NRC Generic Letter 1981-17: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:
| page count = 1
| page count = 1
}}
}}
{{#Wiki_filter:UNITED STATES pop1A °NUCLEAR REGULATORY COMMISSIONC ¢WASHINGTON, 0. C. 20555e/ E0 5 1981TO ALL LICENSEES OF OPERATING PLANTS AND HOLDERS OF CONSTRUCTION PERMITS(GENERIC LETTER No. 17)Gentlemen:SUBJECT: FUNCTIONAL CRITERIA FOR EMERGENCY RESPONSE FACILITIES (NUREG-0696)On February 18, 1981 the NRC staff sent you a clarification (in connectionwith NUREG-0737) for TMI Action Plan item III.A.1.2, Upgrade EmergencySupport Facilities. That letter further stated that NUREG-0696, "FunctionalCriteria for Emergency Response Facilities," would be issued in the nearfuture. Enclosed is a copy of NUREG-0696.The Commission has approved NUREG-0696 and noted that this document providesgeneral guidance only, is an acceptable way to meet the NRC rules andregulations, and that compliance with NUREG-0696 is not a requirement. Thestaff intends to use these criteria as an acceptable method for meetingthe requirements of the regulations for ERFs and will use them to evaluateconceptual design submittals for adequacy.Your attention is directed to page 18 of NUREG-0696 regarding the proposedEOF locations beyond 20 miles of the site. Any such facility would requirean exemption for EOF location.Any questions you may have concerning your specific project should beaddressed to your Project Manager or to Steve Ramos (301-492-9700) of NRC'sDivision of Emergency Preparedness.Sincerely,rell G. E ut, DirectorDivision of LicensingOffice of Nuclear Reactor RegulationEnclosure: .NUREG-06968112170392 810305 $PDR NUREG0696 C PDR  
{{#Wiki_filter:UNITED STATES pop 1A °NUCLEAR REGULATORY  
}}
COMMISSION
C ¢WASHINGTON, 0. C. 20555 e/ E0 5 1981 TO ALL LICENSEES  
OF OPERATING  
PLANTS AND HOLDERS OF CONSTRUCTION  
PERMITS (GENERIC LETTER No. 17)Gentlemen:
SUBJECT: FUNCTIONAL  
CRITERIA FOR EMERGENCY  
RESPONSE FACILITIES (NUREG-0696)
On February 18, 1981 the NRC staff sent you a clarification (in connection with NUREG-0737)  
for TMI Action Plan item III.A.1.2, Upgrade Emergency Support Facilities.
 
That letter further stated that NUREG-0696, "Functional Criteria for Emergency Response Facilities," would be issued in the near future. Enclosed is a copy of NUREG-0696.
 
The Commission has approved NUREG-0696 and noted that this document provides general guidance only, is an acceptable way to meet the NRC rules and regulations, and that compliance with NUREG-0696 is not a requirement.
 
The staff intends to use these criteria as an acceptable method for meeting the requirements of the regulations for ERFs and will use them to evaluate conceptual design submittals for adequacy.Your attention is directed to page 18 of NUREG-0696 regarding the proposed EOF locations beyond 20 miles of the site. Any such facility would require an exemption for EOF location.Any questions you may have concerning your specific project should be addressed to your Project Manager or to Steve Ramos (301-492-9700)  
of NRC's Division of Emergency Preparedness.
 
Sincerely, rell G. E ut, Director Division of Licensing Office of Nuclear Reactor Regulation Enclosure: .NUREG-0696
8112170392
810305 $PDR NUREG 0696 C PDR}}


{{GL-Nav}}
{{GL-Nav}}

Revision as of 12:50, 31 August 2018

NRC Generic Letter 1981-017: Functional Criteria for Emergency Response Facilities (NUREG-0696)
ML031080560
Person / Time
Issue date: 03/05/1981
From: Eisenhut D G
Office of Nuclear Reactor Regulation
To:
References
NUREG-0696, NUREG-0737 GL-81-017, NUDOCS 8112170392
Download: ML031080560 (1)


UNITED STATES pop 1A °NUCLEAR REGULATORY

COMMISSION

C ¢WASHINGTON, 0. C. 20555 e/ E0 5 1981 TO ALL LICENSEES

OF OPERATING

PLANTS AND HOLDERS OF CONSTRUCTION

PERMITS (GENERIC LETTER No. 17)Gentlemen:

SUBJECT: FUNCTIONAL

CRITERIA FOR EMERGENCY

RESPONSE FACILITIES (NUREG-0696)

On February 18, 1981 the NRC staff sent you a clarification (in connection with NUREG-0737)

for TMI Action Plan item III.A.1.2, Upgrade Emergency Support Facilities.

That letter further stated that NUREG-0696, "Functional Criteria for Emergency Response Facilities," would be issued in the near future. Enclosed is a copy of NUREG-0696.

The Commission has approved NUREG-0696 and noted that this document provides general guidance only, is an acceptable way to meet the NRC rules and regulations, and that compliance with NUREG-0696 is not a requirement.

The staff intends to use these criteria as an acceptable method for meeting the requirements of the regulations for ERFs and will use them to evaluate conceptual design submittals for adequacy.Your attention is directed to page 18 of NUREG-0696 regarding the proposed EOF locations beyond 20 miles of the site. Any such facility would require an exemption for EOF location.Any questions you may have concerning your specific project should be addressed to your Project Manager or to Steve Ramos (301-492-9700)

of NRC's Division of Emergency Preparedness.

Sincerely, rell G. E ut, Director Division of Licensing Office of Nuclear Reactor Regulation Enclosure: .NUREG-0696