....................
....................
....................
Line 122: Line 122:
....................
....................
....................
....................
.oring ...........
.o ring ...........
.d Decommi sadioactive Wmination .......
.d Decommi s a dioactive W m ination .......
.ning ............
.n ing ............
....................
....................
....................
....................
Line 137: Line 137:
....................
....................
....................
....................
.Resources ..
.R esources ..
....................
....................
....................
....................
Line 146: Line 146:
....................
....................
....................
....................
.es ................
.e s ................
. Report (PS Dn ..................
. Report (PS D n ..................
....................
....................
....................
....................
Line 163: Line 163:
....................
....................
....................
....................
.ssioning Ev eWaste ...........
.s sioning Ev e W aste ...........
....................
....................
....................
....................
Line 205: Line 205:
....................
....................
....................
....................
.ents ............
.e nts ............
....................
....................
....................
....................
Line 224: Line 224:
....................
....................
....................
....................
.... 8-1... 8-1... 8-1... 8-1... 8-2... 8-3... 8-5... 8-5... 8-6... 8-6... 8-6... 8-6... 8-6... 8-7... 8-7... 8-7... 8-8... 8-8... 8-8... 8-9... 8-9. 8-10. 8-10. 8-12. 8-12. 8-13. 8-14. 8-14. 8-14. 8-14. 8-15. 8-16. 8-17. 8-17. 8-18. 8-19. 8-20. 8-20. 8-20. 8-21. 8-21. 8-22. 8-22 La CrossLicense TRevision88 88.7.8.7.888.7.8.8.8.9. Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-  se Boiling WTermination n 0 .6.3.16.Irr.6.3.17.Tr.6.3.18.CuOverview o1.Federal.7.1.1.Nuc.7.1.2.U.S2.FederalConclusion References 1SummaNuclea-1Site Re-2Site Ov-3LACBW-4Topogr-5GroundWater Reacto rPlan retrievable Rraffic and T rumulative I mof Regulatio nl Requirem eclear Regul aS. Environm el, State and L...................
.... 8-1... 8-1... 8-1... 8-1... 8-2... 8-3... 8-5... 8-5... 8-6... 8-6... 8-6... 8-6... 8-6... 8-7... 8-7... 8-7... 8-8... 8-8... 8-8... 8-9... 8-9. 8-10. 8-10. 8-12. 8-12. 8-13. 8-14. 8-14. 8-14. 8-14. 8-15. 8-16. 8-17. 8-17. 8-18. 8-19. 8-20. 8-20. 8-20. 8-21. 8-21. 8-22. 8-22 La Cros s License T Revisio n 8 8 8 8.7.8.7.8 8 8.7.8.8.8.9. Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-  s e Boiling W Termination n 0 .6.3.16.Ir r.6.3.17.T r.6.3.18.C u Overview o 1.Federa l.7.1.1.Nu c.7.1.2.U.S 2.Federa l Conclusion References 1Summ a Nucle a-1Site R e-2Site O v-3LACB W-4Topog r-5Groun d W ater Reacto r Plan retrievable R r affic and T r umulative I m o f Regulatio n l Requirem e clear Regul a S. Environm e l, State and L...................


...................
...................
ary of the E nar Power Fa cegional Loc averview .......
a ry of the E n ar Power Fa c e gional Loc a v erview .......
WR Buildin graphical Ma pdwater Sam pr Resources ....
W R Buildin g r aphical Ma p d water Sam p r R esources ....
.ransportatio nmpacts .........
.r ansportatio n m pacts .........
.ns Governin gents .............
.ns Governin g e nts .............
.atory Comm ental Protec tLocal Requi
.atory Comm ental Protec t L ocal Requi
...................
...................
....................
....................
.LIST nvironment acilities ........
.LIST nvironment a c ilities ........
.LIST Oation ............
.LIST O a tion ............
....................
....................
.gs ...............
.g s ...............
.p .................
.p .................
.pling Wells  ii ...................
.p ling Wells  ii ...................
.n .................
.n .................
....................
....................
.g Decommis...................
.g Decommi s...................
.ission .........
.ission .........
.tion Agenc yrements .....
.t ion Agenc yrements .....
....................
....................
....................
....................
.OF TABLEal Impacts fr o...................
.OF TABL E al Impacts fr o...................
.OF FIGURE...................
.O F FIGUR E...................
....................
....................
....................
....................
....................
....................
.- LACBWR...................
.- LACBW R...................
....................
....................
....................
....................
.ssioning Ac t...................
.s sioning Ac t...................
....................
....................
.y ..................
.y ..................
Line 261: Line 261:
....................
....................
....................
....................
.ES om Decomm...................
.E S om Decom m...................
.RES ...................
.RES ...................
....................
....................
Line 276: Line 276:
....................
....................
....................
....................
.missioning  
.m issioning  
...................
...................
....................
....................
Line 299: Line 299:
....................
....................
....................
....................
.. 8-23. 8-23. 8-238-24. 8-24. 8-24. 8-25. 8-25. 8-25. 8-26. 8-11. 8-28. 8-29. 8-30. 8-31. 8-32 La CrossLicense TRevisionACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/ PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACBWLSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP se Boiling WTermination n 0 AmerAtom AboveAs LoBelowBest MBoilinDeparDeparDecomEnviroEnviroFuel EFinal GenoaGenoaGenerGeogrIndepWR La CrLACBLicenMegawMegawNationNucleOff-S OccupPolychPost-SRadiaWater Reacto rPlan LIST OF ican Commuic Energy C e Mean Sea ow As Reas ow Ground S uManagementng Water Re rtment of E nrtment of Tr ammissionin gonmental P ronmental R eElement Sto rRadiation S ua No. 1 Stat ia No. 3 Fos sric Environ mraphic Man aendent Spe nrosse Boilin gBWR Site E nse Terminat iwatts Electr iwatts Ther mnal Pollutan tear Regulato rite Dose Ca lpational Saf ehlorinated BShutdown D ation Work Pr ACRONYMunity Surve yommission Level onably Achi eurface t Practices actor nergy ansportatio ng Plan/Post Srotection Ag eeport rage Well urvey ion sil Station mental Impa cagement Un int Fuel Stor ag Water Rea cnclosure ion Plan ic mal t Discharge ry Commisslculation M aety and Hea lBiphenyl ecommissio Permit 8-iii MS AND ABy evable n Shutdown A ency ct Statemen tit age Installati octor Elimination ion anual lth Adminis tning Activi tBBREVIATctivities Re pt on  System tration ties Report TIONS port La CrossLicense TRevisionRCRA REMP RPV SAFSTOSSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES se Boiling WTermination n 0 ResouRadioReactOR SAFe StructTotal ToxicUnitedUnitedVerticWasteWiscoWiscoWater Reacto rPlan urce Conser vological Env ior Pressure VSTORage tures, Syste mEffective D o Substance Cd States Ar md States En vcal Concrete e Control S ponsin Depar tonsin Pollut ar vation and Rironmental MVessel ms and Com pose Equival eControl Act my Corps of vironmental P Cask ecialists tment of Na tant Dischar g8-iv Recovery Ac tMonitoring Pponents ent Engineers Protection Atural Resou rge Eliminati ot Program Agency rces on System La CrossLicense TRevision8.S8.1.InIn accorRegulatoNuclear describinspecific dReactor (8.1.1.PThis chaReport, Ldescribinspecific Terminatdetailed dbetween activitie sThe supppredictedEnvironm(NUREG(GEIS) oLACBWRPlan/PSDto be peactivitie s8.1.2.BLACBWWater R U.S. Ato1973, theApril 30,electrica lCharacteLimited disposal  
.. 8-23. 8-23. 8-238-24. 8-24. 8-24. 8-25. 8-25. 8-25. 8-26. 8-11. 8-28. 8-29. 8-30. 8-31. 8-32 La Cros s License T Revisio nACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/ PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACB W LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP s e Boiling W Termination n 0 AmerAtom Abov e As L o Belo w Best M Boili n Depa r Depa r Deco m Envir o Envir o Fuel E Final Geno a Geno a Gene r Geog r Indep WR La C r LAC B Licen Mega w Mega w Natio n Nucl e Off-S Occu p Polyc h Post-S Radi a W ater Reacto r Plan LIST OF i can Comm u i c Energy C e Mean Sea o w As Reas o w Ground S u Managemen t ng Water Re rtment of E n rtment of Tr a mmissionin g onmental P r onmental R e Element Sto r Radiation S u a No. 1 Stat i a No. 3 Fos s ric Environ m r aphic Man a endent Spe n r osse Boilin g B WR Site E nse Terminat i w atts Electr i w atts Ther m nal Pollutan t ear Regulato r i te Dose Ca l pational Saf e hlorinated B S hutdown D ation Work P r ACRONY M u nity Surve yommission Level o nably Achi e u rface t Practices acto r n ergy a nsportatio n g Plan/Post S rotection Ag e e port rage Well urvey i on sil Station mental Impa c agement Un i n t Fuel Stor a g Water Rea c n closure i on Plan i c m al t Discharge ry Commis s l culation M a e ty and Hea l B iphenyl ecommissio Permit 8-iii M S AND A B y e vable n S hutdown A e ncy ct Statemen t i t age Installati o c to r Elimination ion a nual l th Adminis t ning Activi t B BREVIA Tctivities Re p t on  System tration ties Report TIONS p ort La Cros s License T Revisio n RCRA REMP RPV SAFST O SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES s e Boiling W Termination n 0 Reso u Radi o React O R SAFe Struc t Total Toxi c Unite d Unite d Verti c Wast eWisc oWisc o W ater Reacto r Plan u rce Conser v o logical Env i or Pressure V STORage tures, Syste m Effective D o Substance C d States Ar m d States En v cal Concrete e Control S p o nsin Depar t o nsin Pollut a r v ation and R ironmental M V essel ms and Com p o se Equival e C ontrol Act m y Corps of vironmental P Cask ecialists tment of Na t a nt Dischar g 8-iv R ecovery Ac t M onitoring P p onents e nt Engineers P rotection A t ural Resou r g e Eliminati o t P rogra m A gency rces o n System La Cros s License T Revisio n 8.S 8.1.I n In acco r R egulat o Nuclear describi n specific d Reactor (8.1.1.P This ch a R eport, L describi n specific Termina t detailed d b etween activitie s The sup ppredicte d Environ m (NURE G(GEIS) o LACBW R Plan/PS D to be p eactivitie s 8.1.2.B LACB W Water R U.S. At o 1973, th e April 30 , electrica l Charact eLimited disposal consisti n(FESW)
Septemb s e Boiling W Termination n 0 S uppleme n n troductio n rdance wit h ory Guide 1.
Power Rea c n g any new decommissi o (LACBWR)P urpose a pter supple m L a Crosse B n g any new decommis s t ion Plan (L description othose acti v s. plement dis c d by the U n mental Stat e G-0191) (4);
o n Decom m R Decommi s D AR) (6).
T erformed fr o s. B ack g round W R consists eactor (BW R omic Energ y e reactor an d , 1987, whe n l output.
T rization Sur vdismantle m of the Rea c n g of 333 s p to dry cask e r 19, 2012.
W ater Reacto r Plan n t to the E n h the requi 179, Stand a ctors (1), t hinformatio n o ning and s isite. m ents the 1 B oiling Wate rinformatio n s ioning an d L TP). This of the remai vities and t h c usses whet h n ited States ement relate d NUREG-0 5 m issioning o f ssioning Pl a T his chapter om time of of a single R) construc t Commissi o d its fuel w e n it was sh u T he plant w v ey for SA F m ent activiti e c tor Pressu r p ent fuel as sstorage at t h On Marc h r  E nvironm erements o f a rd Format his chapter p n or signifi c ite closure a 1 972 Dairyl a r Reactor (E n or signific a d license tsupplement
, ning decom m h e environ m h er the acti vNuclear R e d to operat i 5 86, Supple f Nuclear F a n and Pos t discusses d esubmittal o Allis-Chal m t ed in 1967 o n (AEC).
T e re transferr e u t down b ec w as placed i FSTOR was c es were st a r e Vessel (R s emblies, w a he on-site In d h 12, 2014, D 8-1 e ntal Rep o f 10 CFR 5 0 and Cont e p rovides a s c ant environ m activities pe r a nd Power E R) (2), wh i a nt environ m termination
, including r missioning a m ent, and th e v ities and t h e gulatory C o i on of La Cment 1, "G e Facilities", N t-Shutdown e commissio n f this LTP m ers design eas a demo n T he plant w a ed to Dairy l ause of eco n i n SAFST O c ompleted i n arted in 19 9 R PV) in M a a s transferr e d ependent S D airylan d s u o rt 0.82 (a)(9)(i i e nts for Lic supplement m ental cha n rformed at t Cooperativ e i ch was revi m ental chan activities r eference t o a nd site clo s e likely en v heir impacts ommission (C ross Boilin g e neric Envi r Novembe r 2 Decommiss i ning activit i until the c o ed 50 mega w n stration re a as commiss i l an d. It wa snomic reas o OR on Aug u n October 1 9 94, includi n ay 2007. A ed from the pent Fuel S t ubmitted a r i)(A) and tense Termi nto the env i n ge associa t t he La Cros s e (Dairylan d sed on June n ges associa t presented i o LTP Chap sure activiti e vironmental are bounde (NRC) NU R g Water Re a r onmental I 2 002 (5); a n ioning Acti v i es, with a f o ompletion o w att electri c a ctor in con j i oned in No v s operated b y o ns due to i t u st 7, 1991.
9 95. ng the rem oll of the s p Fuel Elem e t orage Insta l evision of t h t he guidan c nation Pla n i ronmental r t ed with the s e Boiling W d) Environ m 15, 1973 (3 t ed with th ein this Li c p ter 3, provi es, the inter aimpact of d by the i m R EG-0191, F actor, Apri l I mpact Stat e n d the Dair y vities Repo r o cus on acti vf site resto r c (MWe) B o j unction wi t v embe r 196 9 y Dairylan d t s small siz e An initia l o val and o f pent nuclear e nt Storage llation (ISF S h e LACB W ce of ns for report  site-W ater m enta l 3), by e site-c ense des a action those mpacts F inal 1980 e ment yland r t (D-vities ration oiling t h the 9. In d until e an d l Site ff-site fuel, Well S I) by W R D-La Cros s License T Revisio n Plan/PS D characte r concludi n Energy S o Survey R Charact e As state d was doc u 1987. L A environ m support o LACB W noted in 1,155 M W known a LACB W the gen e decomm i located i that this


consistin(FESW)
Elk Riv elicense t e The late s"The en dismantl e specific a this Sup p potential Offs iAqu aTerr eThre aSoci oEnvi r 8.2.S LACB W Mississi p south of site loca t coordina t s e Boiling W Termination n 0 DAR to the N rization wa s n g on Aug u o lutions is d Report for O e rization Su r d in the D-P l umented in ACBWR d e mental impa o f the Augu s W R, dated A pthe ER an d We WNP-2 as Columbi a WR is a muc h e ric environ m i ssioning i m n Elk Rive rdecommiss i e r facility w a e rmination i n st D-Plan/P S vironmenta l ement activ i ally evaluate plement as aenvironme n te land use a a tic ecology estrial ecolo g a tened and e oeconomic ronmental j u ite Locatio n W R is locate d ppi River, a bthe city of L tion, includi n t es for LA C W ater Reacto r Plan N RC that a c s performe d ust 6, 2015.
Septembse Boiling WTermination n 0 Supplemenntroductio nrdance wit hory Guide 1.
documented i O ctober an d rvey Report f l an/PSDAR ,a suppleme n e commissio n ct not pre v s t 7, 1991, D pril 21, 198 0 d NUREG-0 BWR ope r a Generati n h smaller re a mental ass e m pact of a s m r , Minnesot a i oning was c a s another A n 1974 (9).
Power Rea cng any new decommissi o(LACBWR)Purpose apter supple mLa Crosse Bng any new decommisstion Plan (
S DAR docu m l impact o f i ties is SM A d in the GE a basis for m ntal impacts activities as to activit i g y as to acti v e ndangered s u stice" n and Desc r d in south w bout 1 mile L a Crosse, W n g nearby p C BWR are l r  ccounts for t d by Ener g The result s i n two sepa r d November f or June thr u , "Review o f n t to the E n n ing and dis m viously eval u Decommissi o 0."  This rev 0 586. The r ated by W a n g Station, actor compa r essment. N mall 58.2 m e a , which wa s c ompleted s a Allis-Chalm e m ent (issued fall compl e A LL as deter m IS. As stat e m eeting the r enot determi n i es beyond t h v ities beyon d s pecies ription western Wis c south of th e W I. The Si trominent fe a l ongitude 9 8-2 the completi g y Solutions s of the sit e r ate reports, L 2014 Fiel d u August 20 1 f post-opera t nvironmenta l mantlement uated in th e o ning Order iew include d reference B a shington P u owned and red to WNP-N UREG-058 6 e gawatt the r s dismantle d afely with l i ers reactor, ain March 2 0 e ted or pla n m ined by t h ed in the G E equirement s n ed in the G h e operatio n d the operat i c onsin, in V e Village o f te Regional atures such 1 o , 13', 53.
Ldescription othose acti vs. plement dis cd by the U nmental Stat eG-0191) (4);
3 i on of the s pcommenci n e characteri z L ACBWR R d Work (7)15 Field W o a ting license l Report fo r activities h a e NRC's E n or NURE G d the evalu a BWR facili t u blic Powe r operated b-2, its impa c 6 also pro v rmal (MWt) d between 1 i ttle risk to w a superheate 0 14) conclu d nned LAC B h e GEIS. L A E IS, license e s in 10 CFR G EIS are: nal are a i onal area V ernon Cou n fGenoa, WI Location gr as highway s35" West a p ent fuel tra n ng on Oct o zation surv e adiological and LACB W o rk (8). stage envir o r LACBWR a ve resulted nvironment a G-0191 relat e ation of imp a t y in NUR E r Supply S y b y Energy N cts fall withi n vided infor mBWR dem o 971 and 19 7 w orkers an d d test BW R ded the foll o B WR deco m A CBWR de c es can rely o50.83(a)(6)
on DecommR DecommisDAR) (6).
(n ty, on the e and appro x aphic (Figu r s , rivers an d a nd latitude n sfe r. Addi t o be r 9, 201 4 e ys perform e Characteri z W R Radiol o onmental i m dated Dec e in no signi f a l Assessm e e d to operat i a cts against EG-0586 w a ystem (plan t N orthwest).
Terformed fr os. Background WR consists eactor (BW Romic Energ ye reactor an d, 1987, whe nl output.
n the envel o mation abo u o nstration r e 74. It was n d the public.
Trization Sur vdismantle mof the Rea cng of 333 s pto dry cask er 19, 2012.
R , which ach o wing: mmissionin g commission i on informat i (ii). Site-sp e east shore o ximately 19 m re 8-1) sho w d lakes. Th e 43 o, 33', 3 tional 4 and ed by z ation o gical m pacts ember f icant e nt in i on of those a s the t now  As o pe of u t the e actor n oted  The ieved g and ing is i on in e cific of the miles ws the e map 6.22" La Cros s License T Revisio n North. T The Rea cthe carg o 639 feet Mississi pfilled wi tThe lice n LACB Wthe plant the l aform ethe l a gene r the Lthe l athe p a The Site The site i Mississi p Corps o f The site Highwa y Highwa ycurrentl y Mississi p2.4 mile s mussels, 0.75 mil e 8.2.1.S This se c decomm i defined a piping a n 10 CFR 2 The dec o b uilding s structure be remo v and flo o structure s e Boiling W Termination n 0 The site is a ctor Buildin g o-carrying-o n Above M e ppi River.
Water Reacto rPlan nt to the En h the requi 179, Stand actors (1), thinformatio noning and s isite. ments the 1Boiling Wate rinformatio nsioning an dLTP). This of the remai vities and t hcusses whet hnited States ement relate d NUREG-05missioning o fssioning Pl aThis chapter om time of of a single R) construc t Commissi od its fuel w en it was sh uThe plant wvey for SA Fment activiti ector Pressu rpent fuel as sstorage at t h On Marchr  Environmerements o f ard Format his chapter pn or signifi cite closure a1972 Dairyl ar Reactor (En or signific ad license tsupplement
T th sand mat e n sed site co m W R plant co moff of High w a nd north o f e r Genoa N o a nd area di r rating statio n LACBWR pl a nd area sou t arcel of lan dOverview (F is bordered o ppi River a n f Engineers (is border e y 35. A B y 35, carries y do not use ppi River N a s from LA C brook tro u e s south of t hite Descrip t c tion provi d i ssioning an d as the confi g n d open la n 2 0.1402.
,ning decom mhe environ mher the acti vNuclear R ed to operat i586, Supple f Nuclear Fan and Pos tdiscusses d esubmittal o Allis-Chal mted in 1967 on (AEC).
ommissioni n s, structures s above a d e ved from b a o rs in the "s:  W ater Reacto r Plan at mile 678.
Tere transferr eut down becwas placed iFSTOR was ces were st are Vessel (
6 g is approxi nly rail roa d e an Sea Le v T he covered e rial dredge d m prises a to m prising onl y way 35. Ot h f the LACB W o. 1 Station (r ectly south n (Genoa N antt h of G-3, w d to the east o F igure 8-2) i o n the nort h nd Highway (USACE) R o e d on the w B urlington N commercia lthis rail lin a tional Wil d CBWR, is t u t and sturg h e LACBW R t ion After U d es a sum m d site closu r g uration of t nd areas at n g of the Cl aand comp o e pth of 3 fe e asements lo c"En d-State."r  6 on the Mimately 300  
Rsemblies, w ahe on-site In dh 12, 2014, D8-1 ental Repof10 CFR 50and Conteprovides a scant environ mactivities pe rand Power ER) (2), wh iant environ mtermination
: d. The Rea c v el (AMS Lland consis t d from the M t al of 163.5 y 1.5 acres.
, including rmissioning ament, and th evities and t hegulatory C oion of La Cment 1, "G eFacilities"
her promine n WR plant, w (G-1) coal (a of LACB W No. 3 Fossil S where the IS F o f Highway illustrates th h by the Mis s 35. The U
, Nt-Shutdown ecommissio nf this LTP mers design eas a demo nThe plant w aed to Dairy lause of eco nin SAFSTOcompleted i narted in 19 9RPV) in Maas transferr edependent S Dairyland suort 0.82 (a)(9)(i ients for Lic supplement mental cha nrformed at tCooperativ eich was revi mental chan activities reference t oand site clo se likely en vheir impacts ommission (Cross Boilin generic Envi rNovember 2Decommiss ining activit iuntil the c oed 50 mega wnstration re aas commiss iland. It wasnomic reas oOR on Augun October 1 994, includi nay 2007. A ed from the pent Fuel S tubmitted a r i)(A) and tense Termi nto the env inge associa tthe La Cros se (Dairylan dsed on June nges associa tpresented io LTP Chap sure activiti evironmental are bounde (NRC) NURg Water Re aronmental I2002 (5); a nioning Acti vies, with a f oompletion o watt electri cactor in con jioned in No vs operated b yons due to i tust 7, 1991.
.ock Island D w est b y th e N orthern-S a l freight al o e. The site dlife & Fis h t he Genoa eon. On t h R plant, the r Unrestricte d m ary of the re activities.
995. ng the rem oll of the s pFuel Elem etorage Insta levision of t hthe guidan cnation Pla nironmental rted with the se Boiling Wd) Environm 15, 1973 (
the remaini nthe time o ass 1 areas o o nents) will e t below gra d c ated below  
3ted with th ein this Li cpter 3, provi es, the inter aimpact of d by the i mREG-0191, Factor, Apri lImpact Stat end the Dair yvities Repo rocus on acti vf site resto rc (MWe) Bojunction wi tvember 1969y Dairylan d ts small siz e An initia loval and o fpent nuclear ent Storage llation (ISF She LACBWce of ns for report  site-Water mental 3), by e site-cense des a action those mpacts Final 1980 ement yland rt (D-vities ration oiling th the 9. In d until e and l Site ff-site fuel, Well SI) by WR D-La CrossLicense TRevisionPlan/PSDcharacterconcludinEnergySoSurvey RCharacteAs statedwas docu1987. LAenvironmsupport oLACBWnoted in 1,155 MWknown aLACBWthe genedecommilocated i that this
"  This ap p 8-3 ssissippi Ri vfeet from t h ctor Buildin g L), or 19 fe t ed of the ri v Mississippi R acres whic h The site is n t site featu r w hich includ a nd later oil
 
)WR, which c Station [G-3 FSI is locate d 35, across fr e boundary o s issippi Riv e.S. Lock &
Elk Rivelicense t eThe lates"The en dismantlespecificathis Supppotential OffsiAquaTerreThreaSocioEnvir8.2.SLACBWMississipsouth of site loca tcoordinatse Boiling WTermination n 0 DAR to the Nrization wa sng on Auguolutions is dReport for Oerization Su rd in the D-P lumented in ACBWR demental impa of the Augu sWR, dated A pthe ER an dWe WNP-2 as Columbi aWR is a muc heric environ missioning i mn Elk Rive rdecommiss ier facility w aermination i nst D-Plan/P Svironmenta lement activ ially evaluate plement as aenvironme nte land use aatic ecology estrial ecolo gatened and eoeconomic ronmental j uite Locatio nWR is locate dppi River, a bthe city of Ltion, includi ntes for LA CWater Reacto rPlan NRC that a cs performe dust 6, 2015.
D istrict, is l o e Mississip p a nta Fe rai l o ng the east eis bordered h Refuge Po oNational F i h e southwe s r e is a publi c d Release final con d The "End-S n g below gr of license t e o f the plantinclude the de (designatthe 636 fo o proach will v e r above t h h e Mississip p g stands on et above t h v er edge an d River. h is owned baccessed b y res include:
documented iOctober an drvey Report flan/PSDAR,a suppleme necommissio nct not pre vst 7, 1991, Dpril 21, 198 0d NUREG-0BWR opera Generati nh smaller re amental ass empact of a s mr, Minnesot aioning was cas another An 1974 (9).
SDAR documl impact o f ities is SM Ad in the GE a basis for mntal impacts activities as to activit igy as to acti vendangered sustice" n and Desc rd in south wbout 1 mile La Crosse, Wng nearby p CBWR are lr  ccounts for td by EnergThe result sin two sepa rd November for June thr u, "Review o fnt to the E nning and dis mviously eval uDecommissi o0."  This rev 0586. The rated by W ang Station, actor compa ressment.
Nmall 58.2 m ea, which wa scompleted s aAllis-Chalm ement (issued fall compl eALL as deter mIS. As stat emeeting the r enot determi nies beyond t hvities beyon dspecies ription western Wis csouth of th eWI. The Si trominent fe alongitude 9 8-2 the completi gySolutions s of the sit erate reports, L2014 Fiel du August 20 1f post-opera tnvironmenta lmantlement uated in th eoning Order iew include dreference Bashington P uowned and red to WNP
-NUREG-0586egawatt the rs dismantle dafely with l iers reactor, ain March 2 0eted or pla nmined by t hed in the G Eequirement sned in the Ghe operatio nd the operat iconsin, in Ve Village o f te Regional atures such 1o, 13', 53.
3ion of the s pcommencine characteri zLACBWR Rd Work (7)15 Field W oating license l Report fo ractivities h ae NRC's Enor NUREGd the evalu aBWR facili tublic Powe roperated b-2, its impa c6 also pro vrmal (MWt) d between 1 ittle risk to wa superheate 014) conclu dnned LACBhe GEIS. L AEIS, license es in 10 CFR GEIS are:
nal area ional area Vernon Cou nfGenoa, WI Location gr as highway s35" West apent fuel tra nng on Octozation surv eadiological and LACBWork (8). stage envir or LACBWR ave resulted nvironment aG-0191 relat eation of imp aty in NUREr Supply S yby Energy Ncts fall withi nvided infor mBWR demo971 and 19 7workers an dd test BW Rded the foll oBWR decomACBWR deces can rely o50.83(a)(6)
(nty, on the e and appro xaphic (Figu rs, rivers an dand latitude nsfer. Additober 9, 2014eys perform eCharacteri zWR Radioloonmental i mdated Dec ein no signi fal Assessm eed to operat iacts against EG-0586 waystem (plan tNorthwest).
n the envel omation abo uonstration r e74. It was nd the public.
R, which ach owing: mmissionin gcommission ion informat i(ii). Site-sp eeast shore oximately 19 mre 8-1) sho wd lakes. Th e43o, 33', 3tional 4 and ed by zation ogical mpacts ember ficant ent in ion of those as the t now  As ope of ut the eactor noted  The ieved g and ing is ion in ecific of the miles ws the e map 6.22" La CrossLicense TRevisionNorth. TThe Reacthe cargo639 feet Mississipfilled wi tThe licenLACBWthe plant the laformethe lagenerthe Lthe lathe paThe Site The site iMississipCorps of The site HighwayHighwaycurrentlyMississip2.4 milesmussels, 0.75 mile8.2.1.SThis secdecommidefined apiping an10 CFR 2The decobuildingsstructure be removand floostructure se Boiling WTermination n 0 The site is actor Buildin go-carrying-o nAbove Meppi River.
Tth sand mat ensed site co mWR plant co moff of High wand north o fer Genoa N oand area di rrating statio nLACBWR pland area sou tarcel of lan dOverview (
Fis bordered oppi River a nfEngineers (is border ey 35. A By 35, carries y do not use ppi River N as from LACbrook tro ues south of t hite Descrip tction provi dissioning an das the confi gnd open la n20.1402.
ommissioni ns, structures s above a d eved from b aors in the "s:  Water Reacto rPlan at mile 678.
6g is approxi nly rail roa dean Sea Le vThe covered erial dredge dmprises a to mprising onl yway 35. Ot hf the LACB Wo. 1 Station (rectly south n (Genoa Nantth of G-3, wd to the east oFigure 8-2) ion the nort hnd Highway (USACE) Roed on the wBurlington Ncommercia lthis rail lin ational Wil dCBWR, is tut and sturg he LACBWRtion After Udes a summd site closu rguration of tnd areas at ng of the Cl aand compoepth of 3 fe easements lo c"End-State."r  6 on the Mimately 300  
: d. The Rea cvel (AMSLland consis td from the Mtal of 163.5 y 1.5 acres.
her promine nWR plant, w(G-1) coal (
aof LACBWNo. 3 Fossil Swhere the IS Fof Highway illustrates th h by the Mis s35. The U
.ock Island Dwest by theNorthern-S al freight al oe. The site dlife & Fis hthe Genoa eon. On t hR plant, the rUnrestricte dmary of the re activities.
the remaini nthe time o ass 1 areas oonents) will et below gra dcated below  
"  This ap p8-3 ssissippi Ri vfeet from t hctor Buildin gL), or 19 fe ted of the ri vMississippi Racres whic h The site is nt site featu rwhich includ and later oil
)WR, which cStation [G-3FSI is locate d35, across fre boundary osissippi Riv e.S. Lock &
District, is l oe Mississip panta Fe rai long the east eis bordered h Refuge Po oNational F ihe southwe sre is a publi cd Release final con d The "End-Sng below gr of license t eof the plantinclude the de (designatthe 636 fo oproach will ver above thhe Mississip pg stands on et above t hver edge an dRiver. h is owned baccessed b yres include:
es the site s
es the site s
) fueled po wcontains an 3]), located d, and from LACBWof the licen ser and a narrDam No. 8, ocated appropi River a nl line, loc aern portion oto the sout hol 9 area.
) fueled po w c ontains an 3]), located d , and from LACB Wof the licen s e r an d a nar rDam No. 8, o cate d appro p i River a nl line, loc a e rn portion oto the sout hol 9 area.
Fish Hatcher ystern corne rc boat launc hdition of th eState" for L Aound backfilermination m(the on-sit edemolition,ed as 636 f oot elevation apply to t hhe mouth o fpi River an dfilled land ahe normal d low forest aby Dairylan dy a road on witchyard awer plant (re moperational approximat eWR. sed site.
F i sh Hatcher ystern corne r c boat launc h dition of th e State" for L A o und b ackfi l ermination m (the on-sit e demolition,ed as 636 f o o t elevation apply to t h h e mouth o f pi River an dfilled land a he normal d low forest a b y Dairylan d y a road on witchyard a w er plant (re m operational approximat e W R. sed site.
row strip of  managed bximately 0.
r ow strip of  managed bximately 0.
6nd bordered ated betwe eof the site.
6 nd bordered ated betwe e of the site.
h by a seg mFurther sou ty, which r ar of the sit ehing ramp we site at t hACBWR declled buildingmeeting the e radiologic a removal a noot AMSL).
h by a seg m F urther sou t y , which r a r of the sit e hing ramp w e site at t h ACBWR de c lled b uildin g meeting the e radiologic a removal a n o ot AMSL).
leaving on lhe followi nf the Ohio Rd 475 feet w eat an elevati elevation o areas which d, with the athe south s iand the site omoved in 19 350 MWe ely 175 feet land betwe eby the U.S.
leaving on l he followi n f the Ohio R d 475 feet w e a t an elevati elevation o areas which d, with the a the south s i a nd the site o m oved in 19 350 MWe ely 175 feet land betwe e b y the U.S.
A6 miles upst ron the ea sen the site Passenger tment of the Uth, approxi maises endan ge, approxi mwith a parkin ghe conclusi ocommission igs, structurerequireme nally contami nnd disposal o All system sly concrete ng buildingsRiver. est of on of f the were actual ide of of the 89), fossil from en the Army ream. st by  and trains Upper mately gered mately g lot. on of ing is s and nts of nated of all s will walls s and La CrossLicense TRevisionReactWastVentiPipe WastTurbiLow MainThe debrdisposal.
A 6 miles upst r on the ea s en the site Passenger t m ent of the U t h, approxi m a ises endan g e, approxi m w ith a parkin g he conclusi o commission i gs, structurerequireme n ally contami n n d disposal o All system s l y concrete n g building s R iver. est of on of f the were actual i de of of the 89), fossil from e n the Army ream. st by  and trains U pper m ately gered m ately g lot. o n of i ng is s and n ts of n ated of all s will walls s and La Cros s License T Revisio nReac tWas tVent iPipe Was tTurb iLow Mai n The deb r disposal.Figure 8-structurewill be d and stru c require r e G-3 Cri b structure potential  
Figure 8-structurewill be dand strucrequire r eG-3 Cribstructure
 
potential  
 
the LTP The belofilled wi tDepartmbackfille The strudismantleAdmLACBOutfaG-3 Ccoal waterElectPavedplant After all


process aand the sse Boiling WTermination n 0 tor Buildin gte Treatmen tilation Stac kand Ventila tte Gas Tank ine Buildin gSpecific Ac tntenance Eat ris generate d -3 shows t hs and comp odemolished actures asso cemedial act ib House, wil ls at depths gremoval.
the LTP The b el ofilled wi t Departmbackfille The str udismantl eAdmLAC BOutf aG-3 C coal wate rElec tPave d plant After all process a and the s s e Boiling W Termination n 0 t or Buildin g te Treatmen t ilation Stac k and Ventila t t e Gas Tank i ne Buildin g Specific Ac t n tenance Eat ris generate d -3 shows t hs and comp o demolished a c tures asso c e medial act i b House, wil l s at depths g removal.
FChapter 3.
F Chapter 3.
ow grade str uth suitable cent of Natu rd, returned tuctures outs ed and will rinistration BBWR Crib Hall diffuser dCoal Plant a nbarge wash ir systems a ntrical Switc hd roadways area. demolition as described surrounding Water Reacto rPlan g,  t Building, k,  tion Tunnel sVault,  g and Turbi ntivity (LSA
o w grade str u th suitable cent of Natu r d , returned t u ctures outs e d an d will r i nistration B BWR Crib H all diffuser d C oal Plant a n barge wash i r systems a n trical Switc h d roadways area. demolition as described s urrounding W ater Reacto r Plan g ,  t Building, k ,  t ion Tunnel s Vault,  g and Turbi n tivity (LSA
)Shack.
)Shack. d from dem o h e key LA C onents, oth e and remove d ciated with G ions; theref o l remain int a g reater than F urther info r uctures to r e clean soil, s a r al Resourc e t o grade, se eide of the remain on si Building, inc l H ouse, incl u discharge pi p n d all assoc i i ng station t n d piping, h yar d , and, and the Bu rand remed i in Chapte r open land r  s , n e Office Bu i) Storage B ulition and r e C BWR buil d er than the L d to a depth o G-3 are ex p ore, no reme d a ct and fun c3 foot belo w rmation on t e main in th e a nd and/or o e s (WDNR) e ded an d ap p"LACBW Rte. These i n l uding asso c u ding fire pr o p ing, extend i iated buildi n t o the nort h rlington No r i ation activ i 5 of this L Tareas withi n 8-4 i ldingu ilding, and emoval oper a dings at the LACBWR A of at least 3 pected to be diation is pl a ctional for G w grade wil l t he approac h e "End Stat e other suitab l regulations p ropriate ero R Site Encl n clude: ciated sanita r o tection pip i i ng 110 feet n gs, wareho u h of the pla n rthern-Santa ities are co m T P, will be p n its license ations will bsite. All o Administrati o feet below g e radiologic a a nned and t h G-3 power o p l be assesse d h to the var i e" such as b l e me d ia, a s. The rest o sion control losure" (LS r y sewer an d ing systems,into the Mi s uses and su p n t and all a sFe rail line m plete, a F i performed t o d boundari e be segregate d o n-site LA C on Building grade. Non e a lly impact e h ese structu r p erations.
d from dem ohe key LAConents, oth eand remove dciated with Gions; theref ol remain int agreater than Further info ructures to r eclean soil, s aral Resourc eto grade, se eide of the remain on si Building, inc lHouse, incl udischarge pi pnd all assoc iing station tnd piping, hyard, and, and the Bu rand remed iin Chapte r open land r  s, ne Office Bu i) Storage B ulition and r eCBWR builder than the Ld to a depth oG-3 are ex pore, no reme dact and fun c3 foot belo wrmation on temain in th eand and/or oes (WDNR) eded and app"LACBWRte. These i nluding asso cuding fire pr oping, extend iiated buildi nto the nort hrlington No riation activ i5 of this L Tareas withi n8-4 ildinguilding, and emoval oper adings at the LACBWR Aof at least 3 pected to be diation is pl actional for Gw grade wil lthe approac he "End Stat eother suitab lregulations propriate ero R Site Encl nclude: ciated sanita rotection pip iing 110 feet ngs, wareho uh of the pla nrthern-Santa ities are co mTP, will be pn its license ations will bsite. All oAdministrati ofeet below ge radiologic aanned and t hG-3 power o pl be assesse dh to the var ie" such as ble media, as. The rest osion control losure" (LS ry sewer an ding systems,into the Mi suses and su pnt and all a sFe rail line mplete, a F iperformed t od boundari ebe segregate don-site LA Con Building grade. Non eally impact ehese structu rperations.
A d for radiol o ious buildin basement fo u s allowable o re d areas o n s will be est E) are not d water syst e ssissippi Ri v p port structu r ssociated s a and spur i n i nal Radiati o o demonstra t es, with the d for recycl i C BWR buil d and Crib H e of the buil e d such tha t res, includi n Any contami n ogical impa c n gs is provi d undations wunder Wisc n the site wablishe d. expected t ems and pip i v e r , res, includi n anitary sewe r nto the LAC B on Survey (t e that LAC Bexception o i ng or dings, House, dings t they n g the nated c t and d ed in w ill be onsin w ill be t o be i ng, n g the r and BWR (FRS) B WR of the La Cros s License T Revisio n ISFSI fa 10 CFR 2 dry stor a dry stor a Isolation remediat control mcompro mequipme n access. I there is n survey a r Several s support t supporti n 8.3.R To date, removal RPV inco rFES WVari o RPV , Puri fVari o Chapter 3remediat achieve t 8.4.I m As prev i decomm i associat e b y the p rNU RNU R Chapter 3 schedule footprint s e Boiling W Termination n 0 a cility, co m 2 0.1402. A s age casks an ge within t h and contr o ion activitie measures w mised by t h nt. Open l a I solation an d n o risk of re reas that ha v services suc h t he ISFSI m n g the adjac e R emainin g D several key of the follo w and associ a re monitor g u W stored co m o us system p , and prima r fication, Sea l o us Turbine 3 of this LT ion activiti e t he "End-St a m pacts to t h i ously note d i ssioning o p e d with dec o reviously iss u R EG-0191, a n R EG-0586. 3 of the L T d to be co m). The i d en t W ater Reacto r Plan m ply with s part of the d transferre d e ISFSI unt i ol measures s. These ac t will be imp l h e potential and areas, a c d control m e-contaminat v e been rele a h as sanitar y m onitoring a e nt G-3 foss i Dismantlemdismantle m wing compo n ated reactor uide tubes, e mponents s u p iping and c ry systems s u l Injection a n and auxilia r P provides d es currently b a te" conditi o h e Post-Sh u d , the D-P l p erations at t ommissioni n ued environ m nd T P identifi e m pleted pri o tified activit i r the radiol odecommiss i d to the ISF il it is transf e will be im p t ivities will lemented t o for re-co n ccess roads a e asures will ion from de ased from th e y sewer serv i a nd security i l station w h ent and De c m ent and dec o n ents: component s etc.), uch as fuel s h components u ch as the C n d Main Ste ry systems.
Ad for radiol oious buildin basement fo us allowable ored areas ons will be est E) are not d water syst essissippi Ri vpport structu rssociated s aand spur i ninal Radiati oo demonstra tes, with the d for recycl iCBWR buildand Crib He of the buil ed such tha tres, includi nAny contami nogical impa cngs is provi dundations wunder Wisc n the site wablished. expected tems and pip iver, res, includi nanitary sewe rnto the LAC Bon Survey (te that LAC Bexception oing or dings, House, dings t they ng the nated ct and ded in will be onsin will be to be ing, ng the r and BWR (FRS) BWR of the La CrossLicense TRevisionISFSI fa10 CFR 2dry storadry storaIsolation remediatcontrol mcompromequipmenaccess.
d etailed des c b eing perfo r on. utdown Dec o l an/PSDAR, the site and n g the site h a mental imp a es the dis m o r to the u n i es are not s 8-5 ogical crite r i oning proc e SI. It is ex p erred to the D p lemented f o be complet e o ensure th e ntamination a nd bounda rremain in ecommissio n e license.
Ithere is nsurvey arSeveral ssupport tsupportin8.3.RTo date, removal RPV incorFESWVarioRPV,PurifVarioChapter 3remediat achieve t8.4.ImAs previdecommiassociateby the prNURNURChapter 3schedule footprint se Boiling WTermination n 0 acility, co m20.1402. A sage casks an ge within t hand contr oion activitie measures wmised by t hnt. Open l aIsolation an dno risk of re reas that ha vservices suc hthe ISFSI mng the adjac eRemaining Dseveral key of the follo wand associ are monitor g uW stored co mous system p, and prima rfication, Sea lous Turbine 3 of this LT ion activiti ethe "End-St ampacts to t hiously note dissioning o ped with dec oreviously iss uREG-0191, a nREG-0586.
i ces and ele c operations.
3 of the L Td to be co m). The identWater Reacto rPlan mply with s part of the d transferre de ISFSI unt iol measures s. These ac twill be imp lhe potential and areas, a cd control m e-contaminat ve been releah as sanitar ymonitoring aent G-3 foss iDismantlemdismantle mwing compo nated reactor uide tubes, emponents s upiping and cry systems s ul Injection a nand auxilia rP provides des currently bate" conditi ohe Post-Sh ud, the D-P lperations at tommissioni nued environ mnd TP identifi empleted pri otified activit ir the radiol odecommiss id to the ISF il it is transf ewill be im ptivities will lemented t o for re-co nccess roads aeasures will ion from de ased from th ey sewer serv iand security il station w hent and De cment and dec onents: component setc.), uch as fuel s hcomponents uch as the C nd Main Ste ry systems.
hich will re m c ommissio n ommissioni n s (e.g. fuel h rouds, cont r associated ontrol Rod D a m. c riptions of rmed and t h ommissioni n amended concluded t ave already act statemen t mantlement a nrestricted r eignificantly ria for un r ess, all spen t pected that t Department following th ed prior to s t e final rad i as result r ies will be ffect throug h n ing. These c trical servi c  There ar e m ain in plac e n in g Activit i ng activities shrouds, co r ol rods, an d with the F o D rive Mech athe dismant he remainin g n g Activiti ein March 2 that the pot e been postul a t s, specifica l a nd decont a elease of t hdifferent fr o restricted u t nuclea r fu e t his spent f u of Energy (De conclusio n t arting the F i ological c o of access b posted wit hhout FRS a cmeasures a r ce will rema e three pota b e. ies have occur r ntrol ro d s, s d start-up so u o rced Circul a anisms, De clement, dec o g activities t e s Report (P014, descri b e ntial envir oated in, an d lly: amination a c h e site (exc l om those or i use specifi e e l was loade d u el will rem a D OE). n of radiol o FRS process.
detailed des cbeing perfo ron. utdown Dec olan/PSDAR, the site and ng the site h amental imp aes the dis mor to the u nies are not s 8-5 ogical crite rioning proc eSI. It is ex perred to the Dplemented fobe complet eo ensure th entamination and bounda rremain in ecommissio ne license.
onditions ar e b y personn e h signs restr i ctivities an d r e not requi r in in operat i b le wells o n r ed, includi n steam separ a urces, and a tion syste m c ay Heat, Pr i ontaminatio n t o be execu t PSDAR) b ed the pl a onmental i m d will be bo u ctivities th a l uding the I i ginally disc u e d in d into ain in o gical   The e not el or icting d until red in i on to n site n g the ators, m , the imary n and ted to a nned m pacts u nded a t are ISFSI ussed La Cros s License T Revisio n in the D-will be didentifie d provide decomm i 8.5.L 8.5.1.G 8.5.1.1.The site Vernon C 300 feet by fillin g The site 642 feet Mississi p silts) un d sands an d 8.5.1.2.The U.S reliable ctotal po p 744 for Snear the small to w (populat i5 miles s 8.5.1.3.The LA C of the M b ounded north, a n electric p This sta t Genoa, l o within t h The are a and fres h to the G-site, loc a s e Boiling W Termination n 0 -Plan/PSDA d efined duri n d in the D-additional i ssioning.
ices and ele coperations.
L a Crosse B o G eo g raph y a Site Llocation an d County, Wi s from the ea s g in river e dis relativel y AMSL b o u ppi River to d erlain by fi n d gravels.
hich will re mcommissionommissioni ns (e.g. fuel hrouds, cont rassociated ontrol Rod Dam. criptions of rmed and t hommissioni n amended concluded tave already act statemen tmantlement anrestricted r eignificantly ria for un ress, all spen tpected that tDepartment following th ed prior to s te final rad ias result ries will be ffect throug hning. These ctrical servi c  There ar emain in plac ening Activiting activities shrouds, co rol rods, an dwith the F oDrive Mech athe dismant he remainin gng Activiti ein March 2 that the pot ebeen postul ats, specifica land decont aelease of t hdifferent fr orestricted ut nuclear fuethis spent f uof Energy (
B Popu l. Census B u census data f p ulation in 2 S toddard, lo cplant, loca t w ns west o ion 397), lo outhwest.
De conclusio ntarting the Fiological c oof access bposted wit hhout FRS a cmeasures a rce will rema e three pota be. ies have occur rntrol rods, sd start-up so uorced Circul aanisms, De clement, dec og activities tes Report (
Site A C BWR prop e M ississippi R by the Mi s nd a wildlife p ower statio n tion is locat e o cated appr o h e town. Th e a of the Mis s h water fish i-3 station lo a ted approxi m W ater Reacto r Plan R. Althou g n g decomm i-Plan/PSDA R evaluation o ilin g Wat e a nd Demo gr L ocation and d descriptio n s consin, in t s t bank of th e d ge and low y flat with t h u nded by th ethe west.
P014, descri bential envir oated in, an d lly: amination a che site (exc lom those or iuse specifi eel was loade duel will rem aDOE). n of radiol oFRS process.
T ne to mediu m B edrock is e n lation ureau, Ame r f or nearby W 2 013 was 25 cated 7 mile s ted 17 miles o f the plant cated 3 mi l Access, Lan d erty is locat e River. Alth o s sissippi Ri vand fish re f n complete d e d to the s o oximately 1 m e re are no r e s issippi Riv e i ng) and co m cated south m ately 4,00 0 r  gh additiona l i ssioning pl R have be eand info r er Reactor E r aph y Descriptio n n were disc u the Mississi p e Mississip p forest area s he reactor f e railroad tr T he geolog y m sands wit h ncountered a rican Com m W isconsin v i8 for the V i s N of the p l N; and 30 , across the es northwe d and Water ed in the fa r o ugh the sit e ver to the w f uge to the s d in 1969, w outh, adjace n m ile to the n e sidences wi t er adjacent t mmercial ba r of the LA C 0 feet south o 8-6 l details reg a a nning effo r en identifie d rmation re g E nvironme n n ussed in sect i ppi River V p i River. T w s with mate r facilities sta n acks to the y consists p r h some soil s a t approxim a m unity Surv e illages and c illage of G e l ant; 51,522
onditions ar eby personn eh signs restr ictivities an dre not requi rin in operat ible wells o nred, includi nsteam separ aurces, and ation syste mcay Heat, Pr iontaminatio nto be execu tPSDAR) bed the pl aonmental i md will be bo uctivities th aluding the Iiginally disc ued in d into ain in ogical   The e not el or icting d until red in ion to n site ng the ators, m, the imary n and ted to anned mpacts unded at are ISFSI ussed La CrossLicense TRevisionin the D-will be didentifie dprovide decommi8.5.L8.5.1.G8.5.1.1.The site Vernon C300 feet by fillingThe site  
, 329 for Ve r Mississipp i s t, and Ne w U se r western po r e area is 16 3 west, a rail l i s outh. The s w hich is also nt to the L A n ortheast of t t hin 2,000 f e to the site i s r ge and ship C BWR plant)o f the plant.
arding majo r ts, no sign i d. Subseq u garding the n t Descripti o ion 8.2. Th ealley, with t w enty-seven r ial dredge d nding at ele veast and th rimarily of f s containing a tely 130 fe e e y (ACS) r e cities and V e e noa, locate d for La Cros r non Count y i River, inc w Albin, I A rtion of Ve r 3.5 acres, it ine to the e site include s owned an d A CBWR fa c t he site. A n e et of any L A s used for r e p traffic (e.g
.). There is There is a pr decommis ificant impa uent section s environm e o n  e 163.5 acre t he Reactor acres of the d from the M vations ran g h e riprap on fill material s higher perc e t below gro u e port (11) p r e rnon Count y d 1 mile no rse, the large
: y. There a rluding Ren o A (populat i r non Count yis relativel y e ast, USAC E s G-3, a co a d operated b y cilities. Th e n elementary A CBWR st r e creational
: p. barges of c a public bo p ortion (Po o sioning acti v cts b eyond s in this c h e ntal effec t e site is loca t Building l o site were f o M ississippi R ging from 6the shore o s (fine sandentages of c u nd surface rovides the
: y. The esti m rth of LAC Bst Wisconsi n r e also num o township, ion 513), l o y on the east y isolated a s E property t a l-fired 379 M y Dairyland e closest to w school is l o r ucture. p urposes (b o c oal are deli vat landing o o l 9) of the U v ities those hapter t s of ted in ocated o rmed River. 36 to of the s and c oarse (10). most m ated B WR; n city erous  MN o cated bank s it is t o the M We (12). w n is o cated oating v ered o n the U pper La Cros s License T Revisio n Mississi p for hunt i Genoa Nmile 679 long loc k public a c through Highwa y No. 8. 8.5.2.C The cli m continen triver val l Lock an d of the i nfrom 60 winter m the aver a summer s The ave r range fr o month f o The blu ff winds a t monthly experien c tornado oF3 (max icenter in j 8.5.3.T 8.5.3.1.The site i dissecte d varies b e river lev e Highwa y Prior to c lying w e dredged to const r s e Boiling W Termination n 0 ppi River N a i ng, fishing N ational Fis h.2, is appro x k and dam s ccess to an oNovembe r. y 35 approx i Climate m ate at the L tal climate w l ey location d Dam No. 8 nformation f to 90 o F d u m onths of D e age temper a s eason (15).
r age annual r om 3 to 5 in c or the remai n f s of the Mi s t the site w h average w i ced tornado s o ccurred 27 imum wind j ured one p e T opo g raph y Topo g i s located w d uplands.
F e tween 21/2 a e l. The LA C y 35. Figure constructio ntlands. Th esands from t r uction, the a W ater Reacto r Plan ational Wild l and recreati h Hatchery.x imately 0.
6 s tructure ow o bservation The Stat e imately 1/2 m L a Crosse r with cold w iof the site.
8 site with a f or the past uring the m o e cembe r 20 1ture is appr rainfall is 3 5 ches per mo n n der of the y s sissippi Ri v h ere the va ind speeds
: s. On Apri l.4 miles aw a speeds 158-e rson and ca u , Geolo gy a n g raphy ithin the Mi F rom La Cro and 41/2 mile C BWR site i 8-4 provid e n of the LA C e property g r t he Mississi p area was gr a r  life & Fish R onal activit
: i. Lock an d 6 miles nort h n ed and op eplatfor m , o p e of Wisco n m ile north o r egion of W i nters and h o The USA C a rchived we a year (May onths of Ju n 1 4 to Febru aoximately 2 5.2 inches.
M n th in the s p ear. ver Valley c h lley runs n o are typical l l 30, 1954, a ay from the 216 mph) t o u sed betwe e n d Seismol o ssissippi Ri v sse to Prairi s in width.
is located b e e s a Topogr a CBWR faci l rade was th e ppi River.
D a ded to a re l 8-7 R efuge just s i es (13). Fu r d Dam No.h of the sit e e rated by th e pen from d a n sin also m of the LAC B W isconsin a n o t summers CE maintain s ather infor m 2014 to M a n e through A ary 2015.
C 2 0 o F in the M onthly pre c p ring and su m hannel the w o rth-south a y 6 to 10 m a category F 4 Genoa vill a o rnado that o e n $500,000 ogy ver Valley, w e du Chien,  The valley etween two v a phy Map o f lity, the site en increase d D uring grad e l atively flat s outh of the rther south a 8, located
: e. The da m e USACE (awn to dus k m aintains a BWR site, a nd at the L A and extre m s an active w mation for th e ay 2015) in d A ugust 201 4 C ity data co mwinter mo n cipitation a v m mer seaso n w inds at the L are from th e m ph. The 4 (maximu m a ge center.
o ccurred 6.
6 and $5,000, w here the v aapproximat ewalls rise s valleys on e fthe site. location c o d through th e e manipulat i ground sur f site which h a re public l a on the Mis m is a 110 fe 14). This fa c k during the highway w across fro m A CBWR si t m es influenc e weather stat e Genoa, W dicated tem p 4 and 45 to m piled for G n ths and rea c verages in th e ns and from LACBWR s e north and Genoa, W I m wind speeOn June 5, 6 miles awa y 000 in dam a alley is deep ely 40 mile s s harply 500 e ither side o f o nsisted of m e depositio n i on and site f ace. The r e has limited a a nd areas a n sissippi Ri v et wide, 60 0cility also amonths of w ayside off m Lock and te is typical e d because o ion at the n eI area. A r e peratures ra n-5 o F duri n G enoa show s c hes 72 o F i e Genoa, W I1 to 3 inch e ite. Predo m the south.
I area has r ds 207-260 1980, a cat e y from the v i a ges. ly cut into h s south, the vto 600 feet f the bluff e a m arshes and n of hydraul ipreparation e sulting gra d a ccess n d the v er at 0 feet llows April State Dam  of a of the earby eview n ging n g the s that i n the I area e s per m inant  The r arely mph) e gory illage highly v alley from a st of low-i cally prior d e for La Cros s License T Revisio n the LA C access r o 8.5.3.2.LACB W of the C e of the W b edrock i Generall y to 130 f e Valley. Dreshba cPrecamb r (BGS). A 509 feet river sho 8.5.3.3.Many fa u capable i conditio nin the si t nuclear p any evi d Therefor Seismic a 2008 all 8.5.4.H Hydrolo g Ground w 25 feet B Mississi p the Miss i the west towards ground wfossil st asome pe r flooding.Hydraul ithe shall o structure s e Boiling W Termination n 0 BWR site i s o ad along th e Geol o WR is locate d e ntral Lowl a W isconsin D o i n this regio n y , the local get of glacial These unc o c h Group (r ian crystal l A t the subj e AMSL nea rreline. Seis m u lts have b e i n accordan c n s in the sit e t e region, b u p ower plant d ence of ca p e, capable f a a ctivity (m a occurred ov e Hy drolo gy a g y and hy d w ater beneat h B GS and the ppi River.
T i ssippi Rive r and dischar gthe west b u w ater elevati o a tion, it app e r iods where
. i c conductiv i o w sands th a of the shal l W ater Reacto r Plan s generally f e eastern bo u o gy d on the east a nd Physiog rme and the n dips less t h g eology is d outwash an onsolidated d Upper Ca m line rocks e ect site, the b r the Reacto r m ology een mappe d c e with 10 C e vicinity th a ut investigat isites in the pable faulti n a ulting does a gnitudes ra n er 180 mile s nd H y dro ge d rogeologic a h the site i s water table T herefore, c h r. Groundw g es into the M ut then may on measure m ears that th ethe gradie n ity is influe n at were hyd r l ow soils w o r  flat with gr a u ndary of th e bank of the raphic Prov i western fla n h an 20 feet p d escribed as a d fluvial de p deposits are mbrian). T h e ncountere d bedrock sur f r Building a d in the site C FR 100, A at represent i ons of all o region, in a d n g. Additi o not need to nging from 3 s from the si t e ology al informa t s first enco u aquifer is i n hanges in th e a ter in the s h Mississippi turn and fl o m ents colle c ere is a slig h nts are reve r nced by the s raulically dr e o uld not lik e 8-8 a de level at e site to the r Mississipp i i nce (16).
T nk of the Wi per mile to t h approximat e p osits on th eunderlain b h e Dreshba c d at approx i face is enco u and slopes t o region. N o Appendix A.
hazard to t hf these faul t d dition to s t onally, the a be consider e 3.5 to 5.4) t h t e and did n o t ion was p untered at d e n strong hy d e water tabl e h allow depo R iver. The o w parallel c ted during h t downwar rsed and th i soil structur e e dged, depo ely influenc eapproximat eriprap alon g i River in th e The site is l o i sconsin Ar c h e southwe s ely 15 feet o e east flood p b y flat lying ch Group i imately 65 0 u ntered at a n o approxima t o ne of thes e Per the N h e facility.
N t s during th e tudies for th e area is one o ed in the an a hat has bee n ot impact th e primarily o b e pths rangi n draulic com m e elevation asits and fill m deeper gro uto the rive rroutine sa m r d vertical g i s is likely de and grain sited, and c o e groundwa t ely 639 feet g the river s h e Wisconsi n ocated on th e ch. The sed i s t. f hydraulic f plain of the Msandstone a i s then un d 0 feet belo w n elevation tely 501 fee e faults are N RC, "Ther e Numerous f e course of v e LACBW R of relativel y alysis of thi s n recorded b e plant site o btained fro m n g from app m unication w a re depende n material lik e u ndwater is a r. Based o n m pling in su p gradient. H o due to high size distrib u ompacted o n t er flow dir e AMSL fro m hore. n Driftless s e e southwest imentary str a fill overlyin g M ississippi R and shales o derlain by d w ground s u of approxi m t AMSL ne aconsidered e are no ge o f aults are m a v alidating s e R, have not f y low seis m s site" (17).
etween 197 5 o r operation s m Referen c roximately with the adj nt on the st a ely flows to w also likely t o n a review o p port of th e o wever, the rriver stage s ution. Beca u n site, the in t ection. Ho w m the ection flank a ta or g 100 River of the d ense u rface mately ar the to be o logic a pped everal f ound micity. 5 and s. c e 10. 15 to acent age of wards o flow of the e G-3 r e are s and u se of t ernal w ever, La Cros s License T Revisio nthe nati v anisotro p the hori z these la y The vel o gradient.across t h the grou n range) e v 8.6.E 8.6.1.S The eva lfollows t includes consider e"Large."
evaluati o For tho s evaluati o 1) T N i d 2) A 3) P d 4) A e s e n a d a v t h 5) A A concl uthe level 0586 ev athe form e Table 8-1 LACB W screen t h s e Boiling W Termination n 0 v e sands un d py of the aq u ontal direct iers. o city of gro u  The gradi e h e site it is l i ndwater vel o v en though t h E nvironme n ummar y l uation of t h t he approac hidentificati o e d to be ge n If identifi e o n in NURE G s e environ m o n, a standar d The issue or N UREG-019 d entified in t A pplicable r e otential im pescribed.
A n evaluati o stimate or d nvironment d ditional m i v oided, a d e he resource o A conclusio n usion is deri v of signific a aluation. N o e r G-1 coal/
o 1 was used WR. It is ex c h e issues t W ater Reacto r Plan d erlying the u ifer would i on than in t h undwater fl o ent of the w akely that th e o city across he hydrauli c ntal Effects o h e environm e h and metho d o n of enviro n eric, it is a e d as generi c G-0586 whi c m ental issu d approach iactivity is s 1 and D-Pl a t hese docu m e gulations, p pacts from d e o n is perfo r determine w hconsidering itigation me a etermination or attribute. is reached.
ved from th e ance of the ote that the e o il fueled p o as the ba s cerpted fro m o identify r  hydraulic fi be more pe r he vertical d o w is directl y ater table is e water tabl e the site is c conductivi t o f Decomm i e ntal effects d ology outl inmental iss u a ssigned a s c , the envir o c h conclude s es or dec o i s followed.
summarize d , a n/PSDAR.
ments. ermits, limi t ecommissio n rmed. Thi s h ether the a the availa b a sures that cis made as e evaluation impacts. S i environment a o wer plant w s is for the m Table 6.1 o site-specifi c 8-9 fi ll would li k rmeable an d d irection. T h y related to influenced b e has a very also relativ e t y could sup p i ssionin g  (or impact s i ned and de s ues as eithe r ignificance onmental i m s that the o v ommissioni n It is summ a including a Note that m t s or other r e ning activiti e s includes ctivity is li k b le informat i c an be take nto whether steps sum m ite-specific i al impacts o w as not cons isite specifi c of NUREG-0 c issues.
D k ely provid e d have a hig h his decrease s both the h y b y the topo g low gradie n e ly slow (i.
e port faster fl s) of the de c scribed in N r generic or level of eit h mpact is con s verall impac t ng activitie s arized as fol l a summary o m any deco m e gulatory re q es relating t oanalysis an kely to mak e ion. If an i m n are evalu athe impact i m arized abo v issues are n o f the operat i idered in thi s c environ m e 0586. The f Decommiss i e sufficient h er hydraul i s the vertic a ydraulic con g raphy and w n t. Therefo r e., in the in c flow. commission i N UREG-058 6site-specifi c her "Small,"s idered to b e t significanc e s that req u l ows:  of the impa c mmissioning quirements a o the enviro n n d professio n e a noticea b m pact is li k ated. If an i is likely to s ve. The con ot bounded i ng G-3 coa l s review. e ntal impac t f irst step in i oning acti vstructure th a i c conductiv al transport w ductivity a n with the flat re, it is likel y c hes and fe e i ng of LAC B 6. This app r c. If the is s" "Moderat e e bounded b e is "Small.
"uire site-sp e c ts as repor t activities a r are identifie d nmental iss u nal judgme ble impact o k ely, existin g impact can n s eriously da m n clusion ide n by the NU R l power pla n t assessme nthis proces s vities speci f a t the v ity in within nd the areas y that e t/day BWR roach s ue is e ," or b y the " e cific ted in r e not d. u e are nt to on the g and n ot be m age ntifies R EG-n t and nt for s is to fic to La Cros s License T Revisio n LACB Widentifie d evaluati oOffs i 35 y eAqu a sensi tTerr e of se nThre a threa tEnvi r 35 y eCult u histo r 8.6.2.R 8.6.2.1.During d in accor d of the R a exposur e 2,000 m r also be mprogram Radiatio nmaterial s In Augu s of the st a 1994 wi t allowed levels at


642 feet
Protecti o exposur e significa nremoval (SSCs). s e Boiling W Termination n 0 WR are then
 
: d. The scr e o n: te land use a ears, since t h a tic ecology tive areas.
Mississipsilts) un dsands and8.5.1.2.The U.Sreliable ctotal pop744 for Snear the small tow(populati5 miles s8.5.1.3.The LACof the Mbounded north, anelectric pThis statGenoa, lowithin thThe areaand freshto the G-site, loc ase Boiling WTermination n 0 -Plan/PSDA defined duri nd in the D
estrial Ecolo nsitive area s a tened and t ened and e n ronmental J ears. ural and Hi ric landmar k R adiolo g ica l Occu p decommissi o dance with t h a diation Pro es and main t rem/yr Tota l m aintained Aand proce d n Work Per m s incorporat e st 1987, Dai r abilized and t h the com mfor the dec athe facility
-additional issioning.
.on Program e during th e n t contribut o and packa g W ater Reacto r Plan reviewed a e ening iden t activities: c h h e FES was i affected by g y affected b s. endangered n dangered s p J ustice: cha n storic Reso u k designatio n l Effects of D pational Ra d o ning, Solut i h e license s p tection Pro g tain occupa t l Effective D A s Low As R dures will e mits (RWP) e effective r a r yland plac edefueled fa c mencement o ay of most
La Crosse B oGeography aSite Llocation an dCounty, Wi sfrom the ea sg in river e dis relativel yAMSL bouppi River to derlain by fi nd gravels.
: s. This dela y and ALAR A e decommis s ors to occup ging of rem a r  and the acti v tified the f o h anges in de m i ssue d. activities b e by activitie s species: c h pecies that h n ges in de m u rce impac t n s and other Decommiss i d iation Expo ions will co n pecification s g ram are to tional work e D ose Equiv a Reasonably A ensure that involving p o a diological c ed LACBW R c ility). LA C of incremen t short-lived r y, combine d A measures , s ioning of L ational dos e a ining Reac 8-10 v ities that m o llowing po mographics e yond the o p s beyond the hanges in l o have occurre d m ographics t s beyond t cultural res o i onin g sure ntinue to i m s and the re q control radi a e r exposure s a lent (TEDE A chievable (work spec i otential ra d i a controls. R in a SAF S CBWR rema i t al decomm i radionuclide s d with the e f , minimized LACBWR t from remaitor Buildin g m ay requir e otential area s and zoning t p erational ar e operationa l o cal flora a n d in the pas t and socio e t he operati o ources. mplement a R q uirements o ation hazar d s to less th a E). Dose to (ALARA). i fications, d a tion expos u S TOR condi tined in a fu l i ssioning ac t s , which su b ffective imp l the actual t o date. It ining disma n g Structure s e site-specif i s for additi o t hat have oc ea; changes l area; chan g n d fauna a n t 35 years.
BPopul. Census B ucensus data fpulation in 2Stoddard, lo cplant, loca twns west oion 397), lo outhwest.
economic s t onal areas; c R adiation Pr of 10 CFR 2 0 ds, avoid ac c an the admi n workers an d The LACB W designs, wo r u re or handl i t ion (a peri o l ly SAFST O t ivities. T h b sequently rlementation and project eis anticipat e ntlement act i s, Systems, i c evaluatio n o nal site-sp e curred in th e in designat i g es in desig n n d designati o t atus in the c hanges in otection Pr o 0. The obje c cidental rad i nistrative li m d the public WR work c o r k package s i ng of radio a o d of safe st o O R conditio n h is period o f r educed rad i of the Rad i e d radiation ed that the ivities will band Compo n are e cific e past ion of nation o n of past local ogram c tives iation m it of must o ntrol s and active orage n until f time i ation iation dose most be the o nents La Cros s License T Revisio n Table 8 Secti o8.6.2   8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4  8.6.3.5 8.6.3.6  8.6.3.7  8.6.3.8 8.6.3.9 8.6.3.18.6.3.1 28.6.3.1 3 8.6.3.1 48.6.3.1 58.6.3.1 68.6.3.1 78.6.3.1 88.6.3.1 98.6.3.2 0 s e Boiling W Termination n 0 8-1 Sum mPowe o n Radiol o Activit i worker s Activit i Radiol o Onsite l Offsite Water U Water Q Surfac e Groun d Air Qu a Aquati c Activit i Activit i Terrest r Activit i Activit i Threat e Occup a1 Socioe c 2 Enviro n 3 Cultur a Activit i Activit i 4 Aesthe t 5 Noise 6 Irretrie v 7 Traffic 8 ISFSI c 9 VCC c oimpact s 0 Rail li n offsite) W ater Reacto r Plan m ar y of the r Facilities Envir o o gical ies resulting i s ies resulting i o gical Accid e l and use acti v land use acti v U se Q uality e water d wate r a lity c Ecology ies within th e ies beyond th rial Ecology ies within th e i es beyond th ened and End a ational Issues c onomic nmental Justi c al and Histori c ies within th e ies beyond th t ics v able Resour c and Transpo r construction:
Site ACBWR propeMississippi Rby the Mi snd a wildlife power statio ntion is locat eocated appr ohe town. Th ea of the Mis sh water fish i-3 station lo ated approxi mWater Reacto rPlan R. Althou gng decommi-Plan/PSDA Revaluation oiling Wateand DemogrLocation and d descriptio nsconsin, in tst bank of th edge and low y flat with t hunded by th ethe west.
l o nstruction f o s (onsite) ne upgrade an d r  Environm e onmental Iss u in occupation i n dose to the e nts v ities v ities e operational a e operational e operational a e operational a ngered Spe c c e c Resource I m e operational a e operational ces r tation land use imp a or the ISFSI:
Tne to mediu mBedrock is e nlation ureau, Amerfor nearby W2013 was 25 cated 7 mile sted 17 miles of the plant cated 3 mi lAccess, Lan derty is locat eRiver. Alth ossissippi Ri vand fish re fn complete ded to the s ooximately 1 mere are no r esissippi Riv eing) and co mcated south mately 4,00 0r  gh additiona lissioning pl R have beeand inforer Reactor Eraphy Descriptio nn were disc uthe Mississi pe Mississip pforest area she reactor fe railroad tr The geolog ym sands wit hncountered arican CommWisconsin v i8 for the V is N of the p lN; and 30
l d extension (o 8-11 e ntal Impac t u e al dose to public a rea area a rea area c ies mpacts a rea area acts (onsite) land use o nsite and ts from De c NURE G 0586 (GEIS) Yes Yes Yes Yes No Yes  Yes Yes Yes  Yes No  Yes No No Yes Yes No  Yes No Yes Yes Yes Yes No No No commission i G-) Impa c Small Small Small Small Site-speSmall  Small Small Small  Small Site-spe Small Site-spe Site-speSmall Small Site-spe Small Site-speSmall Small Small Small Site-spe Site-spe Site-spe i n g Nuclea r c t Significan ccific cific cific cific cific cific cific cific cific r c e La Cros s License T Revisio nNUREG-The cur restimate d dose for b ounded 8.6.2.2.Dairylan (REMP) environ m the radi o decomm iof 10 C F to adher e public d o consider e The onl y liquid w a piping" wcollectio n through t discharg eof the cprotectio LACB W bounded The gas emeteoro l noble ga s or expos u gaseous r 8.6.2.3.
,across the es northwe d and Water ed in the fa rough the sit ever to the wfuge to the sd in 1969, wouth, adjace nmile to the nesidences wi ter adjacent tmmercial ba rof the LA C0 feet south o8-6 l details reg aanning effo ren identifie drmation re gEnvironmenn ussed in sect ippi River V pi River. T ws with mate rfacilities sta nacks to the y consists p rh some soil sat approxim amunity Surv eillages and cillage of G elant; 51,522
Decom mthis anal y conduct e Fuel Ac c decomm ithe min i LACB W otherwis e The dec o and cont Protecti o s e Boiling W Termination n 0 -0586 esti m rent occupa t d to be 130.
,329 for Ve rMississipp ist, and Ne wUse r western po re area is 16 3west, a rail l isouth. The swhich is also nt to the L Anortheast of tthin 2,000 f eto the site i srge and ship CBWR plant
3 the decom m by NURE G Offsi t d implemen t at LACB W m ent in and a o active gas e i ssioning ac t FR 50, Appe n e to these l ose from de c ed as "Smal l y authorized aste from t h w hich is a p a n system p u t he East T u e s to the inl e c u rrent and n in accor WR to date c oby the eval u e ous pathw a l ogical cond i s, the gaseo u u re pathwa y releases. Envir o m issioning a c y sis has co n e d and prov i cident Anal y i ssioning an dmal radioa c WR site is i n e involving a ommissioni namination l e o n and Safe t W ater Reacto r Plan m ated that 1, tional expe n 3 Rem, whi c missioning w G-0586 and t h t e Radiation t ed a regula t WR which p a round the e e ous (airbo r t ivities do n ndix I, or th limits throu g commission i l." effluent rel e h e LACBW R art of the G-3 umps are no t urbine build i et of the liq ufuture Ra ddance with o nclude tha t u ation in N U a y (which i i tions durin g u s pathway c y. Routine a onmental E f ccident anal y n tinued duri n i ded in reg u y sis" have n o d with spen t ctive materi n sufficient f a significan t n g of radio a evels remai n t y and Heal r  874 Rem w i n ded and d o c h is well be l will meet th e h e impact is Exposure a n tory compli a p rovided a n nvirons of t h r ne) and li qot exceed t h e fuel cycle ghout the c o i ng is boun d ease pathwa y R site to the 3 circulatin g t operable.
)of the plant.
T ing sump u s u id waste m o diation Pro t 10 CFR 2 0 t the public e UREG-0586, i ncludes no b g the time o f consists of a a i r samples a ffects of Ac c ysis is inte g n g shutdow n u lar updates o ted that "
arding majo rts, no sign id. Subseq ugarding the nt Descripti oion 8.2. Th ealley, with twenty-seven rial dredge dnding at ele veast and th rimarily of fs containing ately 130 fe eey (ACS) recities and V eenoa, locate dfor La Cros rnon Count yi River, inc w Albin, I Artion of Ve r3.5 acres, it ine to the esite include s owned an dACBWR facthe site. A neet of any L As used for r ep traffic (e.g
w t nuclear fu eal resulting for any pot t adverse ef fe a ctively con t n ing at LA C t h Program s 8-12 i ll be need e o se expecte l ow the NU R e regulator yconsidered nd Monitori n a nt Radiolo g n nual report he site. Th e q uid efflue n he concentra tdose limits o urse of th e ded by the c r y for the dis Mississipp i g water disc h T he only li q s ing an air o onitor, whic h tection and 0 and 10 C F exposure as which con c ble gas an d f the release.
.). There is There is a pr decommis ificant impa uent section senvironmeon  e 163.5 acre the Reactor acres of the d from the Mvations ran ghe riprap on fill material shigher perc et below gro ueport (11) p rernon Count yd 1 mile no rse, the large
airborne par t are collected c idents and D gral to the l i n and deco m to the D-P l with conside r e l now store d from LA C e ntial even t fe ct on publi c t aminated S CBWR. Wo r s for LAC B e d to deco m ed to comp l R EG-0586 e y standards oas "Small."
: y. There a rluding Ren oA (populat irnon Count yis relativel yeast, USAC Es G-3, a co ad operated b ycilities. Th en elementary ACBWR strecreational
n g g ical Enviro n s with ass e e REMP pro g n t releases d ation limits oof 40 CFR e decommi s riteria in N Ucharge of tr e i River is th r h arge syste m q uid effluen t operated pu m h is still ope r REMP at FR 50, Ap pa result of d c ludes the i m d particulat
: p. barges of ca public bo portion (Po osioning acti vcts beyond s in this c hental effec te site is loca tBuilding l osite were f oMississippi Rging from 6the shore os (fine sandentages of cund surface rovides the
: e. Due to pl a ticulate only to determi n Decommissi o i censing de s mmissioning
: y. The esti mrth of LAC Bst Wisconsi nre also num o township, ion 513), l oy on the east y isolated a sE property tal-fired 379 My Dairyland e closest to w school is l oructure. purposes (b ocoal are deli vat landing ool 9) of the Uvities those hapter ts of ted in ocated ormed River. 36 to of the s and coarse (10). most mated BWR; n city erous  MN ocated bank s it is to the MWe (12). wn is ocated oating vered on the Upper La CrossLicense TRevisionMississipfor huntiGenoa Nmile 679long lockpublic acthrough HighwayNo. 8. 8.5.2.CThe climcontinentriver val lLock andof the infrom 60 winter mthe averasummer sThe averrange fromonth foThe bluffwinds atmonthly experienctornado oF3 (maxicenter in j8.5.3.T8.5.3.1.The site idissectedvaries beriver lev eHighwayPrior to clying wedredged to constrse Boiling WTermination n 0 ppi River N aing, fishing National Fis h.2, is appro xk and dam sccess to an oNovember. y 35 approx iClimate mate at the Ltal climate wley location d Dam No.
.l an/PSDAR , ration for th d in the ISF S C BWR oper a t to result i c health an dSCs will i n r ker safety i B WR which m mission a s l ete the de c estimate. A s of 10 CFR 2 nmental Mo essments of gram provi d d uring plan t of 10 CFR 2 0 190. Soluti o s sioning.
8nformation fto 90o F dumonths of D eage temper aseason (15).
C U REG-0586 e ated and fi l h rough the "
rage annual rom 3 to 5 in cor the remai nfs of the Mi st the site w haverage w iced tornado soccurred 27 imum wind jured one p eTopographyTopogis located w d uplands.
s m. Currentl y t discharges m p. The a i r able. Cont i LACBW R pendix I. R E decommissi o mpact is min i e) analysis i a nt shutdow n and presen t n e the dose d oning Even t s ign basis f
Fetween 21/2 ael. The LA Cy 35. Figure constructio ntlands. Th esands from truction, the aWater Reacto rPlan ational Wild land recreati h Hatchery
.ximately 0.
6structure ow observation The Stat eimately 1/2 mLa Crosse rwith cold w iof the site.
8 site with afor the past uring the m oecember 201ture is appr rainfall is 3 5ches per mo nnder of the y ssissippi Ri vhere the va ind speeds
: s. On Apri l.4 miles aw aspeeds 158-erson and ca u, Geology angraphy ithin the Mi From La Cro and 41/2 mile CBWR site i8-4 provid en of the LA Ce property g rthe Mississi parea was gr ar  life & Fish Ronal activit
: i. Lock an d6 miles nort hned and op eplatform, ope of Wisco nmile north oregion of Winters and h o The USACarchived we ayear (May onths of Ju n14 to Febru aoximately 25.2 inches.
Mnth in the s pear. ver Valley c hlley runs n oare typical ll 30, 1954, aay from the 216 mph) t oused betwe end Seismol ossissippi Ri vsse to Prairi s in width.
is located b ees a Topogr aCBWR facilrade was th eppi River.
Daded to a re l8-7 Refuge just sies (13). Fu rd Dam No.h of the sit eerated by th epen from d ansin also mof the LAC BWisconsin a not summers CE maintain sather infor m2014 to M ane through Aary 2015.
C20o F in the Monthly pre cpring and su mhannel the worth-south ay 6 to 10 ma category F 4Genoa vill aornado that oen $500,000 ogy ver Valley, we du Chien, The valley etween two vaphy Map o f lity, the site en increase dDuring grad elatively flat south of the rther south a8, located
: e. The da me USACE (awn to dus kmaintains a BWR site, and at the L Aand extre ms an active wmation for th eay 2015) in dAugust 201 4City data co mwinter mo ncipitation a vmmer seaso nwinds at the Lare from th emph. The 4 (maximumage center.
occurred 6.
6and $5,000, where the v aapproximat ewalls rise svalleys on efthe site. location c od through th ee manipulat iground sur fsite which hare public l aon the Mis m is a 110 fe 14). This fa ck during the highway wacross fro mACBWR sitmes influenc eweather stat e Genoa, W dicated tem p4 and 45 to mpiled for Gnths and rea cverages in th ens and from LACBWR se north and Genoa, WIm wind speeOn June 5, 6 miles awa y000 in dam aalley is deep ely 40 mile ssharply 500 either side o fonsisted of me depositio nion and site face. The r ehas limited aand areas a nsissippi Ri vet wide, 60 0cility also amonths of wayside off m Lock and te is typical ed because oion at the n eI area. A r eperatures ra n-5o F durinGenoa show sches 72o F ie Genoa, W I1 to 3 inch eite. Predo mthe south.
I area has rds 207-260 1980, a cat ey from the v iages. ly cut into hs south, the vto 600 feet f the bluff e amarshes and n of hydraul ipreparation esulting gra daccess nd the ver at 0 feet llows April State Dam of a of the earby eview nging ng the s that in the I area es per minant  The rarely mph) egory illage highly valley from ast of low-ically prior de for La CrossLicense TRevisionthe LACaccess ro8.5.3.2.LACBWof the Ceof the Wbedrock iGenerallyto 130 feValley.
DreshbacPrecambr(BGS). A509 feet
 
river sho 8.5.3.3.Many faucapable iconditionin the si tnuclear pany evidTherefor Seismic a2008 all 8.5.4.HHydrologGroundw25 feet BMississipthe Missithe west towards groundwfossil st asome perflooding.Hydraulithe shall ostructure se Boiling WTermination n 0 BWR site i soad along th eGeoloWR is locate dentral Lowl aWisconsin D oin this regio ny, the local get of glacial These unc och Group (rian crystal lAt the subj eAMSL nearreline. Seismults have b ein accordan cns in the sit ete region, b upower plant dence of ca pe, capable f aactivity (m aoccurred ov eHydrology agy and hydwater beneat hBGS and the ppi River.
Tissippi Rive rand dischar gthe west b uwater elevati oation, it app eriods where
. ic conductiv iow sands th aof the shal lWater Reacto rPlan s generally fe eastern bo uogy d on the east and Physiog rme and the n dips less t hgeology is doutwash an onsolidated dUpper Camline rocks eect site, the br the Reacto rmology een mappedce with 10 Ce vicinity th aut investigat isites in the pable faulti naulting does agnitudes ra ner 180 mile snd Hydrogedrogeologic ah the site i swater table Therefore, c hr. Groundw ges into the Mut then may on measure mears that th ethe gradie nity is influe nat were hyd rlow soils w or  flat with gr aundary of th ebank of the raphic Prov iwestern fla nhan 20 feet pdescribed as ad fluvial de pdeposits are mbrian). T hencountere dbedrock sur fr Building ad in the site CFR 100, Aat represent ions of all o region, in a dng. Additi onot need to nging from 3s from the si teology al informa ts first enco u aquifer is i nhanges in th eater in the s hMississippi turn and fl oments colle cere is a slig hnts are reve rnced by the sraulically dr eould not lik e8-8 ade level at e site to the rMississipp iince (16).
Tnk of the Wi per mile to t happroximat eposits on th eunderlain bhe Dreshba cd at approx iface is enco uand slopes t oregion. N oAppendix A.
hazard to t hf these faul tddition to s tonally, the abe consider e3.5 to 5.4) t hte and did n otion was puntered at d en strong hy de water tabl ehallow depo River. The ow parallel cted during ht downwar rsed and th isoil structur eedged, depo ely influenc eapproximat eriprap alon gi River in th eThe site is l oisconsin Ar che southwe sely 15 feet o e east flood pby flat lying ch Group iimately 65 0untered at a no approxima tone of thes e Per the N he facility.
Nts during th etudies for th earea is one oed in the an ahat has bee not impact th eprimarily o bepths rangi ndraulic com me elevation asits and fill mdeeper gro uto the rive rroutine sa mrd vertical g is is likely de and grain sited, and c oe groundwa tely 639 feet g the river s he Wisconsi nocated on th ech. The sed ist. f hydraulic fplain of the Msandstone ais then un d0 feet belo wn elevation tely 501 fee e faults are NRC, "Ther eNumerous fe course of ve LACBWRof relativel yalysis of thi sn recorded be plant site obtained fro mng from app munication ware depende nmaterial lik eundwater is ar. Based o nmpling in su pgradient. H odue to high size distrib uompacted o nter flow dir eAMSL fromhore. n Driftless s ee southwest imentary str afill overlyin gMississippi Rand shales oderlain by dw ground s uof approxi mt AMSL ne aconsidered e are no ge ofaults are m avalidating s eR, have not fy low seis ms site" (17).
etween 197 5or operation sm Referencroximately with the adj nt on the st aely flows to walso likely t on a review opport of th eowever, the rriver stage sution. Beca un site, the in tection. Ho wm the ection flank ata or g 100 River of the dense urface mately ar the to be ologic apped everal found micity. 5 and s. ce 10. 15 to acent age of wards o flow of the e G-3 re are s and use of ternal wever, La CrossLicense TRevisionthe nativanisotropthe horizthese layThe velogradient.
across ththe grounrange) ev8.6.E8.6.1.SThe evalfollows tincludes considere"Large."
 
evaluatioFor thosevaluatio1) TNid2) A3) Pd4) Aesenadavth5) AA concluthe level
 
0586 evathe formeTable 8-1LACBWscreen thse Boiling WTermination n 0 ve sands un dpy of the aq uontal direct iers. ocity of gro u  The gradi ehe site it is l indwater vel oven though t hEnvironmenummary luation of t hthe approac hidentificati oed to be ge n If identifi eon in NURE Gse environ mon, a standar dThe issue or NUREG-019dentified in tApplicable r eotential im pescribed.
An evaluati ostimate or dnvironment dditional m ivoided, a d ehe resource oA conclusio nusion is deri v of signific aaluation. N oer G-1 coal/
o1 was used WR. It is ex che issues t Water Reacto rPlan derlying the uifer would ion than in t hundwater fl oent of the w akely that th eocity across he hydrauli cntal Effects ohe environm eh and metho don of enviro neric, it is aed as generi cG-0586 whi cmental issu d approach iactivity is s1 and D-Pl athese docu megulations, p pacts from d eon is perfo rdetermine w hconsidering itigation me aetermination or attribute. is reached.
ved from th eance of the ote that the eoil fueled p oas the ba scerpted fro mo identify r  hydraulic fibe more pe rhe vertical dow is directl yater table is e water tabl e the site is c conductivi tof Decommiental effects dology outl inmental iss uassigned a s c, the envir och conclude ses or dec ois followed.
summarized,an/PSDAR.
ments. ermits, limi tecommissio nrmed. Thi shether the a the availa basures that cis made as e evaluation impacts. S ienvironment aower plant wsis for the m Table 6.1 osite-specifi c8-9 fill would li krmeable an ddirection. T hy related to influenced be has a very also relativ ety could sup pissioning  (or impact sined and de sues as eithe rignificance onmental i ms that the o vommissioni n It is summ a including aNote that mts or other r ening activiti es includes ctivity is li kble informat ican be take nto whether steps sum mite-specific ial impacts o was not cons isite specifi cof NUREG-0c issues.
Dkely provid ed have a hig hhis decrease sboth the h yby the topo glow gradie nely slow (i.
eport faster fls) of the de cscribed in N r generic or level of eit hmpact is con sverall impac tng activitie sarized as fol la summary omany decomegulatory re qes relating t oanalysis an kely to mak eion. If an i mn are evalu athe impact imarized abo vissues are n of the operat iidered in thi sc environme0586. The fDecommissie sufficient her hydraul is the vertic aydraulic con graphy and wnt. Therefo re., in the in cflow. commission iNUREG-0586site-specifi cher "Small, "sidered to b et significanc es that req ulows:  of the impa cmmissioning quirements ao the enviro nnd professio ne a noticea bmpact is li kated. If an iis likely to sve. The con ot bounded ing G-3 coa ls review.
ental impac tfirst step in ioning acti vstructure th aic conductiv al transport wductivity a nwith the flat re, it is likel yches and fe eing of LAC B6. This app rc. If the is s" "Moderat ee bounded be is "Small.
"uire site-sp ects as repor tactivities a rare identifie dnmental iss unal judgme ble impact okely, existin gimpact can nseriously da mnclusion ide nby the NU Rl power pla nt assessme nthis proces svities speci fat the vity in within nd the areas y that et/day BWR roach sue is e," or by the " ecific ted in re not d. ue are nt to on the g and not be mage ntifies REG-nt and nt for s is to fic to La CrossLicense TRevisionLACBWidentifie devaluatioOffsi35 yeAquasensitTerreof senThreathreatEnvir35 yeCultuhistor8.6.2.R8.6.2.1.During din accordof the Raexposure2,000 mralso be mprogram RadiationmaterialsIn Augusof the st a1994 witallowed levels at
 
Protectioexposuresignifica nremoval (SSCs). se Boiling WTermination n 0 WR are then
: d. The scr eon: te land use aears, since t hatic ecology tive areas.
estrial Ecolo nsitive area satened and tened and e nronmental Jears. ural and Hi ric landmar kRadiologicalOccupdecommissi odance with t hadiation Pro es and main trem/yr Tota lmaintained Aand proce dn Work Per ms incorporat est 1987, Dai rabilized and th the com mfor the dec athe facility
.on Program e during th ent contribut oand packa gWater Reacto rPlan reviewed aeening iden tactivities: c hhe FES was iaffected by gy affected bs. endangered ndangered s pJustice: cha nstoric Reso uk designatio nl Effects of Dpational Ra doning, Solut ihe license s ptection Pro gtain occupa tl Effective DAs Low As Rdures will emits (RWP) e effective r aryland plac edefueled fa cmencement oay of most
: s. This dela yand ALARAe decommis sors to occup ging of rem a r  and the acti vtified the f ohanges in de missued. activities b eby activitie sspecies: c hpecies that hnges in de murce impac tns and other Decommissidiation Expo ions will co npecification sgram are to tional work eDose Equiv aReasonably Aensure that involving p oadiological ced LACBWRcility). LA Cof incremen tshort-lived ry, combine dA measures
,sioning of Lational dos eaining Reac 8-10 vities that mollowing po mographics eyond the o ps beyond the hanges in l ohave occurre dmographics ts beyond tcultural res oioning sure ntinue to i ms and the re qcontrol radi aer exposure salent (TEDE Achievable (work spec iotential ra diacontrols.
R in a SAF SCBWR remaital decomm iradionuclide sd with the e f, minimized LACBWR t from remaitor Buildin gmay requir eotential area sand zoning tperational ar e operationa local flora a nd in the pas tand socio ethe operati oources. mplement a Rquirements o ation hazar ds to less th aE). Dose to (ALARA).
ifications, dation expos uSTOR condi tined in a fu lissioning ac ts, which su bffective imp lthe actual to date. It ining disma ng Structure se site-specif is for additi othat have oc ea; changes l area; chan gnd fauna a nt 35 years.
economic s tonal areas; cRadiation Pr of 10 CFR 2 0ds, avoid ac can the admi nworkers an dThe LACBWdesigns, wo rure or handl ition (a peri olly SAFSTOtivities. T hbsequently rlementation and project eis anticipat entlement act is, Systems, ic evaluatio nonal site-sp ecurred in th ein designat iges in desig nnd designati otatus in the changes in otection Pr o0. The obje ccidental rad inistrative li md the public WR work cork package sing of radio aod of safe st oOR conditio nhis period o freduced rad iof the Rad ied radiation ed that the ivities will band Compo n are ecific e past ion of nation on of past local ogram ctives iation mit of must ontrol s and active orage n until f time iation iation dose most be the onents La CrossLicense TRevisionTable 8Sectio8.6.2    8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4  8.6.3.5 8.6.3.6  8.6.3.7  8.6.3.8 8.6.3.9 8.6.3.18.6.3.128.6.3.13  8.6.3.148.6.3.158.6.3.168.6.3.178.6.3.188.6.3.198.6.3.20 se Boiling WTermination n 0 8-1 SummPoweon RadioloActivitiworkersActivitiRadioloOnsite lOffsite Water UWater QSurfaceGroundAir QuaAquaticActivitiActivitiTerrestrActivitiActivitiThreateOccupa1 Socioec2 Environ3 CulturaActivitiActiviti4 Aesthet5 Noise 6 Irretrie v7 Traffic 8 ISFSI c9 VCC coimpacts0 Rail linoffsite)
Water Reacto rPlan mary of the r Facilities Enviroogical ies resulting is ies resulting iogical Accid eland use acti vland use acti vUse Quality e water d water ality c Ecology ies within th eies beyond th rial Ecology ies within th eies beyond thened and End aational Issues conomic nmental Justi cal and Histori cies within th eies beyond th tics vable Resour cand Transpo rconstruction:
lonstruction f os (onsite) ne upgrade an dr  Environmeonmental Iss uin occupation in dose to the ents vities vities e operational ae operational e operational ae operational angered Spe cce c Resource I me operational ae operational ces rtation land use imp aor the ISFSI:
ld extension (
o8-11 ental Impac tue al dose to public area area area area cies mpacts area area acts (onsite) land use onsite and ts from De cNUREG0586(GEIS) Yes Yes Yes Yes No Yes  Yes Yes Yes  Yes No  Yes No No Yes Yes No  Yes No Yes Yes Yes Yes No No No commission iG-) Impac Small Small Small Small Site-speSmall  Small Small Small  Small Site-spe Small Site-speSite-speSmall Small Site-spe Small Site-speSmall Small Small Small Site-speSite-speSite-speing Nuclearct Significan ccific cific cific cific cific cific cific cific cific r ce La CrossLicense TRevisionNUREG-The currestimateddose for bounded 8.6.2.2.Dairylan(REMP) environmthe radiodecommiof 10 CFto adherepublic doconsidereThe onlyliquid wapiping" wcollectio nthrough tdischargeof the cprotectio
 
LACBWbounded The gasemeteorolnoble gasor exposugaseous r8.6.2.3.
Decommthis anal yconducteFuel Accdecommithe miniLACBWotherwiseThe decoand contProtectiose Boiling WTermination n 0 -0586 esti mrent occupa td to be 130.
3the decom mby NUREGOffsitd implemen tat LACBWment in and aoactive gas eissioning ac tFR 50, Appe ne to these lose from de ced as "Smal ly authorized aste from t hwhich is a p an system p uthe East T ues to the inl ecurrent and n in accor WR to date c oby the eval ueous pathw alogical cond is, the gaseo uure pathwa yreleases.
Enviromissioning a cysis has co ned and prov icident Anal yissioning an dmal radioa cWR site is i ne involving aommissioni namination l eon and Safe tWater Reacto rPlan mated that 1, tional expe n3 Rem, whi cmissioning wG-0586 and t hte Radiation ted a regula tWR which paround the e eous (airbo rtivities do n ndix I, or th limits throu gcommission il." effluent rel ehe LACBWRart of the G-3umps are no turbine build iet of the liq ufuture Ra ddance with onclude tha tuation in N Uay (which iitions durin gus pathway cy. Routine aonmental E fccident anal yntinued duri nided in reg uysis" have n od with spen tctive materi nsufficient fa significan tng of radio aevels remai nty and Heal r  874 Rem w inded and d och is well be lwill meet th ehe impact is Exposure a ntory compli aprovided a nnvirons of t hrne) and li qot exceed t he fuel cycle ghout the c oing is boun dease pathwa yR site to the 3 circulatin gt operable.
Ting sump u suid waste m odiation Pro t10 CFR 20t the public eUREG-0586, includes no bg the time o fconsists of aair samples affects of Ac cysis is inte gng shutdow nular updates oted that "
wt nuclear fu eal resulting for any pot t adverse ef feactively con tning at LA Cth Program s8-12 ill be need eose expecte low the NU Re regulator yconsidered nd Monitori nant Radiolo gnnual report he site. Th equid efflue nhe concentra tdose limits ourse of th eded by the c ry for the dis Mississipp ig water disc hThe only li qsing an air oonitor, whic htection and 0 and 10 C Fexposure as which con cble gas an df the release.
airborne par tare collected cidents and Dgral to the l in and deco mto the D-P lwith conside rel now store dfrom LACential even tfect on publi ctaminated S CBWR. Wors for LACBed to deco med to comp lREG-0586 ey standards oas "Small."
ng gical Enviro ns with ass ee REMP pro gnt releases dation limits oof 40 CFR e decommisriteria in N Ucharge of tr ei River is th rharge syste mquid effluen toperated pu mh is still ope rREMP atFR 50, Appa result of dcludes the i md particulat
: e. Due to pl aticulate only to determi nDecommissi oicensing de smmissioning
.lan/PSDAR,ration for th d in the ISF SCBWR operat to result ic health an dSCs will i nrker safety iBWR which mmission a slete the de cestimate. A sof 10 CFR 2nmental Mo essments of gram provi dduring plan tof 10 CFR 2 0190. Soluti ossioning.
CUREG-0586 eated and fi lhrough the "
sm. Currentl yt discharges mp. The a irable. Cont iLACBWR pendix I. R Edecommissi ompact is min ie) analysis iant shutdow n and presen tne the dose doning Even tsign basis f
: o. Post-fuel  
: o. Post-fuel  
, within sece current st aSI, this anal yation and r in exceedin gd safety."
, within sece current st a S I, this anal y ation and r i n exceedin g d safety."
nvolve the h is addresse drely on A Lsingle unit Bcommissioni ns the occupa t20, it is the ronitoring Pr othe radiol odes assuranc et operation s0, the dose lons will co nConsequentl yand the imp ltered radio aseal well/di fy, the liquid wat LACBWRir operated pinued applicR ensures pEMP reportoning activi timal. is subject t on and cessat its a minor r edue to radio ats or LACBWRaccident an ation "Plant age of LAC Bysis confirmemaining o ng dose lim ihighest dose d in the Rad iLARA princ BWR. ng is tional refore ogram ogical e that s and limits ntinue y, the pact is active ffuser waste R are pump cation public ts for ties is o the ion of elease active R and alysis Post-BWR s that n the its or rates iation iples.
nvolve the h is addresse d rely on A L s ingle unit B c ommissioni n s the occupa t 2 0, it is the r o nitoring Pr othe radiol o des assuranc e t operation s 0 , the dose l o ns will co n C onsequentl yand the imp ltered radio a seal well/di f y , the liquid wat LACBW R ir operated p i nue d appli c R ensures p EMP repor t o ning activi t imal. is subject t o n and cessat i ts a minor r e d ue to radio a t s o r LACBW Raccident an a tion "Plant a ge of LAC B ysis confirmemaining o n g dose lim i h ighest dose d in the Rad i L ARA princ BWR. ng is t ional r efore ogram o gical e that s and limits n tinue y , the pact is active ffuser w aste R are pump cation p ublic ts for ties is o the i on of elease active R and alysis Post-BWR s that n the its or rates iation iples.
La CrossLicense TRevisionThe saferelease o During daddition in NUREdecommiLACBWpotential
La Cros s License T Revisio n The safe release o During d addition in NUR E decomm i LACB W potential
 
reductionDecoPrior RadioOperationand serviin the IS FRadioExploLoss NaturHumThe publaccidentsdose conPlan/PSDanalysis i8.6.2.4.The decovolumes bulk debare, and implementhe approand liquiThe majoEnergySoand trucktransferr ese Boiling WTermination n 0 ty of the p uf radioactiv edecommissi oto maintena nEG-0586 as sissioning o fWR are boun dconsequen cn of the tota lontaminatio nradioactive oactive dec anal acciden tice conditio nFSI, operati ooactive was tosions and/
oof contami nral phenom ean caused e vlic dose con ss during dec onsequences fDAR and re sis therefore bStoragommissioni nof low lev eris material swill contin untation of t hopriate segr ed radioactiv ority of the olutions dispked to a r aed to a rail cWater Reacto rPlan ublic is prin e materials doning, Soluti nce, waste msociated wi tf LACBWRded by the ces associat el radionucli dn efforts ma dwaste ship may. s during de cns. With th eonal accide nte transporta tor fires asso cnation contr oena, and vents extern asequences r eommissioni nfrom accide nsulted in do sbounding fo ge and Disp ong of LACBel radioactiv s such as co nue to be dis phe Waste M aegation, cla se wastes. Class A lo wposal site in ail trans-loa dcar. Rail a nr  cipally rela tduring deco mons will per fmanagement
,th immedia tR. Conseq uaccident ev aed with tho sde inventory de before de cments, and commissioni e spent nucl ents during de tion accide nciated with e ol, al to LACB Weported in Nng ranged fr onts during Lse ranging frr the decom mosal of Low
-BWR has, ae waste, in cncrete, met apositioned aanagement Pssification, pw level radi oClive, Uta hd facility i nnd truck sh i8-13 ted to pote nmmissionin gform decon t, and survei lte dismantli nuently, the paluation pre se accidents at LACBWRcommission ing could re sear fuel re mcommissio nnts, xplosive an dWR. NUREG-0586om 0.02 to 0LACBWR deom 0.027 t omissioning o-Level Radi oand will c ocluding cont aal and aspha las low level rogram and processing, poactive wast eh. Waste wn Winona, Mipments are ntial hazards g operations.
tamination a nllance activi tng would a lpotential d esented in N would be lR from: ing, sult from eq umoved from tning can be cd/or combu s6 for onsite, 0.96 rem.
Aecommissio no 0.065 rem.
of LACBWRoactive Was tontinue to r eaminated e qlt. Material sradioactiveassociated ppackaging, s e from LACwill be loade MN where made in ac c associated nd dismantl eties. The ac lso be appl iecommissio nNUREG-0586less at LA Cuipment fail uthe LACBWcategorized astible materi anon-fuel re lAn analysis oning was p r The NURER. te equire the dquipment, t os that canno te waste. Th procedures, Sshipment an dCBWR will bd into appr othe waste ccordance wi twith an air bement of S Scidents disc uicable duri nning accide n6. Howeve rCBWR due ture, human eWR site and sas follows:
als, lated radiol oof potential provided in t hEG-0586 ac cdisposal of ools, clothin gt be free rel erough the p Solutions e nd control of be shipped topriate cont acontainer w ith Departm eborne SCs in ussed ng the nts at r, the to the error, stored ogical public he D-cident large g and eased roper nsures solid to the ainers ill be ent of La CrossLicense TRevisionTransporWaste Co8.6.2.5.Followinradiologiremainin(excludinradiologilicense wChapter 6criteria.
8.6.3.N8.6.3.1.The enviwithin seThe LACexisting Lto be conslips are onsite raactivitie sparking ato occur Several sroadwaysincludingremediat636 foot
 
waste strNo signactivitie scomply wregulatorIn accordonsite ar e8.6.3.2.Only areand licenand demse Boiling WTermination n 0 rtation (DO Tontrol Speci Radiong the comical surveys ng in backfing the ISFS Iical conditio will be termi 6 provide t hNon-radiolo gOnsiteironmental iection 4.3.1 oCBWR decoLACBWR lnducted wit hbeing cons tail line will
: s. Contain eand equipm ein a manner structures s us and rail l ig piping an ded, as nece selevation wream. nificant env s are anticip awith applic ary requirem edance with te considere dOffsiteas within t hnse terminat imolition equi pWater Reacto rPlan T) regulatio nalist (WCS) ological Crit empletion of will be per filled struct uI) meets the ns are dem onated, with he methodogical Effect se Land Use impact asso cof NUREG-0ommissioni nicensed pro phin the LSE tructed. Th ebe modifie ders will be uent/containesimilar to wuch as the Sines, will r ed tunnels, b essary. All o twill be rem oironmental ated. In ad dable United ents. the guidanc ed as "Small.
"te Land Use he existing s ion activiti epment, was tr  ns. If Clas sfacility in Aeria for Licedecontami nformed to d ure baseme nunrestricted onstrated to bthe excepti oology for d es of Decom mciated with 0586 to be gng project i sperty previo ufootprint.
Se existing r ad and refur bunloaded a nr laydown, swhen the fac iSwitchyard, emain at lic elow the 63 ther system soved during changes a sdition to NR CStates Envi re presented
" (in the Vici nite licensed es (such as t te container 8-14 s B/C wast eAndrews, Te xnse Termin anation, dis memonstrate tnts, any re muse  criteri abe below th eon of the ar eemonstratin gmissioningonsite land generically c s located a nusly used f oSome onsite ail line sup pbished with nd loaded o nstorage, sta gility was op eAdministra tense termi n6 foot elev as and comp othe decom mssociated wC requirem eronmental P rin NUREG-nity) boundary wemporary s ts, etc.). O fe is identifi exas. ation mantlement that the dos maining pip ia specified i ne unrestricte ea around th g complian cuses has beonsidered a snd executed or power ge ne roads have ported the o pa rail spur nsite. Onsi ging and w aerational.
tion Buildin gnation. Sub ation will beonents as w emissioning pwith the si tents, decommrotection A g-0586, the pwill be used torage and sf the 163.5 aed, it will band remedse from resi ding and soin 10 CFR 2 0ed use criter ie ISFSI. L Tce with the een determi ns a "Small" iwithin the neration; all been refur bperation of tto support dite activitie saste loading g, Crib Ho usurface bas ee radiologic aell as all str uprocess and te-specific dmissioning agency (USEpotential im pto support dstaging area sacre site, a bbe shipped tdiation acti vdual radioa cils at LAC B0.1402. Aft eia, the 10 C FTP Chapter 5unrestricte dned by the Nimpact. boundary owork is ex pbished. No bthe facility.
decommissi os such as v eare and co nuse as well aement struc tally assesse ductures abo vdisposed o fdecommissi oactivities wil EPA) and Wpacts to lan ddecommissi os for remed ibout 1.5 acr eto the vities, ctivity BWR er the FR 50 5 and d use NRC, of the pected barge  The oning ehicle ntinue as all tures, d and ve the f as a oning l also WDNR d use oning iation es are La CrossLicense TRevisionlocated AppropricontaminThese mimpacts activitie sLand in twithin a


Upper MCrosse-BCounty hwater qulocated wbasin lansome of tThe closnorth of  
reductio nDec oPrior Radi o Operatio n and serv i in the IS FRadi oExpl oLoss Natu rHum The pub laccident s dose co n Plan/PS Danalysis i 8.6.2.4.The dec ovolumes b ulk deb are, and impleme nthe appr o and liquiThe maj o Energy S o and truc k transferr e s e Boiling W Termination n 0 ty of the p u f radioactiv e decommissi oto maintena n EG-0586 as s i ssioning o f W R are boun d consequen c n of the tota l ontaminatio nradioactive o active dec a n al acciden t i ce conditio n F SI, operati o o active was t o sions and/
 
oof contami n ral phenom e an caused e v lic dose con s s during dec o nsequences f D AR and re s i s therefore b Stora g ommissioni nof low lev e ris material s will contin u n tation of t h o priate segr e d radioactiv o rity of the o lutions dis p ked to a r a e d to a rail c W ater Reacto r Plan ublic is prin e materials d oning, Soluti n ce, waste m s ociated wi t f LACBW R d ed by the c es associat e l radionucli d n efforts ma dwaste ship m ay. s during de c ns. With th e o nal accide n te transporta t o r fires asso c n ation contr o e na, an d vents extern a sequences r e ommissioni n from accide n s ulted in do s b ounding fo g e and Disp o n g of LAC B el radioactiv s such as co n u e to be dis p h e Waste M a e gation, cla se wastes. Class A lo w posal site in a il trans-loa d car. Rail a n r  cipally rela t d uring deco m ons will per f management , t h immedia t R. Conseq uaccident ev a e d with tho s d e inventory de before de c m ents, an d commissioni e spent nucl e n ts during de t ion accide n ciated with e ol, al to LACB W e ported in N n g ranged fr o n ts during L s e ranging frr the decom m o sal of Low
with a povalley beDecommthe Refusouthern traffic e ndecommi8.6.3.3.LACBWSlough tpredominMississipthe reactsystems.
-B WR has, a e waste, in c ncrete, met a p ositioned a anagement P s sification, p w level radi o Clive, Uta h d facility i n n d truck sh i 8-13 t ed to pote n mmissionin g f orm decon t , and survei l te dismantli n uently, the p a luation pre se accidents at LACBW R commission i ng could re s e ar fuel re mcommissio n nts, xplosive an d WR. N UREG-058 6 om 0.02 to 0 LACBWR d e om 0.027 t o missioning o-Level Radi o a nd will c o c luding cont a a l and aspha l as low level rogram and p rocessing, p o active wast e h. Waste w n Winona, M ipments are ntial hazards g operations.
Water puto be proFor a di towns anriver watin Lansinriver wa40 miles The LACwell at t hPotable wse Boiling WTermination n 0 within the iate isolati onation from measures wil lassociated ws at LACBWthe vicinity five-mile rMississippi RBad Axe Ri vhas establis hality and pr owithin the Bnd use is agr ithe agricult usest munici pthe site, acr oopulation o f elow the eas tmissioning a cge at the s oend of the ntering or le issioning ac tWaterWR is locate dtributary ex tnant water uppi River as tor, river w a River wat eulled from o ncessed onsi tstance of 4 0nd cities alo nter for indus tng, Iowa, a bater for ind udownstrea mCBWR site he site. Th ewater use d uWater Reacto rPlan fence-encl oon and conthe LSE ar el also be m owith the u sWR. of the LAC Bradius, appr oRiver Natio nver Basin W ahed a Land &otection of tBad Axe Ri vicultural an dural land to rpality to the oss from th e258 consist tern bluff.
tamination a n llance activi t n g would a l potential d e sented in N would be l R fro m: i ng, sult from eq u moved from t n ing can be c d/or combu s 6 for onsite, 0.96 rem.
ctivities are nouthern bou nsite will be aving the si tivities and tr Use d on the sho rtends along usage durin gcondensate ater is not cer does sup pnsite wells wte and disch a0 miles do wng the Missi strial purpos ebout 15 mil eustrial purp om. has its ow ne locations ouring decom mr osed LSE, ntrol measu rea to the a donitored to ese of offsit eBWR site i soximately o nal Wildlif eatershed as a& Water Re sthe environ mver Watersh ed over 50%
A e commissio n o 0.065 rem.
orecreational lLACBWR e north-sout hs of various not being p endary of theminimally ite. Conseq uthe potential res of the M ithe LACBWg the oper acooling wat currently b eply the Lo wwill support arged in acc ownstream of ssippi River es, excludin ges downstre aoses betwe en potable w aof all wells missioning o8-15 where mostres will b edjacent LA Censure their e lands are s predominane third is e & Fish Ra Geograph isource Man ment within ed. Approx of the land i sland use, si msite is the h running Hresidences, rformed in a site. Also
of LACBW R o active Was t o ntinue to r eaminated e q lt. Material s radioactiveassociated p p ackaging, s e from LA C will be loade M N where made in ac c associated nd dismantl e ties. The ac l so be appl i ecommissio n N UREG-058 6 l ess at LA C uipment fail u t he LACB W categorized a stible materi anon-fuel re l A n analysis o ning was p r The NUR E R. te equire the d quipment, t o s that canno t e waste. Th procedures, S shipment an d C BWR will b d into appr o the waste c c ordance wi twith an air b ement of S S cidents disc u i cable duri n n ing accide n 6. Howeve r C BWR due t ure, human e W R site and s a s follows:
,impacted d uuently, the oimpacts to lississippi R iWR site fo ration of LA Cer. With th eeing used a sw Pressure a ndecommiss iordance wit hthe site, vi rare obtaine dg the adjace nam of the s ien the LACater supply, (active and operations i st work is e instituted CBWR proper effectiven eanticipated antly rural anwater and bRefuge. W Dic Managemagement Pl athis GMU. imately 36
a ls, l ated radiol o of potential p r ovided in t h E G-0586 ac c disposal of o ols, clothin g t be free rel e rough the p S olutions e n d control of b e shipped t opriate cont a c ontainer w i t h Departm e borne S Cs in u ssed n g the n ts at r, the to the e rror, stored ogical public h e D-c ident large g and e ased roper n sures solid t o the ainers ill be e nt of La Cros s License T Revisio n Transpo r Waste C o 8.6.2.5.Followi n radiolog iremaini n(excludi n radiolog ilicense w Chapter 6criteria.
8.6.3.N 8.6.3.1.The env i within s e The LA C existing L to b e co nslips are onsite r aactivitie s parking a to occur Several s roadway sincludin gremediat 636 foot waste st r No sig nactivitie scomply w regulato r In accor d onsite ar e 8.6.3.2.Only ar e and lice n and de m s e Boiling W Termination n 0 r tation (DO T o ntrol Speci Radi o n g the co m ical surveys n g in b ackf i n g the ISFS I i cal conditio will be termi 6 provide t h N on-radiolo g Onsit e ironmental i e ction 4.3.1 o CBWR dec o LACBWR l nducted wit h being cons t a il line will
: s. Contain e a nd equipm e in a manner structures s u s and rail l i g piping an d ed, as nece s elevation w r eam. nificant env s are anticip a w ith applic a r y requirem e dance with t e considere d Offsi t e as within t h nse terminat i molition equi p W ater Reacto r Plan T) regulatio nalist (WCS) o logical Crit e m pletion of will be per f illed struct u I) meets the ns are dem o nate d , with he method o gical Effect s e Land Use impact asso c of NUREG-0 ommissioni n icensed pro p hin the LSE tructed. Th e be modifie d ers will be u e nt/containesimilar to w u ch as the S ines, will r e d tunnels, b e ssary. All o t w ill be rem oironmental ated. In ad d able United e nts. t he guidanc e d as "Small.
"te Land Use he existing s ion activiti e pment, was t r  n s. If Clas sfacility in A e ria for Licedecontami n formed to d u re baseme n unrestricted o nstrated to b the excepti o o logy for d e s of Decom m ciated with 0 586 to be g n g project i s perty previo u footprint.
S e existing r a d and refur b u nloaded a n r laydown, s w hen the fac i Switchyard, emain at lic elow the 63 t her system s oved during changes a s dition to NR C States Envi r e presented
" (in the Vici n ite licensed e s (such as t te container 8-14 s B/C wast e A ndrews, Te xnse Termin a n ation, dis memonstrate t n ts, any re muse  criteri a be below th e o n of the ar e emonstratin g missionin g onsite land generically c s located a n usly used f o Some onsite ail line sup p bished with n d loaded o n storage, sta g i lity was op eAdministra tense termi n6 foot elev a s and comp o the decom m s sociated w C requirem e ronmental P rin NUREG-n ity) b oundary wemporary s t s, etc.). O f e is identifi e x as. a tion mantlement t hat the dos m aining pip i a specified i n e unrestricte ea around th g complian c uses has beonsidered a s n d executed or power ge n e roads have p orted the o p a rail spur n site. Onsi g ing and w a erational.
t ion Buildin g nation. Sub ation will be o nents as w e m issioning p w ith the si t e nts, d ecom m rotection A g-0586, the p will be used torage and s f the 163.5 a e d, it will band reme d se from resi d i ng and so i n 10 CFR 2 0 e d use criter ie ISFSI. L T ce with the een determi n s a "Small" i within the n eration; all been refur b p eration of t to support d ite activitie s a ste loading g , Crib Ho u surface bas e e radiologic a e ll as all str u p rocess and te-specific d m issioning a gency (US E potential im p to support d staging area s acre site, a b b e shipped t diation acti v d ual radioa c i ls at LAC B 0.1402. Aft e ia, the 10 C F T P Chapte r 5unrestricte d ned by the N impact. boundary o work is ex p bished. No b the facility.
decommissi o s such as v e are and co n u se as well a ement struc t ally assesse d uctures abo v disposed o f decommissi o a ctivities wil E PA) and W p acts to lan d decommissi o s for remed i bout 1.5 acr e t o the vities, ctivity BWR er the FR 50 5 and d use NRC, of the pected barge  The oning e hicle n tinue a s all tures, d and v e the f as a oning l also W DNR d use o ning i ation es are La Cros s License T Revisio n located Appropr icontami n These mimpacts activitie s Land in t within a Upper M Crosse-B County h water q u located w b asin la nsome of t The clo s north of with a p o valley b e Decom m the Ref u southern traffic e n decomm i 8.6.3.3.LACB W Slough tpredomi n Mississi p the reac tsystems. Water p u to be pr o For a di towns a n river wa t in Lansi n river w a40 miles The LA C well at t h Potable w s e Boiling W Termination n 0 w ithin the i ate isolati o nation from m easures wil lassociated w s at LACB W t he vicinity five-mile r Mississippi R B ad Axe Ri v has establis h ality and pr o within the B n d use is agr i the agricult u sest munici pthe site, acr o o pulation o f elow the eas t m issioning a c ge at the s o end of the n tering or le i ssioning ac t Wate r W R is locate d tributary ex t n ant water u ppi River as tor, river w a River wat e ulled from o n cessed onsi t stance of 4 0 nd cities alo n t er for indus t ng, Iowa, a b ater for ind u downstrea m C BWR site h e site. Th e w ater use d u W ater Reacto r Plan fence-encl o o n and co n the LSE ar e l also be m o w ith the u s W R. of the LAC B radius, appr o River Natio n v er Basin W a h ed a Land &o tection of t B ad Axe Ri v i cultural an d u ral land to r pality to the oss from th e 258 consist t ern bluff.
c tivities are n o uthern bou nsite will be aving the si t ivities and t r Use d on the sho r t ends along u sage durin gcondensate ater is not c er does sup p n site wells w t e and disch a 0 miles do w ng the Missi s t rial purpos e bout 15 mil e u strial purp o m. has its ow n e locations o uring decom m r o sed LSE, ntrol measu r ea to the a d o nitored to e se of offsit e B WR site i s o ximately o nal Wildlif e a tershed as a& Water Re s t he environ m v er Watersh e d over 50%
o recreational l LACBWR e north-sout hs of various not being p e n dary of theminimally i te. Conseq u the potential res of the M ithe LACB W g the oper a cooling wat c urrently b e p ly the Lo w w ill support arged in acc o wnstream of s sippi River es, excludin g e s downstre a o ses betwe e n potable w a of all wells m issioning o 8-15 where mos t r es will b e djacent LA C e nsure their e lands are s predominane third is e & Fish R a Geograph i s ource Man m ent within e d. Approx of the land i s l and use, si m site is the h running H residences, rformed in a site. Also
, impacted d u uently, the oimpacts to l i ssissippi R i WR site fo r a tion of LA C er. With th e e ing used a s w Pressure a ndecommiss i o rdance wit hthe site, vi rare obtaine d g the adjace n am of the s i e n the LA C a te r supply, (active and o perations i s t work is e instituted C BWR prop e r effectiven eanticipated a ntly r ural a n water and b R efuge. W D i c Manage m agement Pl athis GMU. imately 36
%s forested.
%s forested.
Tmilar to othe rvillage of GHighway 35.
T m ilar to othe rvillage of G H ighway 35.
farms, and any land are
farms, and a ny land are
, public acc euring deco moffsite land land use off siver. The Mr 3,000 fee tCBWR wase plant shut ds a cooling nd High Pr eioning task sh the site's s rtually all md from grou nnt G-3 fossi lite. There aCBWR site provided t habandoned
, public acc e u ring deco m offsite land l and use off s i ver. The M r 3,000 fee t CBWR wa s e plant shut d s a cooling nd High Pr e i oning task s h the site's s rtually all m d from grou n n t G-3 fossi l i te. There a C BWR site provided t h abandoned)s not expec texpected t o to preven t erty as wel l e ss. Thus, nfrom the d n d undevelo bottomland s D NR has d e m ent Unit (G M a n (18), ad d The comm u% of the La T here is an i n r parts of ru r G enoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are n o s ite are con s M ississippi R i t from nort h s the use o f d own and f umedium f o essure servi c s and this w a tate dischar g m unicipal w und water.
)s not expec texpected t oto preven terty as wel less. Thus, nfrom the dnd undevelo bottomland sDNR has dement Unit (G Man (18), ad dThe commu% of the La There is an i nr parts of ru rGenoa, appr This small a few retail as adjacent tess to the b mmissioning areas are n osite are con sMississippi R it from nort hs the use o fdown and f umedium foessure servi cs and this w atate dischar gmunicipal wund water.
Tl plant, is t h a re no othe r and Prairi e h rough a si n)are illustra t ted to be sig o be cond u t the spre a l as offsite a n o environ m decommissi o ped. Of th e s included i n esignated t h M U) and V e dressing lan d unity of Ge n Crosse-Ba d n creasing s h ral Wiscons ioximately 1rural com m businesses i t o the site o r oat launch a by rail and o t affected b sidered "Sm a ive r and its h to south.
Tl plant, is t hare no othe rand Prairi ehrough a si n)are illustra tted to be sig o be condut the spre al as offsite ano environ mdecommissi oped. Of th es included i nesignated t hMU) and Vedressing lan dunity of Ge nCrosse-Ba dncreasing s hral Wiscons ioximately 1rural com mbusinesses ito the site o roat launch aby rail and ot affected bsidered "Sm aiver and its h to south.
f water fro m u el removed or reactor o r c e water sys a ter will co n ge permits.
f water fro muel removed or reactor o rce water sys ater will co nge permits.
w ater suppli e The nearest u h e coal-fired r known us e e du Chien , n gle ground w t ed in Figur e nificantly g r u cted. a d of areas. m ental oning e area n the he La ernon d use, noa is d Axe hift of in. 1 mile m unity i n the r near at the truck by the a ll."  Thief  The m the from r fuel tems. ntinue  e s for u se of plant ers of , WI, w ater e 8-5. r eater La Cros s License T Revisio nthan the solids h o includes tank tha t Mississi p discolor a downsp o located i n to water u 8.6.3.4.This sec trelated t o ponds, r e to the w e The en v section 4a "Small"At LAC Bits WD N LACB WSystem (and WD N reduced erosion decomm idemoliti o Radiolo g (ODCM)Potentia l onsite m per year elevatio n 201 A/B b uilding s LACB W As the w LACB W No adve r decomm i quality a r s e Boiling W Termination n 0 pota b le wa t o lding tank a sanitary h t services t h ppi River a a tion. Roof o uts or throu n side the L S use are con s Wate r tion evalua t o surface w e servoirs an d e st and the R vironmental 4.3.3 of NU R" impact. BWR, all no NR permits.
water suppli eThe nearest uhe coal-fired r known us ee du Chien
W R which m (WPDES) a s NR Waste w through i m and sedi i ssioning, s t o n will be m gical impact
,ngle ground wted in Figur enificantly g ructed. ad of areas. mental oning e area n the he La ernon d use, noa is d Axe hift of in. 1 mile munity in the r near at the truck by the all."  Thief  The m the from r fuel tems. ntinue  es for use of plant ers of , WI, water e 8-5. reater La CrossLicense TRevisionthan the solids hoincludes
) limits an d l onsite gro u onitoring w efor radiolo g n s. The pla n; MW-202 A s in appro p WR former p r water from W R, the ther m rse impacts i ssioning a c r e bounded b W ater Reacto r Plan t er use duri nand pump e olding tank h e LSE Tur b at outfalls.
 
drains are e gh the nor m S E. Conse q s idered "Sm a r Quality t es potentia l w ater and g r d lakes. At R efuge wetla nimpact ev a R EG-0586 h a n-radiologi c Water m a m eet the Ge n s well as L A water Permit mplementatiomentation t orm water r m onitored an ds are mini m d assessed t h u ndwater i m e lls at LAC B gical analy s n t's networ k A/B; MW-20riate locati o r ocess areas the Missi s m al impact t o on surface w c tivities. C o by NUREG-r  n g plant po ed off by a that service s b ine Buildi n Release a r ither discha r m al effluent r quently, in a c a ll." l project ef f r oundwater.
tank thatMississipdiscoloradownspolocated i nto water u8.6.3.4.This sectrelated t oponds, reto the weThe envsection 4a "Small"At LACBits WDNLACBWSystem (and WDNreduced erosion decommidemolitioRadiolog(ODCM)Potentialonsite m per year  
LACBWR, n ds to the s o aluation ass a s been det e c al water dis anagement p n oa site's W A CBWR's W. In additi o n of appro p control d r un-off fro m d controlled m ized throu g h rough the m pacts are m B WR. Rep is purposes k of down g r 3A/B; and M o ns and qu a and potenti a ssippi is n o o the Missis s w ater and g r o nsequently
 
,-0586 and c o 8-16 wer operati olocal state s the Admi n ng. Storm r eas are pe r rged to the g release path w c cordance w fects on th o Surface w the nearby b outh. ociated wit h ermined to becharges to t h programs a n WDNR Wis c W DNR Tier I o n, impacts p riate Best d uring dec m active im pif necessar y g h adheren c REMP an d m onitored b y resentative g when grou n radient well s M W-204A/B antity to i n a l release po i o longer us e sippi River h r oundwater a , the potent i o nsidered "
elevation201 A/BbuildingsLACBWAs the wLACBWNo adverdecommiquality a rse Boiling WTermination n 0 potable watolding tank a sanitary h t services t hppi River aation. Roof outs or throu nside the L Suse are con sWatertion evalua to surface weservoirs an dest and the Rvironmental 4.3.3 of NU R" impact.
S ons. Sanit apermitted s nistration B u water runo f riodically m ground area w ay after pr o w ith NURE G o se portions w ater genera l b odies of w a th surface a e generally a h e Mississi p n d practice s consin Poll u II Industrial to the Miss Manage m e n c ommissioni n p acted area s y. ce to Off-si t d the groun d y the routin g roundwate r ndwater co n s (five pair e B) are situat e ntercept an d ints. e d to cool h as been eli m are expecte d ial impacts Small." a ry wastes a sanitary wa s uilding and a f f is divert e m onitore d f o surroundin g o cessing thr u G-0586, the p of the nat u lly refers t o a ter are the M a nd ground w a pplicable t o p pi River ar e s have bee n utant DischStorm Wat e sissippi Riv e nt Practices n g operat i s undergoin t e Dose Ca l dwater mo n n e sampling r samples a r n ditions are e d wells: M W e d around t h d detect co n operating p m inate d. d from the i mto surface a re collecte d s te hauler.
BWR, all no NR permits.
a sanitary h o e d directly t o r oil shee n g the facilit y u an oil sep a potential i m u ral enviro n o streams, r i Mississippi R w ater quali o LACBW R e controlled u n implemen targe Elimi n e r General P e r will be g r (BMP) fo r ions. Dg remediati o l culation M n itoring pro gof 10 perm r e obtained t at low and W-200A/B; he key LAC B ntamination plant syste m m plementati and ground w d in a This olding t o the n and y thru arator m pacts nment i vers, River ty in R with u nder t ed at nation Permit reatly r soil D uring o n or anual g ra m. anent twice high MW-BWR from ms at on of w ater La Cros s License T Revisio n 8.6.3.5.The env i 0586 ha s LACB W require m BMP to m sources sfrom the Fugitive demoliti o controll e Radiatio n excessiv e suppress iDemolit i specific a Appropr i extende dimpacte d No adve ractivitie s consider e 8.6.3.6.The en vNUREG-impact.
WR which m(WPDES) asNR Wastewthrough i mand sediissioning, s ton will be mgical impact
The aqu a House a t approxi m disturbe d decomm i fauna in removal Various these aq u included Plans fo requipme n Solution s perform e s e Boiling W Termination n 0 Air Q ironmental i s been deter m WR complies ments of the W minimize f u s uch as the facility. dust will o n of concrd demolitio n n Protectio n e or harmf u ion by misti n i on equipm e ations whic h i ate Health a d periods of d by exhaust rse impacts  
) limits an dl onsite gro uonitoring w efor radiolo gns. The pla n; MW-202As in appro pWR former p rwater from WR, the ther mrse impacts issioning a cre bounded bWater Reacto rPlan ter use duri nand pumpeolding tank he LSE Tur bat outfalls.
: s. Consequ e ed "Small."
drains are egh the nor mSE. Conse qsidered "Sm ar Quality tes potentia lwater and g rd lakes. At Refuge wetla nimpact ev aREG-0586 h an-radiologi c Water mameet the Ge ns well as L Awater Permit mplementatiomentation torm water rmonitored an ds are mini md assessed t hundwater i mells at LAC Bgical analy snt's networ kA/B; MW-20riate locati orocess areas the Missi smal impact t oon surface wctivities. C oby NUREG-r  ng plant po ed off by a that service sbine Buildi nRelease a rither discha rmal effluent rquently, in a call." l project ef froundwater.
Aqua t vironmental
LACBWR, nds to the s oaluation ass as been det ecal water dis anagement pnoa site's WACBWR's W. In additi on of appro pcontrol drun-off fro md controlled mized throu ghrough the mpacts are mBWR. Repis purposes k of down g r3A/B; and Mons and qu aand potenti assippi is n oo the Missis swater and g ronsequently
-0586 has b atic habitat a t the shore l m ately 110 fe d during th e i ssioning a c the Missis s of the diffu sfresh water u atic enviro 53 species a r the demo l n t by barge.
,-0586 and c o8-16 wer operati olocal state s the Admi nng. Storm reas are pe rrged to the grelease path wccordance wfects on th o Surface wthe nearby bouth. ociated wit hermined to becharges to t hprograms a nWDNR WiscWDNR Tier Ion, impacts priate Best during dec m active im pif necessar ygh adheren cREMP andmonitored b yresentative gwhen grou nradient well sMW-204A/Bantity to i nal release po io longer us esippi River hroundwater a, the potent ionsidered "
s will conti n e d within a p W ater Reacto r Plan uality impact eval u m ined to be g with all ap p W DNR and u gitive dust d plant's die s be genera t ete buildin g n and d ism a n, Environm e ul dust emis s n g water wi l e nt will be h will pre v a nd Safety a operation t oemissions.
Sons. Sanit apermitted snistration B uwater runo friodically mground area way after pr owith NUREGose portions water genera lbodies of w ath surface ae generally ahe Mississi pnd practice sconsin Poll uII Industrial to the Miss Managemencommissioni npacted area sy. ce to Off-si td the groun dy the routin groundwate rndwater co ns (five pair eB) are situat entercept an dints. ed to cool has been eli mare expecte dial impacts Small." ary wastes asanitary wa suilding and aff is divert emonitored fosurroundin gocessing thr uG-0586, the pof the nat ully refers t oater are the Mand ground wapplicable t oppi River ar es have bee nutant DischStorm Wat esissippi Riv ent Practices ng operatis undergoin te Dose Ca ldwater monne sampling r samples a rnditions are ed wells: M Wed around t hd detect co noperating pminated. d from the i mto surface are collecte dste hauler.
on air qua l e ntly, the po t ic Ecology impact ev a b een deter m a t LACBW R line to the fe et from th e e initial cotivities is n o s ippi River s er structure
a sanitary h oed directly t or oil shee ng the facilit yu an oil sep apotential i mural enviro no streams, r iMississippi Rwater quali o LACBWRe controlled un implemen targe Elimi ner General Per will be g r (BMP) fo rions. Dg remediati olculation M nitoring pro gof 10 perm re obtained tat low and W-200A/B; he key LAC Bntamination plant syste mmplementati and ground wd in a This olding to the n and y thru arator mpacts nment ivers, River ty in R with under ted at nation Permit reatly r soil During on or anual gram. anent twice high MW-BWR from ms at on of water La CrossLicense TRevision8.6.3.5.The envi0586 hasLACBWrequiremBMP to msources sfrom the
,fish speci enments. A and 19 fami l lition of str u Conseque n nue to mai n p plicable li m r u ation asso c generally ap plicable Fe dthe Wisco n d uring dem o sel generato r ted from v g structures antlement te c e ntal, and S s ions are n o ll be used to operated a n vent excess issessments a o ensure th a l ity are exp etential imp a aluation as s mined to be R includes t hdiffuser str u e shoreline.
 
nstruction o o t expected and also n e , which shar es, macro-in 1980 stud y l ies (19).
Fugitive demolitiocontrolleRadiationexcessivesuppressiDemolitispecificaAppropriextendedimpactedNo adveractivitie sconsidere8.6.3.6.The envNUREG-impact.
uctures at L n tly, there is ntain WDN R mits. Protec t 8-17 ciated with plicable to L d eral and St a n sin Bureau o o lition and d r s are no lo n v arious dec oand the ex c c hniques, w i S afety and H o t generate dmitigate du nd maintai n i ve exhaust a nd controls a t personne l ected from t a cts to air q u sociated wi t generally a p h e area fro m ucture that  Habitats a s o f the facil to disturb e e arby River e s a line wit v ertebrate p y indicated t LACBWR d no impact t o R permits a n tion of the nair quality i LACBWR w a te air qual i of Air Man aecommissio nger in ser v ommissioni n c avation of i th appropri a H ealth staff, d. As nece sst emission s n ed in acc oemissions s will also b e l and the e n t he implem e uality are b o t h aquatic e pplicable t o m the intake extends ou t ssociated w i l ity. How e existing aq utributaries, t h the G-3 f o p opulations, t hat the po p d o not incl u o the shoreli n n d decom m n earby Ref u in section 4 with a "Smal l ity regulati o agement, anning activit i v ice and ha v ng activitie ssoil. Care ate assessm e will be co n ssary, meas u s. ordance wit h from defe c e establishe d nvironment a e ntation of d o unded by N ecology in o LACBW R structure in t t into the M i th this are a e ver, the i m u atic habitat sstreams an d o ssil station, and veget a p ulation of f ude the rem o ne from thi s m issioning o p u ge wetland s.3.4 of NU R l" impact.
The aquaHouse atapproximdisturbeddecommifauna in removal Various these aquincluded Plans forequipmenSolutionsperformese Boiling WTermination n 0 Air Qironmental is been deter mWR complies ments of the Wminimize f usuch as the facility. dust will on of concrd demolitio nn Protectio ne or harmf uion by misti nion equipm eations whic hiate Health ad periods of d by exhaust rse impacts  
o ns, includi nd will impl e i es. Air em i v e been re m s , includin g ful plannin g e nts by Sol u n ducted to e n u res such a s h manufact u c tive equip m d during ex p a re not adv e decommissi o N UREG-058 6 section 4.3 R with a "S m tegral to th e Mississippi R a were previ mplementati o s , their flor a d wetlands.
: s. Consequ eed "Small."
is not plan n ation exist w f ish near th e o val of wa s s type of act i p erations w i s and habit a R EG-n g the ement i ssion moved g the g and u tions nsure s dust u rer's ment. p ected ersely o ning 6 and .5 of mall" e Crib River ously on of a and  The n ed. within e site s te or i vity. ill be ats is, La Cros s License T Revisio n and will operatio n Exotic s reprodu c While t h rusty cra y ones in t conduct e the site.
Aquatvironmental
A stud ymacroch i and cha n& Fish R perform e subsequ efossil st a require a construc t aquatic a The pot e 0586 an d The pot e and cons 8.6.3.7.The env i b een det e No kno w decomm i appropri a The lan dthe form afrom th e prevalen t operatio n onsite h a addition, that the d to the so udemoliti oanticipat e s e Boiling W Termination n 0 continue t o n s. s pecies ca ntion or sur v here are so m yfish, etc.)
-0586 has batic habitat at the shore lmately 110 fed during th eissioning a cthe Missis sof the diffu sfresh water uatic enviro 53 species ar the demo lnt by barge.
i the vicinity e d at LACB W  of the i m irus), fresh w n nel catfish (R efuge Pool e d in 1980.
s will conti ned within a pWater Reacto rPlan uality impact eval umined to be gwith all ap pWDNR and ugitive dust dplant's die sbe genera tete buildin gn and disman, Environm eul dust emis sng water wi lent will be h will pre vand Safety a operation t oemissions.
e nt shutdow n a tion, has fu r a ny operati o tion, demoli a reas beyon d ential impac t d considered ential impac tidered to be Terre s ironmental i m e rmined to b wn terrestr i i ssioning p r a te BMPs a r d around L A a tion of ab o e Mississip p t in surroun d n s associate d abitats for m with the s h direct heav y uth, no dire c on activities e d impact t o W ater Reacto r Plan o be a prior i n threaten n vival rate, a m e known a q n Vernon C of the LAC WR have n o mpingement water drum  
on air qua lently, the po tic Ecology impact ev abeen deter mat LACBWRline to the feet from th ee initial cotivities is n osippi River ser structure
((Ictalurus p u 9 navigatio n It was d e n of LACB W rther reduce d ons resultin g tion, materi a d the site bo u t s to the aq uto be "Sma l t s to the aq u"Small."
,fish speci enments. A and 19 fami llition of str u Conseque nnue to mai npplicable li mr uation asso cgenerally ap plicable Fe dthe Wisco nduring dem osel generato rted from vg structures antlement te cental, and Ssions are n oll be used to operated a nvent excess issessments ao ensure th ality are exp etential imp aaluation as smined to be R includes t hdiffuser str ue shoreline.
strial Ecolo g m pact eval u be generally i al exotic o roject area.
nstruction oot expected and also n e, which shar es, macro-in 1980 stud ylies (19).
re, and will c A CBWR wa s out 27 acres p i Rive r. T ding areas.
uctures at Lntly, there is ntain WDNRmits. Protec t8-17 ciated with plicable to Lderal and St ansin Bureau oolition and d rs are no lo nvarious dec oand the ex cchniques, w iSafety and Hot generate dmitigate du nd maintai nive exhaust and controls at personne lected from tacts to air q usociated wi tgenerally a phe area fro mucture that  Habitats a sof the facil to disturb eearby River es a line wit vertebrate py indicated tLACBWR dno impact t oR permits a ntion of the nair quality iLACBWR wate air qual iof Air Man aecommissio nger in ser vommissioni ncavation of ith appropri aHealth staff,  
d with G-1 m any plant a n hort-term na t constructio n c t impacts t o do not incl u o the shoreli n r i ty when pl a n ative spe c and disease s q uatic invasi ounty, thes e BWR site (o t resulted i n and entrai n (Aplodinotu u nctatus), w n areas fro m etermined t h WR and red u d this impa c g in any i m al and wast e u ndary. uatic ecolog y l l.u atic ecolog y g y uation of ter rapplicable t o o r invasive  To minim c ontinue to b s initially di sby filling ri vherefore, t h Given the e and G-3 a s nd animal s p t ure of the w n and demo o any off-sit e u de the rem o n e. 8-18 a nning onsi t c ies and e c s or parasit eve species (e have been n 20). The o p n the introd u nment of t s grunniens
: d. As nece sst emission sned in acc oemissions s will also b el and the e nthe implem euality are b oth aquatic epplicable t om the intake extends ou tssociated w ility. How eexisting aq utributaries, th the G-3 f opopulations, that the po pdo not incl uo the shoreli nnd decommnearby Ref uin section 4 with a "Smal lity regulati oagement, anning activit ivice and ha vng activitie ssoil. Care ate assessm ewill be co nssary, meas us. ordance wit hfrom defe ce establishe dnvironment aentation of dounded by Necology in o LACBWRstructure in tt into the Mith this are aever, the i muatic habitat sstreams an dossil station, and veget apulation of fude the rem one from thi smissioning o puge wetland s.3.4 of NU Rl" impact.
)within the U p m the operati o hat the imp a u ce d intake o c t. Decom m mpingement e staging or y within the y beyond th e r estrial ecol o o LACBW Rspecies h ize the intr o b e followed.
ons, includi nd will impl eies. Air em ive been re ms, includin gful plannin gents by Sol unducted to e nures such a sh manufact uctive equip md during ex pare not adv edecommissi oNUREG-0586section 4.3 R with a "S mtegral to th eMississippi Ra were previ mplementati os, their flor ad wetlands.
sturbed by t h v er edge an d h e site shor e e xtensive la n s well as L A p ecies, incl u work associ a lition proje c e sensitive s p o val of wast e te dismantl e cosystems d es they ma y (e.g. zebra m n oted in slo u p eration an d u ction of an y the fishes, ), gizzard s h p per Missis s o n of LAC B act was mo o perations, l m issioning o p and entrai n transfer op e site bound a e site bound a o gy in secti o R with a "S m h ave been n oduction o f t he construc t d low fores t eline no lo n n d distu r b an c A CBWR, t h u ding endan gated with d e ct area is se p p ecies are a n e or equip m ement or w a d ue to ag g y transmit t o m ussel, curl y u ghs and la k d decommisy aquatic i nsuch as b l h a d (Doros o sippi River N B WR and G-st likely in s limited to s u p erations ar e nment imp a erations wil l a ry are bou n ary have al s on 4.3.6 of N mall" impact.
is not plan nation exist wfish near th eoval of wa ss type of act iperations w is and habit aREG-ng the ement ission moved g the g and utions nsure s dust urer's ment. pected ersely oning 6 and .5 of mall" e Crib River ously on of a and  The ned. within e site ste or ivity. ill be ats is, La CrossLicense TRevisionand will operationExotic sreproducWhile thrusty cra yones in tconductethe site.
n oted to o f exotic or i t ion of the f t areas with nger resembce, constru c h e terrain h g ered or inv ecommissio n parated fro m n ticipated.
A studymacrochiand chan& Fish Rperformesubsequefossil st arequire aconstructaquatic aThe pote0586 andThe poteand cons8.6.3.7.The envibeen deteNo knowdecommiappropriaThe landthe formafrom theprevalentoperationonsite haaddition, that the dto the so udemolitioanticipat ese Boiling WTermination n 0 continue t ons. species ca ntion or sur vhere are so myfish, etc.)
S m ent by barg e a ste manag e gressive gr o o native sp e y-leaf pond w kes other th a sioning acti v nvasive spec i luegill (Le p oma cepedi a National W i-3 was previ s ignificant.
ithe vicinity ed at LACB W  of the i mirus), fresh wnnel catfish (Refuge Pool ed in 1980.
u pporting th e e not expec t a cts to fish.
ent shutdow nation, has fu rany operati otion, demoli areas beyon dential impac td considered ential impac tidered to be Terresironmental i mermined to bwn terrestr iissioning p rate BMPs a rd around L Aation of ab oe Mississip pt in surroun dns associate dabitats for m with the s hdirect heav yuth, no dire con activities ed impact t oWater Reacto rPlan o be a prior in threaten nvival rate, ame known a qn Vernon C of the LAC WR have nompingement water drum  
l be perfor m n ded by NU R so been eval u N UREG-058. occur withi n i nvasive sp e f acility, incl umaterial dr eles the sho r c tion and ye aas not sup pasive speci e n ing and th e m the Refug e Since the pl a e , there is al ement owth, ecies. w eed, a n the v ities i es to pomis anum) ildlife ously  The e G-3 ted to  No med in REG-uated 6 has n the e cies, uding e dged reline ars of p orted es. In e fact e area a nned so no La Cros s License T Revisio n Best Ma n spills res The pot e"Small."
((Ictalurus p u9 navigatio n It was d en of LACBWrther reduce dons resultin gtion, materi ad the site bo uts to the aq uto be "Sma lts to the aq u"Small."
The pot e evaluate d 8.6.3.8.
strial Ecolo gmpact eval ube generally ial exotic oroject area.
The pot e and cons A revie w Endang e two spe c which L AA m Miss iA pl a facin No note d due to t hthe exist i River to terrestri a presence been no t Higgins e Likewis eWiscons i Habitat Plimeston e townshi pfor this p The Per e Species l of falco n protecti odelisted hatching decomm i falcon re s e Boiling W Termination n 0 nagement P rulting from ential impa c ential impa c d and consi d Thre a ential impac t idered "Sm a w of the U e red, Propo s cies are desi g ACBWR re s m ussel speci e i ssippi Rive r a nt species, g slopes:  T h d adverse i m he siting and i ng G-3 fos sthe west an d a l or aquatic of the Hig g ted. A mu s e ye pearly m e , the North e i n Departm e P rogram (2 2 e cliffs ove r ps within V e p lant species e grine Falco n l ist in 1975 n nesting bo x n (23). Ov e i n 1999 (2 4efforts.
re, and will cACBWR wasout 27 acres pi River. Tding areas.
S i ssioning w icovery effo r W ater Reacto r Plan r actices an d equip m ent o cts to terre s cts to the t dered to be "
d with G-1 many plant a nhort-term na t constructio nct impacts t odo not incl uo the shoreli nr ity when pl anative spe cand disease squatic invasi ounty, thes eBWR site (
atened o r En d t s to "Thre a a ll." U.S. Fish a n s ed, and Ca g nated as "
ot resulted i nand entrai n(Aplodinotu unctatus),
T sides in: es, Higgins r:  Endange r Northern m hreatened.
wn areas fro metermined t hWR and red ud this impa cg in any i mal and wast eundary. uatic ecolog yll.uatic ecolog ygy uation of ter rapplicable t oor invasive  To minim continue to bs initially di sby filling ri vherefore, t hGiven the eand G-3 a snd animal s pture of the wn and demo o any off-sit eude the rem one. 8-18 anning onsi tcies and e cs or parasit eve species (e have been n20). The o pn the introd unment of ts grunniens
mpacts to aq u operation o f sil station, t h d the rail linhabitats w h gins eye pe a s sel survey o m ussels were e rn monksh o e nt of Agri
)within the U pm the operati ohat the imp auced intake oct. Decom mmpingement e staging or y within the y beyond th erestrial ecol oo LACBWRspecies h ize the intr obe followed.
: 2) has noted r creeks an d e rnon Count yto be impa c n (Falco pe rand startin g xes at its fa c erall, Peregr 4); however, Since the G ill not inter f r t and popul a r d site proce d o peration.
sturbed by t hver edge an dhe site shor eextensive la ns well as L Apecies, incl uwork associ alition proje ce sensitive s poval of wast ete dismantl ecosystems des they ma y(e.g. zebra mnoted in slo uperation an duction of an ythe fishes,  
s trial ecolo g t errestrial e cSmall."
), gizzard s hpper Missis son of LACBact was mo operations, lmissioning o pand entrai ntransfer op esite bound ae site bound aogy in secti oR with a "S mhave been noduction o fthe construc td low fores teline no lo nnd disturbancACBWR, thuding endan gated with d ect area is se ppecies are a ne or equip mement or w adue to aggy transmit t omussel, curl yughs and la kd decommisy aquatic i nsuch as b lhad (Dorososippi River NBWR and G-st likely in slimited to s uperations ar enment impaerations wil lary are bou nary have al son 4.3.6 of Nmall" impact.
d angered S p a tened" or "
noted to of exotic or ition of the ft areas with nger resembce, constru che terrain h gered or inv ecommissio nparated fro mnticipated.
E nd Wildlife ndidate Sp e T hreatened" eye pearl y red. monkshood uatic species f the LACB W he majority o e and High w hich may be arlymussel i of the Thie f found. o od has not culture, Tr athat the No r d streams a n y. This ha b c ted by deco m r egrinus) w e g in 1993, D c ilities, incl u i ne Falcon r Dairyland G-3 facility fere with G
Sment by barg easte manag egressive gr oo native sp ey-leaf pond wkes other th asioning acti vnvasive spec iluegill (Le poma cepedi aNational W i-3 was previ significant.
-a tion. 8-19 d ures requir e g y are b ou n c ology bey o pecies E ndangered"Service li s e cies' Coun ty or "Endang ymussel (L a (Aconitum n have been n WR facility
upporting th ee not expec tacts to fish.
, of the licen s way 35 to th einhabited b yn mussel b e f Slough ri v been noted a de & Con s rthern mon k n d the plant b itat is not p mmissionin g e re put on th eairylan d su p uding at the G r estoration p has continu e will still c-3 operatio n e prompt cl e n ded by N U o nd the sit e" species ar e sting, the F ty Distribut iered" withi n ampsilis hi g n oveboranc e n oted during  
l be perfor mnded by NU Rso been eval uNUREG-058. occur withi ninvasive sp efacility, incl umaterial dr eles the sho rction and ye aas not sup pasive speci ening and th em the Refug eSince the pl ae, there is al ement owth, ecies. weed, an the vities ies to pomis anum) ildlife ously  The e G-3 ted to  No med in REG-uated 6 has n the ecies, uding edged reline ars of ported es. In e fact e area anned so no La CrossLicense TRevisionBest Manspills res The pote"Small."  
, as well as t sed site, situ e east, is de v y threatene d eds in the v i v e r area wa s on or in th e sumer Prot e kshood's ha bis present i present with i g operationse Wisconsi n pported rec o G-3 stack, t o program eff oed to maint c ontinue op e ns or its sta c e anup and r e U REG-058 6 e boundary e bounded b Federally-Li s i on (21) co n n Vernon C o g ginsii), wit h e nse), with plant opera t t he previous uated betwe e v eloped and d or endang e icinity of L A s conducte d e vicinity of ection's En d b itat is leac h i n the Whit e i n or near t
 
: h. n Endangere d overy effort s o support c h o rts resulted t ain the G-3 erations an d ck, there is emediation o 6 and consi d have also b y NUREG-s ted Threa t ncluded that o unty, the c o h habitat i nhabitat in n t ions. In ge n G-1 facilit y e n the Missi s does not s u ered species.
The poteevaluated8.6.3.8.
A CBWR h a d in 1978 a n LACBWR. d angered S p h ed sandston e stown and he LACBW R d and Threa t s with instal l h ick hatchin gin the bird b nesting sit e d the LAC Bno impact t of oil dered been -0586 tened, only o unty n the n orth-neral, y , and s sippi u pport   The as not n d no  The pecies e and Stark R site tened lation g and being e and BWR t o the La Cros s License T Revisio n 8.6.3.9.Occupat i consider e The env iNUREG-impact. program s also dur iare thos e ergono m Solution s contract o prevent owith fed States O c Typical followin gSafe tSafe tProv iWor k spec i such Obta iInvo l pack aIssui n lesso nHold reinf o 8.6.3.10.A detail eLTP. 8.6.3.11.LACB W efficient with so m s e Boiling W Termination n 0 Occu p i onal issues/
The poteand cons A reviewEndangetwo specwhich LAA mMissiA plafacinNo noteddue to ththe exist iRiver to terrestri apresence
 
been notHiggins eLikewiseWisconsiHabitat Plimestonetownshipfor this pThe PereSpecies lof falconprotectiodelisted
 
hatching  
 
decommifalcon re se Boiling WTermination n 0 nagement P rulting from ential impa cential impa cd and consi dThreaential impac tidered "Sm aw of the Uered, Propo scies are desi gACBWR resmussel speci eissippi Rive rant species, g slopes:  T hd adverse i mhe siting and ing G-3 fos sthe west an dal or aquatic of the Hig gted. A mu seye pearly me, the North ein Departm eProgram (22e cliffs ove rps within V eplant species egrine Falco nlist in 1975 n nesting bo xn (23). Ov ein 1999 (2 4efforts.
Sissioning w icovery effo rWater Reacto rPlan ractices an dequipment octs to terre scts to the tdered to be "
atened or Endts to "Thre aall." U.S. Fish a nsed, and Ca gnated as "
Tsides in:
es, Higgins r:  Endange rNorthern mhreatened.
mpacts to aq uoperation o fsil station, t hd the rail linhabitats w hgins eye pe assel survey omussels were ern monksh oent of Agri
: 2) has noted r creeks an dernon Count yto be impa cn (Falco perand startin gxes at its fa cerall, Peregr 4); however, Since the Gill not inter frt and popul ar d site proce doperation.
strial ecolo gterrestrial e cSmall."
dangered S patened" or "
End Wildlife ndidate Sp eThreatened" eye pearl yred. monkshood uatic species f the LACB Whe majority oe and High which may be arlymussel i of the Thie ffound. ood has not culture, Tr athat the No rd streams a ny. This ha bcted by deco mregrinus) weg in 1993, D cilities, incl uine Falcon r Dairyland G-3 facility fere with G
-ation. 8-19 dures requir egy are bouncology bey opecies Endangered "Service li secies' Coun tyor "Endang ymussel (La(Aconitum nhave been nWR facility
,of the licen sway 35 to th einhabited b yn mussel b ef Slough ri vbeen noted ade & Consrthern mon knd the plant bitat is not pmmissionin gere put on th eairyland supuding at the Grestoration phas continu ewill still c-3 operatio ne prompt cl ended by NUond the sit e" species ar esting, the Fty Distribut iered" withi nampsilis hi gnoveboranc enoted during  
, as well as tsed site, situ e east, is de vy threatene deds in the v iver area wason or in th esumer Prot ekshood's ha bis present ipresent with ig operationse Wisconsi npported rec oG-3 stack, t oprogram eff oed to maint continue op ens or its sta ceanup and r eUREG-0586e boundary e bounded bFederally-Li sion (21) conn Vernon C ogginsii), withense), with plant opera tthe previous uated betwe eveloped and d or endang eicinity of L As conducte de vicinity of ection's Endbitat is leac hin the Whit ein or near t
: h. n Endangere dovery effort so support c horts resulted tain the G-3 erations an dck, there is emediation o6 and consi dhave also by NUREG-sted Threa tncluded that ounty, the c oh habitat i nhabitat in ntions. In ge n G-1 facilit yen the Missi sdoes not s uered species.
ACBWR had in 1978 a nLACBWR. dangered S phed sandston estown and he LACBWRd and Threa ts with instal lhick hatchin gin the bird b nesting sit ed the LACBno impact tof oil dered been -0586 tened, only ounty n the north-neral, y, and ssippi upport   The as not nd no  The pecies e and Stark R site tened lation g and being e and BWR to the La CrossLicense TRevision8.6.3.9.OccupaticonsidereThe enviNUREG-impact.
programsalso duriare thoseergonomSolutionscontractoprevent owith fedStates OcTypical followingSafetSafetProviWorkspecisuch ObtaiInvolpackaIssuinlessonHoldreinfo8.6.3.10.A detaileLTP. 8.6.3.11.LACBWefficient with somse Boiling WTermination n 0 Occupional issues/
ed "Small."
ed "Small."
ironmental i-0586 has bWhile deco ms addressin ging repair a ne related t omic, and biol os is commior health an doccupationa leral and st accupational Hcontractor g: ty training a sty emphasis iding all worker training ific worker qas heavy eq uining and re vlving Healt hages and pa rng periodic ns learned.
ironmental i-0586 has b While deco m s addressin g i ng repair a n e related t o m ic, and biol o s is comm i or health an d o ccupationa l eral and st a c cupational Hcontractor g: t y training a s ty emphasis i ding a ll wo r k er training ific worker qas heavy eq u i ning and re v l ving Healt h a ges and pa r n g periodic n s learned.
ing safety sorce safety eCost ed discussio nSocioWR was shut to operate.
ing safety s o rce safety e Cost e d discussio n Socio W R was shut to operate.
me projects Water Reacto rPlan pational Iss usafety has bimpact eval ubeen deter mmmissionin gg worker sa fnd refueling o human heogical hazar ditted to de cd safety pro gl injuries an ate regulati oHealth and Ssafety prac ts a part of t has the first t orkers with a and requir equalificatio nuipment de mviewing Sa feh and Safe trticipating i nsafety mess stand-downsevents and l en of the site economic I mdown in 1 9By 1994, s oassociated r  ues/Safety een evaluat euation asso cmined to be g involves i nfety were i moutages.
m e projects W ater Reacto r Plan pational Iss usafety has b impact eval u b een deter m mmissionin g g worker sa f n d refueling o human h e ogical hazar d i tted to de c d safety pro g l injuries an a te regulati o Health and S safety prac t s a part of t h as the first t o r kers with a and requir e qualificatio n uipment de m viewing Sa fe h and Safe t r ticipating i nsafety mess s tan d-down s e vents and l e n of the site economic I mdown in 1 9 By 1994, s oassociated r  ues/Safety een evaluat e u ation asso c mined to b e g involves i n f ety were i m outages.
Tealth and s ads. Radiolo gcommission igrams to eff ed illnesses.
T e alth and s a d s. Radiolo g commission i grams to eff e d illnesses.
ons includin gSafety Adm itices and che site acces sopic of disc uHealth and Sed certificat ins. Certain smolition fir mfety Data Sh ety staff in n pre-job wa lages to co ms whenever essons learn edecommiss impacts 987 as the s mome increm ewith the r8-20 ed to be bou nciated with generally a pncreased ind umplemented The occupat iafety, inclu dgical impact ing LACBWectively con tContractor g Wisconsi ninistration (
o ns includin g S afety Adm i tices and c h e site acces s opic of disc u Health and S e d certificat i n s. Certain s molition fir m fe ty Data Sh e ty staff in n pre-job wa l ages to co m s whenever e ssons learn edecommiss i m pacts 9 87 as the s m ome increm e with the r 8-20 e d to be bou n ciated with generally a p n creased ind u mplemented T he occupat i afety, inclu d gical impact i ng LACB W e ctively con t Contractor g Wisconsi n i nistration (O communicat i s program f o ussion at me S afety book l i ons revie w s pecialty su b m s. e ets for che m reviewing l kdowns, w o m municate a wserious sa f ed site-wide
Ocommunicat is program f oussion at me Safety book lions revie wspecialty su bms. eets for che mreviewing lkdowns, w ommunicate a wserious sa fed site-wide
.i oning proj e mall size o f e ntal decom m removal of nded by N Uoccupation a pplicable t o ustrial activ i during the i onal issues ding impac t t s were disc u WR safely trol hazards health and s n Departme O SHA) req u ions will i n o r all emplo y e etings. let. w prior to a s b contractors m icals boug h and appro v o rk conditio n wareness o f f ety events  
.ioning proj emall size o fental decom mremoval of nded by N Uoccupation applicable t oustrial activ iduring the ional issues ding impac tts were disc uWR safelytrol hazards health and sn Departme OSHA) requions will i nor all emplo yeetings. let. w prior to a sbcontractors micals boug hand appro vork conditio nwareness o f fety events  
. ect costs is p f the plant d m issioning p the RPV i U REG-0586 al issues in o LACBW R i ties and sa fe operation o f and safety ts from ph y u ssed in sec tthrough th ein the work safety prog r e nt of Labo r u irements.
. ect costs is pf the plant dmissioning pthe RPV iUREG-0586 al issues in o LACBWRities and sa feoperation o fand safety ts from ph yussed in sec tthrough th ein the work safety prog rent of Labo ruirements.
nclude acti o y ees and su b ssignment t o are mobili z h t onsite.
nclude acti oyees and su bssignment t o are mobili zht onsite.
v ing decom m n assessme n f significant occur to c presented in did not mak e p lanning an d in 2007 anand the imp section 4.3.
ving decom mn assessme nfsignificant occur to c presented in did not mak eplanning an din 2007 anand the imp section 4.3.
R with a "S m fety focus, s i f the facilit yimpacts ass y sical, che m t ion 8.6.2.
R with a "S mfety focus, s if the facilit yimpacts ass ysical, che mtion 8.6.2.
e applicati oenvironme n r a m s will c o r and the U o ns such a s b-contractor s o tasks req u zed, as nece s m issioning n ts and revie wsafety issue ommunicat e Chapte r 7 o e it econom i d activities b d other m e p act is 10 of mall" imilar y and essed mical, o n of n t and omply United s the s. uiring ssary, work w s. s and e and of this ically began etallic La Cros s License T Revisio n radioacti vcomplet e periodic the ISFS I More a ctimefra m obtained personn eactivitie sincrease d project a n Therefor impact i s 8.6.3.12.The per c Vernon C Crosse) aimpact t o Decom mtranspor t Highwa yrelative t There is impacte dsite spec i 8.6.3.13.A revie w May 201 historica l the plan t Archeol o which w a Also, as along Hi the US A Upper M Axe. T h first nuc lmarker a concern s s e Boiling W Termination n 0 ve compon e e d by 2012.
e applicati oenvironme nrams will cor and the Uons such a sb-contractor so tasks req uzed, as nece smissioning nts and revie wsafety issue ommunicat eChapter 7 oe it econom id activities bd other m epact is 10 of mall" imilar y and essed mical, on of nt and omply United s the s. uiring ssary, work ws. s and e and of this ically began etallic La CrossLicense TRevisionradioacti vcompleteperiodic the ISFSIMore actimeframobtained
spikes in w I project) (2 ctive deco m me. Some ofrom outsi d el from the l o s will have a d use of the n d workers w e, the soci o s considered Envir o c entages of C ounty are q and more p o o the greater m issioning a c t equipment y 35 traversi n o rail and tr u no reason d by the dec o ific impact i Cultu r w of the N 5 a nd the W l sites in V e t. The clos e ogical Site n e a s certified bindicated i nghway 35 i nCE Lock a n Mississippi.
 
T h e third wa s l ear gene r at i t the waysi d associated w W ater Reacto r Plan e nts over t hStaff size a t o r kforce hi r 5). mmissioning of the labor de Wiscons i o cal and re g a short-ter mlocal craft w w ith suppli e oeconomic i"Small." onmental J u low-incom e q uite low, a opulated Wi population, c tivities will and debris.
personneactivitie sincreasedproject a nTherefor impact is8.6.3.12.The percVernon CCrosse) aimpact toDecommtransportHighwayrelative tThere is impactedsite spec i8.6.3.13.A reviewMay 201historica lthe plantArcheolowhich waAlso, as  
n g north-so u u ck transpo rto believe ommissioni n s considere d ral, Historic
 
, National Par k W isconsin H e rnon Count y e st historica l e ar Stoddar d b y the Natio n n NUREG-0 n Vernon C o nd Dam No.
along Hi the USAUpper MAxe. Thfirst nuc lmarker aconcernsse Boiling WTermination n 0 ve componeed by 2012.
T he second , s adjacent t o i ng plant. I n d e across Hi g w ith having r  he past 7 y e t the plant h a r ing to supp oand struc ttasks requ i i n; however
spikes in w I project) (2 ctive deco mme. Some ofrom outsi del from the l os will have ad use of the nd workers we, the soci os considered Envirocentages of County are qand more p oo the greater missioning a ct equipment y 35 traversi no rail and tr uno reason d by the dec oific impact i Culturw of the N5 and the Wl sites in V et. The clos eogical Site n eas certified bindicated i nghway 35 i nCE Lock a nMississippi.
, g ional areas m positive e c w orkforce a e s and servic impact is e v ustice e and mino r approximate l sconsin cou n including s pcause sligh t The truck t u th by the s i rtation as a r ethat low-i n n g project.
The third wa slear generatit the waysi d associated wWater Reacto rPlan ents over t hStaff size a torkforce hi r5). mmissioning of the labor de Wiscons iocal and re ga short-ter mlocal craft wwith suppli eoeconomic i"Small."
onmental J ulow-incom equite low, aopulated Wi population, ctivities will and debris.
ng north-so uuck transpo rto believe ommissioni ns considere dral, Historic
,National Par kWisconsin Hernon Count yest historica lear Stoddar dby the Natio nn NUREG-0n Vernon C ond Dam No.
The second
,s adjacent t oing plant. I nde across Hi gwith having r  he past 7 y et the plant h aring to supp oand struc ttasks requ iin; however
,gional areas m positive e cworkforce aes and servic impact is e vustice e and mino rapproximate lsconsin cou nincluding s pcause sligh t The truck tuth by the s irtation as a r ethat low-i nng project.
d "Small."  
d "Small."  
, and Arche ok Service NHistorical S oy and no st rl site with p rd, WI. locat enal Park Se r191, the St aounty. One i8. It descr i, about 7.5 mo LACBWRn 2009, cre wghway 35 fr oa public-ac c8-21 ears. A s mas graduall yort specific tural demol iire speciali z, some of t hsurroundin gconomic im pand opportu nes. valuated to ity groups wly 3%, and nties furthe rpecial grou pt increases itraffic will uite. There esult of dec oncome and mPer NUREGological Res National Re gociety (29) t hructures in t hre-historica led approxim arvice in 198 0ate of Wisc ois about a h aibes the ori gmiles south oR and comm ews erected a om the site (cess marker omall ISFSI fy been reduceproject nee dition is an tzed skills a nhe workforc g the site.
, and Arche o k Service N Historical S o y and no st r l site with p r d , WI. locat e n al Park Se r191, the St a o unty. One i 8. It descr i , about 7.5 m o LACBW R n 2009, cre w g hway 35 fr o a public-ac c 8-21 ears. A s m a s graduall y ort specific tural demol i ire speciali z , some of t hsurroundin g conomic im p a nd opportu nes. v aluated to ity groups w l y 3%, and nties furthe r p ecial grou p t increases i traffic will u i te. There e sult of dec o ncome and m Per NURE G o logical Res N ational Re g ociety (29) t h ructures in t h re-historica l e d approxim a r vice in 198 0 ate of Wisc o i s about a h a ibes the ori g m iles south o R and comm e w s erected a om the site (cess marker o m all ISFSI f y been r educ e project nee d i tion is an t zed skills a n h e workforc g the site.
Opact on the nities for lo cbe bounde dwithin the Vlower than r from the Lps, is expect ein truck traf fuse existing will be no eommissioni nminority p oG-0586 and ources gister of Hthrough Ma yhe village o l structural rately 7 mile s0 (30). onsin has pl aalf mile nor tgin of the p rof the plant,emorates th a new, updat (31). This n eon Dairylan facility hol ded as opera tds (e.g. 40 pticipated i nnd equipme ne will be c oOverall, the dlocal com mcal business d by NUREVillage of Gthose in lar gLACBWR sied. fic to and fr omain street environmen tng. opulations wthis evalua tHistoric Pla cy 2015 iden tf Genoa or wremnants is s north of t haced three hth of LACB Wresent syste m, highlights te plant itse lted Wisconsiew location d property.
O p act on the nities for lo c be bounde d within the Vlower than r from the L p s, is expect e i n truck traf f use existing will be no e ommissioni n m inority p o G-0586 and ources gister of H t hrough Ma y h e village o l structural rately 7 mile s 0 (30). o nsin has pl a alf mile nor t gin of the p r of the plant,emorates th a new, updat (31). This n e on Dairylan f acility hol ded as opera t ds (e.g. 40 p ticipated i n nd equipme ne will be c o Overall, the d local com m cal business d by NUR E Village of Gthose in lar g LACBWR s i ed. fic to and fr omain street environmen t ng. o pulations w this evalua t Historic Pla c y 2015 iden t f Genoa or w remnants is s north of t h aced three h t h of LACB W resent syste m , highlights t e plant itse l t e d Wiscons i ew location d property.
ding 5 cask stions ceased
ding 5 cask s t ions ceased
,personnel st an the 2016
, personnel st a n the 2016-n t which w i o mprised o f decommissi o m unity due t s es to suppo r E G-0586 an d G enoa as w e ge cities (e.
-nt which w iomprised o f decommissi omunity due tses to suppo rEG-0586 an dGenoa as w ege cities (e.
i te (26) (27)om LACB W routes, pri m tal justice i m will be adv e t ion, the pot e c es (28) th r tified only a within 5 mi lthe Goose I h e LACBW R historical m a W R, overlo o m of locks o the Battle o f lf as Wisco n i n state hist o resolved se c s was , with affing -2017 ill be f craft o ning t o the rt the d the ell as g. La . No WR to marily mpact ersely ential r ough a few l es of Island R site, a rkers oking o n the f Bad n sin's orical c urity La Cros s License T Revisio n Dairylan presents or categ o Land d iprimaril y Land th a the cons t station) w erosion c Based o ntranspor timpact o n 0586 a n Archaeo l 8.6.3.14.The env i 0586 ha sThe imp a disturba ncomplet eremoved River. Tcompleti ThereforNUREG-8.6.3.15.The env i has been LACB W 475 feet north si d south si d hospital s approxi m Noise g eequipme ntempora rcomplet e experien c s e Boiling W Termination n 0 d sent an u nthe control r o rize any pa r i sturbance f o y shipped vi a a t was distu r t ruction an d w ere perfor m c ontrols and n the histo r i c t ation of sy s n cultural, h n d based u logical Res o Aest h ironmental i s been deter m a ct of deco m n ce and dur a e d. Once al l , the aesthe t T he final d e on of the de c e, the envir o-0586 and t h Nois e ironmental idetermined WR is locate d west of the d e and a por t d e. There a r within 1 m mately 1 mil e e neration w i nt. Noise r y and will e , noise leve l c ed during t h W ater Reacto r Plan n used contro l r od an d a r e rt of the LA C or the remo v a rail. rbed for pro j d demolition m ed in acc ostormwater cal informat stem compo nistoric, and a u pon this e o urces are c o hetics impact eval u m ined to be g mmissioning ation. These l of the maj o t ics will im p etermination c ommissio n onmental i m h e impact is impact eval u to b e gener a d on the sh orail roa d li n tion of the U re no reside n mile. The n e to the nort h ill primarily associated woccur pri m ls in the vic i he operatio n r l rod to the W e plica fuel a s CBWR plan t v al of large jects beyon d of the G-1 ordance wi t pollution pr i on present e n ents and w a rcheologic a valuation, t o nsidered "S m u ation asso c generally ap on site aest h impacts ar e or plant stru c p rove slightl y on usage oing. mpact assoc iconsidered "uation asso c ally applica b ore of the M n e. USAC E U pper Missi s nces within 1 earest com m h of the pla nresult fro m w ith decom m marily duri n inity of the L n of the facil i 8-22 W isconsin H s sembly (3 2 t as a histori component s d the nucle afossil stati o th applicabl e e vention pl a e d in NURE G w aste, the d e a l resources.
ite (26) (27)om LACBWroutes, pri mtal justice i mwill be adv etion, the pot eces (28) thrtified only awithin 5 mi lthe Goose Ihe LACBWRhistorical m aWR, overlo om of locks othe Battle o flf as Wisco nin state hist oresolved se cs was , with affing -2017 ill be fcraft oning to the rt the d the ell as g. La . No WR to marily mpact ersely ential rough a few les of Island R site, arkers oking on the f Bad nsin's orical curity La CrossLicense TRevisionDairylanpresents
t he potenti a mall." ciated with aplicable to L h etics (e.g.
 
v e temporary c tures and b u y b y provid i o f the deco m iated with a e"Small." ciated with n b le to LAC B Mississippi R E land and L s sippi River 1,000 feet o f munity, the nt. m demolitio n m issioning a n g daylight LACBWR s i ty. Historical M u 2); however, ical site.
or catego Land diprimarilyLand thathe conststation) werosion cBased ontransportimpact on0586 anArchaeol8.6.3.14.The envi0586 hasThe impadisturbancompleteremovedRiver. TcompletiThereforNUREG-8.6.3.15.The envihas been  
s will be mi n a r operation a o n an d the c e permits a n a ns. G-0191 an d ecommissio n. Conseque n a l impacts aesthetics i n LACBWR w visual skyli n and will ce a uildings eas t ing a more o mmissioned esthetics is n oise in sec t B WR with a "River, 300 f e L ock and D National W f the station village of G n activities i and shipmen t hours. O n site will be r u seum in M athere is no n imized as t a l areas (e.
 
g onstruction n d include d d the current n ing will h a n tly, as bou n to Cultur a n section 4.
LACBW475 feet north sidsouth sidhospitalsapproximNoise geequipmentemporarcompleteexperiencse Boiling WTermination n 0 d sent an u nthe control rorize any pa risturbance f oy shipped vi aat was distu rtruction an dwere perfor mcontrols and n the histo rictation of sy sn cultural, h nd based ulogical Res oAesthironmental is been deter mact of deco mnce and dur aed. Once al l, the aesthe tThe final d eon of the de ce, the envir o-0586 and t hNoiseironmental idetermined WR is locate dwest of the de and a por tde. There a r within 1 mmately 1 mil eeneration w int. Noise ry and will e, noise leve lced during t hWater Reacto rPlan nused contro lrod and a rert of the LA Cor the remo va rail. rbed for pro jd demolition med in acc ostormwater cal informat stem compo nistoric, and aupon this e ources are c ohetics impact eval umined to be gmmissioning ation. These l of the maj otics will im petermination commissiononmental i mhe impact is impact eval uto be generad on the sh orail road lintion of the Ure no reside nmile. The n e to the nort hill primarily associated woccur pri mls in the vic ihe operatio nr l rod to the Weplica fuel a sCBWR plantval of large jects beyon dof the G-1 ordance wi tpollution pr ion present enents and warcheologic avaluation, tonsidered "S muation asso cgenerally ap on site aest h impacts ar eor plant stru cprove slightl yon usage oing. mpact assoc iconsidered "uation asso cally applica bore of the Mne. USACEUpper Missi snces within 1earest com mh of the pla nresult fro mwith decom mmarily duri ninity of the Ln of the facil i8-22 Wisconsin Hssembly (3 2t as a histori component sd the nucle afossil stati oth applicabl eevention pl aed in NURE Gwaste, the d eal resources.
3 with a "Smal l ne) is limite d a se when de c t of the Mis s o pen view o property w ievaluated t otion 4.3.16 o"Small" im p feet from th e Dam No. 8 a r Wildlife & Fi structures a Genoa, Wis c nvolving h e t of waste i s nce the de c reduced to l e adison, WI w objective t o t he waste w g. associate d of the G-3 d appropriat eapproach f o a ve no signi f n ded by NU R al, Historic, 3.15 of NU R l" impact.
the potenti amall." ciated with aplicable to Lhetics (e.g.
d in terms o f commission i sissippi Riv e o f the Missi s ill be made o be bound e of NUREG-p act. e river ban k re located o sh Refuge o a nd no scho o c onsin is l o e avy constr u s intermitte n commissioni n e vels below w hich o save will be d with fossil e soil o r the f icant R EG- and R EG-f land ing is er are ssippi upon e d by -0586 k , and o n the o n the ols or ocated uction nt and n g is those La Cros s License T Revisio n Due to timpacts decomm iimposed ThereforNUREG-8.6.3.16.The env iNUREG-impact.
ve temporary ctures and b uy by providiof the deco miated with a e"Small." ciated with nble to LAC BMississippi RE land and Lssippi River 1,000 feet o fmunity, the nt. m demolitio nmissioning ang daylight LACBWR sity. Historical M u2); however, ical site.
During t hefforts w Low lev e disposal addition, Texas. As state d process a and fuel These r edestabili z Therefor b ounded 8.6.3.17.The env iNUREG-impact.
s will be mi nar operation aon and the ce permits a nans. G-0191 an decommissio
The nu m than durincrease d effect o n b arge tr a support t operatio n Therefor by NUR E 8.6.3.18.Cumulat iimpact o f s e Boiling W Termination n 0 t he distanc e on noise l i ssioning, S by the Vill a e, the envi r-0586 and t hIrretr i ironmental i m-0586 has b he demoliti o will be mad e e l radioacti vsite in Cliv e any Class B d in NURE G are the mate r used for co n esource co m zing. e, the envir o by NURE G Traff i ironmental i-0586 has b mber of ship m i ng the ope d traffic and n traffic flo w affic. The e t he operatin g n s. e, the envir o E G-0586 an dCum u ive impact i s f the action w W ater Reacto r Plan e of the sta t l evels duri n S olutions ag r a ge of Geno a ronmental i h e impact is ievable Res o m pact eval u b een deter m o n and struc
: n. Conseque nal impacts aesthetics i nLACBWR wvisual skyli nand will ce auildings eas ting a more ommissioned esthetics is noise in sec tBWR with a "River, 300 f eLock and DNational Wf the station village of Gn activities i and shipmen thours. O nsite will be ruseum in M athere is no nimized as tal areas (e.
: e. Some m e v e waste ha s e , Utah. T h B/C waste t h G-0586, irret r rials used to n struction m mmitments onmental i m G-0586 and t h c and Trans p impact eval u b een deter m ments and t h ration of t h wear and te w or road w e xisting bar g g G-3 fossil onmental i m d the impac t ulative Impa c s defined th e w hen added r  tion from s e ng decomm rees to co m a. mpact asso cconsidered "ources uation assoc i mined to be tural disma n etals from t h s been and his facility h h at is gener a rievable res odecontami n m achinery an d are consid e mpact assoc i h e impact is p ortation uation asso c mined to be he volume o f he facility. ar on road w e ar. There w g e traffic on station and m pact associ t is consider e c ts e impact on to other pa s 8-23 e nsitive rec e issioning a n m ply with a ciated with "Small." iated with ir r generally a p ntlement of h e site are a n will contin u has sufficien t a ted will be s o urces that w nate the facil i d for transp o ered to be iated with i rconsidered ciated with t generally a p f waste shi p Non-radiol o ways. It is a n will be no r athe Thief Sare not asso ated with tr ed as "Smal l the environ s t, present, a e ptors, ther e nd demolit i a ny noise l i noise is e v retrievable r pplicable t o the station, anticipated t o u e to be shi p t space for t s hipped to t h w ould occur ity (e.g., ra g o rtation of mminor and r retrievable "Small." transportati o pplicable t o p ped are gre a ogical impa c nticipated th a adioactive w S lough b ran c ociated with ransportatio n l." nment which a nd reasona b e will be l i ion activiti e imitations (e valuated to r esources in o LACBW R recycling a n o be release p ped to the t he disposal h e WCS fa c during the d gs, solvents, m aterials to aare neithe rresources i s on issues in o LACBW R ater during d cts of trans p at there will waste shipm e c h and the M LACBWR d n is evaluat e h results fro m b ly foreseea b imited temp e s. Durin g e.g. quiet h be bound e section 4.3.
gonstruction nd include dd the current ning will h antly, as bou nto Cultur an section 4.
R with a "S m n d asset rec o d as clean s Energy Sol uof this was t c ility in An d decommissi ogases, and t o and from th e r detectabl e s evaluated section 4.3.
3with a "Smal lne) is limite dase when de ct of the Mis sopen view oproperty w ievaluated t otion 4.3.16 o"Small" im pfeet from th eDam No. 8 a rWildlife & Fi structures aGenoa, Wis cnvolving h et of waste i snce the de creduced to l eadison, WI wobjective t othe waste wg. associate dof the G-3 d appropriat eapproach f oave no signi fnded by NU Ral, Historic, 3.15 of NU Rl" impact.
R with a "S m decommissi o p ortation in be no signi f e nts execut e M ississippi R decommissi o e d to be bo u m the incre m ble future ac torary g the h ours) ed by 18 of mall" o very scrap. utions te. In drews, oning ools), e site. e nor to be 17 of mall" o ning clude ficant e d via River oning unded m ental t ions.
d in terms o fcommission isissippi Riv eof the Missi sill be made o be bound eof NUREG-pact. e river ban kre located osh Refuge oand no scho oconsin is l oeavy constr us intermitte ncommissioni nevels below which o save will be d with fossil e soil or the ficant REG- and REG-f land ing is er are ssippi upon ed by -0586 k, and on the on the ols or ocated uction nt and ng is those La CrossLicense TRevisionDue to timpacts decommiimposed ThereforNUREG-8.6.3.16.The enviNUREG-impact.
La Cros s License T Revisio n The cu m decomm iterrestri acumulati v Past, p r decomm i Mississi p resource sactivitie s over timmajor ir r disposal disposal In sum m 8.7.O 8.7.1.F Decom mHan dWor kPubl iLice nWor kLiqu iHaz aHan d Charact e of lead p 8.7.1.1.The maj oare admi nPart 2Part 5Part 5Part 6 s e Boiling W Termination n 0 mulative imp a i ssioning.
During thefforts wLow levedisposal
T a l ecology.
: addition,
v e impact.
 
r oposed a n i ssioning o f ppi river for s listed ab o s are not pro j e , exceed t h r etrievable r eof low le vand will the r ary, the cu m Overview of F ederal Req u m issioning a c d ling, packa g k er radiatio n i c radiation p nse terminat i k er health a n i d and gase o a rdous waste d ling and re m rization an d aint. Nucl e o rity of radi o n istered by t 2 0 - Radiati o 5 0 - Decom m 5 1 - Enviro n 6 1 - Dispos a W ater Reacto r Plan a cts were as hese includ eIrretrievab l nd future f coal-fired p boating. T h o ve were a l jected to si g h e minor i m esource attr i v el radioacti v refore have n mulative imp a Re g ulatio n uirements c tivities that g ing, and sh i n protection, protection, i on and fina l n d safety, o us effluent r generation/
Texas. As statedprocess aand fuel These redestabili zThereforbounded 8.6.3.17.The enviNUREG-impact.
m oval of as b d removal o f ear Regulato r ological act i t he NRC. A o n protectio n m issioning a nmental pro t a l of radioa c r sessed by fi e surface w l e resource sforeseeabl e p ower plan t h e individua l ll determin e g nificantly a c m pact of the i butable to L ve waste. N no cumulati v a ct to site r e n s Governinare subject t ipment of ra d l site releas e releases, disposition,estos, f Polychlori n ry Commis s ivities fall u n A pplicable T i n. activities.
The numthan durincreasedeffect onbarge trasupport toperationTherefor by NURE8.6.3.18.Cumulatiimpact ofse Boiling WTermination n 0 the distanc eon noise lissioning, Sby the Vill ae, the envi r-0586 and t hIrretriironmental i m-0586 has bhe demoliti owill be mad eel radioacti vsite in Cliv e any Class Bd in NUREGare the mate rused for co nesource co mzing. e, the envir oby NUREGTraffiironmental i-0586 has bmber of ship ming the ope d traffic and n traffic flo waffic. The ethe operatin gns. e, the envir oEG-0586 an dCumuive impact i sf the action wWater Reacto rPlan e of the sta tlevels duri nSolutions ag rage of Geno aronmental i he impact is ievable Res ompact eval ubeen deter mon and struc
tection. c tive waste.
: e. Some m eve waste ha se, Utah. T hB/C waste t hG-0586, irret rrials used to nstruction mmmitments onmental i mG-0586 and t hc and Trans pimpact eval ubeen deter mments and t hration of t hwear and te w or road w existing bar gg G-3 fossil onmental i md the impac tulative Impa cs defined th ewhen added r  tion from s eng decommrees to co ma. mpact asso cconsidered "ources uation assoc imined to be tural disma netals from t hs been and his facility hhat is gener arievable res odecontami nmachinery an dare consid empact assoc ihe impact is portation uation asso cmined to be he volume o fhe facility. ar on road wear. There wge traffic on station and mpact associ t is consider ects e impact on to other pa s8-23 ensitive rec eissioning a nmply with aciated with "Small." iated with ir rgenerally a pntlement of he site are a nwill contin uhas sufficien tated will be sources that wnate the facil id for transp oered to be iated with i rconsidered ciated with tgenerally a pf waste shi pNon-radiol oways. It is a nwill be no r athe Thief Sare not asso ated with tr ed as "Smal lthe environ st, present, aeptors, ther end demolit iany noise l inoise is e vretrievable rpplicable t othe station, anticipated t oue to be shi pt space for t shipped to t hwould occur ity (e.g., ra gortation of mminor and rretrievable "Small."
8-24 rst determi n w ater and gr o s were als o e actions ts and recre a l impacts o f e d to be m i ccumulate e n individual a LACBWR d N o future a c ve effect.
transportati opplicable t opped are gre aogical impa cnticipated th aadioactive wSlough brancociated with ransportatio nl." nment which and reasona be will be l iion activiti eimitations (
e sources is p r g Decommi t o federal re g dioactive w a e , nated Biphe n ion nder Title 1 0 i tle 10 regul a n ing the res o o undwater, o evaluate d include c o ational use f the LACB W i nor. The p nvironment a activities o n d ecommissi o ctivities wi l rojected to b i ssionin g A c g ulations in c aste, n yls (PCBs)0 of the Co d ations inclu d o urces affec tair quality, d from th e onstruction, of the land W R decom m p ast, presen t al impacts t h n the affect e o ning was t h ll involve r be minor.
evaluated to resources in o LACBWRrecycling a no be release pped to the the disposal he WCS facduring the dgs, solvents, materials to aare neithe rresources i son issues in o LACBWRater during dcts of trans pat there will waste shipm ech and the MLACBWR dn is evaluat eh results fro mbly foreseea bimited temp es. Durin ge.g. quiet hbe boundesection 4.3.
ctivities an d clude: ), and Hand l d e of Fede r a d e: t ed by LAC B aquatic ec o e perspecti v operation as access t m issioning o t and futur e h at would in e d resources he use of la n radioactive w d Site Relea s l ing and re m al Regulatio n BWR ology, ve of and t o the o n the e site total, . The n d for w aste s e m oval n and La Cros s License T Revisio nPart 7 thro uPart 7 8.7.1.2.The En v Federal RPart 6Parts Part 1Part 1Parts Part 2Part 7Part 1 8.7.2.FPermits a environ m fall undeWiscWisc Envi rVillaOcc u This inf o intended 8.8.C As previ o decomm i"site-spe potential predicte d (NURE G environ m s e Boiling W Termination n 0 7 1 - Packag u gh 174 also 7 3 - Physic a U.S. E vironmental R egulations 6 1 - Asbest o 122 to 125  
R with a "S mnd asset rec od as clean sEnergySoluof this was tcility in An ddecommissi ogases, and t oand from th er detectabl es evaluated section 4.3.
-141 - Safe D 1 90 - Radia t 260 to 272  
R with a "S mdecommissi oportation in be no signi fents execut eMississippi Rdecommissi oed to be bo um the incre mble future ac torary g the hours) ed by 18 of mall" overy scrap. utions te. In drews, oning ools), e site. e nor to be 17 of mall" oning clude ficant ed via River oning unded mental tions.
-2 80 - Unde r 761 - Toxic 1 29-132 - C F ederal, Sta t a nd approva l m ental prote cr Federal, S t onsin Depa r onsin Dep a ronmental a n ge of Geno a u pational Sa f o rmation pr o to be all-in c C onclusion ously evalu a i ssioning L A cific" in N Uenvironme n d in and wi l G-0191, NU R m ental chan g W ater Reacto r Plan ing and tra napply). al Protectio n Environmen tProtection Aapply as fol l os Handling  
La CrossLicense TRevisionThe cumdecommiterrestri acumulativPast, prdecommiMississipresourcesactivitie sover timmajor irrdisposal
- National P D rinking W a t ion Protect i- Resource C r ground Sto r Substance C C lean Water A t e and Loc a ls from or n o c tion purpo s t ate and loc a rtment of N a artment of n d Occupati o a f ety and He a o vided abo v clusive. a te d in the D A CBWR are U REG-0586 ntal impacts l l be bound e R EG-0586, a ges associat e r n sportation o n of Plants a n tal Protectio A gency (E P l ows:  and Remov a Pollutant Di s ater Standar d i on Standar d C onservatio rage Tanks C ontrol Act (A ct a l Require m otifications t s es. Decom m al jurisdictio n a tural Resou r Health S e onal Health, a lth Admini s ve is a gen e D-Plan/PSD A temporary a have been associated w e d by the p a nd D-Plan/
 
P e d with deco m 8-25 f radioactiv e n d Materials n Agency P A) regulati o a l s charge Eli m d s d s for Nucle a n and Reco v (TSCA) for ments t o state and l m issioning a n include, b u r ces (WDN R ervices, Di v Radiation P s tration (OS H eral overvie w AR, the non-a nd not sign i evaluated a with decom m r eviously is P SDAR). T mmissionin g e waste (reg. ons outline d m ination Sys t a r Power O p v ery Act (R C Polychlorin a l ocal agenci activities a n ut are not li m R) v ision of Protection S e H A) w of the a pradiologica lificant. Th e a nd there is m issioning L ssued envir o Therefore, t h g. g ulations in 4 d in Title 4 0 tem (NPDE S perations CRA) ated Biphe n es are requi r n d related si t m ited to the Public He a ection pplicable re g l environme n e potential is no signific a LACBWR h onmental i m h ere are no n 49 CFR Par t 0 of the Co d S) n yls (PCBs) r ed for safet y t e operation sfollowing:
disposal In summ8.7.O8.7.1.FDecommHandWorkPubliLicenWorkLiquiHazaHandCharacteof lead p 8.7.1.1.The majoare adminPart 2Part 5Part 5Part 6se Boiling WTermination n 0 mulative imp aissioning.
a lth, Bure a g ulations an d ntal impacts sues identif i ant impact.
Tal ecology.
h ave already m pact assess m new or signi f t s 171 d e of y and s that au of d not from ied as  The been m ents ficant La Cros s License T Revisio n 8.9.R 1. U C 2 2. D R 3. D S 4. U r e C 5. U S N 6. D D 7. E S 8. E S 9. A 10. H 3 11. U h t 12. D 13. U 14. U h t15. h t s e Boiling W Termination n 0 R eferences U.S. Nuclear C ontent of L i 011. D airylan d Po R eactor - Se p Dairyland Poupplement R U.S. Nuclear elated to Op e C ooperative
ve impact.
-U.S. Nuclear tatement (G November 2 0 Dairyland Po Decommissi o E nergySoluti urvey Repo r E nergySoluti urvey Repo r Atomic Pow e H aley & Ald r 0, 2012.
roposed anissioning o f ppi river for s listed ab os are not pro je, exceed t hretrievable r eof low le vand will the rary, the cu mOverview of Federal Req umissioning a cdling, packa gker radiatio nic radiation pnse terminat iker health a nid and gase oardous waste dling and re mrization an daint. Nucleority of radi onistered by t20 - Radiati o50 - Decom m51 - Enviro n61 - Dispos aWater Reacto rPlan acts were as hese includ eIrretrievab lnd future fcoal-fired pboating. T hove were a ljected to si ghe minor i mesource attr ivel radioacti vrefore have nmulative imp aRegulationuirements ctivities that ging, and sh in protection, protection, ion and fina lnd safety, ous effluent r generation/
U.S. Census B t tps://www.
moval of as bd removal o fear Regulato rological act ithe NRC.
c Dairyland Po U.S. Fish &
Aon protectio nmissioning anmental pro tal of radioa cr sessed by fi e surface wle resource sforeseeabl epower plan the individua lll determin egnificantly a cmpact of the ibutable to Lve waste.
W U.S. Army C t tp://www.m t tp://www.c i W ater Reacto r Plan Regulatory i cense Term iwer Compa n ptember 197 2 wer Cooper a R eport - Ju nRegulatory e ration of t h- April 1980Regulatory EIS) on De c 0 02. wer Cooper a o ning Activi t ons GG-EO-rt for Octob e ons LC-RS-r t for June t h e r Review, "
Nno cumulati vact to site r ens Governinare subject tipment of ra dl site releas ereleases, disposition,estos, f Polychlori nry Commissivities fall u nApplicable T in. activities.
A r ich, Hydro g B ureau, 200 c ensus.gov/
tection. ctive waste.
p wer Cooper a Wildlife Ser vorps of Eng i m vp.usace.a r ity-data.co m r Commissio n i nation Plan n y, DPC-E D 2. a tive, Envir o n e 15, 1973. Commissio n he La Crosse . Commissio n commission i a tive, LAC B ties Report  
8-24 rst determi nwater and gr os were als oe actions ts and recre al impacts o fed to be m iccumulate e nindividual aLACBWR dNo future a cve effect.
(-313196-R S e r and Nove m PN-164017-h ru August 2 Atomic Jou r geological C 8-2012 Am e programs-s u ative - http:
esources is p rg Decommito federal re gdioactive w ae, nated Biphe nion nder Title 1 0itle 10 regul aning the res ooundwater, o evaluate dinclude c oational use f the LACB Winor. The pnvironment aactivities o ndecommissi octivities wi lrojected to bissioning Acgulations in caste, nyls (PCBs
)0 of the Co dations inclu dources affec tair quality, d from theonstruction, of the land WR decommpast, presen tal impacts t hn the affect eoning was t hll involve rbe minor.
ctivities an dclude: ), and Hand lde of Fede rade: ted by LAC Baquatic ec oe perspecti voperation as access tmissioning ot and futur ehat would in ed resources he use of la nradioactive wd Site Relea sling and re mal Regulatio nBWR ology, ve of and to the on the e site total, . The nd for waste se moval n and La CrossLicense TRevisionPart 7throuPart 78.7.1.2.The EnvFederal RPart 6Parts Part 1Part 1Parts Part 2Part 7Part 18.7.2.FPermits aenvironmfall undeWiscWiscEnvirVillaOccuThis infointended 8.8.CAs previodecommi"site-spe potential predicted(NUREGenvironmse Boiling WTermination n 0 71 - Packag ugh 174 also 73 - Physic aU.S. Evironmental Regulations 61 - Asbest o122 to 125  
-141 - Safe D190 - Radia t260 to 272  
-280 - Unde r761 - Toxic 129-132 -
CFederal, Sta tand approva lmental prote cr Federal, S tonsin Depa ronsin Dep aronmental a nge of Geno aupational Sa formation pr oto be all-in cConclusion ously evalu aissioning L Acific" in N Uenvironme nd in and wi lG-0191, NU Rmental chan gWater Reacto rPlan ing and tra napply). al Protectio nEnvironmen tProtection Aapply as fol los Handling  
- National PDrinking W ation Protect i- Resource Crground Sto rSubstance CClean Water Ate and Loc als from or n oction purpo state and loc artment of N aartment of nd Occupati oa fety and He aovided abo vclusive. ated in the DACBWR are UREG-0586ntal impacts ll be bound eREG-0586, ages associat er nsportation o n of Plants a ntal Protectio Agency (EPlows:  and Remov aPollutant Di sater Standar dion Standar dConservatio rage Tanks Control Act (Act al Require motifications tses. Decom mal jurisdictio natural Resou rHealth Seonal Health, alth Admini sve is a gen eD-Plan/PSD Atemporary a have been associated wed by the p and D-Plan/
Ped with deco m8-25 f radioactiv end Materials n Agency PA) regulati oal scharge Eli mds ds for Nucle an and Reco v(TSCA) for ments to state and lmissioning an include, b urces (WDNRervices, Di v Radiation Pstration (OS Heral overvie wAR, the non-and not sign ievaluated awith decom mreviously is PSDAR). Tmmissionin ge waste (reg
. ons outline dmination Sys tar Power O pvery Act (R CPolychlorin alocal agenci activities a nut are not li mR) vision of Protection S eHA) w of the a pradiologica lificant. Th eand there is missioning Lssued envir oTherefore, t hg. gulations in 4d in Title 4 0tem (NPDESperations CRA) ated Biphe nes are requi rnd related si tmited to the Public He aection pplicable re gl environme ne potential is no signific aLACBWR honmental i mhere are no n49 CFR Par t0 of the Co dS) nyls (PCBs) red for safet yte operation sfollowing:
alth, Bure agulations an dntal impacts sues identif iant impact.
have already mpact assess mnew or signi fts 171 de of y and s that au of d not from ied as  The been ments ficant La CrossLicense TRevision8.9.R1. UC22. DR3. DS4. UreC5. USN6. DD7. ES8. ES9. A10. H311. Uht12. D13. U14. Uht15. htse Boiling WTermination n 0 References U.S. Nuclear Content of L i011. Dairyland PoReactor - Se pDairyland Poupplement RU.S. Nuclear elated to Op eCooperative
-U.S. Nuclear tatement (G November 2 0Dairyland Po Decommissi oEnergySoluti urvey Repo rEnergySoluti urvey Repo rAtomic Pow eHaley & Ald r0, 2012.
U.S. Census Bttps://www.
cDairyland Po U.S. Fish &
WU.S. Army C ttp://www.
mttp://www.c iWater Reacto rPlan Regulatory icense Term iwer Compa nptember 197 2wer Cooper aReport - Ju nRegulatory eration of t h- April 1980Regulatory EIS) on De c002. wer Cooper aoning Activi tons GG-EO
-rt for Octob eons LC-RS-rt for June t her Review, "
Arich, Hydro gBureau, 200 census.gov/
pwer Cooper aWildlife Ser vorps of Eng imvp.usace.a rity-data.co mr Commissio nination Plan ny, DPC-ED2. ative, Envir one 15, 1973. Commissio nhe La Crosse  
. Commissio ncommission iative, LAC Bties Report  
(-313196-RSer and Nove mPN-164017
-hru August 2Atomic Jou rgeological C 8-2012 Am eprograms-s uative - http:
/vice - http://
/vice - http://
ineers - rmy.mil/Mis sm/city/Geno a8-26 n Regulator ys for Nucle aD-3, Environ onmental R en NUREG-0Boiling W an NUREG-0ing of Nucle BWR Decom(D-Plan/PS DS-RP-001, L Amber 2014 F-001, LACB2015 Field Wrnal" - Sept eonceptual S ierican Com murveys/acs/n e//www.dair ywww.fws.gosions/Navig aa-Wisconsin
i neers - rmy.mil/Mis s m/city/Geno a 8-26 n Regulator y s for Nucle a D-3, Environ onmental R e n NUREG-0 Boiling W a n NUREG-0 i ng of Nucle B WR Deco m (D-Plan/PS D S-RP-001, L A m ber 2014 F-001, LAC B 2 015 Field W r nal" - Sept e onceptual S i erican Com m u rveys/acs/n e//www.dair y www.fws.g o s ions/Navig a a-Wisconsin
.y Guide 1.1 7ar Power Re anmental Rep oeport, La Cr o0191, Final Eater Reactor 0586, Gener iear Facilities mmissioning DAR), Revi sACBWR RaField Work  
.y Guide 1.1 7 a r Power Re a nmental Rep o e port, La Cr o 0 191, Final E ater Reactor 0 586, Gener i ear Facilities mmissioning D AR), Revi s A CBWR R a Field Work  
-BWR Radiol oWork - Nov eember 24, 2 0ite Model, Fmunity Surv eews/data-rel eynet.com/en eov/refuge/U pation/Locks D.html. 79, Standar dactors, Revi sort - Lacros sosse Boilin gEnvironmen tby Dairyla nic Environ m, Suppleme nPlan and P osion - Marc hadiological C- Novemberogical Char aember 2015.
-B WR Radiol o W ork - Nov e e mber 24, 2 0 ite Model, F m unity Surv e e ws/data-rel e ynet.com/en e o v/refuge/U pation/Locks D.html. 7 9, Standar d actors, Revi s ort - Lacros s o sse Boilin g Environmen t by Dairyla n i c Environ m, Suppleme n Plan and P o s ion - Marc h a diological C- Novembe r o gical Char a ember 2015.
011. File No. 387 0ey. (5-year deases.2012.
0 11. F ile No. 387 0 ey. (5-year d e ases.2012.
hergy_resour cpper_Missi sDams/LockDd Format an dsion 1 - Jun ese Boiling Wg Water Rea ctal Stateme nnd Power mental Impac tnt 1, Volum eost Shutdow nh 2014. Characteriza tr 2015. acterization 05-001 - A udata sets) -
h e rgy_resour c p per_Missi s Dams/Lock D d Format an d s ion 1 - Jun e s e Boiling W g Water Rea c tal Stateme n n d Power mental Impac t n t 1, Volum e o st Shutdow n h 2014. C haracteriza t r 2015. a cterization 0 5-001 - A u d ata sets) -
html. ces/genoa.p hssippi_River
h tml. c es/genoa.p h s sippi_River
/Dam8.aspx.
/Dam8.aspx.
d e Water ctor, nt t e 1 - n tion ugust hp.  /.
d e W ater c tor, n t t e 1 - n t ion u gust h p.  /.
La CrossLicense TRevision16. DPW17. DD18. V19. MCD20. W- 21. UCht22. WS23. Dht24. Wht25. HL26. Vre27. U28. N29. W30. NS31. D232. Wse Boiling WTermination n 0 Dame & Moootential, La Wisconsin fo Dairyland Po Decommissi oVernon Cou nMcInterny, MCooperative' sDecember 1 9Wisconsin D ehttp://dnr.w U.S. Fish an dCandidate S pttp://www.f wWisconsin D epecies Habi tDairyland Po ttp://www.
La Cros s License T Revisio n 16. D P W 17. D D 18. V 19. M C D 20. W- 21. U C h t 22. W S 23. D h t 24. W h t 25. H L 26. V r e 27. U 28. N 29. W 30. N S 31. D 2 32. W s e Boiling W Termination n 0 Dame & Mo o otential, La W isconsin fo Dairyland Po Decommissi o V ernon Cou n M cInterny, M C ooperative' s December 1 9 W isconsin D ehttp://dnr.w U.S. Fish an d C andidate S p t tp://www.f w W isconsin D epecies Habi t Dairyland Po t tp://www.d W isconsin D e ttp://dnr.wi.
dWisconsin D ettp://dnr.wi.
g H ubbuch, C h L a Crosse Tr i Village of G e ecords.com/
gHubbuch, C hLa Crosse Tr iVillage of G eecords.com/
w U.S. Census B National Par k W isconsin H i National Par k ite Ve-502  
wU.S. Census BNational Par kWisconsin H iNational Par kite Ve-502  
-Dairyland Po 009. W isconsin H i W ater Reacto r Plan o re, Geotec h Crosse Boil r Gulf Unit e wer Cooper a o ning Plan, r n ty, Land &
-Dairyland Po 009. Wisconsin H iWater Reacto rPlan ore, Geotec hCrosse Boil r Gulf Unit ewer Cooper aoning Plan, rnty, Land &
W M ichael. C., I s Genoa Sit e 9 80. epartment o f i.gov/lakes/
WMichael. C.,
i d Wildlife S e pecies' Cou n ws.gov/mid w epartment o f tat Program wer Cooper a dairynet.com
Is Genoa Sit e980. epartment o fi.gov/lakes/
/epartment o f g ov/eek/crit t h ris, A nucle a i bune - Jul y e noa, Verno n wisconsin/g e B ureau, Ver n k Service, N a istorical So c k Service, N a- http://nrhp.
id Wildlife S epecies' Cou nws.gov/mid wepartment o ftat Program wer Cooper adairynet.com
wer Cooper a istorical So c r h nical Invest iing Water R e d Nuclear F a tive, LaCr o r evised Nov e W ater Reso u Impingeme n e , Thesis, su b f Natural R e i nvasives.
/epartment o fgov/eek/crit thris, A nucle aibune - Jul yenoa, Verno nwisconsin/g eBureau, Ver nk Service, N aistorical So ck Service, N a- http://nrhp.
ervice, Fede r n ty Distribut i w est/endang f Agricultur e- http://datc p a tive, Pereg r/environme n f Natural R e ter/bird/falc o a r option: A y 15, 2012.
wer Cooper aistorical So cr hnical Invest iing Water Red Nuclear Fative, LaCr orevised Nov eWater Reso uImpingemene, Thesis, su bf Natural R einvasives.
n County, W e noa_data.h t n on County , ational Regi c iety - http:/
ervice, Fede rnty Distribut iwest/endang f Agricultur e- http://datc pative, Pereg r/environme nf Natural R eter/bird/falc oar option: A y 15, 2012.
/ational Regi focus.nps.g o a tive, Powe r ciety, Nucle a 8-27 i gation of G Reactor (LA C F uels Corpo r osse Boiling ember 2003.
n County, Wenoa_data.h tnon County
urce Manag e nt and Entrai bmitted to U esources, Aq u rally-Listed i on, April 2 0ered/lists/w i e , Trade &
,ational Regi ciety - http:/
C p.wi.gov/Fa rine Falcon R ntal/falcon_
/ational Regi focus.nps.g oative, Powe rciety, Nucle a8-27 igation of GReactor (LA CFuels Corpo rosse Boiling ember 2003.
p e sources, Pe r on.htm. f ter 25 year s W I Public Re c t m.  , Wisconsin ster of Hist o/www.wisco stry of Hist o o v/natregse a r for Genera t ar Fuel Asse m G eology, Sei s CBWR) nea r r ation - Oct oWater Rea c. ement Plan  
urce Manag ent and Entrai bmitted to Uesources, Aq urally-Listed ion, April 2 0ered/lists/w ie, Trade &
-inment of Fi U niversity o f q uatic Invasi vThreatened, 0 15 - i sc-city.htm l Consumer P r arms/Endan g Restoration program.ph p regrine Falc o s , Genoa re a c ords - http:- http://ww w o ric Places -
Cp.wi.gov/Fa rine Falcon Rntal/falcon_
o nsinhistory.
pesources, Pe ron.htm. fter 25 year sWI Public Re ctm.  , Wisconsin ster of Hist o/www.wisco stry of Hist oov/natregse ar for Genera tar Fuel Asse mGeology, Sei sCBWR) nearration - Oct oWater Rea
o ric Places, G a rchresult.d o t ions, Geno a m bly - http:
: c. ement Plan  
/s mology an d r Genoa, Ve r o ber 1973.
-inment of Fi University o fquatic Invasi vThreatened, 015 - isc-city.htm lConsumer P rarms/Endan gRestoration program.ph pregrine Falc os, Genoa re acords - http:- http://ww woric Places -
c tor (LACB W- February 2 shes at Dair y f Wisconsin
onsinhistory.
-v e Species  
oric Places, Garchresult.d otions, Geno ambly - http:
-, Endangere d l. r otection, E n gered_Speci eProgram -  
/smology an dr Genoa, Ve rober 1973.
: p. o n - a ctor's wast e//www.ope n w.census.go v http://ww.n p org/. G oose Islan d o. a Site Upda t//www.wisc d Liquefacti o r non Count y W R) 2 009. y land Powe r-La Crosse  
ctor (LACB W- February 2shes at Dair yf Wisconsin
-- Vernon C o d, Proposed n dangered e s/index.asp x e gets new h o n-public-v/. p s.gov/nr/.
-ve Species  
d Archeolo g te - Decemb onsinhistor y o n y , r - o unty and x. ome, g ical er y.org.
-, Endangere dl. rotection, E ngered_Speci eProgram -  
La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan Fi g r ure 8-1 S 8-28 S ite Re g ion a a l Location
: p. on - actor's wast e//www.ope nw.census.go vhttp://ww.n porg/. Goose Islan do. a Site Upda t//www.wisc d Liquefacti ornon Count yWR) 2009. yland Powe r-La Crosse  
-- Vernon C od, Proposed ndangered es/index.asp xe gets new h on-public-v/. ps.gov/nr/.
d Archeolo gte - Decemb onsinhistor yon y, r - ounty and x. ome, gical er y.org.
La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan Figr ure 8-1 S8-28 Site Regionaal Location
 
La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan r  Figure 8-28-29 2 Site Ovverview LLR La Crosse Boili nLicense Termin Revision 0 ng Water Reac tation Plan or  Figure 8-3 8-30 LACBWR Buuildings La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan Fir  igure 8-48-31 Topographhical Map


LLRLa Crosse Boili nLicense Termin Revision 0 ng Water Reac tation Plan or Figure 8-55 Groundwa t8-32 ter Samplin g WWells - LACB WWR Site}}
La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan r  Figure 8-2 8-29 2 Site O v v erview L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r Figure 8-3 8-30 LACBWR B u u ildin g s La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan F i r  ig ure 8-4 8-31 Topo g rap h hical Map L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r  Figure 8-5 5 Groundwa t 8-32 t er Samplin g W Wells - LACB W WR Site}}

Revision as of 06:47, 8 July 2018

La Crosse Boiling Water Reactor License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0
ML16200A091
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 06/27/2016
From:
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML16200A091 (37)


Text

LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT

La Cros s License T Revisio n 8.Sup 8.1.8.1.8.1.8.2.8.2.8.3.8.4.8.5.8.5.8 8

8 8.5.

8.5.8 8

8 8.5.4 8.6.8.6.

8.6.8 8

8 8

8 8.6.8 8

8 8

8 8

8 8

8 8

8 8

8 8

8 s e Boiling W Termination n 0 plement to t Introductio n 1.Purpos 2.Backg rSite Locati o 1.Site D eRemaining Impacts to t La Crosse B 1.Geogr a.5.1.1.Sit e.5.1.2.Po p.5.1.3.Sit e 2.Climat e 3.Topog r.5.3.1.To p.5.3.2.Ge o.5.3.3.Sei 4.Hydro lEnvironme n 1.Summ a 2.Radiol o.6.2.1.Oc c.6.2.2.Of f.6.2.3.En v.6.2.4.St o.6.2.5.Ra d 3.Non-r a.6.3.1.On s.6.3.2.Of f.6.3.3.W a.6.3.4.W a.6.3.5.Ai r.6.3.6.Aq u.6.3.7.Te r.6.3.8.Th r.6.3.9.Oc c.6.3.10.C o.6.3.11.S o.6.3.12.E n.6.3.13.C u.6.3.14.A e.6.3.15.N o W ater Reacto r Plan t he Environ m n .................

e .................

r oun d ..........

o n and Desc r e scription A fDismantle m t he Post-Sh u Boiling Wat e a phy and De m e Location a n p ulation ......

e Access, L a e .................

r aphy, Geol o p ography ....

o logy ..........smology .....

l ogy and Hy d ntal Effects o ary ..............

ogical Effec t c upational R f site Radiati o vironmental rage and Di s diological C r a diological E site Land U s fsite Land U ater Use .......

ater Quality .

r Quality .....

uatic Ecolo g rrestrial Eco l reatened or E c upational I s o st...............

ocioeconom i nvironment a ultural, Hist o e sthetics .....

o ise.............

r TABLE O mental Repo r...................

....................

....................

.r iption ........

.f ter Unrestri m ent and De c u tdown Dec o e r Reactor E m ography ..

.n d Descript i...................

.a nd and Wat

...................

.o gy and Sei s...................

....................

....................

.d rogeology

.o f Decomm i...................

.t s of Deco m R adiation Ex p o n Exposur eEffects of A s posal of L o riteria for L i Effects of D e s e ................

.se (in the V i...................

....................

....................

.g y................

.l ogy ............

.E ndangered ssues/Safet y...................

.ic Impacts ...

.al Justice .....

.o ric, and Ar c...................

....................

.8-i OF CONT E r t ................

....................

....................

....................

....................

.cted Releas e commission i o mmissioni nnvironment

...................

.i on ..............

....................

.er Use ........

....................

.smology......

....................

....................

....................

....................

.issioning ....

....................

.mmissioning

.p osure ........

.e and Monit o A ccidents an d o w-Level R a i cense Term e commissio n...................

.i cinity) .......

....................

....................

....................

....................

....................

.Species ......

.y ..................

....................

....................

....................

.c heological R...................

....................

.E NTS ...................

....................

....................

....................

....................

.e .................

.i ng Activiti e n g Activities Descriptio n...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.o ring ...........

.d Decommi s a dioactive W m ination .......

.n ing ............

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.R esources ..

....................

....................

....................

....................

....................

....................

....................

....................

.e s ................

. Report (PS D n ..................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.s sioning Ev e W aste ...........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.DAR) .........

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.e nts ............

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.... 8-1... 8-1... 8-1... 8-1... 8-2... 8-3... 8-5... 8-5... 8-6... 8-6... 8-6... 8-6... 8-6... 8-7... 8-7... 8-7... 8-8... 8-8... 8-8... 8-9... 8-9. 8-10. 8-10. 8-12. 8-12. 8-13. 8-14. 8-14. 8-14. 8-14. 8-15. 8-16. 8-17. 8-17. 8-18. 8-19. 8-20. 8-20. 8-20. 8-21. 8-21. 8-22. 8-22 La Cros s License T Revisio n 8 8 8 8.7.8.7.8 8 8.7.8.8.8.9. Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8- s e Boiling W Termination n 0 .6.3.16.Ir r.6.3.17.T r.6.3.18.C u Overview o 1.Federa l.7.1.1.Nu c.7.1.2.U.S 2.Federa l Conclusion References 1Summ a Nucle a-1Site R e-2Site O v-3LACB W-4Topog r-5Groun d W ater Reacto r Plan retrievable R r affic and T r umulative I m o f Regulatio n l Requirem e clear Regul a S. Environm e l, State and L...................

...................

a ry of the E n ar Power Fa c e gional Loc a v erview .......

W R Buildin g r aphical Ma p d water Sam p r R esources ....

.r ansportatio n m pacts .........

.ns Governin g e nts .............

.atory Comm ental Protec t L ocal Requi

...................

....................

.LIST nvironment a c ilities ........

.LIST O a tion ............

....................

.g s ...............

.p .................

.p ling Wells ii ...................

.n .................

....................

.g Decommi s...................

.ission .........

.t ion Agenc yrements .....

....................

....................

.OF TABL E al Impacts fr o...................

.O F FIGUR E...................

....................

....................

....................

.- LACBW R...................

....................

....................

.s sioning Ac t...................

....................

.y ..................

....................

....................

....................

.E S om Decom m...................

.RES ...................

....................

....................

....................

.R Site ..........

....................

....................

....................

.tivities and S...................

....................

....................

....................

....................

....................

.m issioning

...................

....................

....................

....................

....................

....................

....................

....................

....................

.Site Release

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.. 8-23. 8-23. 8-238-24. 8-24. 8-24. 8-25. 8-25. 8-25. 8-26. 8-11. 8-28. 8-29. 8-30. 8-31. 8-32 La Cros s License T Revisio nACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/ PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACB W LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP s e Boiling W Termination n 0 AmerAtom Abov e As L o Belo w Best M Boili n Depa r Depa r Deco m Envir o Envir o Fuel E Final Geno a Geno a Gene r Geog r Indep WR La C r LAC B Licen Mega w Mega w Natio n Nucl e Off-S Occu p Polyc h Post-S Radi a W ater Reacto r Plan LIST OF i can Comm u i c Energy C e Mean Sea o w As Reas o w Ground S u Managemen t ng Water Re rtment of E n rtment of Tr a mmissionin g onmental P r onmental R e Element Sto r Radiation S u a No. 1 Stat i a No. 3 Fos s ric Environ m r aphic Man a endent Spe n r osse Boilin g B WR Site E nse Terminat i w atts Electr i w atts Ther m nal Pollutan t ear Regulato r i te Dose Ca l pational Saf e hlorinated B S hutdown D ation Work P r ACRONY M u nity Surve yommission Level o nably Achi e u rface t Practices acto r n ergy a nsportatio n g Plan/Post S rotection Ag e e port rage Well urvey i on sil Station mental Impa c agement Un i n t Fuel Stor a g Water Rea c n closure i on Plan i c m al t Discharge ry Commis s l culation M a e ty and Hea l B iphenyl ecommissio Permit 8-iii M S AND A B y e vable n S hutdown A e ncy ct Statemen t i t age Installati o c to r Elimination ion a nual l th Adminis t ning Activi t B BREVIA Tctivities Re p t on System tration ties Report TIONS p ort La Cros s License T Revisio n RCRA REMP RPV SAFST O SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES s e Boiling W Termination n 0 Reso u Radi o React O R SAFe Struc t Total Toxi c Unite d Unite d Verti c Wast eWisc oWisc o W ater Reacto r Plan u rce Conser v o logical Env i or Pressure V STORage tures, Syste m Effective D o Substance C d States Ar m d States En v cal Concrete e Control S p o nsin Depar t o nsin Pollut a r v ation and R ironmental M V essel ms and Com p o se Equival e C ontrol Act m y Corps of vironmental P Cask ecialists tment of Na t a nt Dischar g 8-iv R ecovery Ac t M onitoring P p onents e nt Engineers P rotection A t ural Resou r g e Eliminati o t P rogra m A gency rces o n System La Cros s License T Revisio n 8.S 8.1.I n In acco r R egulat o Nuclear describi n specific d Reactor (8.1.1.P This ch a R eport, L describi n specific Termina t detailed d b etween activitie s The sup ppredicte d Environ m (NURE G(GEIS) o LACBW R Plan/PS D to be p eactivitie s 8.1.2.B LACB W Water R U.S. At o 1973, th e April 30 , electrica l Charact eLimited disposal consisti n(FESW)

Septemb s e Boiling W Termination n 0 S uppleme n n troductio n rdance wit h ory Guide 1.

Power Rea c n g any new decommissi o (LACBWR)P urpose a pter supple m L a Crosse B n g any new decommis s t ion Plan (L description othose acti v s. plement dis c d by the U n mental Stat e G-0191) (4);

o n Decom m R Decommi s D AR) (6).

T erformed fr o s. B ack g round W R consists eactor (BW R omic Energ y e reactor an d , 1987, whe n l output.

T rization Sur vdismantle m of the Rea c n g of 333 s p to dry cask e r 19, 2012.

W ater Reacto r Plan n t to the E n h the requi 179, Stand a ctors (1), t hinformatio n o ning and s isite. m ents the 1 B oiling Wate rinformatio n s ioning an d L TP). This of the remai vities and t h c usses whet h n ited States ement relate d NUREG-0 5 m issioning o f ssioning Pl a T his chapter om time of of a single R) construc t Commissi o d its fuel w e n it was sh u T he plant w v ey for SA F m ent activiti e c tor Pressu r p ent fuel as sstorage at t h On Marc h r E nvironm erements o f a rd Format his chapter p n or signifi c ite closure a 1 972 Dairyl a r Reactor (E n or signific a d license tsupplement

, ning decom m h e environ m h er the acti vNuclear R e d to operat i 5 86, Supple f Nuclear F a n and Pos t discusses d esubmittal o Allis-Chal m t ed in 1967 o n (AEC).

T e re transferr e u t down b ec w as placed i FSTOR was c es were st a r e Vessel (R s emblies, w a he on-site In d h 12, 2014, D 8-1 e ntal Rep o f 10 CFR 5 0 and Cont e p rovides a s c ant environ m activities pe r a nd Power E R) (2), wh i a nt environ m termination

, including r missioning a m ent, and th e v ities and t h e gulatory C o i on of La Cment 1, "G e Facilities", N t-Shutdown e commissio n f this LTP m ers design eas a demo n T he plant w a ed to Dairy l ause of eco n i n SAFST O c ompleted i n arted in 19 9 R PV) in M a a s transferr e d ependent S D airylan d s u o rt 0.82 (a)(9)(i i e nts for Lic supplement m ental cha n rformed at t Cooperativ e i ch was revi m ental chan activities r eference t o a nd site clo s e likely en v heir impacts ommission (C ross Boilin g e neric Envi r Novembe r 2 Decommiss i ning activit i until the c o ed 50 mega w n stration re a as commiss i l an d. It wa snomic reas o OR on Aug u n October 1 9 94, includi n ay 2007. A ed from the pent Fuel S t ubmitted a r i)(A) and tense Termi nto the env i n ge associa t t he La Cros s e (Dairylan d sed on June n ges associa t presented i o LTP Chap sure activiti e vironmental are bounde (NRC) NU R g Water Re a r onmental I 2 002 (5); a n ioning Acti v i es, with a f o ompletion o w att electri c a ctor in con j i oned in No v s operated b y o ns due to i t u st 7, 1991.

9 95. ng the rem oll of the s p Fuel Elem e t orage Insta l evision of t h t he guidan c nation Pla n i ronmental r t ed with the s e Boiling W d) Environ m 15, 1973 (3 t ed with th ein this Li c p ter 3, provi es, the inter aimpact of d by the i m R EG-0191, F actor, Apri l I mpact Stat e n d the Dair y vities Repo r o cus on acti vf site resto r c (MWe) B o j unction wi t v embe r 196 9 y Dairylan d t s small siz e An initia l o val and o f pent nuclear e nt Storage llation (ISF S h e LACB W ce of ns for report site-W ater m enta l 3), by e site-c ense des a action those mpacts F inal 1980 e ment yland r t (D-vities ration oiling t h the 9. In d until e an d l Site ff-site fuel, Well S I) by W R D-La Cros s License T Revisio n Plan/PS D characte r concludi n Energy S o Survey R Charact e As state d was doc u 1987. L A environ m support o LACB W noted in 1,155 M W known a LACB W the gen e decomm i located i that this

Elk Riv elicense t e The late s"The en dismantl e specific a this Sup p potential Offs iAqu aTerr eThre aSoci oEnvi r 8.2.S LACB W Mississi p south of site loca t coordina t s e Boiling W Termination n 0 DAR to the N rization wa s n g on Aug u o lutions is d Report for O e rization Su r d in the D-P l umented in ACBWR d e mental impa o f the Augu s W R, dated A pthe ER an d We WNP-2 as Columbi a WR is a muc h e ric environ m i ssioning i m n Elk Rive rdecommiss i e r facility w a e rmination i n st D-Plan/P S vironmenta l ement activ i ally evaluate plement as aenvironme n te land use a a tic ecology estrial ecolo g a tened and e oeconomic ronmental j u ite Locatio n W R is locate d ppi River, a bthe city of L tion, includi n t es for LA C W ater Reacto r Plan N RC that a c s performe d ust 6, 2015.

documented i O ctober an d rvey Report f l an/PSDAR ,a suppleme n e commissio n ct not pre v s t 7, 1991, D pril 21, 198 0 d NUREG-0 BWR ope r a Generati n h smaller re a mental ass e m pact of a s m r , Minnesot a i oning was c a s another A n 1974 (9).

S DAR docu m l impact o f i ties is SM A d in the GE a basis for m ntal impacts activities as to activit i g y as to acti v e ndangered s u stice" n and Desc r d in south w bout 1 mile L a Crosse, W n g nearby p C BWR are l r ccounts for t d by Ener g The result s i n two sepa r d November f or June thr u , "Review o f n t to the E n n ing and dis m viously eval u Decommissi o 0." This rev 0 586. The r ated by W a n g Station, actor compa r essment. N mall 58.2 m e a , which wa s c ompleted s a Allis-Chalm e m ent (issued fall compl e A LL as deter m IS. As stat e m eeting the r enot determi n i es beyond t h v ities beyon d s pecies ription western Wis c south of th e W I. The Si trominent fe a l ongitude 9 8-2 the completi g y Solutions s of the sit e r ate reports, L 2014 Fiel d u August 20 1 f post-opera t nvironmenta l mantlement uated in th e o ning Order iew include d reference B a shington P u owned and red to WNP-N UREG-058 6 e gawatt the r s dismantle d afely with l i ers reactor, ain March 2 0 e ted or pla n m ined by t h ed in the G E equirement s n ed in the G h e operatio n d the operat i c onsin, in V e Village o f te Regional atures such 1 o , 13', 53.

3 i on of the s pcommenci n e characteri z L ACBWR R d Work (7)15 Field W o a ting license l Report fo r activities h a e NRC's E n or NURE G d the evalu a BWR facili t u blic Powe r operated b-2, its impa c 6 also pro v rmal (MWt) d between 1 i ttle risk to w a superheate 0 14) conclu d nned LAC B h e GEIS. L A E IS, license e s in 10 CFR G EIS are: nal are a i onal area V ernon Cou n fGenoa, WI Location gr as highway s35" West a p ent fuel tra n ng on Oct o zation surv e adiological and LACB W o rk (8). stage envir o r LACBWR a ve resulted nvironment a G-0191 relat e ation of imp a t y in NUR E r Supply S y b y Energy N cts fall withi n vided infor mBWR dem o 971 and 19 7 w orkers an d d test BW R ded the foll o B WR deco m A CBWR de c es can rely o50.83(a)(6)

(n ty, on the e and appro x aphic (Figu r s , rivers an d a nd latitude n sfe r. Addi t o be r 9, 201 4 e ys perform e Characteri z W R Radiol o onmental i m dated Dec e in no signi f a l Assessm e e d to operat i a cts against EG-0586 w a ystem (plan t N orthwest).

n the envel o mation abo u o nstration r e 74. It was n d the public.

R , which ach o wing: mmissionin g commission i on informat i (ii). Site-sp e east shore o ximately 19 m re 8-1) sho w d lakes. Th e 43 o, 33', 3 tional 4 and ed by z ation o gical m pacts ember f icant e nt in i on of those a s the t now As o pe of u t the e actor n oted The ieved g and ing is i on in e cific of the miles ws the e map 6.22" La Cros s License T Revisio n North. T The Rea cthe carg o 639 feet Mississi pfilled wi tThe lice n LACB Wthe plant the l aform ethe l a gene r the Lthe l athe p a The Site The site i Mississi p Corps o f The site Highwa y Highwa ycurrentl y Mississi p2.4 mile s mussels, 0.75 mil e 8.2.1.S This se c decomm i defined a piping a n 10 CFR 2 The dec o b uilding s structure be remo v and flo o structure s e Boiling W Termination n 0 The site is a ctor Buildin g o-carrying-o n Above M e ppi River.

T th sand mat e n sed site co m W R plant co moff of High w a nd north o f e r Genoa N o a nd area di r rating statio n LACBWR pl a nd area sou t arcel of lan dOverview (F is bordered o ppi River a n f Engineers (is border e y 35. A B y 35, carries y do not use ppi River N a s from LA C brook tro u e s south of t hite Descrip t c tion provi d i ssioning an d as the confi g n d open la n 2 0.1402.

ommissioni n s, structures s above a d e ved from b a o rs in the "s: W ater Reacto r Plan at mile 678.

6 g is approxi nly rail roa d e an Sea Le v T he covered e rial dredge d m prises a to m prising onl y way 35. Ot h f the LACB W o. 1 Station (r ectly south n (Genoa N ant, t h of G-3, w d to the east o F igure 8-2) i o n the nort h nd Highway (USACE) R o e d on the w B urlington N commercia lthis rail lin a tional Wil d CBWR, is t u t and sturg h e LACBW R t ion After U d es a sum m d site closu r g uration of t nd areas at n g of the Cl aand comp o e pth of 3 fe e asements lo c"En d-State."r 6 on the Mimately 300

d. The Rea c v el (AMS Lland consis t d from the M t al of 163.5 y 1.5 acres.

her promine n WR plant, w (G-1) coal (a of LACB W No. 3 Fossil S where the IS F o f Highway illustrates th h by the Mis s 35. The U

.ock Island D w est b y th e N orthern-S a l freight al o e. The site dlife & Fis h t he Genoa eon. On t h R plant, the r Unrestricte d m ary of the re activities.

the remaini nthe time o ass 1 areas o o nents) will e t below gra d c ated below

" This ap p 8-3 ssissippi Ri vfeet from t h ctor Buildin g L), or 19 fe t ed of the ri v Mississippi R acres whic h The site is n t site featu r w hich includ a nd later oil

)WR, which c Station [G-3 FSI is locate d 35, across fr e boundary o s issippi Riv e.S. Lock &

D istrict, is l o e Mississip p a nta Fe rai l o ng the east eis bordered h Refuge Po oNational F i h e southwe s r e is a publi c d Release final con d The "End-S n g below gr of license t e o f the plantinclude the de (designatthe 636 fo o proach will v e r above t h h e Mississip p g stands on et above t h v er edge an d River. h is owned baccessed b y res include:

es the site s

) fueled po w c ontains an 3]), located d , and from LACB Wof the licen s e r an d a nar rDam No. 8, o cate d appro p i River a nl line, loc a e rn portion oto the sout hol 9 area.

F i sh Hatcher ystern corne r c boat launc h dition of th e State" for L A o und b ackfi l ermination m (the on-sit e demolition,ed as 636 f o o t elevation apply to t h h e mouth o f pi River an dfilled land a he normal d low forest a b y Dairylan d y a road on witchyard a w er plant (re m operational approximat e W R. sed site.

r ow strip of managed bximately 0.

6 nd bordered ated betwe e of the site.

h by a seg m F urther sou t y , which r a r of the sit e hing ramp w e site at t h ACBWR de c lled b uildin g meeting the e radiologic a removal a n o ot AMSL).

leaving on l he followi n f the Ohio R d 475 feet w e a t an elevati elevation o areas which d, with the a the south s i a nd the site o m oved in 19 350 MWe ely 175 feet land betwe e b y the U.S.

A 6 miles upst r on the ea s en the site Passenger t m ent of the U t h, approxi m a ises endan g e, approxi m w ith a parkin g he conclusi o commission i gs, structurerequireme n ally contami n n d disposal o All system s l y concrete n g building s R iver. est of on of f the were actual i de of of the 89), fossil from e n the Army ream. st by and trains U pper m ately gered m ately g lot. o n of i ng is s and n ts of n ated of all s will walls s and La Cros s License T Revisio nReac tWas tVent iPipe Was tTurb iLow Mai n The deb r disposal.Figure 8-structurewill be d and stru c require r e G-3 Cri b structure potential

the LTP The b el ofilled wi t Departmbackfille The str udismantl eAdmLAC BOutf aG-3 C coal wate rElec tPave d plant After all process a and the s s e Boiling W Termination n 0 t or Buildin g te Treatmen t ilation Stac k and Ventila t t e Gas Tank i ne Buildin g Specific Ac t n tenance Eat ris generate d -3 shows t hs and comp o demolished a c tures asso c e medial act i b House, wil l s at depths g removal.

F Chapter 3.

o w grade str u th suitable cent of Natu r d , returned t u ctures outs e d an d will r i nistration B BWR Crib H all diffuser d C oal Plant a n barge wash i r systems a n trical Switc h d roadways area. demolition as described s urrounding W ater Reacto r Plan g , t Building, k , t ion Tunnel s Vault, g and Turbi n tivity (LSA

)Shack. d from dem o h e key LA C onents, oth e and remove d ciated with G ions; theref o l remain int a g reater than F urther info r uctures to r e clean soil, s a r al Resourc e t o grade, se eide of the remain on si Building, inc l H ouse, incl u discharge pi p n d all assoc i i ng station t n d piping, h yar d , and, and the Bu rand remed i in Chapte r open land r s , n e Office Bu i) Storage B ulition and r e C BWR buil d er than the L d to a depth o G-3 are ex p ore, no reme d a ct and fun c3 foot belo w rmation on t e main in th e a nd and/or o e s (WDNR) e ded an d ap p"LACBW Rte. These i n l uding asso c u ding fire pr o p ing, extend i iated buildi n t o the nort h rlington No r i ation activ i 5 of this L Tareas withi n 8-4 i lding, u ilding, and emoval oper a dings at the LACBWR A of at least 3 pected to be diation is pl a ctional for G w grade wil l t he approac h e "End Stat e other suitab l regulations p ropriate ero R Site Encl n clude: ciated sanita r o tection pip i i ng 110 feet n gs, wareho u h of the pla n rthern-Santa ities are co m T P, will be p n its license ations will bsite. All o Administrati o feet below g e radiologic a a nned and t h G-3 power o p l be assesse d h to the var i e" such as b l e me d ia, a s. The rest o sion control losure" (LS r y sewer an d ing systems,into the Mi s uses and su p n t and all a sFe rail line m plete, a F i performed t o d boundari e be segregate d o n-site LA C on Building grade. Non e a lly impact e h ese structu r p erations.

A d for radiol o ious buildin basement fo u s allowable o re d areas o n s will be est E) are not d water syst e ssissippi Ri v p port structu r ssociated s a and spur i n i nal Radiati o o demonstra t es, with the d for recycl i C BWR buil d and Crib H e of the buil e d such tha t res, includi n Any contami n ogical impa c n gs is provi d undations wunder Wisc n the site wablishe d. expected t ems and pip i v e r , res, includi n anitary sewe r nto the LAC B on Survey (t e that LAC Bexception o i ng or dings, House, dings t they n g the nated c t and d ed in w ill be onsin w ill be t o be i ng, n g the r and BWR (FRS) B WR of the La Cros s License T Revisio n ISFSI fa 10 CFR 2 dry stor a dry stor a Isolation remediat control mcompro mequipme n access. I there is n survey a r Several s support t supporti n 8.3.R To date, removal RPV inco rFES WVari o RPV , Puri fVari o Chapter 3remediat achieve t 8.4.I m As prev i decomm i associat e b y the p rNU RNU R Chapter 3 schedule footprint s e Boiling W Termination n 0 a cility, co m 2 0.1402. A s age casks an ge within t h and contr o ion activitie measures w mised by t h nt. Open l a I solation an d n o risk of re reas that ha v services suc h t he ISFSI m n g the adjac e R emainin g D several key of the follo w and associ a re monitor g u W stored co m o us system p , and prima r fication, Sea l o us Turbine 3 of this LT ion activiti e t he "End-St a m pacts to t h i ously note d i ssioning o p e d with dec o reviously iss u R EG-0191, a n R EG-0586. 3 of the L T d to be co m). The i d en t W ater Reacto r Plan m ply with s part of the d transferre d e ISFSI unt i ol measures s. These ac t will be imp l h e potential and areas, a c d control m e-contaminat v e been rele a h as sanitar y m onitoring a e nt G-3 foss i Dismantlemdismantle m wing compo n ated reactor uide tubes, e mponents s u p iping and c ry systems s u l Injection a n and auxilia r P provides d es currently b a te" conditi o h e Post-Sh u d , the D-P l p erations at t ommissioni n ued environ m nd T P identifi e m pleted pri o tified activit i r the radiol odecommiss i d to the ISF il it is transf e will be im p t ivities will lemented t o for re-co n ccess roads a e asures will ion from de ased from th e y sewer serv i a nd security i l station w h ent and De c m ent and dec o n ents: component s etc.), uch as fuel s h components u ch as the C n d Main Ste ry systems.

d etailed des c b eing perfo r on. utdown Dec o l an/PSDAR, the site and n g the site h a mental imp a es the dis m o r to the u n i es are not s 8-5 ogical crite r i oning proc e SI. It is ex p erred to the D p lemented f o be complet e o ensure th e ntamination a nd bounda rremain in ecommissio n e license.

i ces and ele c operations.

hich will re m c ommissio n ommissioni n s (e.g. fuel h rouds, cont r associated ontrol Rod D a m. c riptions of rmed and t h ommissioni n amended concluded t ave already act statemen t mantlement a nrestricted r eignificantly ria for un r ess, all spen t pected that t Department following th ed prior to s t e final rad i as result r ies will be ffect throug h n ing. These c trical servi c There ar e m ain in plac e n in g Activit i ng activities shrouds, co r ol rods, an d with the F o D rive Mech athe dismant he remainin g n g Activiti ein March 2 that the pot e been postul a t s, specifica l a nd decont a elease of t hdifferent fr o restricted u t nuclea r fu e t his spent f u of Energy (De conclusio n t arting the F i ological c o of access b posted wit hhout FRS a cmeasures a r ce will rema e three pota b e. ies have occur r ntrol ro d s, s d start-up so u o rced Circul a anisms, De clement, dec o g activities t e s Report (P014, descri b e ntial envir oated in, an d lly: amination a c h e site (exc l om those or i use specifi e e l was loade d u el will rem a D OE). n of radiol o FRS process.

onditions ar e b y personn e h signs restr i ctivities an d r e not requi r in in operat i b le wells o n r ed, includi n steam separ a urces, and a tion syste m c ay Heat, Pr i ontaminatio n t o be execu t PSDAR) b ed the pl a onmental i m d will be bo u ctivities th a l uding the I i ginally disc u e d in d into ain in o gical The e not el or icting d until red in i on to n site n g the ators, m , the imary n and ted to a nned m pacts u nded a t are ISFSI ussed La Cros s License T Revisio n in the D-will be didentifie d provide decomm i 8.5.L 8.5.1.G 8.5.1.1.The site Vernon C 300 feet by fillin g The site 642 feet Mississi p silts) un d sands an d 8.5.1.2.The U.S reliable ctotal po p 744 for Snear the small to w (populat i5 miles s 8.5.1.3.The LA C of the M b ounded north, a n electric p This sta t Genoa, l o within t h The are a and fres h to the G-site, loc a s e Boiling W Termination n 0 -Plan/PSDA d efined duri n d in the D-additional i ssioning.

L a Crosse B o G eo g raph y a Site Llocation an d County, Wi s from the ea s g in river e dis relativel y AMSL b o u ppi River to d erlain by fi n d gravels.

B Popu l. Census B u census data f p ulation in 2 S toddard, lo cplant, loca t w ns west o ion 397), lo outhwest.

Site A C BWR prop e M ississippi R by the Mi s nd a wildlife p ower statio n tion is locat e o cated appr o h e town. Th e a of the Mis s h water fish i-3 station lo a ted approxi m W ater Reacto r Plan R. Althou g n g decomm i-Plan/PSDA R evaluation o ilin g Wat e a nd Demo gr L ocation and d descriptio n s consin, in t s t bank of th e d ge and low y flat with t h u nded by th ethe west.

T ne to mediu m B edrock is e n lation ureau, Ame r f or nearby W 2 013 was 25 cated 7 mile s ted 17 miles o f the plant cated 3 mi l Access, Lan d erty is locat e River. Alth o s sissippi Ri vand fish re f n complete d e d to the s o oximately 1 m e re are no r e s issippi Riv e i ng) and co m cated south m ately 4,00 0 r gh additiona l i ssioning pl R have be eand info r er Reactor E r aph y Descriptio n n were disc u the Mississi p e Mississip p forest area s he reactor f e railroad tr T he geolog y m sands wit h ncountered a rican Com m W isconsin v i8 for the V i s N of the p l N; and 30 , across the es northwe d and Water ed in the fa r o ugh the sit e ver to the w f uge to the s d in 1969, w outh, adjace n m ile to the n e sidences wi t er adjacent t mmercial ba r of the LA C 0 feet south o 8-6 l details reg a a nning effo r en identifie d rmation re g E nvironme n n ussed in sect i ppi River V p i River. T w s with mate r facilities sta n acks to the y consists p r h some soil s a t approxim a m unity Surv e illages and c illage of G e l ant; 51,522

, 329 for Ve r Mississipp i s t, and Ne w U se r western po r e area is 16 3 west, a rail l i s outh. The s w hich is also nt to the L A n ortheast of t t hin 2,000 f e to the site i s r ge and ship C BWR plant)o f the plant.

arding majo r ts, no sign i d. Subseq u garding the n t Descripti o ion 8.2. Th ealley, with t w enty-seven r ial dredge d nding at ele veast and th rimarily of f s containing a tely 130 fe e e y (ACS) r e cities and V e e noa, locate d for La Cros r non Count y i River, inc w Albin, I A rtion of Ve r 3.5 acres, it ine to the e site include s owned an d A CBWR fa c t he site. A n e et of any L A s used for r e p traffic (e.g

.). There is There is a pr decommis ificant impa uent section s environm e o n e 163.5 acre t he Reactor acres of the d from the M vations ran g h e riprap on fill material s higher perc e t below gro u e port (11) p r e rnon Count y d 1 mile no rse, the large

y. There a rluding Ren o A (populat i r non Count yis relativel y e ast, USAC E s G-3, a co a d operated b y cilities. Th e n elementary A CBWR st r e creational
p. barges of c a public bo p ortion (Po o sioning acti v cts b eyond s in this c h e ntal effec t e site is loca t Building l o site were f o M ississippi R ging from 6the shore o s (fine sandentages of c u nd surface rovides the
y. The esti m rth of LAC Bst Wisconsi n r e also num o township, ion 513), l o y on the east y isolated a s E property t a l-fired 379 M y Dairyland e closest to w school is l o r ucture. p urposes (b o c oal are deli vat landing o o l 9) of the U v ities those hapter t s of ted in ocated o rmed River. 36 to of the s and c oarse (10). most m ated B WR; n city erous MN o cated bank s it is t o the M We (12). w n is o cated oating v ered o n the U pper La Cros s License T Revisio n Mississi p for hunt i Genoa Nmile 679 long loc k public a c through Highwa y No. 8. 8.5.2.C The cli m continen triver val l Lock an d of the i nfrom 60 winter m the aver a summer s The ave r range fr o month f o The blu ff winds a t monthly experien c tornado oF3 (max icenter in j 8.5.3.T 8.5.3.1.The site i dissecte d varies b e river lev e Highwa y Prior to c lying w e dredged to const r s e Boiling W Termination n 0 ppi River N a i ng, fishing N ational Fis h.2, is appro x k and dam s ccess to an oNovembe r. y 35 approx i Climate m ate at the L tal climate w l ey location d Dam No. 8 nformation f to 90 o F d u m onths of D e age temper a s eason (15).

r age annual r om 3 to 5 in c or the remai n f s of the Mi s t the site w h average w i ced tornado s o ccurred 27 imum wind j ured one p e T opo g raph y Topo g i s located w d uplands.

F e tween 21/2 a e l. The LA C y 35. Figure constructio ntlands. Th esands from t r uction, the a W ater Reacto r Plan ational Wild l and recreati h Hatchery.x imately 0.

6 s tructure ow o bservation The Stat e imately 1/2 m L a Crosse r with cold w iof the site.

8 site with a f or the past uring the m o e cembe r 20 1ture is appr rainfall is 3 5 ches per mo n n der of the y s sissippi Ri v h ere the va ind speeds

s. On Apri l.4 miles aw a speeds 158-e rson and ca u , Geolo gy a n g raphy ithin the Mi F rom La Cro and 41/2 mile C BWR site i 8-4 provid e n of the LA C e property g r t he Mississi p area was gr a r life & Fish R onal activit
i. Lock an d 6 miles nort h n ed and op eplatfor m , o p e of Wisco n m ile north o r egion of W i nters and h o The USA C a rchived we a year (May onths of Ju n 1 4 to Febru aoximately 2 5.2 inches.

M n th in the s p ear. ver Valley c h lley runs n o are typical l l 30, 1954, a ay from the 216 mph) t o u sed betwe e n d Seismol o ssissippi Ri v sse to Prairi s in width.

is located b e e s a Topogr a CBWR faci l rade was th e ppi River.

D a ded to a re l 8-7 R efuge just s i es (13). Fu r d Dam No.h of the sit e e rated by th e pen from d a n sin also m of the LAC B W isconsin a n o t summers CE maintain s ather infor m 2014 to M a n e through A ary 2015.

C 2 0 o F in the M onthly pre c p ring and su m hannel the w o rth-south a y 6 to 10 m a category F 4 Genoa vill a o rnado that o e n $500,000 ogy ver Valley, w e du Chien, The valley etween two v a phy Map o f lity, the site en increase d D uring grad e l atively flat s outh of the rther south a 8, located

e. The da m e USACE (awn to dus k m aintains a BWR site, a nd at the L A and extre m s an active w mation for th e ay 2015) in d A ugust 201 4 C ity data co mwinter mo n cipitation a v m mer seaso n w inds at the L are from th e m ph. The 4 (maximu m a ge center.

o ccurred 6.

6 and $5,000, w here the v aapproximat ewalls rise s valleys on e fthe site. location c o d through th e e manipulat i ground sur f site which h a re public l a on the Mis m is a 110 fe 14). This fa c k during the highway w across fro m A CBWR si t m es influenc e weather stat e Genoa, W dicated tem p 4 and 45 to m piled for G n ths and rea c verages in th e ns and from LACBWR s e north and Genoa, W I m wind speeOn June 5, 6 miles awa y 000 in dam a alley is deep ely 40 mile s s harply 500 e ither side o f o nsisted of m e depositio n i on and site f ace. The r e has limited a a nd areas a n sissippi Ri v et wide, 60 0cility also amonths of w ayside off m Lock and te is typical e d because o ion at the n eI area. A r e peratures ra n-5 o F duri n G enoa show s c hes 72 o F i e Genoa, W I1 to 3 inch e ite. Predo m the south.

I area has r ds 207-260 1980, a cat e y from the v i a ges. ly cut into h s south, the vto 600 feet f the bluff e a m arshes and n of hydraul ipreparation e sulting gra d a ccess n d the v er at 0 feet llows April State Dam of a of the earby eview n ging n g the s that i n the I area e s per m inant The r arely mph) e gory illage highly v alley from a st of low-i cally prior d e for La Cros s License T Revisio n the LA C access r o 8.5.3.2.LACB W of the C e of the W b edrock i Generall y to 130 f e Valley. Dreshba cPrecamb r (BGS). A 509 feet river sho 8.5.3.3.Many fa u capable i conditio nin the si t nuclear p any evi d Therefor Seismic a 2008 all 8.5.4.H Hydrolo g Ground w 25 feet B Mississi p the Miss i the west towards ground wfossil st asome pe r flooding.Hydraul ithe shall o structure s e Boiling W Termination n 0 BWR site i s o ad along th e Geol o WR is locate d e ntral Lowl a W isconsin D o i n this regio n y , the local get of glacial These unc o c h Group (r ian crystal l A t the subj e AMSL nea rreline. Seis m u lts have b e i n accordan c n s in the sit e t e region, b u p ower plant d ence of ca p e, capable f a a ctivity (m a occurred ov e Hy drolo gy a g y and hy d w ater beneat h B GS and the ppi River.

T i ssippi Rive r and dischar gthe west b u w ater elevati o a tion, it app e r iods where

. i c conductiv i o w sands th a of the shal l W ater Reacto r Plan s generally f e eastern bo u o gy d on the east a nd Physiog rme and the n dips less t h g eology is d outwash an onsolidated d Upper Ca m line rocks e ect site, the b r the Reacto r m ology een mappe d c e with 10 C e vicinity th a ut investigat isites in the pable faulti n a ulting does a gnitudes ra n er 180 mile s nd H y dro ge d rogeologic a h the site i s water table T herefore, c h r. Groundw g es into the M ut then may on measure m ears that th ethe gradie n ity is influe n at were hyd r l ow soils w o r flat with gr a u ndary of th e bank of the raphic Prov i western fla n h an 20 feet p d escribed as a d fluvial de p deposits are mbrian). T h e ncountere d bedrock sur f r Building a d in the site C FR 100, A at represent i ons of all o region, in a d n g. Additi o not need to nging from 3 s from the si t e ology al informa t s first enco u aquifer is i n hanges in th e a ter in the s h Mississippi turn and fl o m ents colle c ere is a slig h nts are reve r nced by the s raulically dr e o uld not lik e 8-8 a de level at e site to the r Mississipp i i nce (16).

T nk of the Wi per mile to t h approximat e p osits on th eunderlain b h e Dreshba c d at approx i face is enco u and slopes t o region. N o Appendix A.

hazard to t hf these faul t d dition to s t onally, the a be consider e 3.5 to 5.4) t h t e and did n o t ion was p untered at d e n strong hy d e water tabl e h allow depo R iver. The o w parallel c ted during h t downwar rsed and th i soil structur e e dged, depo ely influenc eapproximat eriprap alon g i River in th e The site is l o i sconsin Ar c h e southwe s ely 15 feet o e east flood p b y flat lying ch Group i imately 65 0 u ntered at a n o approxima t o ne of thes e Per the N h e facility.

N t s during th e tudies for th e area is one o ed in the an a hat has bee n ot impact th e primarily o b e pths rangi n draulic com m e elevation asits and fill m deeper gro uto the rive rroutine sa m r d vertical g i s is likely de and grain sited, and c o e groundwa t ely 639 feet g the river s h e Wisconsi n ocated on th e ch. The sed i s t. f hydraulic f plain of the Msandstone a i s then un d 0 feet belo w n elevation tely 501 fee e faults are N RC, "Ther e Numerous f e course of v e LACBW R of relativel y alysis of thi s n recorded b e plant site o btained fro m n g from app m unication w a re depende n material lik e u ndwater is a r. Based o n m pling in su p gradient. H o due to high size distrib u ompacted o n t er flow dir e AMSL fro m hore. n Driftless s e e southwest imentary str a fill overlyin g M ississippi R and shales o derlain by d w ground s u of approxi m t AMSL ne aconsidered e are no ge o f aults are m a v alidating s e R, have not f y low seis m s site" (17).

etween 197 5 o r operation s m Referen c roximately with the adj nt on the st a ely flows to w also likely t o n a review o p port of th e o wever, the rriver stage s ution. Beca u n site, the in t ection. Ho w m the ection flank a ta or g 100 River of the d ense u rface mately ar the to be o logic a pped everal f ound micity. 5 and s. c e 10. 15 to acent age of wards o flow of the e G-3 r e are s and u se of t ernal w ever, La Cros s License T Revisio nthe nati v anisotro p the hori z these la y The vel o gradient.across t h the grou n range) e v 8.6.E 8.6.1.S The eva lfollows t includes consider e"Large."

evaluati o For tho s evaluati o 1) T N i d 2) A 3) P d 4) A e s e n a d a v t h 5) A A concl uthe level 0586 ev athe form e Table 8-1 LACB W screen t h s e Boiling W Termination n 0 v e sands un d py of the aq u ontal direct iers. o city of gro u The gradi e h e site it is l i ndwater vel o v en though t h E nvironme n ummar y l uation of t h t he approac hidentificati o e d to be ge n If identifi e o n in NURE G s e environ m o n, a standar d The issue or N UREG-019 d entified in t A pplicable r e otential im pescribed.

A n evaluati o stimate or d nvironment d ditional m i v oided, a d e he resource o A conclusio n usion is deri v of signific a aluation. N o e r G-1 coal/

o 1 was used WR. It is ex c h e issues t W ater Reacto r Plan d erlying the u ifer would i on than in t h undwater fl o ent of the w akely that th e o city across he hydrauli c ntal Effects o h e environm e h and metho d o n of enviro n eric, it is a e d as generi c G-0586 whi c m ental issu d approach iactivity is s 1 and D-Pl a t hese docu m e gulations, p pacts from d e o n is perfo r determine w hconsidering itigation me a etermination or attribute. is reached.

ved from th e ance of the ote that the e o il fueled p o as the ba s cerpted fro m o identify r hydraulic fi be more pe r he vertical d o w is directl y ater table is e water tabl e the site is c conductivi t o f Decomm i e ntal effects d ology outl inmental iss u a ssigned a s c , the envir o c h conclude s es or dec o i s followed.

summarize d , a n/PSDAR.

ments. ermits, limi t ecommissio n rmed. Thi s h ether the a the availa b a sures that cis made as e evaluation impacts. S i environment a o wer plant w s is for the m Table 6.1 o site-specifi c 8-9 fi ll would li k rmeable an d d irection. T h y related to influenced b e has a very also relativ e t y could sup p i ssionin g (or impact s i ned and de s ues as eithe r ignificance onmental i m s that the o v ommissioni n It is summ a including a Note that m t s or other r e ning activiti e s includes ctivity is li k b le informat i c an be take nto whether steps sum m ite-specific i al impacts o w as not cons isite specifi c of NUREG-0 c issues.

D k ely provid e d have a hig h his decrease s both the h y b y the topo g low gradie n e ly slow (i.

e port faster fl s) of the de c scribed in N r generic or level of eit h mpact is con s verall impac t ng activitie s arized as fol l a summary o m any deco m e gulatory re q es relating t oanalysis an kely to mak e ion. If an i m n are evalu athe impact i m arized abo v issues are n o f the operat i idered in thi s c environ m e 0586. The f Decommiss i e sufficient h er hydraul i s the vertic a ydraulic con g raphy and w n t. Therefo r e., in the in c flow. commission i N UREG-058 6site-specifi c her "Small,"s idered to b e t significanc e s that req u l ows: of the impa c mmissioning quirements a o the enviro n n d professio n e a noticea b m pact is li k ated. If an i is likely to s ve. The con ot bounded i ng G-3 coa l s review. e ntal impac t f irst step in i oning acti vstructure th a i c conductiv al transport w ductivity a n with the flat re, it is likel y c hes and fe e i ng of LAC B 6. This app r c. If the is s" "Moderat e e bounded b e is "Small.

"uire site-sp e c ts as repor t activities a r are identifie d nmental iss u nal judgme ble impact o k ely, existin g impact can n s eriously da m n clusion ide n by the NU R l power pla n t assessme nthis proces s vities speci f a t the v ity in within nd the areas y that e t/day BWR roach s ue is e ," or b y the " e cific ted in r e not d. u e are nt to on the g and n ot be m age ntifies R EG-n t and nt for s is to fic to La Cros s License T Revisio n LACB Widentifie d evaluati oOffs i 35 y eAqu a sensi tTerr e of se nThre a threa tEnvi r 35 y eCult u histo r 8.6.2.R 8.6.2.1.During d in accor d of the R a exposur e 2,000 m r also be mprogram Radiatio nmaterial s In Augu s of the st a 1994 wi t allowed levels at

Protecti o exposur e significa nremoval (SSCs). s e Boiling W Termination n 0 WR are then

d. The scr e o n: te land use a ears, since t h a tic ecology tive areas.

estrial Ecolo nsitive area s a tened and t ened and e n ronmental J ears. ural and Hi ric landmar k R adiolo g ica l Occu p decommissi o dance with t h a diation Pro es and main t rem/yr Tota l m aintained Aand proce d n Work Per m s incorporat e st 1987, Dai r abilized and t h the com mfor the dec athe facility

.on Program e during th e n t contribut o and packa g W ater Reacto r Plan reviewed a e ening iden t activities: c h h e FES was i affected by g y affected b s. endangered n dangered s p J ustice: cha n storic Reso u k designatio n l Effects of D pational Ra d o ning, Solut i h e license s p tection Pro g tain occupa t l Effective D A s Low As R dures will e mits (RWP) e effective r a r yland plac edefueled fa c mencement o ay of most

s. This dela y and ALAR A e decommis s ors to occup ging of rem a r and the acti v tified the f o h anges in de m i ssue d. activities b e by activitie s species: c h pecies that h n ges in de m u rce impac t n s and other Decommiss i d iation Expo ions will co n pecification s g ram are to tional work e D ose Equiv a Reasonably A ensure that involving p o a diological c ed LACBW R c ility). LA C of incremen t short-lived r y, combine d A measures , s ioning of L ational dos e a ining Reac 8-10 v ities that m o llowing po mographics e yond the o p s beyond the hanges in l o have occurre d m ographics t s beyond t cultural res o i onin g sure ntinue to i m s and the re q control radi a e r exposure s a lent (TEDE A chievable (work spec i otential ra d i a controls. R in a SAF S CBWR rema i t al decomm i radionuclide s d with the e f , minimized LACBWR t from remaitor Buildin g m ay requir e otential area s and zoning t p erational ar e operationa l o cal flora a n d in the pas t and socio e t he operati o ources. mplement a R q uirements o ation hazar d s to less th a E). Dose to (ALARA). i fications, d a tion expos u S TOR condi tined in a fu l i ssioning ac t s , which su b ffective imp l the actual t o date. It ining disma n g Structure s e site-specif i s for additi o t hat have oc ea; changes l area; chan g n d fauna a n t 35 years.

economic s t onal areas; c R adiation Pr of 10 CFR 2 0 ds, avoid ac c an the admi n workers an d The LACB W designs, wo r u re or handl i t ion (a peri o l ly SAFST O t ivities. T h b sequently rlementation and project eis anticipat e ntlement act i s, Systems, i c evaluatio n o nal site-sp e curred in th e in designat i g es in desig n n d designati o t atus in the c hanges in otection Pr o 0. The obje c cidental rad i nistrative li m d the public WR work c o r k package s i ng of radio a o d of safe st o O R conditio n h is period o f r educed rad i of the Rad i e d radiation ed that the ivities will band Compo n are e cific e past ion of nation o n of past local ogram c tives iation m it of must o ntrol s and active orage n until f time i ation iation dose most be the o nents La Cros s License T Revisio n Table 8 Secti o8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.18.6.3.1 28.6.3.1 3 8.6.3.1 48.6.3.1 58.6.3.1 68.6.3.1 78.6.3.1 88.6.3.1 98.6.3.2 0 s e Boiling W Termination n 0 8-1 Sum mPowe o n Radiol o Activit i worker s Activit i Radiol o Onsite l Offsite Water U Water Q Surfac e Groun d Air Qu a Aquati c Activit i Activit i Terrest r Activit i Activit i Threat e Occup a1 Socioe c 2 Enviro n 3 Cultur a Activit i Activit i 4 Aesthe t 5 Noise 6 Irretrie v 7 Traffic 8 ISFSI c 9 VCC c oimpact s 0 Rail li n offsite) W ater Reacto r Plan m ar y of the r Facilities Envir o o gical ies resulting i s ies resulting i o gical Accid e l and use acti v land use acti v U se Q uality e water d wate r a lity c Ecology ies within th e ies beyond th rial Ecology ies within th e i es beyond th ened and End a ational Issues c onomic nmental Justi c al and Histori c ies within th e ies beyond th t ics v able Resour c and Transpo r construction:

l o nstruction f o s (onsite) ne upgrade an d r Environm e onmental Iss u in occupation i n dose to the e nts v ities v ities e operational a e operational e operational a e operational a ngered Spe c c e c Resource I m e operational a e operational ces r tation land use imp a or the ISFSI:

l d extension (o 8-11 e ntal Impac t u e al dose to public a rea area a rea area c ies mpacts a rea area acts (onsite) land use o nsite and ts from De c NURE G 0586 (GEIS) Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No No Yes Yes No Yes No Yes Yes Yes Yes No No No commission i G-) Impa c Small Small Small Small Site-speSmall Small Small Small Small Site-spe Small Site-spe Site-speSmall Small Site-spe Small Site-speSmall Small Small Small Site-spe Site-spe Site-spe i n g Nuclea r c t Significan ccific cific cific cific cific cific cific cific cific r c e La Cros s License T Revisio nNUREG-The cur restimate d dose for b ounded 8.6.2.2.Dairylan (REMP) environ m the radi o decomm iof 10 C F to adher e public d o consider e The onl y liquid w a piping" wcollectio n through t discharg eof the cprotectio LACB W bounded The gas emeteoro l noble ga s or expos u gaseous r 8.6.2.3.

Decom mthis anal y conduct e Fuel Ac c decomm ithe min i LACB W otherwis e The dec o and cont Protecti o s e Boiling W Termination n 0 -0586 esti m rent occupa t d to be 130.

3 the decom m by NURE G Offsi t d implemen t at LACB W m ent in and a o active gas e i ssioning ac t FR 50, Appe n e to these l ose from de c ed as "Smal l y authorized aste from t h w hich is a p a n system p u t he East T u e s to the inl e c u rrent and n in accor WR to date c oby the eval u e ous pathw a l ogical cond i s, the gaseo u u re pathwa y releases. Envir o m issioning a c y sis has co n e d and prov i cident Anal y i ssioning an dmal radioa c WR site is i n e involving a ommissioni namination l e o n and Safe t W ater Reacto r Plan m ated that 1, tional expe n 3 Rem, whi c missioning w G-0586 and t h t e Radiation t ed a regula t WR which p a round the e e ous (airbo r t ivities do n ndix I, or th limits throu g commission i l." effluent rel e h e LACBW R art of the G-3 umps are no t urbine build i et of the liq ufuture Ra ddance with o nclude tha t u ation in N U a y (which i i tions durin g u s pathway c y. Routine a onmental E f ccident anal y n tinued duri n i ded in reg u y sis" have n o d with spen t ctive materi n sufficient f a significan t n g of radio a evels remai n t y and Heal r 874 Rem w i n ded and d o c h is well be l will meet th e h e impact is Exposure a n tory compli a p rovided a n nvirons of t h r ne) and li qot exceed t h e fuel cycle ghout the c o i ng is boun d ease pathwa y R site to the 3 circulatin g t operable.

T ing sump u s u id waste m o diation Pro t 10 CFR 2 0 t the public e UREG-0586, i ncludes no b g the time o f consists of a a i r samples a ffects of Ac c ysis is inte g n g shutdow n u lar updates o ted that "

w t nuclear fu eal resulting for any pot t adverse ef fe a ctively con t n ing at LA C t h Program s 8-12 i ll be need e o se expecte l ow the NU R e regulator yconsidered nd Monitori n a nt Radiolo g n nual report he site. Th e q uid efflue n he concentra tdose limits o urse of th e ded by the c r y for the dis Mississipp i g water disc h T he only li q s ing an air o onitor, whic h tection and 0 and 10 C F exposure as which con c ble gas an d f the release.

airborne par t are collected c idents and D gral to the l i n and deco m to the D-P l with conside r e l now store d from LA C e ntial even t fe ct on publi c t aminated S CBWR. Wo r s for LAC B e d to deco m ed to comp l R EG-0586 e y standards oas "Small."

n g g ical Enviro n s with ass e e REMP pro g n t releases d ation limits oof 40 CFR e decommi s riteria in N Ucharge of tr e i River is th r h arge syste m q uid effluen t operated pu m h is still ope r REMP at FR 50, Ap pa result of d c ludes the i m d particulat

e. Due to pl a ticulate only to determi n Decommissi o i censing de s mmissioning

.l an/PSDAR , ration for th d in the ISF S C BWR oper a t to result i c health an dSCs will i n r ker safety i B WR which m mission a s l ete the de c estimate. A s of 10 CFR 2 nmental Mo essments of gram provi d d uring plan t of 10 CFR 2 0 190. Soluti o s sioning.

C U REG-0586 e ated and fi l h rough the "

s m. Currentl y t discharges m p. The a i r able. Cont i LACBW R pendix I. R E decommissi o mpact is min i e) analysis i a nt shutdow n and presen t n e the dose d oning Even t s ign basis f

o. Post-fuel

, within sece current st a S I, this anal y ation and r i n exceedin g d safety."

nvolve the h is addresse d rely on A L s ingle unit B c ommissioni n s the occupa t 2 0, it is the r o nitoring Pr othe radiol o des assuranc e t operation s 0 , the dose l o ns will co n C onsequentl yand the imp ltered radio a seal well/di f y , the liquid wat LACBW R ir operated p i nue d appli c R ensures p EMP repor t o ning activi t imal. is subject t o n and cessat i ts a minor r e d ue to radio a t s o r LACBW Raccident an a tion "Plant a ge of LAC B ysis confirmemaining o n g dose lim i h ighest dose d in the Rad i L ARA princ BWR. ng is t ional r efore ogram o gical e that s and limits n tinue y , the pact is active ffuser w aste R are pump cation p ublic ts for ties is o the i on of elease active R and alysis Post-BWR s that n the its or rates iation iples.

La Cros s License T Revisio n The safe release o During d addition in NUR E decomm i LACB W potential

reductio nDec oPrior Radi o Operatio n and serv i in the IS FRadi oExpl oLoss Natu rHum The pub laccident s dose co n Plan/PS Danalysis i 8.6.2.4.The dec ovolumes b ulk deb are, and impleme nthe appr o and liquiThe maj o Energy S o and truc k transferr e s e Boiling W Termination n 0 ty of the p u f radioactiv e decommissi oto maintena n EG-0586 as s i ssioning o f W R are boun d consequen c n of the tota l ontaminatio nradioactive o active dec a n al acciden t i ce conditio n F SI, operati o o active was t o sions and/

oof contami n ral phenom e an caused e v lic dose con s s during dec o nsequences f D AR and re s i s therefore b Stora g ommissioni nof low lev e ris material s will contin u n tation of t h o priate segr e d radioactiv o rity of the o lutions dis p ked to a r a e d to a rail c W ater Reacto r Plan ublic is prin e materials d oning, Soluti n ce, waste m s ociated wi t f LACBW R d ed by the c es associat e l radionucli d n efforts ma dwaste ship m ay. s during de c ns. With th e o nal accide n te transporta t o r fires asso c n ation contr o e na, an d vents extern a sequences r e ommissioni n from accide n s ulted in do s b ounding fo g e and Disp o n g of LAC B el radioactiv s such as co n u e to be dis p h e Waste M a e gation, cla se wastes. Class A lo w posal site in a il trans-loa d car. Rail a n r cipally rela t d uring deco m ons will per f management , t h immedia t R. Conseq uaccident ev a e d with tho s d e inventory de before de c m ents, an d commissioni e spent nucl e n ts during de t ion accide n ciated with e ol, al to LACB W e ported in N n g ranged fr o n ts during L s e ranging frr the decom m o sal of Low

-B WR has, a e waste, in c ncrete, met a p ositioned a anagement P s sification, p w level radi o Clive, Uta h d facility i n n d truck sh i 8-13 t ed to pote n mmissionin g f orm decon t , and survei l te dismantli n uently, the p a luation pre se accidents at LACBW R commission i ng could re s e ar fuel re mcommissio n nts, xplosive an d WR. N UREG-058 6 om 0.02 to 0 LACBWR d e om 0.027 t o missioning o-Level Radi o a nd will c o c luding cont a a l and aspha l as low level rogram and p rocessing, p o active wast e h. Waste w n Winona, M ipments are ntial hazards g operations.

tamination a n llance activi t n g would a l potential d e sented in N would be l R fro m: i ng, sult from eq u moved from t n ing can be c d/or combu s 6 for onsite, 0.96 rem.

A e commissio n o 0.065 rem.

of LACBW R o active Was t o ntinue to r eaminated e q lt. Material s radioactiveassociated p p ackaging, s e from LA C will be loade M N where made in ac c associated nd dismantl e ties. The ac l so be appl i ecommissio n N UREG-058 6 l ess at LA C uipment fail u t he LACB W categorized a stible materi anon-fuel re l A n analysis o ning was p r The NUR E R. te equire the d quipment, t o s that canno t e waste. Th procedures, S shipment an d C BWR will b d into appr o the waste c c ordance wi twith an air b ement of S S cidents disc u i cable duri n n ing accide n 6. Howeve r C BWR due t ure, human e W R site and s a s follows:

a ls, l ated radiol o of potential p r ovided in t h E G-0586 ac c disposal of o ols, clothin g t be free rel e rough the p S olutions e n d control of b e shipped t opriate cont a c ontainer w i t h Departm e borne S Cs in u ssed n g the n ts at r, the to the e rror, stored ogical public h e D-c ident large g and e ased roper n sures solid t o the ainers ill be e nt of La Cros s License T Revisio n Transpo r Waste C o 8.6.2.5.Followi n radiolog iremaini n(excludi n radiolog ilicense w Chapter 6criteria.

8.6.3.N 8.6.3.1.The env i within s e The LA C existing L to b e co nslips are onsite r aactivitie s parking a to occur Several s roadway sincludin gremediat 636 foot waste st r No sig nactivitie scomply w regulato r In accor d onsite ar e 8.6.3.2.Only ar e and lice n and de m s e Boiling W Termination n 0 r tation (DO T o ntrol Speci Radi o n g the co m ical surveys n g in b ackf i n g the ISFS I i cal conditio will be termi 6 provide t h N on-radiolo g Onsit e ironmental i e ction 4.3.1 o CBWR dec o LACBWR l nducted wit h being cons t a il line will

s. Contain e a nd equipm e in a manner structures s u s and rail l i g piping an d ed, as nece s elevation w r eam. nificant env s are anticip a w ith applic a r y requirem e dance with t e considere d Offsi t e as within t h nse terminat i molition equi p W ater Reacto r Plan T) regulatio nalist (WCS) o logical Crit e m pletion of will be per f illed struct u I) meets the ns are dem o nate d , with he method o gical Effect s e Land Use impact asso c of NUREG-0 ommissioni n icensed pro p hin the LSE tructed. Th e be modifie d ers will be u e nt/containesimilar to w u ch as the S ines, will r e d tunnels, b e ssary. All o t w ill be rem oironmental ated. In ad d able United e nts. t he guidanc e d as "Small.

"te Land Use he existing s ion activiti e pment, was t r n s. If Clas sfacility in A e ria for Licedecontami n formed to d u re baseme n unrestricted o nstrated to b the excepti o o logy for d e s of Decom m ciated with 0 586 to be g n g project i s perty previo u footprint.

S e existing r a d and refur b u nloaded a n r laydown, s w hen the fac i Switchyard, emain at lic elow the 63 t her system s oved during changes a s dition to NR C States Envi r e presented

" (in the Vici n ite licensed e s (such as t te container 8-14 s B/C wast e A ndrews, Te xnse Termin a n ation, dis memonstrate t n ts, any re muse criteri a be below th e o n of the ar e emonstratin g missionin g onsite land generically c s located a n usly used f o Some onsite ail line sup p bished with n d loaded o n storage, sta g i lity was op eAdministra tense termi n6 foot elev a s and comp o the decom m s sociated w C requirem e ronmental P rin NUREG-n ity) b oundary wemporary s t s, etc.). O f e is identifi e x as. a tion mantlement t hat the dos m aining pip i a specified i n e unrestricte ea around th g complian c uses has beonsidered a s n d executed or power ge n e roads have p orted the o p a rail spur n site. Onsi g ing and w a erational.

t ion Buildin g nation. Sub ation will be o nents as w e m issioning p w ith the si t e nts, d ecom m rotection A g-0586, the p will be used torage and s f the 163.5 a e d, it will band reme d se from resi d i ng and so i n 10 CFR 2 0 e d use criter ie ISFSI. L T ce with the een determi n s a "Small" i within the n eration; all been refur b p eration of t to support d ite activitie s a ste loading g , Crib Ho u surface bas e e radiologic a e ll as all str u p rocess and te-specific d m issioning a gency (US E potential im p to support d staging area s acre site, a b b e shipped t diation acti v d ual radioa c i ls at LAC B 0.1402. Aft e ia, the 10 C F T P Chapte r 5unrestricte d ned by the N impact. boundary o work is ex p bished. No b the facility.

decommissi o s such as v e are and co n u se as well a ement struc t ally assesse d uctures abo v disposed o f decommissi o a ctivities wil E PA) and W p acts to lan d decommissi o s for remed i bout 1.5 acr e t o the vities, ctivity BWR er the FR 50 5 and d use NRC, of the pected barge The oning e hicle n tinue a s all tures, d and v e the f as a oning l also W DNR d use o ning i ation es are La Cros s License T Revisio n located Appropr icontami n These mimpacts activitie s Land in t within a Upper M Crosse-B County h water q u located w b asin la nsome of t The clo s north of with a p o valley b e Decom m the Ref u southern traffic e n decomm i 8.6.3.3.LACB W Slough tpredomi n Mississi p the reac tsystems. Water p u to be pr o For a di towns a n river wa t in Lansi n river w a40 miles The LA C well at t h Potable w s e Boiling W Termination n 0 w ithin the i ate isolati o nation from m easures wil lassociated w s at LACB W t he vicinity five-mile r Mississippi R B ad Axe Ri v has establis h ality and pr o within the B n d use is agr i the agricult u sest munici pthe site, acr o o pulation o f elow the eas t m issioning a c ge at the s o end of the n tering or le i ssioning ac t Wate r W R is locate d tributary ex t n ant water u ppi River as tor, river w a River wat e ulled from o n cessed onsi t stance of 4 0 nd cities alo n t er for indus t ng, Iowa, a b ater for ind u downstrea m C BWR site h e site. Th e w ater use d u W ater Reacto r Plan fence-encl o o n and co n the LSE ar e l also be m o w ith the u s W R. of the LAC B radius, appr o River Natio n v er Basin W a h ed a Land &o tection of t B ad Axe Ri v i cultural an d u ral land to r pality to the oss from th e 258 consist t ern bluff.

c tivities are n o uthern bou nsite will be aving the si t ivities and t r Use d on the sho r t ends along u sage durin gcondensate ater is not c er does sup p n site wells w t e and disch a 0 miles do w ng the Missi s t rial purpos e bout 15 mil e u strial purp o m. has its ow n e locations o uring decom m r o sed LSE, ntrol measu r ea to the a d o nitored to e se of offsit e B WR site i s o ximately o nal Wildlif e a tershed as a& Water Re s t he environ m v er Watersh e d over 50%

o recreational l LACBWR e north-sout hs of various not being p e n dary of theminimally i te. Conseq u the potential res of the M ithe LACB W g the oper a cooling wat c urrently b e p ly the Lo w w ill support arged in acc o wnstream of s sippi River es, excludin g e s downstre a o ses betwe e n potable w a of all wells m issioning o 8-15 where mos t r es will b e djacent LA C e nsure their e lands are s predominane third is e & Fish R a Geograph i s ource Man m ent within e d. Approx of the land i s l and use, si m site is the h running H residences, rformed in a site. Also

, impacted d u uently, the oimpacts to l i ssissippi R i WR site fo r a tion of LA C er. With th e e ing used a s w Pressure a ndecommiss i o rdance wit hthe site, vi rare obtaine d g the adjace n am of the s i e n the LA C a te r supply, (active and o perations i s t work is e instituted C BWR prop e r effectiven eanticipated a ntly r ural a n water and b R efuge. W D i c Manage m agement Pl athis GMU. imately 36

%s forested.

T m ilar to othe rvillage of G H ighway 35.

farms, and a ny land are

, public acc e u ring deco m offsite land l and use off s i ver. The M r 3,000 fee t CBWR wa s e plant shut d s a cooling nd High Pr e i oning task s h the site's s rtually all m d from grou n n t G-3 fossi l i te. There a C BWR site provided t h abandoned)s not expec texpected t o to preven t erty as wel l e ss. Thus, nfrom the d n d undevelo bottomland s D NR has d e m ent Unit (G M a n (18), ad d The comm u% of the La T here is an i n r parts of ru r G enoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are n o s ite are con s M ississippi R i t from nort h s the use o f d own and f umedium f o essure servi c s and this w a tate dischar g m unicipal w und water.

Tl plant, is t h a re no othe r and Prairi e h rough a si n)are illustra t ted to be sig o be cond u t the spre a l as offsite a n o environ m decommissi o ped. Of th e s included i n esignated t h M U) and V e dressing lan d unity of Ge n Crosse-Ba d n creasing s h ral Wiscons ioximately 1rural com m businesses i t o the site o r oat launch a by rail and o t affected b sidered "Sm a ive r and its h to south.

f water fro m u el removed or reactor o r c e water sys a ter will co n ge permits.

w ater suppli e The nearest u h e coal-fired r known us e e du Chien , n gle ground w t ed in Figur e nificantly g r u cted. a d of areas. m ental oning e area n the he La ernon d use, noa is d Axe hift of in. 1 mile m unity i n the r near at the truck by the a ll." Thief The m the from r fuel tems. ntinue e s for u se of plant ers of , WI, w ater e 8-5. r eater La Cros s License T Revisio nthan the solids h o includes tank tha t Mississi p discolor a downsp o located i n to water u 8.6.3.4.This sec trelated t o ponds, r e to the w e The en v section 4a "Small"At LAC Bits WD N LACB WSystem (and WD N reduced erosion decomm idemoliti o Radiolo g (ODCM)Potentia l onsite m per year elevatio n 201 A/B b uilding s LACB W As the w LACB W No adve r decomm i quality a r s e Boiling W Termination n 0 pota b le wa t o lding tank a sanitary h t services t h ppi River a a tion. Roof o uts or throu n side the L S use are con s Wate r tion evalua t o surface w e servoirs an d e st and the R vironmental 4.3.3 of NU R" impact. BWR, all no NR permits.

W R which m (WPDES) a s NR Waste w through i m and sedi i ssioning, s t o n will be m gical impact

) limits an d l onsite gro u onitoring w efor radiolo g n s. The pla n; MW-202 A s in appro p WR former p r water from W R, the ther m rse impacts i ssioning a c r e bounded b W ater Reacto r Plan t er use duri nand pump e olding tank h e LSE Tur b at outfalls.

drains are e gh the nor m S E. Conse q s idered "Sm a r Quality t es potentia l w ater and g r d lakes. At R efuge wetla nimpact ev a R EG-0586 h a n-radiologi c Water m a m eet the Ge n s well as L A water Permit mplementatiomentation t orm water r m onitored an ds are mini m d assessed t h u ndwater i m e lls at LAC B gical analy s n t's networ k A/B; MW-20riate locati o r ocess areas the Missi s m al impact t o on surface w c tivities. C o by NUREG-r n g plant po ed off by a that service s b ine Buildi n Release a r ither discha r m al effluent r quently, in a c a ll." l project ef f r oundwater.

LACBWR, n ds to the s o aluation ass a s been det e c al water dis anagement p n oa site's W A CBWR's W. In additi o n of appro p control d r un-off fro m d controlled m ized throu g h rough the m pacts are m B WR. Rep is purposes k of down g r 3A/B; and M o ns and qu a and potenti a ssippi is n o o the Missis s w ater and g r o nsequently

,-0586 and c o 8-16 wer operati olocal state s the Admi n ng. Storm r eas are pe r rged to the g release path w c cordance w fects on th o Surface w the nearby b outh. ociated wit h ermined to becharges to t h programs a n WDNR Wis c W DNR Tier I o n, impacts p riate Best d uring dec m active im pif necessar y g h adheren c REMP an d m onitored b y resentative g when grou n radient well s M W-204A/B antity to i n a l release po i o longer us e sippi River h r oundwater a , the potent i o nsidered "

S ons. Sanit apermitted s nistration B u water runo f riodically m ground area w ay after pr o w ith NURE G o se portions w ater genera l b odies of w a th surface a e generally a h e Mississi p n d practice s consin Poll u II Industrial to the Miss Manage m e n c ommissioni n p acted area s y. ce to Off-si t d the groun d y the routin g roundwate r ndwater co n s (five pair e B) are situat e ntercept an d ints. e d to cool h as been eli m are expecte d ial impacts Small." a ry wastes a sanitary wa s uilding and a f f is divert e m onitore d f o surroundin g o cessing thr u G-0586, the p of the nat u lly refers t o a ter are the M a nd ground w a pplicable t o p pi River ar e s have bee n utant DischStorm Wat e sissippi Riv e nt Practices n g operat i s undergoin t e Dose Ca l dwater mo n n e sampling r samples a r n ditions are e d wells: M W e d around t h d detect co n operating p m inate d. d from the i mto surface a re collecte d s te hauler.

a sanitary h o e d directly t o r oil shee n g the facilit y u an oil sep a potential i m u ral enviro n o streams, r i Mississippi R w ater quali o LACBW R e controlled u n implemen targe Elimi n e r General P e r will be g r (BMP) fo r ions. Dg remediati o l culation M n itoring pro gof 10 perm r e obtained t at low and W-200A/B; he key LAC B ntamination plant syste m m plementati and ground w d in a This olding t o the n and y thru arator m pacts nment i vers, River ty in R with u nder t ed at nation Permit reatly r soil D uring o n or anual g ra m. anent twice high MW-BWR from ms at on of w ater La Cros s License T Revisio n 8.6.3.5.The env i 0586 ha s LACB W require m BMP to m sources sfrom the Fugitive demoliti o controll e Radiatio n excessiv e suppress iDemolit i specific a Appropr i extende dimpacte d No adve ractivitie s consider e 8.6.3.6.The en vNUREG-impact.

The aqu a House a t approxi m disturbe d decomm i fauna in removal Various these aq u included Plans fo requipme n Solution s perform e s e Boiling W Termination n 0 Air Q ironmental i s been deter m WR complies ments of the W minimize f u s uch as the facility. dust will o n of concrd demolitio n n Protectio n e or harmf u ion by misti n i on equipm e ations whic h i ate Health a d periods of d by exhaust rse impacts

s. Consequ e ed "Small."

Aqua t vironmental

-0586 has b atic habitat a t the shore l m ately 110 fe d during th e i ssioning a c the Missis s of the diffu sfresh water u atic enviro 53 species a r the demo l n t by barge.

s will conti n e d within a p W ater Reacto r Plan uality impact eval u m ined to be g with all ap p W DNR and u gitive dust d plant's die s be genera t ete buildin g n and d ism a n, Environm e ul dust emis s n g water wi l e nt will be h will pre v a nd Safety a operation t oemissions.

on air qua l e ntly, the po t ic Ecology impact ev a b een deter m a t LACBW R line to the fe et from th e e initial cotivities is n o s ippi River s er structure

,fish speci enments. A and 19 fami l lition of str u Conseque n nue to mai n p plicable li m r u ation asso c generally ap plicable Fe dthe Wisco n d uring dem o sel generato r ted from v g structures antlement te c e ntal, and S s ions are n o ll be used to operated a n vent excess issessments a o ensure th a l ity are exp etential imp a aluation as s mined to be R includes t hdiffuser str u e shoreline.

nstruction o o t expected and also n e , which shar es, macro-in 1980 stud y l ies (19).

uctures at L n tly, there is ntain WDN R mits. Protec t 8-17 ciated with plicable to L d eral and St a n sin Bureau o o lition and d r s are no lo n v arious dec oand the ex c c hniques, w i S afety and H o t generate dmitigate du nd maintai n i ve exhaust a nd controls a t personne l ected from t a cts to air q u sociated wi t generally a p h e area fro m ucture that Habitats a s o f the facil to disturb e e arby River e s a line wit v ertebrate p y indicated t LACBWR d no impact t o R permits a n tion of the nair quality i LACBWR w a te air qual i of Air Man aecommissio nger in ser v ommissioni n c avation of i th appropri a H ealth staff, d. As nece sst emission s n ed in acc oemissions s will also b e l and the e n t he implem e uality are b o t h aquatic e pplicable t o m the intake extends ou t ssociated w i l ity. How e existing aq utributaries, t h the G-3 f o p opulations, t hat the po p d o not incl u o the shoreli n n d decom m n earby Ref u in section 4 with a "Smal l ity regulati o agement, anning activit i v ice and ha v ng activitie ssoil. Care ate assessm e will be co n ssary, meas u s. ordance wit h from defe c e establishe d nvironment a e ntation of d o unded by N ecology in o LACBW R structure in t t into the M i th this are a e ver, the i m u atic habitat sstreams an d o ssil station, and veget a p ulation of f ude the rem o ne from thi s m issioning o p u ge wetland s.3.4 of NU R l" impact.

o ns, includi nd will impl e i es. Air em i v e been re m s , includin g ful plannin g e nts by Sol u n ducted to e n u res such a s h manufact u c tive equip m d during ex p a re not adv e decommissi o N UREG-058 6 section 4.3 R with a "S m tegral to th e Mississippi R a were previ mplementati o s , their flor a d wetlands.

is not plan n ation exist w f ish near th e o val of wa s s type of act i p erations w i s and habit a R EG-n g the ement i ssion moved g the g and u tions nsure s dust u rer's ment. p ected ersely o ning 6 and .5 of mall" e Crib River ously on of a and The n ed. within e site s te or i vity. ill be ats is, La Cros s License T Revisio n and will operatio n Exotic s reprodu c While t h rusty cra y ones in t conduct e the site.

A stud ymacroch i and cha n& Fish R perform e subsequ efossil st a require a construc t aquatic a The pot e 0586 an d The pot e and cons 8.6.3.7.The env i b een det e No kno w decomm i appropri a The lan dthe form afrom th e prevalen t operatio n onsite h a addition, that the d to the so udemoliti oanticipat e s e Boiling W Termination n 0 continue t o n s. s pecies ca ntion or sur v here are so m yfish, etc.)

i the vicinity e d at LACB W of the i m irus), fresh w n nel catfish (R efuge Pool e d in 1980.

e nt shutdow n a tion, has fu r a ny operati o tion, demoli a reas beyon d ential impac t d considered ential impac tidered to be Terre s ironmental i m e rmined to b wn terrestr i i ssioning p r a te BMPs a r d around L A a tion of ab o e Mississip p t in surroun d n s associate d abitats for m with the s h direct heav y uth, no dire c on activities e d impact t o W ater Reacto r Plan o be a prior i n threaten n vival rate, a m e known a q n Vernon C of the LAC WR have n o mpingement water drum

((Ictalurus p u 9 navigatio n It was d e n of LACB W rther reduce d ons resultin g tion, materi a d the site bo u t s to the aq uto be "Sma l t s to the aq u"Small."

strial Ecolo g m pact eval u be generally i al exotic o roject area.

re, and will c A CBWR wa s out 27 acres p i Rive r. T ding areas.

d with G-1 m any plant a n hort-term na t constructio n c t impacts t o do not incl u o the shoreli n r i ty when pl a n ative spe c and disease s q uatic invasi ounty, thes e BWR site (o t resulted i n and entrai n (Aplodinotu u nctatus), w n areas fro m etermined t h WR and red u d this impa c g in any i m al and wast e u ndary. uatic ecolog y l l." u atic ecolog y g y uation of ter rapplicable t o o r invasive To minim c ontinue to b s initially di sby filling ri vherefore, t h Given the e and G-3 a s nd animal s p t ure of the w n and demo o any off-sit e u de the rem o n e. 8-18 a nning onsi t c ies and e c s or parasit eve species (e have been n 20). The o p n the introd u nment of t s grunniens

)within the U p m the operati o hat the imp a u ce d intake o c t. Decom m mpingement e staging or y within the y beyond th e r estrial ecol o o LACBW Rspecies h ize the intr o b e followed.

sturbed by t h v er edge an d h e site shor e e xtensive la n s well as L A p ecies, incl u work associ a lition proje c e sensitive s p o val of wast e te dismantl e cosystems d es they ma y (e.g. zebra m n oted in slo u p eration an d u ction of an y the fishes, ), gizzard s h p per Missis s o n of LAC B act was mo o perations, l m issioning o p and entrai n transfer op e site bound a e site bound a o gy in secti o R with a "S m h ave been n oduction o f t he construc t d low fores t eline no lo n n d distu r b an c A CBWR, t h u ding endan gated with d e ct area is se p p ecies are a n e or equip m ement or w a d ue to ag g y transmit t o m ussel, curl y u ghs and la k d decommisy aquatic i nsuch as b l h a d (Doros o sippi River N B WR and G-st likely in s limited to s u p erations ar e nment imp a erations wil l a ry are bou n ary have al s on 4.3.6 of N mall" impact.

n oted to o f exotic or i t ion of the f t areas with nger resembce, constru c h e terrain h g ered or inv ecommissio n parated fro m n ticipated.

S m ent by barg e a ste manag e gressive gr o o native sp e y-leaf pond w kes other th a sioning acti v nvasive spec i luegill (Le p oma cepedi a National W i-3 was previ s ignificant.

u pporting th e e not expec t a cts to fish.

l be perfor m n ded by NU R so been eval u N UREG-058. occur withi n i nvasive sp e f acility, incl umaterial dr eles the sho r c tion and ye aas not sup pasive speci e n ing and th e m the Refug e Since the pl a e , there is al ement owth, ecies. w eed, a n the v ities i es to pomis anum) ildlife ously The e G-3 ted to No med in REG-uated 6 has n the e cies, uding e dged reline ars of p orted es. In e fact e area a nned so no La Cros s License T Revisio n Best Ma n spills res The pot e"Small."

The pot e evaluate d 8.6.3.8.

The pot e and cons A revie w Endang e two spe c which L AA m Miss iA pl a facin No note d due to t hthe exist i River to terrestri a presence been no t Higgins e Likewis eWiscons i Habitat Plimeston e townshi pfor this p The Per e Species l of falco n protecti odelisted hatching decomm i falcon re s e Boiling W Termination n 0 nagement P rulting from ential impa c ential impa c d and consi d Thre a ential impac t idered "Sm a w of the U e red, Propo s cies are desi g ACBWR re s m ussel speci e i ssippi Rive r a nt species, g slopes: T h d adverse i m he siting and i ng G-3 fos sthe west an d a l or aquatic of the Hig g ted. A mu s e ye pearly m e , the North e i n Departm e P rogram (2 2 e cliffs ove r ps within V e p lant species e grine Falco n l ist in 1975 n nesting bo x n (23). Ov e i n 1999 (2 4efforts.

S i ssioning w icovery effo r W ater Reacto r Plan r actices an d equip m ent o cts to terre s cts to the t dered to be "

atened o r En d t s to "Thre a a ll." U.S. Fish a n s ed, and Ca g nated as "

T sides in: es, Higgins r: Endange r Northern m hreatened.

mpacts to aq u operation o f sil station, t h d the rail linhabitats w h gins eye pe a s sel survey o m ussels were e rn monksh o e nt of Agri

2) has noted r creeks an d e rnon Count yto be impa c n (Falco pe rand startin g xes at its fa c erall, Peregr 4); however, Since the G ill not inter f r t and popul a r d site proce d o peration.

s trial ecolo g t errestrial e cSmall."

d angered S p a tened" or "

E nd Wildlife ndidate Sp e T hreatened" eye pearl y red. monkshood uatic species f the LACB W he majority o e and High w hich may be arlymussel i of the Thie f found. o od has not culture, Tr athat the No r d streams a n y. This ha b c ted by deco m r egrinus) w e g in 1993, D c ilities, incl u i ne Falcon r Dairyland G-3 facility fere with G

-a tion. 8-19 d ures requir e g y are b ou n c ology bey o pecies E ndangered"Service li s e cies' Coun ty or "Endang ymussel (L a (Aconitum n have been n WR facility

, of the licen s way 35 to th einhabited b yn mussel b e f Slough ri v been noted a de & Con s rthern mon k n d the plant b itat is not p mmissionin g e re put on th eairylan d su p uding at the G r estoration p has continu e will still c-3 operatio n e prompt cl e n ded by N U o nd the sit e" species ar e sting, the F ty Distribut iered" withi n ampsilis hi g n oveboranc e n oted during

, as well as t sed site, situ e east, is de v y threatene d eds in the v i v e r area wa s on or in th e sumer Prot e kshood's ha bis present i present with i g operationse Wisconsi n pported rec o G-3 stack, t o program eff oed to maint c ontinue op e ns or its sta c e anup and r e U REG-058 6 e boundary e bounded b Federally-Li s i on (21) co n n Vernon C o g ginsii), wit h e nse), with plant opera t t he previous uated betwe e v eloped and d or endang e icinity of L A s conducte d e vicinity of ection's En d b itat is leac h i n the Whit e i n or near t

h. n Endangere d overy effort s o support c h o rts resulted t ain the G-3 erations an d ck, there is emediation o 6 and consi d have also b y NUREG-s ted Threa t ncluded that o unty, the c o h habitat i nhabitat in n t ions. In ge n G-1 facilit y e n the Missi s does not s u ered species.

A CBWR h a d in 1978 a n LACBWR. d angered S p h ed sandston e stown and he LACBW R d and Threa t s with instal l h ick hatchin gin the bird b nesting sit e d the LAC Bno impact t of oil dered been -0586 tened, only o unty n the n orth-neral, y , and s sippi u pport The as not n d no The pecies e and Stark R site tened lation g and being e and BWR t o the La Cros s License T Revisio n 8.6.3.9.Occupat i consider e The env iNUREG-impact. program s also dur iare thos e ergono m Solution s contract o prevent owith fed States O c Typical followin gSafe tSafe tProv iWor k spec i such Obta iInvo l pack aIssui n lesso nHold reinf o 8.6.3.10.A detail eLTP. 8.6.3.11.LACB W efficient with so m s e Boiling W Termination n 0 Occu p i onal issues/

ed "Small."

ironmental i-0586 has b While deco m s addressin g i ng repair a n e related t o m ic, and biol o s is comm i or health an d o ccupationa l eral and st a c cupational Hcontractor g: t y training a s ty emphasis i ding a ll wo r k er training ific worker qas heavy eq u i ning and re v l ving Healt h a ges and pa r n g periodic n s learned.

ing safety s o rce safety e Cost e d discussio n Socio W R was shut to operate.

m e projects W ater Reacto r Plan pational Iss usafety has b impact eval u b een deter m mmissionin g g worker sa f n d refueling o human h e ogical hazar d i tted to de c d safety pro g l injuries an a te regulati o Health and S safety prac t s a part of t h as the first t o r kers with a and requir e qualificatio n uipment de m viewing Sa fe h and Safe t r ticipating i nsafety mess s tan d-down s e vents and l e n of the site economic I mdown in 1 9 By 1994, s oassociated r ues/Safety een evaluat e u ation asso c mined to b e g involves i n f ety were i m outages.

T e alth and s a d s. Radiolo g commission i grams to eff e d illnesses.

o ns includin g S afety Adm i tices and c h e site acces s opic of disc u Health and S e d certificat i n s. Certain s molition fir m fe ty Data Sh e ty staff in n pre-job wa l ages to co m s whenever e ssons learn edecommiss i m pacts 9 87 as the s m ome increm e with the r 8-20 e d to be bou n ciated with generally a p n creased ind u mplemented T he occupat i afety, inclu d gical impact i ng LACB W e ctively con t Contractor g Wisconsi n i nistration (O communicat i s program f o ussion at me S afety book l i ons revie w s pecialty su b m s. e ets for che m reviewing l kdowns, w o m municate a wserious sa f ed site-wide

.i oning proj e mall size o f e ntal decom m removal of nded by N Uoccupation a pplicable t o ustrial activ i during the i onal issues ding impac t t s were disc u WR safely trol hazards health and s n Departme O SHA) req u ions will i n o r all emplo y e etings. let. w prior to a s b contractors m icals boug h and appro v o rk conditio n wareness o f f ety events

. ect costs is p f the plant d m issioning p the RPV i U REG-0586 al issues in o LACBW R i ties and sa fe operation o f and safety ts from ph y u ssed in sec tthrough th ein the work safety prog r e nt of Labo r u irements.

nclude acti o y ees and su b ssignment t o are mobili z h t onsite.

v ing decom m n assessme n f significant occur to c presented in did not mak e p lanning an d in 2007 anand the imp section 4.3.

R with a "S m fety focus, s i f the facilit yimpacts ass y sical, che m t ion 8.6.2.

e applicati oenvironme n r a m s will c o r and the U o ns such a s b-contractor s o tasks req u zed, as nece s m issioning n ts and revie wsafety issue ommunicat e Chapte r 7 o e it econom i d activities b d other m e p act is 10 of mall" imilar y and essed mical, o n of n t and omply United s the s. uiring ssary, work w s. s and e and of this ically began etallic La Cros s License T Revisio n radioacti vcomplet e periodic the ISFS I More a ctimefra m obtained personn eactivitie sincrease d project a n Therefor impact i s 8.6.3.12.The per c Vernon C Crosse) aimpact t o Decom mtranspor t Highwa yrelative t There is impacte dsite spec i 8.6.3.13.A revie w May 201 historica l the plan t Archeol o which w a Also, as along Hi the US A Upper M Axe. T h first nuc lmarker a concern s s e Boiling W Termination n 0 ve compon e e d by 2012.

spikes in w I project) (2 ctive deco m me. Some ofrom outsi d el from the l o s will have a d use of the n d workers w e, the soci o s considered Envir o c entages of C ounty are q and more p o o the greater m issioning a c t equipment y 35 traversi n o rail and tr u no reason d by the dec o ific impact i Cultu r w of the N 5 a nd the W l sites in V e t. The clos e ogical Site n e a s certified bindicated i nghway 35 i nCE Lock a n Mississippi.

T h e third wa s l ear gene r at i t the waysi d associated w W ater Reacto r Plan e nts over t hStaff size a t o r kforce hi r 5). mmissioning of the labor de Wiscons i o cal and re g a short-ter mlocal craft w w ith suppli e oeconomic i"Small." onmental J u low-incom e q uite low, a opulated Wi population, c tivities will and debris.

n g north-so u u ck transpo rto believe ommissioni n s considere d ral, Historic

, National Par k W isconsin H e rnon Count y e st historica l e ar Stoddar d b y the Natio n n NUREG-0 n Vernon C o nd Dam No.

T he second , s adjacent t o i ng plant. I n d e across Hi g w ith having r he past 7 y e t the plant h a r ing to supp oand struc ttasks requ i i n; however

, g ional areas m positive e c w orkforce a e s and servic impact is e v ustice e and mino r approximate l sconsin cou n including s pcause sligh t The truck t u th by the s i rtation as a r ethat low-i n n g project.

d "Small."

, and Arche o k Service N Historical S o y and no st r l site with p r d , WI. locat e n al Park Se r191, the St a o unty. One i 8. It descr i , about 7.5 m o LACBW R n 2009, cre w g hway 35 fr o a public-ac c 8-21 ears. A s m a s graduall y ort specific tural demol i ire speciali z , some of t hsurroundin g conomic im p a nd opportu nes. v aluated to ity groups w l y 3%, and nties furthe r p ecial grou p t increases i traffic will u i te. There e sult of dec o ncome and m Per NURE G o logical Res N ational Re g ociety (29) t h ructures in t h re-historica l e d approxim a r vice in 198 0 ate of Wisc o i s about a h a ibes the ori g m iles south o R and comm e w s erected a om the site (cess marker o m all ISFSI f y been r educ e project nee d i tion is an t zed skills a n h e workforc g the site.

O p act on the nities for lo c be bounde d within the Vlower than r from the L p s, is expect e i n truck traf f use existing will be no e ommissioni n m inority p o G-0586 and ources gister of H t hrough Ma y h e village o l structural rately 7 mile s 0 (30). o nsin has pl a alf mile nor t gin of the p r of the plant,emorates th a new, updat (31). This n e on Dairylan f acility hol ded as opera t ds (e.g. 40 p ticipated i n nd equipme ne will be c o Overall, the d local com m cal business d by NUR E Village of Gthose in lar g LACBWR s i ed. fic to and fr omain street environmen t ng. o pulations w this evalua t Historic Pla c y 2015 iden t f Genoa or w remnants is s north of t h aced three h t h of LACB W resent syste m , highlights t e plant itse l t e d Wiscons i ew location d property.

ding 5 cask s t ions ceased

, personnel st a n the 2016-n t which w i o mprised o f decommissi o m unity due t s es to suppo r E G-0586 an d G enoa as w e ge cities (e.

i te (26) (27)om LACB W routes, pri m tal justice i m will be adv e t ion, the pot e c es (28) th r tified only a within 5 mi lthe Goose I h e LACBW R historical m a W R, overlo o m of locks o the Battle o f lf as Wisco n i n state hist o resolved se c s was , with affing -2017 ill be f craft o ning t o the rt the d the ell as g. La . No WR to marily mpact ersely ential r ough a few l es of Island R site, a rkers oking o n the f Bad n sin's orical c urity La Cros s License T Revisio n Dairylan presents or categ o Land d iprimaril y Land th a the cons t station) w erosion c Based o ntranspor timpact o n 0586 a n Archaeo l 8.6.3.14.The env i 0586 ha sThe imp a disturba ncomplet eremoved River. Tcompleti ThereforNUREG-8.6.3.15.The env i has been LACB W 475 feet north si d south si d hospital s approxi m Noise g eequipme ntempora rcomplet e experien c s e Boiling W Termination n 0 d sent an u nthe control r o rize any pa r i sturbance f o y shipped vi a a t was distu r t ruction an d w ere perfor m c ontrols and n the histo r i c t ation of sy s n cultural, h n d based u logical Res o Aest h ironmental i s been deter m a ct of deco m n ce and dur a e d. Once al l , the aesthe t T he final d e on of the de c e, the envir o-0586 and t h Nois e ironmental idetermined WR is locate d west of the d e and a por t d e. There a r within 1 m mately 1 mil e e neration w i nt. Noise r y and will e , noise leve l c ed during t h W ater Reacto r Plan n used contro l r od an d a r e rt of the LA C or the remo v a rail. rbed for pro j d demolition m ed in acc ostormwater cal informat stem compo nistoric, and a u pon this e o urces are c o hetics impact eval u m ined to be g mmissioning ation. These l of the maj o t ics will im p etermination c ommissio n onmental i m h e impact is impact eval u to b e gener a d on the sh orail roa d li n tion of the U re no reside n mile. The n e to the nort h ill primarily associated woccur pri m ls in the vic i he operatio n r l rod to the W e plica fuel a s CBWR plan t v al of large jects beyon d of the G-1 ordance wi t pollution pr i on present e n ents and w a rcheologic a valuation, t o nsidered "S m u ation asso c generally ap on site aest h impacts ar e or plant stru c p rove slightl y on usage oing. mpact assoc iconsidered "uation asso c ally applica b ore of the M n e. USAC E U pper Missi s nces within 1 earest com m h of the pla nresult fro m w ith decom m marily duri n inity of the L n of the facil i 8-22 W isconsin H s sembly (3 2 t as a histori component s d the nucle afossil stati o th applicabl e e vention pl a e d in NURE G w aste, the d e a l resources.

t he potenti a mall." ciated with aplicable to L h etics (e.g.

v e temporary c tures and b u y b y provid i o f the deco m iated with a e"Small." ciated with n b le to LAC B Mississippi R E land and L s sippi River 1,000 feet o f munity, the nt. m demolitio n m issioning a n g daylight LACBWR s i ty. Historical M u 2); however, ical site.

s will be mi n a r operation a o n an d the c e permits a n a ns. G-0191 an d ecommissio n. Conseque n a l impacts aesthetics i n LACBWR w visual skyli n and will ce a uildings eas t ing a more o mmissioned esthetics is n oise in sec t B WR with a "River, 300 f e L ock and D National W f the station village of G n activities i and shipmen t hours. O n site will be r u seum in M athere is no n imized as t a l areas (e.

g onstruction n d include d d the current n ing will h a n tly, as bou n to Cultur a n section 4.

3 with a "Smal l ne) is limite d a se when de c t of the Mis s o pen view o property w ievaluated t otion 4.3.16 o"Small" im p feet from th e Dam No. 8 a r Wildlife & Fi structures a Genoa, Wis c nvolving h e t of waste i s nce the de c reduced to l e adison, WI w objective t o t he waste w g. associate d of the G-3 d appropriat eapproach f o a ve no signi f n ded by NU R al, Historic, 3.15 of NU R l" impact.

d in terms o f commission i sissippi Riv e o f the Missi s ill be made o be bound e of NUREG-p act. e river ban k re located o sh Refuge o a nd no scho o c onsin is l o e avy constr u s intermitte n commissioni n e vels below w hich o save will be d with fossil e soil o r the f icant R EG- and R EG-f land ing is er are ssippi upon e d by -0586 k , and o n the o n the ols or ocated uction nt and n g is those La Cros s License T Revisio n Due to timpacts decomm iimposed ThereforNUREG-8.6.3.16.The env iNUREG-impact.

During t hefforts w Low lev e disposal addition, Texas. As state d process a and fuel These r edestabili z Therefor b ounded 8.6.3.17.The env iNUREG-impact.

The nu m than durincrease d effect o n b arge tr a support t operatio n Therefor by NUR E 8.6.3.18.Cumulat iimpact o f s e Boiling W Termination n 0 t he distanc e on noise l i ssioning, S by the Vill a e, the envi r-0586 and t hIrretr i ironmental i m-0586 has b he demoliti o will be mad e e l radioacti vsite in Cliv e any Class B d in NURE G are the mate r used for co n esource co m zing. e, the envir o by NURE G Traff i ironmental i-0586 has b mber of ship m i ng the ope d traffic and n traffic flo w affic. The e t he operatin g n s. e, the envir o E G-0586 an dCum u ive impact i s f the action w W ater Reacto r Plan e of the sta t l evels duri n S olutions ag r a ge of Geno a ronmental i h e impact is ievable Res o m pact eval u b een deter m o n and struc

e. Some m e v e waste ha s e , Utah. T h B/C waste t h G-0586, irret r rials used to n struction m mmitments onmental i m G-0586 and t h c and Trans p impact eval u b een deter m ments and t h ration of t h wear and te w or road w e xisting bar g g G-3 fossil onmental i m d the impac t ulative Impa c s defined th e w hen added r tion from s e ng decomm rees to co m a. mpact asso cconsidered "ources uation assoc i mined to be tural disma n etals from t h s been and his facility h h at is gener a rievable res odecontami n m achinery an d are consid e mpact assoc i h e impact is p ortation uation asso c mined to be he volume o f he facility. ar on road w e ar. There w g e traffic on station and m pact associ t is consider e c ts e impact on to other pa s 8-23 e nsitive rec e issioning a n m ply with a ciated with "Small." iated with ir r generally a p ntlement of h e site are a n will contin u has sufficien t a ted will be s o urces that w nate the facil i d for transp o ered to be iated with i rconsidered ciated with t generally a p f waste shi p Non-radiol o ways. It is a n will be no r athe Thief Sare not asso ated with tr ed as "Smal l the environ s t, present, a e ptors, ther e nd demolit i a ny noise l i noise is e v retrievable r pplicable t o the station, anticipated t o u e to be shi p t space for t s hipped to t h w ould occur ity (e.g., ra g o rtation of mminor and r retrievable "Small." transportati o pplicable t o p ped are gre a ogical impa c nticipated th a adioactive w S lough b ran c ociated with ransportatio n l." nment which a nd reasona b e will be l i ion activiti e imitations (e valuated to r esources in o LACBW R recycling a n o be release p ped to the t he disposal h e WCS fa c during the d gs, solvents, m aterials to aare neithe rresources i s on issues in o LACBW R ater during d cts of trans p at there will waste shipm e c h and the M LACBWR d n is evaluat e h results fro m b ly foreseea b imited temp e s. Durin g e.g. quiet h be bound e section 4.3.

R with a "S m n d asset rec o d as clean s Energy Sol uof this was t c ility in An d decommissi ogases, and t o and from th e r detectabl e s evaluated section 4.3.

R with a "S m decommissi o p ortation in be no signi f e nts execut e M ississippi R decommissi o e d to be bo u m the incre m ble future ac torary g the h ours) ed by 18 of mall" o very scrap. utions te. In drews, oning ools), e site. e nor to be 17 of mall" o ning clude ficant e d via River oning unded m ental t ions.

La Cros s License T Revisio n The cu m decomm iterrestri acumulati v Past, p r decomm i Mississi p resource sactivitie s over timmajor ir r disposal disposal In sum m 8.7.O 8.7.1.F Decom mHan dWor kPubl iLice nWor kLiqu iHaz aHan d Charact e of lead p 8.7.1.1.The maj oare admi nPart 2Part 5Part 5Part 6 s e Boiling W Termination n 0 mulative imp a i ssioning.

T a l ecology.

v e impact.

r oposed a n i ssioning o f ppi river for s listed ab o s are not pro j e , exceed t h r etrievable r eof low le vand will the r ary, the cu m Overview of F ederal Req u m issioning a c d ling, packa g k er radiatio n i c radiation p nse terminat i k er health a n i d and gase o a rdous waste d ling and re m rization an d aint. Nucl e o rity of radi o n istered by t 2 0 - Radiati o 5 0 - Decom m 5 1 - Enviro n 6 1 - Dispos a W ater Reacto r Plan a cts were as hese includ eIrretrievab l nd future f coal-fired p boating. T h o ve were a l jected to si g h e minor i m esource attr i v el radioacti v refore have n mulative imp a Re g ulatio n uirements c tivities that g ing, and sh i n protection, protection, i on and fina l n d safety, o us effluent r generation/

m oval of as b d removal o f ear Regulato r ological act i t he NRC. A o n protectio n m issioning a nmental pro t a l of radioa c r sessed by fi e surface w l e resource sforeseeabl e p ower plan t h e individua l ll determin e g nificantly a c m pact of the i butable to L ve waste. N no cumulati v a ct to site r e n s Governinare subject t ipment of ra d l site releas e releases, disposition,estos, f Polychlori n ry Commis s ivities fall u n A pplicable T i n. activities.

tection. c tive waste.

8-24 rst determi n w ater and gr o s were als o e actions ts and recre a l impacts o f e d to be m i ccumulate e n individual a LACBWR d N o future a c ve effect.

e sources is p r g Decommi t o federal re g dioactive w a e , nated Biphe n ion nder Title 1 0 i tle 10 regul a n ing the res o o undwater, o evaluate d include c o ational use f the LACB W i nor. The p nvironment a activities o n d ecommissi o ctivities wi l rojected to b i ssionin g A c g ulations in c aste, n yls (PCBs)0 of the Co d ations inclu d o urces affec tair quality, d from th e onstruction, of the land W R decom m p ast, presen t al impacts t h n the affect e o ning was t h ll involve r be minor.

ctivities an d clude: ), and Hand l d e of Fede r a d e: t ed by LAC B aquatic ec o e perspecti v operation as access t m issioning o t and futur e h at would in e d resources he use of la n radioactive w d Site Relea s l ing and re m al Regulatio n BWR ology, ve of and t o the o n the e site total, . The n d for w aste s e m oval n and La Cros s License T Revisio nPart 7 thro uPart 7 8.7.1.2.The En v Federal RPart 6Parts Part 1Part 1Parts Part 2Part 7Part 1 8.7.2.FPermits a environ m fall undeWiscWisc Envi rVillaOcc u This inf o intended 8.8.C As previ o decomm i"site-spe potential predicte d (NURE G environ m s e Boiling W Termination n 0 7 1 - Packag u gh 174 also 7 3 - Physic a U.S. E vironmental R egulations 6 1 - Asbest o 122 to 125

-141 - Safe D 1 90 - Radia t 260 to 272

-2 80 - Unde r 761 - Toxic 1 29-132 - C F ederal, Sta t a nd approva l m ental prote cr Federal, S t onsin Depa r onsin Dep a ronmental a n ge of Geno a u pational Sa f o rmation pr o to be all-in c C onclusion ously evalu a i ssioning L A cific" in N Uenvironme n d in and wi l G-0191, NU R m ental chan g W ater Reacto r Plan ing and tra napply). al Protectio n Environmen tProtection Aapply as fol l os Handling

- National P D rinking W a t ion Protect i- Resource C r ground Sto r Substance C C lean Water A t e and Loc a ls from or n o c tion purpo s t ate and loc a rtment of N a artment of n d Occupati o a f ety and He a o vided abo v clusive. a te d in the D A CBWR are U REG-0586 ntal impacts l l be bound e R EG-0586, a ges associat e r n sportation o n of Plants a n tal Protectio A gency (E P l ows: and Remov a Pollutant Di s ater Standar d i on Standar d C onservatio rage Tanks C ontrol Act (A ct a l Require m otifications t s es. Decom m al jurisdictio n a tural Resou r Health S e onal Health, a lth Admini s ve is a gen e D-Plan/PSD A temporary a have been associated w e d by the p a nd D-Plan/

P e d with deco m 8-25 f radioactiv e n d Materials n Agency P A) regulati o a l s charge Eli m d s d s for Nucle a n and Reco v (TSCA) for ments t o state and l m issioning a n include, b u r ces (WDN R ervices, Di v Radiation P s tration (OS H eral overvie w AR, the non-a nd not sign i evaluated a with decom m r eviously is P SDAR). T mmissionin g e waste (reg. ons outline d m ination Sys t a r Power O p v ery Act (R C Polychlorin a l ocal agenci activities a n ut are not li m R) v ision of Protection S e H A) w of the a pradiologica lificant. Th e a nd there is m issioning L ssued envir o Therefore, t h g. g ulations in 4 d in Title 4 0 tem (NPDE S perations CRA) ated Biphe n es are requi r n d related si t m ited to the Public He a ection pplicable re g l environme n e potential is no signific a LACBWR h onmental i m h ere are no n 49 CFR Par t 0 of the Co d S) n yls (PCBs) r ed for safet y t e operation sfollowing:

a lth, Bure a g ulations an d ntal impacts sues identif i ant impact.

h ave already m pact assess m new or signi f t s 171 d e of y and s that au of d not from ied as The been m ents ficant La Cros s License T Revisio n 8.9.R 1. U C 2 2. D R 3. D S 4. U r e C 5. U S N 6. D D 7. E S 8. E S 9. A 10. H 3 11. U h t 12. D 13. U 14. U h t15. h t s e Boiling W Termination n 0 R eferences U.S. Nuclear C ontent of L i 011. D airylan d Po R eactor - Se p Dairyland Poupplement R U.S. Nuclear elated to Op e C ooperative

-U.S. Nuclear tatement (G November 2 0 Dairyland Po Decommissi o E nergySoluti urvey Repo r E nergySoluti urvey Repo r Atomic Pow e H aley & Ald r 0, 2012.

U.S. Census B t tps://www.

c Dairyland Po U.S. Fish &

W U.S. Army C t tp://www.m t tp://www.c i W ater Reacto r Plan Regulatory i cense Term iwer Compa n ptember 197 2 wer Cooper a R eport - Ju nRegulatory e ration of t h- April 1980Regulatory EIS) on De c 0 02. wer Cooper a o ning Activi t ons GG-EO-rt for Octob e ons LC-RS-r t for June t h e r Review, "

A r ich, Hydro g B ureau, 200 c ensus.gov/

p wer Cooper a Wildlife Ser vorps of Eng i m vp.usace.a r ity-data.co m r Commissio n i nation Plan n y, DPC-E D 2. a tive, Envir o n e 15, 1973. Commissio n he La Crosse . Commissio n commission i a tive, LAC B ties Report

(-313196-R S e r and Nove m PN-164017-h ru August 2 Atomic Jou r geological C 8-2012 Am e programs-s u ative - http:

/vice - http://

i neers - rmy.mil/Mis s m/city/Geno a 8-26 n Regulator y s for Nucle a D-3, Environ onmental R e n NUREG-0 Boiling W a n NUREG-0 i ng of Nucle B WR Deco m (D-Plan/PS D S-RP-001, L A m ber 2014 F-001, LAC B 2 015 Field W r nal" - Sept e onceptual S i erican Com m u rveys/acs/n e//www.dair y www.fws.g o s ions/Navig a a-Wisconsin

.y Guide 1.1 7 a r Power Re a nmental Rep o e port, La Cr o 0 191, Final E ater Reactor 0 586, Gener i ear Facilities mmissioning D AR), Revi s A CBWR R a Field Work

-B WR Radiol o W ork - Nov e e mber 24, 2 0 ite Model, F m unity Surv e e ws/data-rel e ynet.com/en e o v/refuge/U pation/Locks D.html. 7 9, Standar d actors, Revi s ort - Lacros s o sse Boilin g Environmen t by Dairyla n i c Environ m, Suppleme n Plan and P o s ion - Marc h a diological C- Novembe r o gical Char a ember 2015.

0 11. F ile No. 387 0 ey. (5-year d e ases.2012.

h e rgy_resour c p per_Missi s Dams/Lock D d Format an d s ion 1 - Jun e s e Boiling W g Water Rea c tal Stateme n n d Power mental Impac t n t 1, Volum e o st Shutdow n h 2014. C haracteriza t r 2015. a cterization 0 5-001 - A u d ata sets) -

h tml. c es/genoa.p h s sippi_River

/Dam8.aspx.

d e W ater c tor, n t t e 1 - n t ion u gust h p. /.

La Cros s License T Revisio n 16. D P W 17. D D 18. V 19. M C D 20. W- 21. U C h t 22. W S 23. D h t 24. W h t 25. H L 26. V r e 27. U 28. N 29. W 30. N S 31. D 2 32. W s e Boiling W Termination n 0 Dame & Mo o otential, La W isconsin fo Dairyland Po Decommissi o V ernon Cou n M cInterny, M C ooperative' s December 1 9 W isconsin D ehttp://dnr.w U.S. Fish an d C andidate S p t tp://www.f w W isconsin D epecies Habi t Dairyland Po t tp://www.d W isconsin D e ttp://dnr.wi.

g H ubbuch, C h L a Crosse Tr i Village of G e ecords.com/

w U.S. Census B National Par k W isconsin H i National Par k ite Ve-502

-Dairyland Po 009. W isconsin H i W ater Reacto r Plan o re, Geotec h Crosse Boil r Gulf Unit e wer Cooper a o ning Plan, r n ty, Land &

W M ichael. C., I s Genoa Sit e 9 80. epartment o f i.gov/lakes/

i d Wildlife S e pecies' Cou n ws.gov/mid w epartment o f tat Program wer Cooper a dairynet.com

/epartment o f g ov/eek/crit t h ris, A nucle a i bune - Jul y e noa, Verno n wisconsin/g e B ureau, Ver n k Service, N a istorical So c k Service, N a- http://nrhp.

wer Cooper a istorical So c r h nical Invest iing Water R e d Nuclear F a tive, LaCr o r evised Nov e W ater Reso u Impingeme n e , Thesis, su b f Natural R e i nvasives.

ervice, Fede r n ty Distribut i w est/endang f Agricultur e- http://datc p a tive, Pereg r/environme n f Natural R e ter/bird/falc o a r option: A y 15, 2012.

n County, W e noa_data.h t n on County , ational Regi c iety - http:/

/ational Regi focus.nps.g o a tive, Powe r ciety, Nucle a 8-27 i gation of G Reactor (LA C F uels Corpo r osse Boiling ember 2003.

urce Manag e nt and Entrai bmitted to U esources, Aq u rally-Listed i on, April 2 0ered/lists/w i e , Trade &

C p.wi.gov/Fa rine Falcon R ntal/falcon_

p e sources, Pe r on.htm. f ter 25 year s W I Public Re c t m. , Wisconsin ster of Hist o/www.wisco stry of Hist o o v/natregse a r for Genera t ar Fuel Asse m G eology, Sei s CBWR) nea r r ation - Oct oWater Rea c. ement Plan

-inment of Fi U niversity o f q uatic Invasi vThreatened, 0 15 - i sc-city.htm l Consumer P r arms/Endan g Restoration program.ph p regrine Falc o s , Genoa re a c ords - http:- http://ww w o ric Places -

o nsinhistory.

o ric Places, G a rchresult.d o t ions, Geno a m bly - http:

/s mology an d r Genoa, Ve r o ber 1973.

c tor (LACB W- February 2 shes at Dair y f Wisconsin

-v e Species

-, Endangere d l. r otection, E n gered_Speci eProgram -

p. o n - a ctor's wast e//www.ope n w.census.go v http://ww.n p org/. G oose Islan d o. a Site Upda t//www.wisc d Liquefacti o r non Count y W R) 2 009. y land Powe r-La Crosse

-- Vernon C o d, Proposed n dangered e s/index.asp x e gets new h o n-public-v/. p s.gov/nr/.

d Archeolo g te - Decemb onsinhistor y o n y , r - o unty and x. ome, g ical er y.org.

La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan Fi g r ure 8-1 S 8-28 S ite Re g ion a a l Location

La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan r Figure 8-2 8-29 2 Site O v v erview L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r Figure 8-3 8-30 LACBWR B u u ildin g s La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan F i r ig ure 8-4 8-31 Topo g rap h hical Map L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r Figure 8-5 5 Groundwa t 8-32 t er Samplin g W Wells - LACB W WR Site