ML16162A755: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


==Subject:==
==Subject:==
-Penn State Breazeale Reactor -Permanent changes in the facility organization-Level 1  
 
-Penn State Breazeale Reactor -Permanent changes in the facility organization-Level 1  


==Dear Sir or Madame:==
==Dear Sir or Madame:==
This letter is submitted in accordance with the requirements of PSBR (TS 6.6.2.b.l) to provide a written report of a "Permanent change to the facility organization involving level 1-2 personnel" within 30 days of the change. Effective May 9, 2016, Dr. Neil Sharkey, Vice President for Research, permanently assumed the Level 1 position. Previous correspondence had notified the NRC of his temporary role while a personnel search was in progress. In addition to this formal role change, the position title has been modified to reflect a new scope of responsibilities necessitating a change to Section 6 of the PSBR Technical Specifications. We will request a change in our Technical Specification reflecting the title change. The contact information for Dr. Sharkey has not changed. Please address any questions regarding this report and amendment request to Mark Trump, Associate Director for Operations, at 814-863-2745. Sincerely, Kenan Dnlii, PhD Director, Radiation Science and Engineering Center Professor of Nuclear Engineering Cc: N. Sharkey A Atchley M. Trump X. Yin, U.S. Nuclear Regulatory Commission 0. Font U.S. Nuclear Regulatory Commission College of Engineering An Equal Opportunity University}}
This letter is submitted in accordance with the requirements of PSBR (TS 6.6.2.b.l) to provide a written report of a "Permanent change to the facility organization involving level 1-2 personnel" within 30 days of the change. Effective May 9, 2016, Dr. Neil Sharkey, Vice President for Research, permanently assumed the Level 1 position.
Previous correspondence had notified the NRC of his temporary role while a personnel search was in progress.
In addition to this formal role change, the position title has been modified to reflect a new scope of responsibilities necessitating a change to Section 6 of the PSBR Technical Specifications.
We will request a change in our Technical Specification reflecting the title change. The contact information for Dr. Sharkey has not changed.
Please address any questions regarding this report and amendment request to Mark Trump, Associate Director for Operations, at 814-863-2745.
Sincerely, Kenan Dnlii, PhD Director, Radiation Science and Engineering Center Professor of Nuclear Engineering Cc: N. Sharkey A Atchley M. Trump X. Yin, U.S. Nuclear Regulatory Commission  
: 0. Font U.S. Nuclear Regulatory Commission College of Engineering An Equal Opportunity University}}

Revision as of 06:37, 30 June 2018

Penn State Breazeale Reactor - Permanent Changes in the Facility Organization - Level 1
ML16162A755
Person / Time
Site: Pennsylvania State University
Issue date: 06/09/2016
From: Unlu K
Pennsylvania State Univ, University Park, PA
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16162A755 (1)


Text

PennState College of Engineering RADIATION SCIENCE & ENGINEERING CENTER June 9, 2016 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No: 50-005 KENAN ONLO, PhD. Director, Radiation Science and Engineering Center Professor ofNuclear Engineering The Pennsylvania State University Breazeale Nuclear Reactor University Park, PA 16802-2301 Phone: 814-865-6351 Fax: 814-863-4840 Email: kxu2@psu.edu 68 BREAZEALE Nuclear Reactor

Subject:

-Penn State Breazeale Reactor -Permanent changes in the facility organization-Level 1

Dear Sir or Madame:

This letter is submitted in accordance with the requirements of PSBR (TS 6.6.2.b.l) to provide a written report of a "Permanent change to the facility organization involving level 1-2 personnel" within 30 days of the change. Effective May 9, 2016, Dr. Neil Sharkey, Vice President for Research, permanently assumed the Level 1 position.

Previous correspondence had notified the NRC of his temporary role while a personnel search was in progress.

In addition to this formal role change, the position title has been modified to reflect a new scope of responsibilities necessitating a change to Section 6 of the PSBR Technical Specifications.

We will request a change in our Technical Specification reflecting the title change. The contact information for Dr. Sharkey has not changed.

Please address any questions regarding this report and amendment request to Mark Trump, Associate Director for Operations, at 814-863-2745.

Sincerely, Kenan Dnlii, PhD Director, Radiation Science and Engineering Center Professor of Nuclear Engineering Cc: N. Sharkey A Atchley M. Trump X. Yin, U.S. Nuclear Regulatory Commission

0. Font U.S. Nuclear Regulatory Commission College of Engineering An Equal Opportunity University