ML15175A402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000259/2015302]]
| number = ML15175A402
| issue date = 06/23/2015
| title = Browns Ferry Nuclear Plant - Notification of Licensed Operator Initial Examination 05000259/2015302, 05000260/2015302, and 05000296/2015302
| author name = McCoy G J
| author affiliation = NRC/RGN-II/DRS
| addressee name = Shea J W
| addressee affiliation = Tennessee Valley Authority
| docket = 05000259, 05000260, 05000296
| license number = DPR-033, DPR-052, DPR-068
| contact person =
| case reference number = 50-259/15-302, 50-260/15-302, 50-296/15-302
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 4
}}
See also: [[followed by::IR 05000259/2015302]]
 
=Text=
{{#Wiki_filter:  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  June 23, 2015  Mr. Joseph W. Shea
Vice President, Nuclear Licensing
Tennessee Valley Authority
1101 Market Street, LP 3D-C
Chattanooga, TN  37402-2801  SUBJECT: BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF LICENSED
  OPERATOR INITIAL EXAMINATION 05000259/2015302, 05000260/2015302, 
  AND 05000296/2015302  Dear Mr. Shea: 
In a telephone conversation on June 17, 2015 between Mr. D. Binkley, Initial License Training
Supervisor, Mr. J. Viera, Chief Under Instruction, and Mr. P. Capehart, Senior Operations
Engineer, arrangements were made for the administration of licensing examinations at Browns Ferry Nuclear Plant during the week of November 16, 2015. The written examination is scheduled to be administered during the week of November 23, 2015. The on-site preparatory
week is scheduled for the week of October 19, 2015.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination. 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by August 10, 2015.  Mr. P. Capehart, provided the written examination outline to your staff in March 2015. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by September 17, 2015. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately
marked.  Any delay in receiving the required examination and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled.  To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff 
J. Shea 2  should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first  examination date. If the applications are not received at least 30 days before the examination  date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of  1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC 20503.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page  of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. 
J. Shea 3 Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov). 
      Sincerely,
      /RA/  Gerald J. McCoy, Chief      Operations Branch 1
      Division of Reactor Safety  Docket Nos.: 50-259, 50-260, and 50-296
License Nos.: DPR-33, DPR-52, and DPR-68
cc: Distribution via Listserv
J. Shea 3 Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov). 
      Sincerely,
      /RA/  Gerald J. McCoy, Chief      Operations Branch 1
      Division of Reactor Safety  Docket Nos.: 50-259, 50-260, and 50-296
License Nos.: DPR-33, DPR-52, and DPR-68
cc: Distribution via Listserv 
 
  PUBLICLY AVAILABLE  NON-PUBLICLY AVAILABLE  SENSITIVE  NON-SENSITIVE ADAMS:  Yes ACCESSION NUMBER:_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS    SIGNATURE JXV3 VIA EMAILPGC1 VIA EMAILGJM1    NAME JVIERA PCAPEHART JMcCOY    DATE 6/23/2015 6/22/2015 6/23/2015 6/    /2015 6/    /2015 6/    /2015 6/    /2015 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\BROWNS FERRY EXAMINATIONS\BF 2015-302 INITIAL EXAM (PHIL)\CORRESPONDENCE\2015-302 CORPORATE NOTIFICATION LETTER.DOCX 
   
 
}}

Revision as of 02:03, 11 June 2018